Loading...
HomeMy WebLinkAboutSUPPLEMENTAL AGREEMENT BETWEEN AUGUSTA, GEORGIA AND EARL L. BABBITT PLUMBING SANITARY SEWER FOR SANITARY SEWER CONNECTION PROGRAM This SUMPLEMENTAL AGREEMENT,made on the ) ay of DC-10194i ,20 I( ,to the AGREEMENT,made on the 11th day of JULY,2017 by and between AUGUSTA,GEORGIA,BY AND THROUGH THE AUGUSTA-RICHMOND COUNTY COMMISSION,party of the first part,hereinafter called the OWNER,and Earl L.Babbitt Plumbing, party of the second part,hereinafter called the CONTRACTOR. WITNES SETH,that the Contractor and the Owner, for the considerations hereinafter named, agree as follows: ARTICLE I-SCOPE OF THE WORK- The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled: SANITARY SEWER CONNECTION SERVICE—PHASE 2—GROUP 2 and in accordance with the requirements and provisions of the Contract Documents as defined in the General and Special Conditions hereto attached,which are hereby made a part of this agreement. ARTICLE II-TIME OF COMPLETION The work to be performed under this Contract shall be commenced within 5 business days after the date of written notice by the Owner to proceed.All work shall be substantially completed within 30 calendar days with all such extensions of time as are provided for in the General Conditions. Substantial completion shall be defined as all lots awarded connected to the city sewer system, all septic tanks abandoned. Final completion shall be 10 days after substantial completion. Final completion shall be defined as a representative of each property has signed off on the completeness and acceptance of work,example included. It is hereby understood and mutually agreed,by and between the Contractor and the Owner,that the date of beginning, rate of progress and the time for completion of the work to be done hereunder are ESSENTIAL CONDITIONS of this contract. Contractor agrees that said work shall be prosecuted regularly, diligently,and uninterruptedly at such rate of progress as will ensure full completion thereof within the time specified.It is expressly understood and agreed by and between the Contractor and the Owner,that the time for completion of the work described herein is a reasonable time for completion of the same, taking into consideration the average climatic range and construction conditions prevailing in this locality. 11Page ARTICLE III—PAYMENT (A) The Contract Sum The Owner shall pay to the contractor for the performance of the Contract the amount as stated in the BID FORM and Schedule of Items. No variations shall be made in the amount except as set forth in the specifications attached hereto. (B) Progress Payment On no later than the fifth day of every month,the Contractor shall submit to the Owner's Engineer an estimate covering the percentage of the total amount of the Contract which has been completed from the start of the job up to and including the last working day of the preceding month, together with such supporting evidence as may be required by the Owner and/or the Engineer.This estimate shall include only the quantities in place and at the unit prices as set forth in the Bid Schedule. On the vendor run following approval of the invoice for payment,the Owner shall after deducting previous payments made,pay to the Contractor 90%of the amount of the estimate on units accepted in place.The 10%retained percentage may be held by the Owner until the final completion and acceptance of all work under the Contract. ARTICLE IV-ACCEPTANCE AND FINAL PAYMENT (A) Upon receipt of written notice that the work is ready for final inspection acceptance,the Engineer shall within 10 days made such inspection, and when he finds the work acceptable under the Contract and the Contract fully performed,he will promptly issue a fmal