HomeMy WebLinkAboutCONTRACT BETWEEN AUGUSTA, GEORGIA AND BLAIR CONSTRUCTION, INC. FOR AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK I CONTRACT DOCUMENTS AND SPECIFICATIONS FOR Augusta Canal Bank Leakage Repairs Near Rock Creek Augusta, Georgia The Honorable Hardie Davis, Jr., Mayor Commissioners: William Fennoy IDennis Williams Mary Davis Sammie Silas IBill Lockett Ben Hasan ILouis "Hap" Harris Wayne Guilfoyle Marion Williams Grady Smith R G Co' oT NO 11971 r- PROFESSIONAL --, Amai Nt• • • 461. aw Tom D. Wiedmeier Director, Augusta Utilities Department Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, GA 30901 January 30, 2015 Revised March 20, 2015 I I CONTENTS SECTION TITLE # OF PAGES II Invitation to Bid IIB Instructions to Bidders 3 IP Proposal 3 IA Agreement 3 NA Notice of Award 1 INP Notice to Proceed 1 ICO Change Order 1 IBB Bid Bonds 2 PB Performance and Payment Bonds 5 GC General a Conditions 47 ISC Supplementary General Conditions 13 ITechnical Specifications are shown on Sheet 2 of 11 of the Drawings and no additional technical specifications Iare included. I I SECTION IB INSTRUCTIONS TO BIDDERS IB-01 GENERAL All proposals must be presented in a sealed envelope, addressed to the OWNER. The proposal must be filed with the OWNER on or before the time stated in the invitation for bids. Mailed proposals will be treated in every respect as though filed in person and will be subject to the same requirements. Proposals received subsequent to the time stated will be returned unopened. Prior to the time stated any proposal may be withdrawn at the discretion of the bidder, but no proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract with the successful bidder. IB-02 EXAMINATION OF WORK Each bidder shall, by careful examination, satisfy himself as to the nature and location of the work; the conformation of the ground; the character, quality and quantity of the facilities needed preliminary to and during the prosecution of the work; the general and local conditions; and all other matters which can in any way affect the work or the cost thereof under the contract. No oral agreement or conversation with any officer, agent, or employee of the OWNER, either before or after the execution of the contract, shall affect or modify any of the terms or obligations therein. IB-03 ADDENDA AND INTERPRETATIONS No interpretation of the meaning of plans, specifications or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to the Geri A. Sams, Director of Procurement; Procurement Department; Room 605; 530 Greene Street; Augusta, GA 30901 and to be given consideration must be received at least ten days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be sent by facsimile or U.S. mail to all prospective bidders (at the respective addresses furnished for such purposes), not later than five days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents. IB-04 PREPARATION OF BIDS Bids shall be submitted on the forms provided and must be signed by the bidder or his authorized representative. Any corrections to entries made on bid forms should be initialed by the person signing the bid. IB-1 Bidders must quote on all items appearing on the bid forms, unless specific directions in the advertisement, on the bid form, or in the special specifications allow for partial bids. Failure to quote on all items may disqualify the bid. When quotations on all items are not required, bidders shall insert the words "no bid" where appropriate. Alternative bids will not be considered unless specifically called for. Telegraphic bids will not be considered. Modifications to bids already submitted will be allowed if submitted by telegraph prior to the time fixed in the Invitation for Bids. Modifications shall be submitted as such, and shall not reveal the total amount of either the original or revised bids. Bids by wholly owned proprietorships or partnerships will be signed by all OWNERs. Bids of corporations will be signed by an officer of the firm and his signature attested by the secretary thereof who will affix the corporate seal to the proposal. NOTE: A 10% Bid Bond is required in all cases. IB-05 BASIS OF AWARD The bids will be compared on the basis of unit prices, as extended, which will include and cover the furnishing of all material and the performance of all labor requisite or proper, and completing of all the work called for under the accompanying contract, and in the manner set forth and described in the specifications. Where estimated quantities are included in certain items of the proposal, they are for the purpose of comparing bids. While they are believed to be close approximations, they are not guaranteed. It is the responsibility of the CONTRACTOR to check all items of construction. In case of error in extension of prices in a proposal, unit bid prices shall govern. IB-06 BIDDER'S QUALIFICATIONS No proposal will be received from any bidder unless he can present satisfactory evidence that he is skilled in work of a similar nature to that covered by the contract and has sufficient assets to meet all obligations to be incurred in carrying out the work. He shall submit with his proposal, sealed in a separate envelope, a FINANCIAL EXPERIENCE AND EQUIPMENT STATEMENT, giving reliable information as to working capital available, plant equipment, and his experience and general qualifications. The OWNER may make such investigations as are deemed necessary to determine the ability of the bidder to perform the work and the bidder shall furnish to him all such additional information and data for this purpose as may be requested. The OWNER reserves the right to reject any bid if the evidence submitted by the bidder or investigation of him fails to satisfy the OWNER that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Part of the evidence required above shall consist of a list of the names and addresses of not less than five (5) firms or corporations for which the bidder has done similar work. IB-2 I IB-07 PERFORMANCE BOND At the time of entering into the contract, the CONTRACTOR shall give bond to the OWNER for the use of the OWNER and all persons doing work or furnishing skill, tools, machinery or materials under or for the purpose of such contract, conditional for the payment as they become due, of all just claims for such work, tools, machinery, skill and terms, for saving the OWNER harmless from all cost and charges that may accrue on account of the doing of the work I specified, and for compliance with the laws pertaining thereto. Said bond shall be for the amount of the contract satisfactory to the OWNER and authorized by law to do business in the State of Georgia. Attorneys-in-fact who sign bonds must file with each copy thereof a certified and effectively dated copy of the power of attorney. IB-08 REJECTION OF BIDS These proposals are asked for in good faith, and awards will be made as soon as practicable, provided satisfactory bids are received. The right is reserved, however to waive any informalities in bidding, to reject any and all proposals, or to accept a bid other than the lowest Isubmitted if such action is deemed to be in the best interest of the OWNER. IB-3 „ SECTION P PROPOSAL Date; June 24,2015 Gentlemen: En Z.DrEpliance with your invitation for bids,the undersigned hereby proposes to fLrnisn au labor, equipment and materia,ane perform a'.1 work for the project referred to herein as: AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK In attic:accordance with the Contract Dommts and in consideration of the amounts shown on the bid scniduie attached hereto mid totaling: Seventy Four Thousand FiveHundred Sixty And 80 IVO Dollars ( $74,560.80 ). The undersigned hereby agrees that,upon written acceptance of this bid,he will within 70 days of receipt of such notice atecute a formal contract agreement with the Owner,and that he will provide the bond or guarantees required by the contract documents. The undersigned hereby agrees that, if awarded the contract, he will commence the work in accordance with required contract performance dates based upon a written notice to proceed per each qualified task order. The undersigned hereby also agrees that the work will be complied within a time frame reasonable to accomplish the work, or that which has been mutually agreed upon by the Augusta Utilities Department,based on the scope for work fin the task order as assigned. The undersigned acknowledges receipt of the fallowing addenda: Addendum No. Addendum Date Enclosed is a bid guarantee consisting of a Bid Bond in the Amount of 10% of bid amount (57,456.08 ) Respectfully Submitted, Blair Construction, Inc. Finn P.O. Box 770 Evans,GA 30809 'ITTLE'. President t-? I OP, '6) - : SE,1L ; ls c G\‘ P-i --ef •...• I Ir • , . -. .- - - I I IBID SCHEDULE AUGUSTA CANAL LEAKAGE REPAIRS NEAR ROCK CREEK ITO ACCOMPANY THE PROPOSAL OF BD ULM 15-181 BIDDER: I ADDRESS: Blair Construction,Inc. P.O.Box 770 Evans,Georgia 30809 IITEM NO. DESCRIPTION QUANTITY.UNIT.&UNIT PRICE AMOUNT IBASE CONSTRUci JON 1. Clearing and Grubbing,including Removal of Root Ball Where I Required Lump Sum s tOz.2 -e--. -" I 2. Excavation to Chase Leak and Removal of Material, (500 CY Allowance) 500 CY @ $ /7 -----6---'- ,CY s I3. Earth Fill,Compacted In Place to Fill Excavation in Item 2 Above (500 CY Allowance) I500 CY @ $ 0,5". _ .--- ICY 5 /2 474.7e, "fff 4. Earth Fill Compacted In Place on Slope I (300 CY Estimated) Lump Sum I /7</-e....c...., e' I 5. Grass Mating Blanket. Including Grass Seed 380 SY @ $ G, ff-`-f- isYs 2-- !_.- e,,--- 0 ..> , ----- I 6. Grassing of Disturbed Areas Not Receiving Matting Lump Sum I l' e_>- 'c'---• I 7. Construction Exits I EA @ 5 0../67c-, --- /EA $ I P-2 I I I s. Silt Fence, Type C. installed and Removed After ConstTuction 446 LF 41- 9, *Lump Sum Construction Lump Sum z- 5 /2/ 4.) ITOTAL $ 79"3-49c) / *NOTE: LUMP SUM CONSTRUCTION INCLUDES ALL ITEMS NOT HAVING AN INDIVIDUAL BID ITEM,INCLUDING,BUT NOT LIMITED TO, MOBILIZATION.PEDESTRIAN TRAFFIC CONTROL,CONSTRUCTION LAYOUT,AND PROPERTY RESTORATION. I P-3 — , IAttachment B You MustCompleteand Rehire all 3 panes of Attectiment B with Your Submittal, Dowincrit Must Be Notarized_ Augusta,Georgia Augusta Procurement Department ATTN:Procurement Director 535 Telfair Street, Suite 605 Augusta,Georgia 30901 Name of Bidder: Blair Construction, Inc. Street Address: City, State,Zp Code: 4308 Evans To Locks Road Evans, Georgia 30809 Phone: 706-868-1950 Fax: 706-868-1855 Errai: patrick@blairconst ru ctio n us Do You Have A Business License? Business License*for your Company(Must Provide):Yes: o IPOZ2:06 Coropary rnj&be'le...wised in the Governrnerftl enfity fa where they do the rriaja4 of their litminess. fyoiur Goverorrenta Saor Lccai) ices net require a business license, you,corriparty will be required to ootair,a Ridynand C .zn ot.siness %cense if awardee a BIPRFP.RFCL For further information contact the Li... nise and Inspection Departrnent @ 706 312-5162. List_the mat%e itv& wit,that issued vow Home: Georgia,Evans,Columbia Coun y Acknowledgement of Addenda:(#1) (1,2) .