Loading...
HomeMy WebLinkAboutSUPPLEMENTAL AGREEMENT #10 FOR THE AUGUSTA LEVEE CERTIFICATION PROJECT FOR CRANSTON ENGINEERING GROUP, P.C. AUGUSTA, GA ENGINEERING DEPARTMENT SUPPLEMENTAL AGREEMENT Augusta Richmond County Project Number(s): 324-041110-209824001 Supplemental Agreement Number: 10 Purchase Order Number: P162085 WHEREAS, We, Cranston Engineering Group, PC Consultants entered into a contract with Augusta, GA on February 17, 2009, for Engineering Design Services associated with the Augusta Levee Certification Project, Project No. 324-041110-209824001, and WHEREAS, certain revisions to the design requested by Augusta, GA., are not covered by the scope of the original contract, we desire to submit the following Supplemental Agreement to-wit: State required Safe Dam Emergency Response Plan&Inspection and USACE Levee noted deficiencies correction action plan including drainage and structural inspections. It is agreed that as a result of the above modification the contract amount is increased by $236,370.00 from $1,277,782.00 to a total of $1,514,152.00. This agreement in no way modifies or changes the original contract of which it becomes a part, except as specifically stated herein. NOW, THEREFORE, Cranston Engineering Group, PC Consultant, hereby agree to said Supplemental Agreement consisting of the above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the original contract to be performed under the specifications thereof, and that the original contract is in full force and effect, except insofar as it might be modified by this Supplemental Agreement. RECOMMEND FOR APPROVAL: CITY OF AUGUSTA, GA AUGUSTA,GEORGIA --1"--- at°e;Pe:/W" Hardie Davis,Jr., Mayor Cranston Engineering Group, PC D. Stott — 14c,E Ppfs/dekr 1zf�'� ►pproved: Date , \ ,� Approved: Date —1'114 s, L o [ATTACHED CORyWRATE SEAL] ' [ATTACHED CORPORATE SEAL] ATTEST . ATTE • jj Tale. � �Pi / /it 11°✓ Title: "lb" A Rol". 1 : /14 elm 5U', nkt act.AAd/44$44;A:spit..,n"- i CEORGt .40