certificate,over his own signature,stating that the work required by this Contract has been completed and is accepted by him under the terms and conditions thereof. The contract shall then submittal a final payment request for the entire balance found to be due the Contractor including the retained percentage. This payment shall be paid to the Contractor by the Owner within 30 days after the date of the receipt of the final payment request. (B) Before final payment is due,the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with work have been paid, except that in case of disputed indebtedness of liens of evidence of payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. (C) The making and acceptance of the final payment shall constitute a waiver of all claims by the Owner, other than those arising from unsettled liens,from faulty work appearing within 12 months after final payment, from requirements of the specifications,or from manufacturer's guarantees.It shall also constitute a waiver of all claims by the Contractor except those previously made and still unsettled. (D) If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Engineer, so certifies, the Owner shall upon certification of the Engineer,and without terminating the Contract,make payment of the balance due for that portion of the work fully completed and accepted. Each payment shall be made under the terms and conditions governing final payment,except that it shall not constitute a waiver of claims. 2IPage IN WITNESS WHEREOF,the parties hereto have executed this Agreement in three(3)counterparts, each of which shall be deemed an original, in the year and day first mentioned above. OWNER: AUGUSTA, GEORGIA ATTEST: •.t� t r' t ' ; ' , k;Ik 1SEAL ��®� �� By: By 0 rr : 1 ` m ; ° The Honorable Hardie Davis,Jr. Lena J1Bonner _ 1( ' i3 Mayor Clerk 6 ►:c' o ► ion ' 7 i' • Date: i` / "' Date: ,m .� ; x`478 APPROVED AS TO FORM: I EPARTMENT11 AL: t j„,By: '` 44er B,„ , Y Thomas D. Wiedmeier Attorney Director, Augusta Utilities Department Date: 0 //i Date: st /, ,..1,'7 CONTRACTOR: ATTEST: SEAL Ae / By: 1` By: . / i/ . 14 '/51"t Name: A #4.14.” /� ` I4 'G.le t/ Name: talon.ch. Pd r-F r:d9C_ Title: 1//2 Title: /4-/P Date: 8' 1q--/7 Date: ?i f h 7 Notary Public,Richmond County,Georgia My Commission Expires January 05,2021 3IPage PERFORMANCE BOND (NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PAYMENT BOND ON PAGE 6, IN FAVOR OF THE OWNER CONDITIONED FOR THE PAYMENT OF LABOR AND MATERIAL.) KNOW ALL MEN BY THESE PRENSENTS: That 579>a-t C.' 441-10//7—/-,2:e L as Principal, hereinafter called Contractor,and lAS7itei 5-trie r ( 04,9 a y ,a corporation organized and existing under the laws of the State of$ ?Z.. 7 x? + ,with its principal office in the City of 0✓X 1Ct State of ..-55•17411-)4`k0a- as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROJTGH THEAU vs �SCOMMISSION as Obligee,herein after called the Owner, in the penal amount of cot Dollars ($ �j ��3 ) for the payment whereof Contractor and Surety bind themselves,their heirs,executors,administrators,successors,and assigns,jointly and severally,firmly by these presents for the faithful performance of a certain written agreement. WHEREAS, Contract has by said written agreement dated entered in to a contract with Owner for the Sanitary Sewer Connection Services Task Order Program in accordance with the drawings and specifications issued by the Augusta Utilities Department and the Augusta-Richmond County Commission, which contract is by reference made a part hereof, and is hereinafter referred to as the CONTRACT. NOW,THEREFORE,the condition of this obligation is such that,if Contractor shall promptly and faithfully perform said CONTRACT,then this obligation shall be null and void;otherwise it shall remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the Owner. 