(*3) : :(#5) (06) NOTE: CHE-CK APPRDPRIATE B0X1ES1,ADD ADDITIONAL NUMBERS-AS APPLICABLE Statement of Non-Discrimination The undersigned understands that it is the DDT-icy of Augusta,. Georgia to promote full and equal; business opportunity for ail persons doing business with Augusta, Georgia. The undersgned covenants that we nave not dscriminated, on the basis of race, region, gender, national origin or ethnicity, with regard to pnrne contracting,supcontractirg or partnering opportunities. The undersigned covenants and agrees to make gooc faith?, efforts to ensure maximum practicable participation of locasmall businesses on the bid or contract awarded by Augusta, Georgia, The undersigned runner covenants that we have completed truthfully and fully the required forms regarding good faith efforts and local small business subcontractor/suppiier utilization. The undersigned further covenants anti agrees not to engage in discriminatory conduct of any type against local small businessesin conformity with Augusta. Georgia's Local Small Business Opportunity Program. Set forth oelow is the signature of an officer of the bidCing/cortracting entity with the authority to bind the entity. The undersigned acknowledge and warrant that this Company has been made aware of understands and agrees to take affirmative action to provide such companies with the maximum practicable opportunities to do business with this Company; That this promise of non-discrimination as made and set forth herein snail be continuing ir nature and shall remain in full force and effect without interruption; That the promises of non-discrimination as made and set forth herein shall be and are 7ereby deemed to be made as part of and incorporated by reference into any contract or portion thereof which this Company may hereafter obtain and That the failure of this Company to satisfactorily discharge any of the promises of nondiscrimination as made and set forth herein shall constitute a material breach of contract entitling Augusta, Georgia to declare the contract in default and to exercise any and all applicable rights remedies including but rot limited to cancellation of the contract, termination of the contract, suspension and debarment from future contracting opportunities, and withholding and or forfeiture of compensation due and owing on a contract. Bi d 15-181 Augusta CanaBark Leakage Repairs Near Reck Creek Page 9 of 17 — , Attachment B -Page 2 of 3 Non-Collusion of Prime Bidder/Offeror By submission of a bid, the vendor certifies, under penalty of perjury, that to the best of its knowledge and belief; (a) The prices in the proposal have been arrived at independently without collusion, consultation, communications, or agreement, for the purpose of restricting competition, as to any matter reiating to such prices with any other vendor or with any competitor (b) Unless otherwise required by law, the prices which have been quoted in the proposal have no: been knowingly disclosed by the vendor prior to opening, direcf_ly or indirectly, to any other vendor or to any competitor. (c)No attempt has been made, or will be made, by the vendor to induce any other person, partnership or corporation to submit or no: to submit a proposal for the purpose of restricting competitor., Collusions and fraud in bid preparation shall be reported to the State of Georgia Attorney General are the United States Justice Department. Conflict of Interest By subrni:ssior of a bid, the responding firm certifies, under Penalty of perjury, that to the best of its knowledge and belief: 1. No circumstances exist which cause a Corlict Ot interest in performing the services required by this ITB, and 2, That no employee of the County. nor ary member thereof, not any public agency 07 official affected by this ITB, has any pecuriary'interest in the business of tine responding firm or nis sub-consultarit(s,, has any interest that would confict in any manner or degree with the performance-elated to this ITB. By submission of a bid, the vendor certifies under penalty of perjury, that to the best of its knowledge and belief: (a) The prices in the bid have been arrived at independertty without collusion, consuitation, communications, or agreement, f or the purpose of restricting corrpetitior, as to any matter relating to such prices with any other vendor or with any competitor. (b)Unless otherwise required by law, the prices which have been quoted in the bid nave not knowingiy beer disclosed by the vendor prior to opening, directly or indirectly,to any other vendor or competitor. c) No attempt has been made, or will be made, by the vendor to induce any other person, partnership or cooperation to submit or not to submit a bid for the purpose of restricting competition. For any breach or violation of this provision, the County shall have the right to terminate any related contract or agreement without liability and at its discretion to deduct from the price, or otherwise recover, the full amount of such fee, commission, percentage, gift, payment or consideration. You Must Complete and Return al!3 oases of Attachment B with Your Submittal,Document Must Be NotariIeci. Bid 15-181 Augusta Canal Bank Leakage Repairs Near Rock Creek Page 10 of 17 I I ,- , . _ IAttachment B-Page 3 of 3 Contractor Affidavit and Agreement I By executing this affidavit, tne undersigned contractor verifies its compliance with 0.C.G,A. 13-10-91, stating affirmatively that the individual, firrr, or corporation which is contracting with Augusta. Georgia Board of Commissioners has registered with and is participating in a federal work authorization prograrr* [any of the eiectronic verification of work authorization programs operated by the United I States DePartment of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform anc Control Act of 1986 (IRCA), P u. 99-603], in accordance with the applicability provisions and deadiines established in 0,C,G.A 13-10-91. The I undersigned further agrees that, should it employ or contract with any subcortractorls) in connection with the physical performance of services pursuant to this contract with Augusta, Georgia Board of Commissioners, contractor will secure from such subcontractors) similar verifcation of compliance I with C.C.G.A 13-10-91 on the Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form. Contractor further agrees to maintain records of such compliance and provide a copy of each such verification to the Augusta, Georgia Board of Corrrn-ss orers a: the time the subcontractor(s)is retained to perforT such service. I Georgia Law requires your company to have an E-VerifrUser Identification Number(Company 1.0.)on or after July 1,2009. For additional information or to enroll your company, visit the State of Georgia website: Ihttas:ile-verify.uscismovienroili aridfo: hPapiiwv.iw.aol.state.cia_usipdfkuitesr3M to I.,pcif **6-Verify* User Identification Number(Company I.D.) 224004 NOTE: F.-VER7FT+.SlER L'XhaFICAT'011i CILIAPAR.'w Eil MUST BE PaC-V1DED: IN ACCK,-,--ON.THE RECONIVENOZE AA/AR 7Eii I v Els 4,11.vt WE—BE TtECAJIRED TO PRal.e0E-4 CV.,-,FY ACASELAND SEC_111-sr S U.E.NICRA.**DLiA Cf c:ATERSIrANO:Rsr...yormr, The undersignec further agrees to submit a notarized copy of Attachment B and any required documentation noted as part of the Augusta. Georgia Board of Commissions specifications which I govern this process. In addition, the undersigned agrees to submit al! required forms for any subcontractor(s) as requested ane or required I further understand that my submittal will be deemed non-compliant if any part of this process is violated. I Blair Construction, Inc. Cornpany Name U1S24a/M le)4lidloVte_A •, ,, i ;,.., .. +it,i) -iir., -' : • / BY: Authorized Officer or Agent - : ca .li Ir. ,,, A- .. I (Contractor Signature) President : : S r L ,-1 ____ I-,, I 2 . ..fp -CR si**: Title of Authorized Officer or Agent of Contractor •. ...- ,, • ..... I William R.Mutimer Printed Name of Authorized Officer or Agent '' iti,,,,,,,,' I SUBSCRIBED AND SWORN BEFORE ME ON THIS THE 24th DAY OF -------- -- -Th-e-i'('t--%_- June , 20 15 NOTARY SEAL Notary Public My Commission Expires: August 7,2016 l ) ' - • CJ4 , ( %. * •4, r e You Must Complete and Return all 3 uncles of Attachment B with Your Submittal. Docum4rit-MuseBe Notarized. -_,-- Rev.a/15/2012 - < o.. . 0,„.....0 L.) PATRICK SCOTT DiLLARD PI.J31.% ) C„.::‘: NOTARY PUBLIC , '4, ,f BURKE COUNTY Bd 5181 Augusta Cana3a' L STATE OF GEORGIA My Commission Expires August 7 2018 i ' - 1m aaxageTikai Ck C reek a(.7)bi tiib Page 11 -17 I I I IG E' 0 R G I A You Must Cornpiate and Return wan Your Submittal, Document Must Be Notarized Systematic Alien Verification for Entitlements (SAVE) Program Affidavit Verifying Status for Augusta, Georgia Benefit Application By executing this affidavit under oath, as an applicant for an Augusta, Georgia Business _icense or Occupation Tax Certificate, Alcohol License, Taxi Permit, Contract or other public benefit as reference in O.C.G,A. Section 50-36-1, i am stating the following with respect to my bid for an Augusta, Georgia contract for Bid Item#15-181 Augusta Canal Bank Leak Repairs IBidIRFP/RFO Project Number and Project Naomi William R_ Mourner IPrint/Type_Name of natural person applying on behalf of Indlrldual,business.corporation,p 1tnersMA or OtherWi►ate emits/ I Blair Construction,Inc. 1Pr►af'Tyaw- Name of business,corporalon,partnership,or other pry: entity) .) ' am a citizen of the United States. I OR 2.) I am a legal permanent resident 18 years of age or older. OR 3.) I arm an otherwise gta►fied alien (8 § USC 1641) or nonimrn grart under the Federa Immigration and Nationality Act(8 USC 1101 et seq.) 18 years of age or c?der and lawfully present it the United States.. in making the above representation under oath, I understand that any person who7ociii.70.gli:yp and willfully makes a false, fictitious, or fraudulent statement or representation In aafait shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia. .• ,L' (X1.csw+1 C' �,'Signature of App scantr William R. Mutimer SE,/1 L F Printed Name - , T i�h 'Alien Registration Number for Non-Citizens 0 SUBSCRIBED AND SWORN BEFORE ME ON THIS THE 24th DAY OF June , 20 15 • e-W`-- )- -1----- Notary Public My Commission Expires: August 7, 2016 NOTAFr.Y SEAL SCO+ r `J/{ Note: THIS FORM MUST BE RETURNED WITH YOUR SUBMITTAL '�- ,C,l A R ,,CC . 7 '. Rev.9/25/2012 PATRICK SCOTT DILLARD `L cp..'.S C NOTARY PUBLIC ` p BURKE COUNT' i �ank Le Bid 15-,8 Augusta CanaailaWe 4epairs•YrserRock Creek STATE OF GEOR,ia '3 • ��• Page 12 of 17 My Commission Expires August 7 201- 1-, it 1 I I CNA S LI R ETY7 Bid Bond lord No. 06-24-2015 CONTRACTOR: SURETY: Western Surety Company: South Dakota Corporation (Nrn , legal status alas'adare3s) i Name. legal status Ora'pr(ncTaZ PlucE Blair Construction, Inc, PO Box 770 01 hz:st.n..ess) Evans,GA 30809 333 S. Wabash Avenue 41st Floor OWNER: Chicago. IL 60604 This document has'moanert Sega consequences Consultation with an attorney is encouraged mt., ',VoniiLegqi status and adciresst respect to its compieton or I Augusta, GA Comudssion 535 Telfair Street - Room 605 mod-it-hoar:Ton Any s'riguiar referenoe to Augusta, Georgia 30901 Contractor Surety Owner or atner party shall be consKiered piurei where BOND AMOUNT: 10% of Bid Amount ,appiloate I PROJECT: I_Vatne, ioc ,r, or address,drid Proken7 t/ aber: ''o- Augusta Canal Bank Leakage Repairs Near Rock Creek Bid item #15-181 I -The Contractor and Surety are bound to the Owner in the amount set forth above. flir the pay-ment of which the Contractor and Surety bind themselves, their heirs. executbrm. administrators. siiceer.-3.and assigns, jointly and severally, as provided herein. The conditions of this Bond are si.ich that if the Owner a..-zepts the bid of:he Contractor I 'thin the time 5 pecifre.d in the bid documentsor within such time period as may be agreed bc, by the Owner and Contractorand the Contractor either,I).enters into a contract with the Owner in accordance with the terms of such bid. and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the itimsdicrion if the Project and otherwise acceptable to the Owner. for the faithful performance of such Contract I and for the prompt payment of tabor and material furnished in t he prosecution thereof: -..:r/...:--!;.pays to the Owner the difference, not to exceed :he amount of thii„.- Bon-a. between the amount specified ill said bid and such larger amount for which the Owner may m good faith contract with another party to perform the work covered by said bid. then this obligation shall be nub and void, otherwise to remain in full farce and effect. The Surety hereby waives any notice of I an agreement between the Owner and Contractor r..-y extend the time in which the Owner may accept the bid. Waiver'of notice by the Surety shall not apply to any extension exce.echne sixty(60-days in the aggregate beyond the time for acceptance of bids specified on the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (GO) days. if this Bond is issued in connection with a subcontractor's bid to a Contractorthe term Contractor in this be deemed no be Subcontractor and the term Owner 5 hall be deemed to be ContractorI ,-" 0,',',..`-'0 0 .:,..-' •t-i (1 ._. , . - , When this Bond ha been furnished to comply with astatutop.:or other legal requirement in the location ' _ PrStt. any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted hire%F.m andC/c L .: provisions conforming to such statutory or other legal requirement shall be teemed incorporated herein. 1,02 si4 r9 7.6 .. furnished, the intent is that rhos Bond shall be -.!onstrileei as a statutory bond and not as a common law bo--:. •:: 071c Signed and sealed this 24th day of June , 2015 . Ifr, • • e.,,,,,,h:t ,,, '' 1,,,,10,016 Blair Construction, Inc. '-----------/-- `---: - ..-----1--- le?1-----L---- (Prin*(.21/ - (Seat) I (Witness/ , . (Title) President .,,,, ;,,.,,.•1 .. . . . .. . .. Western Surety Company _/ /C . 4'...•= (Surety) ' j ':' ' i Se ,, •,, . , . _,.4., % [ (7"t!') Attorney-in-VF 'd . . , ,..) ' ` •,..','') .'. ... . ' '''! r•" r-'-'. Printed in cooperation with the American institute of Architects(A IA). f, The language in this document conforms to the language used in AIA Document A310-Bid Bond-2010 Edition I Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT Know All Alen By These Presents.That WESTERN SURETY COMPANY.A Sotah EXAM t:orctoraLotA fs a jtliy orditnized and ex istinc opt rat hax filfj.its principal office in the Cif', t)f Sioux Falls,and State of South Dakota. end that it does b:ti f rtue ol the',P.:nature and seat herein tiff-Pied hereht. mak e.. constitute and tippoint Buck Leigh,Individually I C demtma SC WUe APE:Indio f.vith fun nn and and AWIttnAy lterehv conferred ' en.sem a: execute Ion and ditt,ftt tAetIA,t''ttttortetA ondertakinun iind other 6/fitgatinn,.inttruireeni,di varm or rititaire - In Unlimited Amounts - and to fnind 0'here'- otiv .frid to the wore extent a if tiath horn:arena, e'e 3,4frofrat :4 dup.atuthstruteci ontudf Ite arpt-yratmi Jni Jit to tAAt _Attogrey.pursuant 7A,toeauttiOrity hi:ATetA;,tztv.:r,...ire heifers-,ratified attar;:tanflfroidd Tit-U.;Power ot AttOATt.ey:P,made anti,ettdut.iftfed p.,.;n;;;;Ell gty and hfft.atuttivisnfii 4ne BtLJnt milted op; acivi,Aka_ e ,Thjp:ace.d. 'he shareholders fst the dialpitirattion, In Witness Whereof AAESTERN SURETY COMPANY tee t,u4'-ed present,to he situ-tett b.:, Presaalerit and ,L,dart-pit-did tZ friL'd Olt 7I.t7t day Devtemrvf-. atid tt. t.s.rt 0 WESTERN SURETY COMPANY 14./.00,044';,u T Brufflat.'vice Pre.sident state or Srmth Dakota s3. Coiintv 441 Minneirialut On thi, 7th Ja oDtxtemhier.ail 3,,netante ate perstynarls•,'afTW Ketd)T Bratiat,tri roe known,who.heirvg Pv me July;worn.flivi deptme and-.an- Mtif he resides in he City of Sioux Falls. State to South Dalvcirat that he t,the. %hue President etf WESTERN SURETY COMPANY desdrirted to and 4vhfch eveucted the ahirte tnsintmentt mat he itiettANii it'aaiduorporation: that the seal affixed no the at instrument is wteh enTorate tea: that a a tTi ti ptir,L11.10 ,el'ortiv izAtA2i itAt. the, Root 0 ihreCtt'T,. Y,wAt ,AwrorttiAAn .tnti that he ;amen hp. name thereto mirror' ti.) ttkeauthorits. and acknowledges same to be the act.d.nd deco(if,;Ludcorporaitort oormnissionexpires MOHR 6--;•---, NOTAfft PUBLIC ea: June 23..2015 SOUTH DAKOTA $ 614LA 1 Mohr.\titrt Pubtfc CE RTIFIC ATE 1, L. Nefson, -mutant Secretary of WESTERN SURETY COMPANY do hereby erttin that the Power id Attorney hereinahove net forth is .till in kirceand further certify that the hi foe of the tairporatton printed on the reverse hereof is still in force In testimonv unierco hone hereuntfi subscribed rioy name and affixed the seal to the;mid COrperation this 24th day to June 2015 Aroirr3N. WESTERN SURETY COMPANY j °44 % .144 l',11 '''42!"0"'" CDT kddriairl"./ I Nelson.Assistant Secretary F-.4.2MA -Cut 2 I Blair Construction, Inc. P.O. Box 770 Evans, Georgia 30809 Phone (706) 868-1950 Fax (706) 868-1855 I BIDDERS QUALIFICATION STATEMENT Bid hem 415-181 In the early 950's Blair L, Minimej began the Augusta located company Blair Construction, In 973 the business was incorporated in the State of Georgia as Blair Consruction. inc. Blair Construction, Inc. has at some time performed grading, paving..and underground utility construction for most every municipality within a 40 to 50 mile radius of the City of,A- gi.lsta. The majority of the work we erform is either for the City of Augusta or Columbia County. V have an outstanding and weikesp.eeted relationship we both these municipalities. Our company.employs approximately 53 persons and has an average annuaL revenue of around S12,.000,000.. Approximately 80 percent of our.work is large diameter underground utilities with the other 20!,•:Nercent being earthwork and base& paving, Our bonding capacity is 520,000.000. We current y hold certificates of qualifications from both the Georgia DOT& South CaroEna DOT, As established M past projects with Augusta-Richmond County, we have both the experience and the means,to perform the subject project to which we are bidding. Listed below are recent projects to which Blair Construction. Inc. has successfully completed for Augusta-Richmond. County. !, Diamond Lakes Basketball Facility Contract Amount: S425..713 2. Fort Gordon Raw Water Irrigation System Contract Amount: S1,848,149 3. Butler Creek Interceptor Upgrade, Phase 2. Contract Amount: 54,1 27,038 4. Jamestown Sewer Extension, Phase 3A Contract Amount: S102,101 3. Gordon Highway 16" Water Line Extension Contract Amount: 5363,656 6. Belair Hills Subdivision Improvements Contract Amount: S6,793,498 7. Eisenhower Hospital Sanitary Sewer Extension Contract Amount: S771,378 8. Lamar Road Grading& Paving Contract Amount: 5169,847 I 9. Fort Gordon Recreation Area Water& Sewer Contract Amount: $692,364 10, Horsepen Street Sanitary Sewer, Phase 2A Contract Amount: 51,304,780 I11. Sixth Street Emergency Sewer Replacement Contract Amount; S562,884 12. Mil)36" Water Main Project IContract Amount: S3,540.420 13. Meadowbrook Area Utility& Roadway Improvements Contract Amount: S2.626.663 14. College Station Entrance Improvements Contract Amount: $198,112 I We appreciate the opportunity to submit our bid on this project an are sure our experience and auaifications will be acceptable. If any other information is needed,please feel free to contact us. Respectfully Submitted: . • William R. Winner President Note: Attached and made a part of this qualification statement is an-Equipment Listing"showing most of our Imajor equipment in our fleet. I IReport Date 10/29/2p13 Equipment Listing for: Page 1 IBlair Construction, Inc. Thru 12/31/2013 I 3–Auto/Transport Number 1 Description , Purch Date 67,FRUEHAUF VAN 01/07/1975 68 i BODY FOR ABM 08/21/1986 I 3007 73 FORD LIME SPREAD 8018, 85 INTL FLATBED 12/31/1,986 01/09/1388 5019 i 90 FORD WATER TRUCK 05131/1990 8028 72 GREAT CANE 6TN 11/28/1990 I 8029'81 DORSEY VAN 08115/199 8036 94 SCOTTSMAN 1 09114/1994 8041 1 97 KENWORTH T-800 02:16/1999 8056 i 99 FRP F500 CREW 0811911999 1 I 8057 00 INTL EAGLE SEMI 8061 00 CHEV 1500 SILVER 09/17/1999 06;16/2002 8067 01 FORD F550 M07/2003 8068,01 CHEV SILV C2500 08477/2003 I 8074 03 DODGE RAM 150 19/2003 8076 03 TALBERT 55 TRAIL 024 06/202003 8078 04 CHEV SILVER '1/1412003 8084:2003 GII1C C-7500 FLT 04128/2004 I 8085 2004 CHEV SERV TRK 09/07/2004 8088 2005 Ford F550 ! 04/16/2007 8389 2005 Chev Silverado 07/31/2007 8094 2006 ETNYRE LOWBOY 09/12/2305 I 8395'D&E TRAILOR 08/11/2005 8098 06 Ford F750Xu WITTK 04/25/2306 8099 1 06 Sierra 1500 PiU OS/01/2006 8100 j GMC C-4500 10/052006 I 8101 06 Hydraulic Traler 08/03/2006 8104 07 Kentwcrth Fuel Tr 12/31/2006 8106 1 2007 Chev SNeradc 061162009 8107 2007 Chev P/U 08/1512007 I 811 3 2009 Chevrolet Siveradc 0131112009 8114 2009 Chevrolet Silverado 11/18/2009 8116 2010 CHEC SILVERADO , 03115/2010 8118 1973 FRLEHAUF FLATBED 08/2412010 I 8119 2007 KENWORTH DUMP TRUCK 12i17)2010 .3120,2005 STRAWBLOWER TRAILER 39/22201 8122 2011 GMC SIERRA 2500 : 1 1221/2011 8123 i 2012 FORD F150 1226/201 I 8124 2012 FORD F550 G3/07/2012 8125 2012 CHEV SILVERQADO 06262012 81261 2013 Chev Avalanche ' 08/11/2012 8127!2005 Terex 15 T Crane Truck 0829/2012 I 8128 2012 FORD F150 , 11126/2012 8130!2013 CHEV SILVERADO 11/30/2012 8131 I 2013 FORD F450S0 ! 10/23/2013 — — I 1 . I IReport Date 10129/2013 Page 2 I 4—Machinery&Equipment Number 133 MOT!TRACTOR.Description Porch Date 08/11/1998 134 LOADER W/54 BUCKET''' 08/11/1998 155 I MULLER TAP MACH 02101/2001 1003 NEW HAUL TN55 BROOM 061 1008 i WACKER RT 820 ROLL 01/2012210:1 03 1010 I DRESSER P3000 09/17/1991 1012 DYNA 151 PAC ROLLER 04121/1998 I 1017 lingersoll-Rand Compa 05/22;2007 1018 i NEW HOLLAND BROOM i 12102/2005 1021 t 1996 Pwr Cutler Asph )5131/2007 2001 WACKER TRENCH ROLLE 10;30/2000 I 2002 2006 WACKER ROLLER 0222200 2003,2006 WACKER ROLLER " 1 022212010 2005;CASE 586 0 FORKLIFT 38/31/1987 2006 WACKER TRENCH ROLL 071142001 I 2011 CAT 936F 1/23/1994 2027 95 INGERSOL ROLL ' 07/25/2000 2028 CAT 325L!VD EXCAV 3321/2001 2029!MOORKA MST1100 DUMP 03/21/2001 I 2033 CAT 4201)HOE 12/15/2001 2036 INGER RD SSD-400 ROL 02/282003 2040 2004 WACKER ROLLER iv-11/2004 2042 I CAT 930G Wheel Loade 07/302307 I 204.1 IR SD25D VIB Roller 09/25/2006 2045 IR SD45D VIB Roller 10/05/2006 2346 CAT 3280 Excavator 12/3012008 2049 CAT 3210 LCR EXCAVATOR 08/06/2008 I 2050!930 H WHEEL LOADER 12/31/2009 2051 CAT 345BL EXCAVATOR 08116/2010 2052 CAT 308DCR SB EXCAVATOR 12/29/2010 20531 CAT 336E EXCAVATOR 12/29/2011 I 3002'CAT 12G MOTOR GRAD 02/07/1986 3010 CAT 12G MOTOR GRADE - 01/13;1993 3017 DYNA C815PCI ROLLER 01;111986 3019,JOHN DEER 2350 TRAC • 08/15/1983 I 3021i HOWARD TILLER HR418 3027 JOHN DEER 5510 TRAC 12/03/2002 1 04/14/2000 3032 2004 KUBOTA TRACTOR 06119/2004 3033 CAT MOTOR GRADER 10/29/2004 1 3034 CAT Dozier 07/30/2007 3035:BATWING MWR MOD3180W I 08/3112005 3036 State Shoulder Mach' 0410212007 3037 2006 IR SD1OOD VIB ROLLER 02/03/2010 7015 PIT BURNER 1 03/29/1991 7027 TAMPO ROLLER 09i0811989 7032,AUGER/BORE MACHINE 07/0112002 7033 REV DRILL SER 4 MD3 03/022004 20321 CAT 315BL 60 BUCK 05/20/2003 20391 ;COUPLER FOR#2039 E 07/23/2004 20461 I Attachment-2046 01/31/2007 20462 42 Bucket-2046r31/31/2007 303311ACCUGRADE KIT-3033 11/07/2005 82026 i BUCK COUP(W/2026) 05/15/2001 83000 I 2 EXCAVATOR BUCKET ATTACHMENT 0120/2011 2050F'FORKS FOR 2050 10/25/2612 i i SECTION A AGREEMENT AGREEMENT This AGREEMENT,made on the day of ,20 , by