41Page Whenever Contractor shall be, and declared by Owner to be in default under the CONTRACT, the Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default,or shall promptly (1) Complete the CONTRACT in accordance with its terms and conditions, or (2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the lowest responsible bidder,or,if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest responsible bidder, arrange for a contract between such bidder and Owner, and make available as Work progresses(even though there should be a default a succession of defaults under the contract or contracts of completion arranged under this paragraph)sufficient funds to pay the cost of completion less the balance of the contract price;but not exceeding, including other costs and damages for which the Surety may be liable hereunder,the amount set forth in the first paragraph hereof. The term"balance of the contract price,"as used in this paragraph,shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by Owner to Contractor Any suit under this bond must be instituted before the expiration of two(2)years from the date on which fmal payment under the CONTRACT falls due. No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the heirs, executors, administrators or successors of the Owner. Signed and sealed this day of A.D. 20 WitnessQ/04 /244-e 6 c' J44 ( (Seal) (Contractor) Notary Public, Richmond County, Georgia My Commission Expires January 05,2021 , Attesty i By , � 11 ) (Seal) (Title) Witness Ce / hJ 4-e."- (Seal) (Surety) Witness By ` P /l�J9� , (Seal) (Title) 5 Page Western Surety Company CONTINUATION CERTIFICATE Western Surety Company hereby continues in force Bond No. 14946128 briefly described.as PLUMBING CONTRACTOR AUGUSTA-RICHMo$D COUNTY for EARL L. BABBJTT DBA EARL BABBJTT j'LUMUNG. INC. as Principal, in the sum of$ TWENTY THOUSAND AND NO/10:0 Dollars, for the term beginning February 08 , 2017 , and ending February Q82018 . , subject to all the covenants and conditions of the original band referred to above. This continuation is issued upon the express condition that the,liability of Western Surety Company under said Bond and this and all continuations thereof shall not be cumulative and shall in no event exceed the total sum above written. Dated this 09 day of January , 2017 .rt�°ot3tlfrs�rr��� WESTERN URETY COMPANY y, sklRF "y �►4+ � t�ry � $ ri,coN � �/ ri ' tar, t''� By Paul T. B at Vice President r 04r rrtrtoett:t:s* THIS"Continuation Certificate"MUST BE FILED WITH THE ABOVE BOND. Form 90-A-8-2012 Western Surety Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That WESTERN SURETY COMPANY,a corporation organized and existing under the laws of the State of South Dakota, and authorized and licensed to do business in the States of Alabama, Alaska, Arizona, Arkansas, California, Colorado, Connecticut, Delaware, District of Columbia, Florida, Georgia, Hawaii, Idaho, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts,Michigan,Minnesota, Mississippi, Missouri,Montana, Nebraska,Nevada, New Hampshire, New Jersey, New Mexico, New York, North Carolina, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, South Dakota, Tennessee, Texas, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin,Wyoming,and the United States of America,does hereby make,constitute and appoint Paul T. Bruflat of Sioux Falls , State of South Dakota ,its regularly elected Woe President , as Attorney-in-Fact,with full power and authority hereby conferred upon him to sign, exeoute, aolotowledge and deliver for and on its behalf as Surety and as its act and deed,the following bond: • One PLUMBING CONTRACTOR AUGUSTA-RICHMOND