and between AUGUSTA,GEORGIA,BY AND THROUGH THE AUGUSTA-RICHMOND COUNTY COMMISSION, party of the first part, hereinafter called the OWNER, and BLAIR CONSTRUCTION, INC., party of the second part,hereinafter called the CONTRACTOR. WITNESSETH, that the Contractor and the Owner, for the considerations hereinafter named, agree as follows: ARTICLE I - SCOPE OF THE WORK The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled: AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK and in accordance with the requirements and provisions of the Contract Documents as defined in the General and Special Conditions hereto attached, which are hereby made a part of this agreement. ARTICLE II -TIME OF COMPLETION-LIQUIDATED DAMAGES The work to be performed under this Contract shall be commenced within 14 calendar days after the date of written notice by the Owner or the Contractor to proceed. All work shall be substantially completed within 60 calendar days with all such extensions of time as are provided for in the General Conditions. It is hereby understood and mutually agreed, by and between the Contractor and the Owner, that the date of beginning, rate of progress and the time for completion of the work to be done hereunder are ESSENTIAL CONDITIONS of this contract. Contractor agrees that said work shall be prosecuted regularly, diligently, and uninterruptedly at such rate of progress as will ensure full completion thereof within the time specified. It is expressly understood and agreed by and between the Contractor and the Owner, that the time for completion of the work described herein is a reasonable time for completion of the same, taking into consideration the average climatic range and construction conditions prevailing in this locality. IF THE CONTRACTOR SHALL NEGLECT, FAIL, OR REFUSE TO COMPLETE THE WORK WITHIN THE TIME HEREIN SPECIFIED, then the Contractor does hereby agree, as a part of the Consideration for the awarding of this contract, to pay the Owner the sum One Thousand Dollars ($1,000.00) Dollars, not as a penalty, but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day that the Contractor shall be in default after the time stipulated in the Contract for completing the work. The said amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would, in such event, sustain, and said amounts shall be retained from time to time by the Owner from current periodical estimates. A-1 It is further agreed that time is of the essence of each and every portion of this Contract and the specifications wherein a definite portion and certain length of time is fixed for the additional time is allowed for the completion of any work, the new time limit fixed by extension shall be the essence of this contract. ARTICLE III—PAYMENT (A)The Contract Sum The Owner shall pay to the contractor for the performance of the Contract the amount as stated in the BID FORM and Schedule of Items. No variations shall be made in the amount except as set forth in the specifications attached hereto. (B) Progress Payment On no later than the fifth day of every month,the Contractor shall submit to the Owner's Engineer an estimate covering the percentage of the total amount of the Contract which has been completed from the start of the job up to and including the last working day of the preceding month, together with such supporting evidence as may be required by the Owner and/or the Engineer. This estimate shall include only the quantities in place and at the unit prices as set forth in the Bid Schedule. On the vendor run following approval of the invoice for payment, the Owner shall after deducting previous payments made, pay to the Contractor 90% of the amount of the estimate on units accepted in place. The 10% retained percentage may be held by the Owner until the final completion and acceptance of all work under the Contract. ARTICLE IV-ACCEPTANCE AND FINAL PAYMENT (A) Upon receipt of written notice that the work is ready for final inspection acceptance,the Engineer shall within 10 days made such inspection, and when he finds the work acceptable under the Contract and the Contract fully performed, he will promptly issue a final certificate, over his own signature, stating that the work required by this Contract has been completed and is accepted by him under the terms and conditions thereof, and the entire balance found to be due the Contractor ,including the retained percentage, shall be paid to the Contractor by the Owner within 15 days after the date of said final certificate. (B) Before final payment is due,the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with work have been paid, except that in case of disputed indebtedness of liens of evidence of payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. (C) The making and acceptance of the final payment shall constitute a waiver of all claims by the Owner, other than those arising from unsettled liens, from faulty work appearing within 12 months after final payment, from requirements of the specifications, or from manufacturer's guarantees. It shall also constitute a waiver of all claims by the Contractor except those previously made and still unsettled. (D) If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Engineer, so certifies,the Owner shall upon certification of the Engineer, and without terminating the Contract, make payment of the balance due for that portion of the work fully completed and accepted. Each payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. A-2 I IN WITNESS WHEREOF, the parties hereto have executed this Agreement in three (3) counterparts, I each of which shall be deemed an original, in the year and day first mentioned above. OWNER: AUGUSTA,GEORGIA , ATTEST. ,f.-"'''''.614 R� �N � i SEAL . . ,t,„9,34 Is I By: -..tce'i'a t, -41I AO t The Honorable Hardie Davis,Jr. i. Lerp: :l on�ter ®'"1 I * % : m . 0 Mayor Cleo4;44.,,w_off Date: Dated �? APPROVED AS TO FORM: DEPARTI E `P *ZEAL: s I By: 4( j,c,v,,,, : :-. .► Thomas D. Wiedmeier IAttorney Director,Augusta Utilities Department VI Date: .3 Ile Date: (1/(. I c I ICONTRACTOR: BLAIR CONSTRUCTION,INC. ATTEST: SE BY: -411-4(A.' tfflk I Name: VS%M ate., 3'. /0'2,..,A.,4,6:- P 9 Name: 3/G.,:- L, e- :-'e; Title: V;"c.e oe•-•sic/�7>' Title: ,r�, Se�,-e71e-1-7 I 1 - I Date: 004 a; Date: ''� ,� ,"�, Ic (i fit^, ©`_ Q EJ L A-3 I NOTICE OF AWARD DATE: I a1 I/a c 15 CONTRACTOR: BLAIR CONSTRUCTION, INC. ADDRESS: Po Box 770 Evans Georgia 30809 City State Zip Code PROJECT: Augusta Canal Bank Leakage Repairs Near PROJECT NO: Rock Creek aj_i0.A his ; COp � 1 � V At a meeting of the J u. C-7 t Of IA. C-O Vii rn r ►C gild on(Date) � a cveo you were awarded the C&ract for the following Project: Enclosedlease find 5 copies of the Contract p Documents for your execution. Please complete the pages,affixing signatures, dates, notary and/or corporate seals,etc.where necessary and return to this office within 10 days from the date of this letter,excluding Legal Holidays. The Certificate of Insurance must be complete. Power of Attorney must be submitted in triplicate;an original and two copies is permissible. Very truly yours, ♦` 0 4 Project Engineer Reciept of this NOTICE OF AWARD is hereby acknowledged this, yH day of �C . �jF pp/� the aettd:;__A. ce Contractor By Title Please sign and return one copy of this Notice of Award Acknowledgement to: Augusta Utilities Department 360 Bay Street,Suite 180 Augusta,GA 30901 1 I NOTICE TO PROCEED DATE: TO: BLAIR CONSTRUCTION, INC. Attn:William R.Mutimer IPO BOX 770 EVANS, GEORGIA 30809 PROJECT: Augusta Canal Bank Leakage Repairs Near Rock Creek PROJECT NO: You are hereby notified to commence WORK in accordance with the Agreement dated on or before ,and you are to complete the WORK within Iconsecutive calendar days thereafter. The date of completion of all WORK is therefore Very truly yours, Project Engineer Receipt of this NOTICE TO PROCEED is hereby acknowledged This,the day of , 2015 Contractor: By: Title: Please sign and return one copy of this Notice to Proceed Acknowledgement to: Augusta Utilities Department 360 Bay Street,Suite 180 Augusta,GA 30901 1 I CONSTRUCTION CONTRACT CHANGE ORDER CO NUMBER BID ITEM DATE PROJECT TITLE AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK ORIGINAL CONTRACT DATE PROJECT NUMBER OWNER AUGUSTA,GEORGIA PO NUMBER IThe following change is hereby made to the contract for the above project: Description of Change(for a more detailed description see attached proposal): I I PAYEE TOTAL AMOUNT OF THIS CHANGE ORDER $ The contract time will be INCREASED by 0 calendar days as a result of this change. IORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDER(INCREASE) $ THIS CHANGE ORDER(INCREASE) $ TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ FUNDING NUMBER/ACCOUNT NUMBER IPROPOSED BY: DATE: CONTRACTOR REQUESTED BY: DATE: ENGINEER SUBMITTED BY: DATE: DEPARTMENT HEAD FINANCE ENDORSEMENT: DATE: COMPTROLLER RECOMMENDED BY: DATE: IADMINISTRATOR APPROVED BY: DATE: MAYOR I SECTION BB BID BOND I KNOW ALL MEN BY THESE PRESENTS, that we,the as Principal, and as Surety, are hereby held and firmly bound unto the Augusta, Georgia Commission of Augusta, Georgia as Owner in thep enal sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. Signed this dayof g , 20 The condition of the above obligation is such that whereas the Principal has submitted to the Augusta, Georgia Commission of Augusta, Georgia, a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing for the AUGUSTA CANAL BANK ILEAKAGE REPAIRS NEAR ROCK CREEK, for Augusta, Georgia in accordance with plans and specifications of the AUGUSTA UTILITIES DEPARTMENT. NOW, THEREFORE, (a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. BB-1 i IThe Surety , for value receive, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid; and said Surety does hereby waive notice of any such extension. i IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers,the day and year first set forth above. ISigned and sealed this day of A. D. 20 . Witness (Seal) (Principal) Attest By (Seal) (Title) Witness (Seal) (Surety) Attest By (Seal) (Title) BB-2 i a -,ems ate, .e,ee 9725 Dunbarton Drive Columbia, SC 29223 TEL: 803/788-4597 FAX: 803/788-4576 Cell: 803/261-6582 Email: buckleigh(2 bellsouth.net I Date: December 14, 2015 Re: Blair Construction, Inc. Job: Augusta Canal Bank Leakage Repairs Near Rock Creek Richmond County, GA This letter gives authorization to the Augusta-Richmond County Commission to write in the agreement date on both the performance and payment bonds in the absence of the surety. Upon signing, please send a copy of the signed and dated bonds and power of attorney back to Blair Construction, Inc. Best Regards BuckLeigh File: Undated Bonds Bond No.587 28678 I • SECTION PB PERFORMANCE BOND (NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PAYMENT BOND ON IPAGE PB-3, IN FAVOR OF THE OWNER CONDITIONED FOR THE PAYMENT OF LABOR AND MATERIAL.) KNOW ALL MEN BY THESE PRESENTS: 1 That Blair Construction,Inc. -. as Principal, hereinafter called Contractor, and -. Western Surety Company Ia corporation organized and existing under the laws of the State of South Dakota ,with its principal office in the City of Sioux Falls _,State of South Dakota ,as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROUGH THE AUGUSTA COMMISSION as Obligee, hereinafter called the Owner, in the penal amount of.Sevety Four Thousand Five Hundred Sixty&80/100 Dollars (5 74,560.80 ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors, and'assigns, jointly and severally, firmly by these presents for the Ifaithful performance of a certain written agreement. WHEREAS,Contractor has by said written agreement dated I entered into a contract with Owner for the AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK in accordance with the drawings and specifications issued by the Augusta • Utilities Department and the Augusta,Georgia Commission,which contract is by reference made Ia part hereof,and is hereinafter referred to as the CONTRACT. NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall promptly 1 Iand faithfully perform said CONTRACT, then this obligation shall be null and void; otherwise it shall remain in full force and effect. 