COUNTY bond with bond number 14940.24 for EARL L, BABBITT DBA EARL BABBITT PLUMBING, INC. as Principal In the penalty amount not to exceed:$20.000.00 Western Surety Company further certifies that the following is a true and exact copy of Section 7 of the by-laws of Western Surety Company duly adopted and now in forte,to-wit: Section 7. All bonds,policies,undertakings,Powers of Attorney,or other obligations of the corporation shall be executed in the corporate name of the Company by the President,Secretary,any Asaistant Secretary,Treasurer,or any Vice President,or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary,or the Treasurer may appoint Attorneys-in-Fad or agents who shall have authority to issue bonds,policies,or undertakings In the name of the Company. The corporate seal is not necessary for the validity of any bonds,policies, undertakings,Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. In Witness Whereof, the said WESTERN SURETY COMPANY has caused these presents to be executed by its Vice President with the oorporate seal affixed this 09 day of January , 2017 ATTEST W E9e3IN SUR COPANY Am, / By t • L Nelson,Assistant Secretary Pa .Bruflat,Vice President °t'llIVi.*14. 4:1‘.4 47 el‘ -1,0111\ea S 1"i(r tta'74):71 STATE OF SOUTH DAKOTA SS COUNTY OF MINNEHAHA .- 6):"•-****.tot'Ir. Inskentitn‘ On this Q9 day of January , 2017 ,before me,a Notary Public,personally appeared Paul T.Bruflat and L.Nelson who,being by me duly sworn,acknowledged that they signed the above Power of Attorney as Vice President and Assistant Secretary, respectively, of the said WESTERN SURETY COMPANY, and acknowledged said instrument to be the voluntary act and deed of said Corporation. +%i.vaov4400000sriwieo•rv0000t•o•&.%4 4' d t J. MOHR $ $ $ • NOTARY PUBLIC SOUTH DAKOTA e,41L) r•-•;t"-- 't'----- .1. Notary Public r + My Commission Expires June 23,2021 To validate bond authenticity, go to www.cnasuretv.com > Owner/Obligee Services > Validate Bond Coverage. Form F1975-1-2016 0 A�Rd CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 8/9/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NQ RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURE.R(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement's). PRODUCER PMEACT Patrisha Phillips Blanchard & Calhoun Insurance Agency, Inc. PHONE (706)650-6000 IANC.No.Ext): a (706)650-6001 C,No): 245 Davis Road E-MAIL t hilli s ADDRESS: P p @blanchardcalhounins.com PO Box 212359 INSURER(S)AFFORDING COVERAGE NAIC a Augusta GA 30917-2359 INSURERA:Cincinnati Insurance Company 10677 INSURED INSURER B:FHM Ins.trance Company Earl L Babbitt Inc, DBA: Earl Babbitt Plumbing INSURER C: 1128 Ellis St INSURERD: INSURER E: Augusta GA 30901 INSURERF: COVERAGES CERTIFICATE NUMBER:17-18 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER . POLICY EFF POLICY EXP LTR TYPE OF INSURANCE IND WVD POLICY NUMBER (MM/DD/YYYYt LMM/DD/YYYYI LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE X OCCUR DAMAGE TO RENTED 500,000 PREMISES(Ea occurrence) $ EPP 0124577/EBA 0124577 4/1/2015 4/1/2018 MED EXP(Any one person) $ 10,000 PERSONAL BADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY JET LOC PRODUCTS-COMP/OP AG(% $ 2,000,000 OTHER: Employee Benefit Liab. $ 1,000,000 AUTOMOBILE LIABILITY CO aBI EDtSINGLE LIMIT $ 1,000,000 (EaA X ANY AUTO BODILY INJURY(Per person; $ ALL AUTOSED ! AUTOSULED EPP 0124577/EBA 0124577 4/1/2015 4/1/2018 BODILY INJURY(Per accident) S HIRED AUTOS NON-OWNED PROPERTY DAMAGE $ AUTOS (Per accident) _ X UMBRELLA LIAB Uninsured motorist combined $ 1,000,000 OCCUR EACH OCCURRENCE $ 1,000,000 A EXCESS LIAR CLAIMS-MADE AGGREGATE $ 1,000,000 DED RETENTIONS EPP 0124577/EBA 0124577 4/1/2015 4/1/2018 $ WORKERS COMPENSATION _ AND EMPLOYERS'LIABILITY Y/N X STATUTE X EERH ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT E 1,000,000 B OFFICER/MEMBER EXCLUDED? y N/A (Mandatory In NH) WC30600246152017 4/1/2017 4/1/2018 EL DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S 1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) CERTIFICATE HOLDER CANCELLATION (706)312-4277 7063124277@fax.to SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Augusta Richmond County License Dept THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN PO Box 9270 ACCORDANCE WITH THE POLICY PROVISIONS. Augusta, GA 30916-9270 AUTHORIZED REPRESENTATIVE Robert Moore/TRISHA r o-a`� ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025(201401) $#IX#$ Western Surety Company CONTINUATION CERTIFICATE Western Surety Company hereby continues in force Bond No. 14946128 briefly described as PLUMBING CONTRACTOR AJJGUSSA-RICHMOND COUNTY for EAR L. BABBITT DBA EARL BABBITT PLUMBING. INP. , as Principal, in the sum of$ TWENTY Tl-IOU$AND AND NO/100 Dollars, for the term beginning February 08 , 2017 , and ending February 08 , 2018 , subject to all the covenants and conditions of the original bond referred to above. This continuation is issued upon the express condition that the liability of Western Surety Company under said Bond and this and all continuations thereof shall not be cumulative and shall in no event exceed the total sum above written. Dated this 09 day of January , 2017 Olt E ;'>.,, WESTER URETY COMPANY 'u 4" By Paul T. Br at,Vice President ✓ ;-.tea s:: , ,, ..l .....`,ems„ p�jtlY7i7sixtaf tf a*�`' THIS "Continuation Certificate”MUST BE FILED WITH THE ABOVE BOND. Form 90-A-8-2012 LABOR AND MATERIAL PAYMENT BOND (NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND ON PAGE 4, IN FAVOR OF THE OWNER CONDITIONED FOR THE PAYMENT OF LABOR AND MATERIAL.) KNOW ALL MEN BY THESE PRENSENTS: That f ,,C //< - / r3//%/ .r-A L as Principal, hereinafter called Contractor,and I 1 4'X*jrtit - 'X t 17 Ce 1/79 7, a corporation organized and existing under the laws of the State ofsd"7)' 21 kv ,with its principal office in the City of c 14fif115 ,State of ✓0`� da/k4 , as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROUGH THE AUGUSTA COMMISSION as Obligee,herein aLlg called th caner, ,411&) f- d v->/her O for the use and benefit of claimants as herein below defined in the amount offs v-e-k vrt cfrea Dollars ($ It/ d� ie:71f� e ve ssv_r- ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors,and assigns,jointly and severally, firmly by these presents. WHEREAS,Contract has by written agreement dated entered in to a contract with Owner for the Sanitary Sewer Connection Services Task Order Program in accordance with the drawings and specifications issued by the Augusta Utilities Department and the Augusta-Richmond County Commission, which contract is by reference made a part hereof, and is hereinafter referred to as the CONTRACT. NOW, THEREFORE, the condition of this obligation is such that, if the Contractor shall Sa promptly make payment to all claimants as hereinafter defined,for all labor and material used or reasonably required to use in the performance of the CONTRACT,then this obligation shall be void;otherwise it shall remain in full force and effect, subject,however,to the following conditions: (1) A claimant is defined as one having a direct contract with the Contractor or with a subcontractor of the Contractor for labor,material, or both,used or reasonably required for use in the performance of the contract,labor and material being construed as to include that part of water,gas,power, light,heat,oil,gasoline,telephone service or rental of equipment directly applicable to the CONTRACT. (2) The above named Contractor