1 The Surety hereby waives notice of any alteration or extension of time made by the Owner. 1 Whenever Contractor shall be, and declared by Owner to be in default under the CONTRACT, the Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default,or shall promptly I (1) Complete the CONTRACT in accordance with its terms and conditions, or (2) Obtain a bid or bids for completing the Contract in accordance with its teens and conditions, and upon determination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest PB-1 .. . . , ... . . ._. I responsible bidder, arrange for a contract between such bidder and Owner, and make Iavailable as Work progresses (even though there should be a default a succession of defaults under the contract or contracts of completion arranged under this paragraph) I sufficient funds to pay the cost of completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the I contract price," as used in this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by Owner to Contractor IAny suit under this bond must be instituted before the expiration of two (2) years from the date f on which final payment under the CONTRACT falls due. 6 No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the heirs, executors,administrators or successors of the Owner. ISigned and sealed this_ _day of A.D. 20 r' S 1 Witness , _l_J� Blair Construction,Inc. OW) G . ' -, " ` / (Contractor) Z / r .: (Yt G G 'ti ' By /4 � ( ealp. on G i P. :'. Corporate Secretary (Title) Vi e President'',, J' IWitne0q A.OYv\. /'1-‘, i c Western Surety Company (Seal) (Surety) \A.,.`i+it'Ii.t,,,Fr,1 is Attest / , By 234.4-/G.,�,.�L 4/ .. ''a})'` <.a•(' ur Secreta Buck Leigh (Titletorney-In- akt n' :)' y.2, 4::, sir -). :. - • . I 1 t PB-2 . . . . Bond No.587 28678 N SECTION PB LABOR AND MATERIAL PAYMENT BOND NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND ON PAGE PB-1, IN FAVOR OF THE OWNER CONDITIONED FOR THE PERFORMANCE OF THE WORK.) KNOW ALL MEN BY THESE PRESENTS: That Blair Construction Inc. as Principal, • hereinafter called Contractor,and Western Surety Company • a corporation organized and existing under the laws of the State of South Dakota with its principal office in the City of Sioux Falls , State of South Dakota as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROUGH THE AUGUSTA, GEORGIA COMMISSION, as Obligee, hereinafter called the Owner, for the use and benefit of claimants as herein below defined in the amount of Seventy Four Thousand Five Hundred Sixty&80/100 Dollars(S 74,560.80 ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators,successors,and assigns,jointly and severally, firmly by these presents. WHEREAS, Contractor has by written agreement dated entered • into a contract with Owner for the AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK in accordance with drawings and specifications issued by the Augusta Utilities Department and Augusta, Georgia Commission, which contract is by reference made a part hereof, and is hereinafter referred to as the CONTRACT. NOW, THEREFORE, the condition of this obligation is such that, if the Contractor shall promptly make payment to all claimants as hereinafter defined,for all labor and material used or reasonably required to use in the performance of the CONTRACT, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions: (1) A claimant is defined as one having a direct contract with the Contractor or with a subcontractor of the Contractor for labor, material, or both, used or reasonably required for use in the performance of the contract, labor and material being construed as to include that part of water,gas,power, light,heat,oil, gasoline,telephone service or rental of equipment directly applicable to the CONTRACT. PB-3 (2) The above named Contractor and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute the suit to final judgement for such sum or sums as may be justly due claimant, and have execution thereon. The Owner shall not be liable for the payment of any costs or expenses of any such suit, (3) No suit or action shall be commenced hereunder by any claimant, (a) Unless claimant,other than one having a direct contract with the Contractor, shall have given written notice to any two of the following:The Contractor, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with 'substantial accuracy the amount claimed and the name of the party to whom the materials were furnished,or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail S or certified mail, postage prepaid, in an envelope addressed to the Contractor, Owner or Surety, at any place where an office • regularly maintained,for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located,save that such service need not be made by a public officer. (b) After the expiration of one(1) year following the date on which Contractor ceased work on said CONTRACT, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof; is situated,or in the United States District Court for the district in which the project, or any part thereof,is situated, and not elsewhere. (4) The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by Surety of mechanics' liens which may be filed of record against said improvement, whether or not claim for the amount of such lien be presented under and against this bond. PB-4 .. . . . I ISigned and sealed this day of A.D. 20 c' ----/-; ‘--) I Witness m -� Blair Construction,Inc. (Seal) ,,,,,,,,. , (Contractor) CJ T G I ./ . ( 41 . 7 Atte t ./ BY E �.`(Aiaill►9 ..l) .S flz (n I Corporate Secretary (Title) Vice President til.....61,‘D78 OaGIA • I WifIle ,j 0)-y� a,o Y Western Surety Company (Seal) (Surety) I AttestBY ,4LC�, �,� ,-t .eal) Lure ' Secreta Buck Leigh(Title) A�forne :Fact: 1,"< , ^ ', (', ` Jdio '` f.. �n 5 t. I 1 PB-5 I Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT I Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby Imake,constitute and appoint Thomas M Albus,Buck Leigh,Individually I of Columbia,SC,its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature I -In Unlimited Amounts- I and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney,pursuant to the authority hereby given,are hereby ratified and confirmed. I This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof,duly adopted,as indicated,by the shareholders of the corporation. I In Witness Whereof,WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 3rd day of June,2015. >y WESTERN SURETY COMPANY so I P X0'7 lik,,,.........."g ______&:‘, #---- tAu sT Dos aul T.Bruflat,Vice President I State of South Dakota ss County of Minnehaha I On this 3rd day of June,2015,before me personally came Paul T.Bnrflat,to me known,who,being by me duly sworn,did depose and say: that he resides in the City of Sioux Falls,State of South Dakota;that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed I pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges same to be the act and deed of said corporation. IMy commission expires +4.4.00~000•40~0.1.4....000. February 12,2021M110"artrtiA ' / . &Lin CERTIFICATE S.Eich,Notary Public I1,L.Nelson,Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force,and further certify that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said corporation this day of , I .s+ *r� WESTERN SURETY COMPANY .oma°0Al Itt I ' L.Nelson,Assistant Secretary Form F4280-7-2012 1 I Aco® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) ks.....----' 12/4/2015 I THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Mitchell CIC NAME: I Sutter, Mclellan, & Gilbreath, Inc. /gHC.NNo.Esti: (770)246-8300g AIC.NoI: (770)246-8301 1424 North Brown Road E-MAIL ADDRESS:lmitchell@am inaurance.com Suite 300 INSURER(S)AFFORDING COVERAGE NAIC# Lawrenceville GA 30043-8107 INsuRERA:National Trust Insurance 20141 I INSURED Blair Construction, Inc., Southern INSURERB:FCCI Insurance Co. 10178 Asphalt, LLC, First Equipment, LLC and INSURERC: Evans Paving and Grading, LLC INSURER D: I P. O. Box 770 INSURERE: Evans GA 30809 INSURER F: COVERAGES CERTIFICATE NUMBER:2015-2016 Master REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD I INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSR Wvn POLICY NUMBER (MM/DD/YYYYI (MM/DD/YYYY1 LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED PREMISES(Ea occurrence) $ 100,000 _ A CLAIMS-MADE X OCCUR CPP0004476 2/14/2015 2/14/2016 MED EXP(Any one person) $ 5,000 X Pollution Liability PERSONAL 8 ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,000 —I POLICY I n l PECO,- n LOC $ AUTOMOBILE LIABILITY COa aBINED SINGLE LIMIT $ 1,000,000 A X ANY AUTO BODILY INJURY(Per person) $ AALLOSNED SCHEDSCHEDULED CA 0005458 2/14/2015 2/14/2016 BODILY INJURY(Per accident) $ X X NON-OWNED PROPERTY DAMAGE $ HIRED AUTOS _ AUTOS (Per accident) Medical payments $ 5,000 X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 B EXCESS LIAB CLAIMS-MADE AGGREGATE $ 10,000,000 DED X RETENTION$ 10,000 UMB0002841 2/14/2015 2/14/2016 $ A WORKERS COMPENSATION WC STATU- 0TH- AND EMPLOYERS'LIABILITY Y/N Y TORY LIMITS ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? n N/A (Mandatory in NH) 010-WC15A-54981 2/14/2015 2/14/2016 E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 C Leased/Rented Equipment CIM9500022 2/14/2015 2/14/2016 Any one item $310,000 Policy Limit $500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Project: Augusta Canal Bank Leakage Repairs Near Rock Creek Contract amount: $ 74,560.80 CERTIFICATE HOLDER CANCELLATION (706)821-2811 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Augusta GA Commission 535 Telfair Street Augusta, GA 30901 AUTHORIZED REPRESENTATIVE :��e?