and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined,who has not been paid in full before the expiration of a period of ninety(90)days after the date on which the last of such claimant's work or labor was done or performed,or materials were furnished by such claimant,may sue on this bond for the use of such claimant,prosecute the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon. The Owner shall not be liable for the payment of any costs or expenses of any such suit. Wage (3) No suit or action shall be commenced hereunder by any claimant, (a) Unless claimant, other than one having a direct contract with the Contractor, shall have given written notice to any two of the following:The Contractor,the Owner,or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made,stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished,or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail,postage prepaid, in an envelope addressed to the Contractor, Owner or Surety, at any place where an office regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer. (b) After the expiration of one(I)year following the date on which Contractor ceased work on said CONTRACT, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project,or any part thereof,is situated, or in the United States District Court for the district in which the project,or any part thereof, is situated,and not elsewhere. (4) The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder,inclusive of the payment by Surety of mechanics'liens which may be filed of record against said improvement,whether or not claim for the amount of such lien be presented under and against this bond. Signed and sealed this day of A. D. 20 Ar Witne �' v trj C - a/// 7$Seal) Ldf y Public, Richmond Coun (Contractor) My Commission Expires January 05 ,2021 Attest • 4A_ 10/71---)(Seal) (Title) Witness (Seal) (Surety) Witness By (Seal) (Title) 7 ' Page APPENDIX 1. Bid Document of Awarded Lots 2. Property Owner Acceptance 81Page AUGUSTA UTILITIES DEPARTMENT Sanitary Sewer Connection Program Phase 2-Group 2 Earl Babbitt Line Item Address 1 2503 Walsh Ct,Hephzibah,GA,30815 53,620.00 2 2509 Sand Ridge Ct,Hephzibah,GA,30815 $4,900.00 3 2514 Mickey Drive,Hephzibah,GA 30815 $3,960.00 4 2521 Sand Ridge Ct,Hephzibah,GA,30815 $3,880.00 5 2530 Sand Ridge Ct,Hephzibah,GA,30815 $3,400.00 7 2543 Anthony Deluan Pkwy,Hephzibah,GA 30815 $2,885.00 8 2547 Anthony Deluan Parkway,Hephzibah,GA 30815 $2,600.00 9 2568 Spirit Creek Rd,Hephzibah,GA,30815 $4,600.00 10 2570 Anthony Deluan Pkwy,Hephzlbah,GA 30815 No Bid 11 2576 Spirit Creek Rd,Hephzibah,GA,30815 No Bid 12 2578 Spirit Creek Rd,Hephzibah,GA,30815 No Bid 13 2607 Anthony Deluan Pkwy,Hephzibah,GA 30815 $3,380.00 14 2610 Anthony Deluan Pkwy,Hephzibah,GA 30815 $3,150.00 15 2610 Sadie Ct,Hephzlbah,GA,30815 $4,205.00 16 2611 Sadie Ct,Hephzlbah,GA,30815 $3,050.00 17 2612 Carrington Dr,Hephzibah,GA,30815 $3,545.00 18 2620 Carrington Dr,Hephzibah,GA,30815 $3,380.00 19 2638 Carrington Dr,Hephzlbah,GA,30815 $3,380.00 20 2640 Carrington Dr,Hephzibah,GA,30815 $3,050.00 21 2803 Harwood Dr,Hephzlbah,GA,30815 $3,200.00 22 2804 Harwood Dr,Hephzibah,GA,30815 $2,600.00 23 2810 Harwood Dr,Hephzibah,GA,30815 $4,100.00 24 2826 Pepperdine Dr,Hephzibah,GA,30815 $3,860.00 25 2835 Pepperdine Dr,Hephzibah,GA,30815 $4,135.00 26 2837 Harwood Dr,Hephzibah,GA,30815 $4,100.00 27 2848 Pepperdine Dr,Hephzibah,GA,30815 $3,045.00 28 2877 Pepperdine Dr,Hephzibah,GA,30815 $2,860.00 29 2905 Arrowwood Or,Hephzibah,GA,30815 $3,350.00 30 2907 Lander Ct,Hephzibah,GA,30815 $2,250.00 31 2927 Old Tobacco Rd,Hephzibah,GA,30815 $2,550.00 32 2938 Arrowwood Or,Hephzibah,GA,30815 $2,760.00 33 3507 Barker Dr,Hephzibah,GA,30815 No Bid 34 3643 Karleen Rd,Hephzlbah,GA,30815 $3,845.00 35 3706 Claybom