/, — M Jaynes CSP/LINDAM r ~— ACORD 25(2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025(201005).01 The ACORD name and logo are registered marks of ACORD i SECTION PB PERFORMANCE BOND (NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PAYMENT BOND ON PAGE PB-3, IN FAVOR OF THE OWNER CONDITIONED FOR THE PAYMENT OF LABOR AND MATERIAL.) KNOW ALL MEN BY THESE PRESENTS: That as Principal, hereinafter called Contractor, and a corporation organized and existing under the laws of the State of ,with its principal office in the City of ,State of , as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROUGH THE AUGUSTA COMMISSION as Obligee, hereinafter called the Owner, in the penal amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents for the faithful performance of a certain written agreement. WHEREAS, Contractor has by said written agreement dated entered into a contract with Owner for the AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK in accordance with the drawings and specifications issued by the Augusta Utilities Department and the Augusta-Richmond County Commission, which contract is by reference made a part hereof, and is hereinafter referred to as the CONTRACT . NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall promptly and faithfully perform said CONTRACT, then this obligation shall be null and void; otherwise it shall remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the Owner. Whenever Contractor shall be, and declared by Owner to be in default under the CONTRACT, the Owner having performed Owner's obligations thereunder, the Surety may promptly remedy the default, or shall promptly (1) Complete the CONTRACT in accordance with its terms and conditions, or (2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest PB-1 I Iresponsible bidder, arrange for a contract between such bidder and Owner, and make available as Work progresses (even though there should be a default a succession of defaults under the contract or contracts of completion arranged under this paragraph) I sufficient funds to pay the cost of completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety may be liable Ihereunder, the amount set forth in the first paragraph hereof. The term "balance of the contract price," as used in this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly Ipaid by Owner to Contractor I Any suit under this bond must be instituted before the expiration of two (2) years from the date on which final payment under the CONTRACT falls due. INo right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named herein or the heirs, executors, administrators or successors of the Owner. I ISigned and sealed this day of A. D. 20 . IWitness (Seal) (Contractor) IAttest By (Seal) (Title) Witness (Seal) (Surety) Attest By (Seal) (Title) PB-2 I SECTION PB LABOR AND MATERIAL PAYMENT BOND NOTE: THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND ON PAGE PB-1, IN FAVOR OF THE OWNER CONDITIONED FOR THE PERFORMANCE OF THE WORK.) KNOW ALL MEN BY THESE PRESENTS: That as Principal, hereinafter called Contractor, and a corporation organized and existing under the laws of the State of with its principal office in the City of , State of as Surety, hereinafter called Surety, are held and firmly bound unto AUGUSTA, GEORGIA BY AND THROUGH THE AUGUSTA, GEORGIA COMMISSION, as Obligee, hereinafter called the Owner, for the use and benefit of claimants as herein below defined in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors, and assigns,jointly and severally, firmly by these presents. WHEREAS, Contractor has by written agreement dated entered into a contract with Owner for the AUGUSTA CANAL BANK LEAKAGE REPAIRS NEAR ROCK CREEK in accordance with drawings and specifications issued by the Augusta Utilities Department and Augusta-Richmond County Commission, which contract is by reference made a part hereof, and is hereinafter referred to as the CONTRACT. NOW, THEREFORE, the condition of this obligation is such that, if the Contractor shall promptly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required to use in the performance of the CONTRACT, then this obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions: (1) A claimant is defined as one having a direct contract with the Contractor or with a subcontractor of the Contractor for labor, material, or both, used or reasonably required for use in the performance of the contract, labor and material being construed as to include thatart of water, gas, power, light, heat, oil, gasoline, telephone P service or rental of equipment directly applicable to the CONTRACT. (2) The above named Contractor and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who has not been paid in full before the PB-3 I expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such claimant, prosecute the suit to final judgement for such sum or sums as may be justly due claimant, and have execution thereon. The Owner shall not be liable for the payment of any costs or expenses of any such suit. (3) No suit or action shall be commenced hereunder by any claimant, (a) Unless claimant, other than one having a direct contract with the Contractor, shall have given written notice to any two of the following: The Contractor, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to the Contractor, Owner or Surety, at any place where an office regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer . (b) After the expiration of one ( I) year following the date on which Contractor ceased work on said CONTRACT, it being understood, however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. (c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the project, or any part thereof, is situated, or in the United States District Court for the district in which the project, or any part thereof, is situated, and not elsewhere. (4) The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by Surety of mechanics' liens which may be filed of record against said improvement, whether or not claim for the amount of such lien be presented under and against this bond. PB-4 i Signed and sealed this da of A. D. 20 . g Y I Witness (Seal) (Contractor) Attest By (Seal) (Title) I Witness (Seal) (Surety) Attest By (Seal) (Title) PB-5 Revision Date August 2001 GENERAL CONDITIONS ARTICLE I--DEFINITIONS Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated, which are applicable to both the singular and plural thereof: Addenda-Any changes, revisions or clarifications of the Contract Documents which have been duly issued by OWNER to prospective Bidders prior to the time of opening of Bids. Agreement-The written agreement between OWNER and CONTRACTOR covering the Work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. Application for Payment-The form accepted by PROFESSIONAL which is to be used by CONTRACTOR in requesting progress or final payments and which is to include such supporting documentation as is required by the Contract Documents. Bid-The offer or proposal of the bidder submitted on the prescribed form setting forth the price(s) for the Work to be performed. Bonds-Bid, performance and payment bonds and other instruments of security furnished by CONTRACTOR and its Surety in accordance with the Contract Documents. Change Order--A document recommended by PROFESSIONAL, which is signed by CONTRACTOR and OWNER, and authorizes an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. Contract Documents-The Agreement: Addenda (which pertain to the Contract Documents); CONTRACTOR's Bid (including documentation accompanying the Bid and any post-Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement; the Bonds; these General Conditions; the Supplementary Conditions; the Plans, Specifications and the Drawings as the same are more specifically identified in the Agreement; Certificates of Insurance; Notice of Award; and Change Order duly delivered after execution of Contract together with all amendments, modifications and supplements issued pursuant to paragraphs 3.3 and 3.5 or after the Effective Date of the Agreement. Contract Price-The moneys payable by OWNER to CONTRACTOR under the Contract Documents as stated in the Agreement(subject to the provisions of paragraph 11.9.1 in the case of Unit Price Work). Contract Time-The number of days (computed as provided in paragraph 17.2.1) or the date stated in the Agreement for the completion of the Work. CONTRACTOR-The person, firm or corporation with whom OWNER has entered into the Agreement. COUNTY-Richmond County, Georgia, or Augusta, Georgia, political subdivisions of the State of Georgia, the Augusta, Georgia Commission, and its authorized designees, agents, or employees. Day-Either a working day or calendar day as specified in the bid documents. If a calendar day shall fall on a legal holiday, that day will be omitted from the computation. Legal Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving Day and the following Friday, and Christmas Day. Defective-An adjective which, when modifying the word Work, refers to Work that is unsatisfactory, faulty or deficient, does not conform to the Contract Documents, or does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to PROFESSIONAL's recommendation of final payment, unless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion (in accordance with GC-1 Revision Date August 200i ' paragraph 14.8 or 14.10). Drawings-The drawings which show the character and scope of the Work to be performed and which have been prepared or approved by PROFESSIONAL and are referred to in the Contract Documents. Effective Date of the Agreement-The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed by the Mayor of Augusta, Georgia. Field Order-A written order issued by PROFESSIONAL that modifies Drawings and Specifications, but Iwhich does not involve a change in the Contract Price or the Contract Time. General Requirements-Sections of Division I of the Specifications. ILaws or Regulations-Laws, rules, regulations, ordinances, codes and/or orders. Notice of Award-The written notice by OWNER to the apparent successful bidder stating that upon I compliance by the apparent successful bidder with the conditions precedent enumerated therein, within the time specified, OWNER will sign and deliver the Agreement. Notice to Proceed-A written notice given by OWNER to CONTRACTOR (with a copy to PROFESSIONAL) fixing the date on which the Contract Time will commence to run and on which CONTRACTOR shall start to perform CONTRACTOR'S obligations under the Contract Documents. OWNER-Augusta, Georgia, and the Augusta, Georgia Commission. Partial Utilization-Placing a portion of the Work in service for the purpose for which it is intended or for a related purpose) before reaching Substantial Completion for all the Work. IPROFESSIONAL-The Architectural/Engineering firm or individual or in-house licensed person designated to perform the design and/or resident engineer services for the Work. IPROGRAM MANAGER — The professional firm or individual designated as the representative or the OWNER who shall act as liaison between OWNER and both the PROFESSIONAL and CONTRACTOR when project is part of an OWNER designated program. Project-The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part, as indicated elsewhere in the Contract Documents. IProject Area-The area within which are the specified Contract Limits of the improvements contemplated to be constructed in whole or in part under this Contract. Project Manager-The professional in charge, serving OWNER with architectural or engineering services, his successor, or any other person or persons, employed by said OWNER, for the purpose of directing or having in charge the work embraced in this Contract. IResident Project Representative-The authorized representative of PROFESSIONAL as PROGRAM MANAGER who is assigned to the site or any part thereof. Shop Drawings-All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR to illustrate some portion of the Work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other information prepared by a I Supplier and submitted by CONTRACTOR to illustrate material or equipment for some portion of the Work. Specifications-Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work and certain administrative details applicable thereto. GC-2 ' Revision Date August 2001 Subcontractor-An individual, firm or corporation having a direct contract with CONTRACTOR or with any other SUBCONTRACTOR for the performance of a part of the Work at the site. Substantial Completion-The Work (or a specified part thereof) has progressed to the point where, in the opinion of PROFESSIONAL as evidenced by PROFESSIONAL's definitive certificate of Substantial Completion, it is sufficiently complete, in accordance with the Contract Documents, so that the Work (or specified part) can be used for the purposes for which it is intended, or if there be no such certificate issued, when final payment is due in accordance with paragraph 14.13. The terms "substantially complete"and "substantially completed"as applied to any Work refer to Substantial Completion thereof. Supplementary Conditions-The part of the Contract Documents which amends or supplements these General Conditions. Supplier-A manufacturer, fabricator, supplier, distributor, materialman or vendor. Underground Facilities-All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasement containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems, or water. Unit Price Work-Work to be paid for on the basis of unit prices. Work-The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. Work is the result of performing services, furnishing labor and furnishing and incorporating materials and equipment into the construction, and furnishing documents, all as required by the Contract Documents. Work Change Directive-A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by PROFESSIONAL, ordering an addition, deletion or revision in the Work, or responding to differing or unforeseen physical conditions under which the Work is to be performed as provided in paragraph 4.2 or 4.3 or to emergencies under paragraph 6.22. A Work Change Directive may not change the Contract Price or the Contract Time but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Time as provided in Article 10. Written Amendment-A written amendment of the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the non- engineering or non-technical rather than strictly Work-related aspects of the Contract Documents. GC-3 Revision Date August 2001 ARTICLE 2-PRELIMINARY MATTERS Delivery of Bonds: 2.1. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with these Contract Documents. Copies of Documents: 2.2. After the award of the Contract, OWNER shall furnish CONTRACTOR, at no cost, one (1) complete set of the Contract Documents for execution of the work. Additional sets of the project manual and drawings and/or individual pages or sheets of the project manual or drawings will be furnished by COUNTY upon CONTRACTOR's request and at CONTRACTOR's expense, which will be OWNER's standard charges for printing and reproduction. Commencement of Contract Time, Notice to Proceed: 2.3. The Contract Time shall commence as established in the Notice to Proceed. A Notice to Proceed may be given at any time after the Effective Date of the Contract. Starting the Project: 2.4. CONTRACTOR shall begin the Work on the date the Contract Time commences. No Work shall be done prior to the date on which the Contract Time commences. Any Work performed by CONTRACTOR prior to date on which Contract Time commences shall be at the sole risk of CONTRACTOR. Before Starting Construction: 2.5. Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. CONTRACTOR shall promptly report in writing to PROFESSIONAL any conflict, error, ambiguity, or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from PROFESSIONAL before proceeding with any Work affected thereby. CONTRACTOR shall be liable to OWNER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents, if CONTRACTOR knew or reasonably should have known thereof. 2.6. Within ten days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRACTOR shall submit to PROFESSIONAL and OWNER for review: 2.6.1. an estimated progress schedule indicating the starting and completion dates of the various stages of the Work: 2.6.2. a preliminary schedule of Shop Drawing and Sample submissions, and 2.6.3. a preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work which will be confirmed in writing by CONTRACTOR at the time of submission. 2.7. Before any Work at the site is started, CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, an original policy or certified copies of each insurance policy (and other evidence of insurance which OWNER may reasonably request)which CONTRACTOR is required to purchase and maintain in accordance with Article 5. GC-4 Revision Date August 2001 Pre-construction Conference: 2.8. Before any Work at the site is started, a conference attended by CONTRACTOR, OWNER , PROFESSIONAL and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in 2.6 as well as procedures for handling Shop Drawings and other submittals, processing applications for payment and maintaining required records. Finalizing Schedules: 2.9. At least ten days before submission of the first Application for Payment, a conference attended by CONTRACTOR, PROFESSIONAL and OWNER and others as appropriate will be held to finalize the schedules submitted in accordance with paragraph 2.6. CONTRACTOR shall have an additional ten (10) calendar days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until the schedules are submitted and acceptable to OWNER and PROFESSIONAL as provided below. The finalized progress schedule will be acceptable to OWNER and PROFESSIONAL as providing an orderly progression of the Work to completion within any specified Milestones and the Contract Time, but such acceptance will neither impose on PROFESSIONAL responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve CONTRACTOR from full responsibility therefor. The finalized schedule of Shop Drawing submissions and Sample submissions will be acceptable to PROFESSIONAL as providing a workable arrangement for reviewing and processing the submissions. CONTRACTOR's schedule of values shall be approved by PROFESSIONAL as to form and substance. CONTRACTOR, in addition to preparing an initially acceptable schedule, shall be responsible for maintaining the schedule, including updating schedule. Schedule updates shall include progression of work as compared to scheduled progress on work. Schedule updates shall accompany each pay request. GC-5 I Revision Date August 2001 IARTICLE 3-CONTRACT DOCUMENTS; INTENT, AMENDING, REUSE IIntent: I 3.1. The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the Work. The Contract Documents are complementary: what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the State of Georgia. I3.2. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any Work, materials or I equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be supplied whether or not specifically called for. When words or phrases which have a well-known technical or construction industry or trade meaning are used to describe Work, materials or equipment, such words shall be interpreted in Iaccordance with that meaning. 3.3. Except as otherwise specifically stated in the Contract Documents or as may be provided by amendment or supplement thereto issued by one of the methods indicated in 3.6 or 3.7, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity or discrepancy between the provisions of the Contract Documents and the provisions of any such standard, specification, manual, code or instruction (whether or not specifically incorporated by reference in the Contract I Documents) and the provisions of any such Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). Clarifications and interpretations of the Contract Documents shall be issued by PROFESSIONAL as provided in paragraph 9.4. I3.4. Reference to standards, specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard, specification, manual, code or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. I3.5. If, during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provision of any such Law or Regulation applicable to the performance of the Work or of any such I standard, specification, manual or code or of any instruction of any Supplier referred to in 6.7, CONTRACTOR shall so report to PROFESSIONAL in writing at once and before proceeding with the Work affected thereby and shall obtain a written interpretation or clarification from PROFESSIONAL; however, CONTRACTOR shall not be liable to OWNER or PROFESSIONAL for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents unless CONTRACTOR had actual knowledge thereof or should reasonably have known thereof. Amending and Supplementing Contract Documents: 3.6. The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: I3.6.1. a formal Written Amendment, 3.6.2. a Change Order(pursuant to paragraph 10.3), or 3.6.3. a Work Change Directive (pursuant to paragraph 10.4). As indicated in paragraphs 11.2 and 12.1, Contract Price and Contract Time may only be changed by a Change Order or a Written Amendment. GC-6 Revision Date August 2001 3.7. In addition, the requirements of the Contract Documents maybe supplemented, and minor q PP , variations and deviations in the Work may be authorized in one or more of the following ways: 3.7.1. a Field Order(pursuant to paragraph 9.5). I 3.7.2. PROFESSIONAL's approval of a Shop Drawing or sample (pursuant to paragraphs 6.24 and 6.26), or 3.7.3. PROFESSIONAL's written interpretation or clarification (pursuant to paragraph 9.4). Reuse of documents: 3.8. Neither CONTRACTOR nor any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with OWNER shall have or acquire any title to or OWNERSHIP rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by or bearing the seal of PROFESSIONAL or PROFESSIONAL's consultant; and they shall not reuse such Drawings, Specifications or other documents (or copies of any thereof) on extensions of the Project or any other project without written consent of OWNER and PROFESSIONAL and specific written verification or adaptation by PROFESSIONAL. I I I I I I I I I GC-7 ' Revision Date August 2001 fARTICLE 4-AVAILABILITY OF LANDS, PHYSICAL CONDITIONS; REFERENCE POINTS Availability of Lands: I 4.1. OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of CONTRACTOR. Necessary easements or rights-of-way will be obtained and expenses will be borne by OWNER. If CONTRACTOR and OWNER are unable to agree on entitlement to or the amount or extent of any adjustments in the Contract Price or the Contract Times as a result of any delay in OWNER's furnishing these lands, rights-of-way or easements, the CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. Physical Conditions: I4.2.1. Explorations and Reports: Reference is made to the Supplementary Conditions for identification of those reports of explorations and tests of subsurface conditions at or contiguous to the I site that have been utilized in preparing the Contract Documents and those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities)that have been utilized in preparing the Contract Documents. 4.2.2. CONTRACTOR may rely upon the general accuracy of the "technical data" contained in such reports and drawings. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," CONTRACTOR may not rely upon or make any claim against r OWNER, PROFESSIONAL, or any of PROFESSIONAL's Consultants with respect to: 11 4.2.2.1. the completeness of such reports and drawings for CONTRACTOR's purposes, including but not limited to, any aspects of the means, methods, techniques, sequences and procedures of Iconstruction to be employed by CONTRACTOR and safety precautions and programs incident thereto, or 4.2.2.2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or 4.2.2.3. any CONTRACTOR interpretation of or conclusion drawn from any "technical data" or any such data, interpretations, opinions or information. 4.2.3. If conditions are encountered, excluding existing utilities, at the site which are (1) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or(2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then CONTRACTOR shall give OWNER notice thereof promptly before conditions are disturbed and in no event later than 48 hours after first observance of the conditions. 