Dr,Hephzibah,GA,30815 52,652.00 36 3706 Elmwood Ct,Hephzlbah,GA,30815 $2,700.00 37 3708 Lynncrest Dr,Hephzibah,GA,30815 $3,475.00 38 3713 Hickory Cove Rd,Hephzibah,GA,30815 $3,380.00 39 3715 Clayborn Dr,Hephzibah,GA,30815 $2,600.00 40 3716 Crest Dr,Hephzibah,GA,30815 $5,700.00 41 3731 Falrington Dr,Hephzibah,GA,30815 $4,040.00 42 3736 Crest Dr,Hephzlbah,GA,30815 $5,950.00 43 3736 Fairington Dr,Hephzibah,GA,30815 $2,895.00 44 3741 Fairington Dr,Hephzlbah,GA,30815 $3,050.00 45 3746 Falrington Dr,Hephzibah,GA,30815 $4,295.00 46 3758 Fairington Dr,Hephzlbah,GA,30815 $3,875.00 47 3762 Fairington Dr,Hephzlbah,GA,30815 $4,100.00 48 3778 Fairington Dr,Hephzibah,GA,30815 $4,090.00 49 3795 Fairington Dr,Hephzibah,GA,30815 $1,600.00 50 3814 Fairington Dr,Hephzlbah,GA,30815 $3,380.00 51 3823 Crest Dr,Hephzibah,GA,30815 $4,370.00 52 3824 Crest Dr,Hephzlbah,GA,30815 $2,340.00 53 3835 Fairington Dr,Hephzibah,GA,30815 $3,500.00 54 3843 Falrington Dr,Hephzlbah,GA,30815 $0.00 55 3850 Falrington Dr,Hephzibah,GA,30815 $4,428.00 56 3903 Crest Dr,Hephzibah,GA,30815 $2,400.00 57 3905 Crest Dr,Hephzlbah,GA,30815 $4,200.00 58 4109 Broxton Ct,Hephzibah,GA,30815 $3,520.00 59 4111 Country Ln,Hephzlbah,GA,30815 $3,480.00 60 4112 Country Ln,Hephzibah,GA,30815 $4,350.00 61 4119 Broxton Ct,Hephzlbah,GA,30815 $3,710.00 62 4201 Cap Chat St,Hephzibah,GA,30815 $4,420.00 Total Lots Awarded 5 lots Total Awarded Amount $14,545.00 UTILITIES DEPARTMENT Tom Wiedmeier,P.E. Marie Corbin,P.E. G E O R G 1 A Director Interim Assistant Director Sanitary Sewer Connection Program Final Liability Waiver and Release Address of 'roperty for which consent for entry and access being granted: Relationship to property: (i.e., owner, owner's representative, tenant, etc.) OWNER NAME: MAILING ADDRESS: PHONE NUMBER: The undersigned is (are) the owner(s), their representative(s), or otherwise control the real property at the location described above. I, the property owner listed above, participated in the Augusta, Georgia Sanitary Sewer Connection Program, and as such, consented to and authorized employees and authorized representatives of the Augusta Utilities Department, and employees and authorized representatives of Universal Plumbing and/or Southern Services to access my property in order to perform the required actions to complete the following: 1. verify location and depth of my sewer service;verify 2. location and depth of my septic tank; 3 survey my property for the sole purpose of collecting the necessary data to determine if or how I could be connected to the Augusta sewer; abandonment of Septic Tank; 4. rerouting of plumbing to connect to Augusta,Georgia's sewer system;restoration of 5. landscaping and property to original state;and; 6. (Other) 7. I understand and acknowledge that Sanitary Sewer Connection Program (SSCP) is a program through which the Augusta Utilities Department (AUD) engaged plumbers pursuant to RFQ 15- 139A to abandon my septic tank and reroute the plumbing to connect to Augusta's sewer system; I acknowledge that the cost I paid, or have been invoiced and agree to pay, to participate in the SSCP was a flat rate of Ten Dollars ($10.00) to be paid by the property owner, and further that thereafter, the property owner/occupant will receive and be responsible for paying a monthly sewer bill; I understand and acknowledge that the improvements shall remain with the property thus belonging to the property owner and therefore shall become the responsibility of the property owner to maintain. The work will be guaranteed by a one (1) year warranty between the plumber (Universal Plumbing and/or Southern Services) and the homeowner. Augusta shall not be responsible for the maintenance or repair of the private sewer line;