4.2.4. The OWNER and PROFESSIONAL shall promptly investigate such conditions, and, if they differ materially and cause an increase or decrease in CONTRACTOR's cost of, or time required for, performance of any part of the Work, the OWNER and PROFESSIONAL shall recommend an equitable adjustment in the Contract Price or Contract Time, or both. If the OWNER and PROFESSIONAL determine that the conditions at the Site are not materially different from those indicated in the Contract Documents or are not materially different from those ordinarily found and that no change in the terms of the Contract is justified, the PROFESSIONAL shall notify CONTRACTOR of the determination in writing. The Work shall be performed after direction is provided by the PROFESSIONAL. GC-8 Revision Date August 2001 Physical Conditions-Underground Facilities: 4.3.1. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to OWNER or PROFESSIONAL by OWNER'S of such Underground Facil- ities or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 4.3.1.1. OWNER and PROFESSIONAL shall not be responsible for the accuracy or completeness of any such information or data; and 4.3.1.2. The cost of all of the following will be included in the Contract Price and CONTRACTOR shall have full responsibility for reviewing and checking all such information and data for locating all Underground Facilities shown or indicated in the Contract Documents, for coordination of the Work with the OWNER'S of such Underground Facilities during construction, for the safety and protection thereof as provided in paragraph 6.20 and repairing any damage thereto resulting from the Work, the cost of all of which will be considered as having been included in the Contract Price. 4.3.2. Not Shown or Indicated. If an Underground Facility is uncovered or revealed at or contiguous to the site which was not shown or indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of, CONTRACTOR shall, promptly after becoming aware thereof and before performing any Work affected thereby except in an emergency as permitted by paragraph 6.22, identify the OWNER of such Underground Facility and give written notice thereof to that OWNER and to OWNER and PROFESSIONAL. PROFESSIONAL will promptly review the Underground Facility to determine the extent to which the Contract Documents should be modified to reflect and document the consequences of the existence of the Underground Facility, and the Contract Documents will be amended or supplemented to the extent necessary. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility as provided in paragraph 6.20. CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, to the extent that they are attributable to the existence of any Underground Facility that was not shown or indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of. If the parties are unable to agree as to the amount or length thereof, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. Reference Points: 4.4. OWNER shall provide Engineering surveys to establish reference points for construction which in PROFESSIONAL's judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for laying out the Work (unless otherwise specified in the General Requirements), shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to PROFESSIONAL whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points by professionally qualified personnel. Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material: 4.5 OWNER shall be responsible for any Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material uncovered or revealed at the site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractor, Suppliers or anyone else for whom CONTRACTOR is responsible. 4.6 CONTRACTOR shall immediately: (i) stop all work in connection with such hazardous condition and in any area affected thereby (except in an emergency as required by 6.22), and (ii) notify OWNER and PROFESSIONAL (and thereafter confirm such notice in writing). OWNER shall promptly GC-9 Revision Date August 2001 consult with PROFESSIONAL concerning the necessity for OWNER to retain a qualified expert to evaluate such hazardous condition or take corrective action, if any. CONTRACTOR shall not be required to resume Work in connection with such hazardous condition or in any such affected area until after OWNER has obtained any required permits related thereto and delivered to CONTRACTOR special written notice (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work, or (ii) specifying any special conditions under which such Work may be resumed I safely. If OWNER and CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Times as a result of such Work stoppage or such special conditions under which Work is agreed by CONTRACTOR to be resumed, either party may make a claim therefor as provided in Articles 11 and 12. I4.7 If after receipt of such special written notice, CONTRACTOR does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such I special conditions, then CONTRACTOR may order such portion of the Work that is in connection with such hazardous conditions or in such affected area to be deleted from the Work. If OWNER and CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Times as a result of deleting such portion of the Work, then either party may make a claim therefor as provided in Articles 11 and 12. OWNER may have deleted such portion of the Work performed by OWNER's own forces or others in accordance with Article 7. 4.7.1 The provisions of 4.2 and 4.3 are not intended to apply to Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Material uncovered or revealed at the site. I I I I GC-10 Revision Date August 2001 ARTICLE 5-BONDS AND INSURANCE Performance and Other Bonds: 5.1. CONTRACTOR shall furnish performance and payment Bonds, each in an amount at least equal to the Contract Price as Security for the faithful performance and payment of all CONTRACTOR's obligations under the Contract Documents. These Bonds shall remain in effect at least until one year after the date when final payment becomes due, except as otherwise provided by Law or Regulation or by the Contract Documents. CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary Conditions. All Bonds shall be in the forms prescribed by Law or Regulation or by the Contract Documents and be executed by such sureties as are named in the current list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds, and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. All Bonds signed by an agent must be accompanied by a certified copy of the authority to act. Licensed Sureties and Insurers; Certificates of Insurance 5.2.1 All bonds and insurance required by the Contract Documents to be purchased and maintained by CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Georgia to issue bonds or insurance policies for the limits and coverages so required. All bonds signed by an agent must be accompanied by a certified copy of authority to act. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.2.2. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in 5.3, an original or a certified copy of the complete insurance policy for each policy required, certificates of insurance (and other evidence of insurance requested by OWNER or any other additional insured) which CONTRACTOR is required to purchase and maintain in accordance with 5.3. 5.2.3. If the surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.1, CONTRACTOR shall within five days thereafter substitute another Bond and Surety, both of which must be acceptable to OWNER. CONTRACTOR's Liability Insurance: 5.3. CONTRACTOR shall purchase and maintain such comprehensive general liability and other insurance as is appropriate for the Work being performed and furnished and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's performance and furnishing of the Work and CONTRACTOR's other obligations under the Contract Documents, whether it is to be performed or furnished by CONTRACTOR, by any Subcontractor, by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable: 5.3.1. Claims under workers' or workmen's compensation, disability benefits and other similar employee benefit acts; 5.3.2. Claims for damages because of bodily injury, occupational sickness or disease, or death of CONTRACTOR's employees; 5.3.3. Claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees; 5.3.4. Claims for damages insured by personal injury liability coverage which are sustained (a) by any person as a result of an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (b) by any other person for any other reason; GC-11 Revision Date August 2001 5.3.5. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; 5.3.6. Claims arising out of operation of Laws or Regulations for damages because of bodily injury or death of any person or for damage to property; and 5.3.7. Claims for damages because of bodily injury or death of any person or property damage arising out of the OWNERSHIP, maintenance or use of any motor vehicle. The insurance required by this paragraph 5.3 shall include the specific coverage's and be written for not less than the limits of liability and coverage's provided in the Supplementary Conditions, or required by law, whichever is greater. The comprehensive general liability insurance shall include completed operations insurance. All of the policies of insurance so required to be purchased and maintained (or the certificates or other evidence thereof) shall contain a provision or endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least thirty days prior written notice has been given to OWNER, PROGRAM MANAGER, and PROFESSIONAL by certified mail. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work in accordance with paragraph 13.12. In addition, CONTRACTOR shall maintain such completed operations insurance for at least two years after final payment and furnish OWNER with evidence of continuation of such insurance at final payment and one year thereafter. Contractual Liability Insurance: 5.4. The comprehensive general liability insurance required by paragraph 5.3 will include contractual liability insurance applicable to CONTRACTOR's obligations under paragraphs 6.32 and 6.33. OWNER's Liability Insurance: 5.5. OWNER shall be responsible for purchasing and maintaining OWNER's own liability insurance, and/or Risk Retention Program, and, at OWNER's option, may purchase and maintain such insurance as will protect OWNER against claims which may arise from operations under the Contract Documents. Property Insurance: 5.6. Unless otherwise provided in the Supplementary Conditions, OWNER shall purchase and maintain property insurance upon the Work at the site to the full insurable value thereof(subject to such deductible amounts as may be provided in the Supplementary Conditions or required by Laws and Regulations). This insurance shall include the interests of OWNER, CONTRACTOR, Subcontractors, PROGRAM MANAGER, PROFESSIONAL and PROFESSIONAL's consultants in the Work, all of whom shall be listed as insureds or additional insured parties, shall insure against the perils of fire and extended coverage and shall include "all risk" insurance for physical loss and damage including theft, vandalism and malicious mischief, collapse and water damage, and such other perils as may be provided in the Supplementary Conditions, and shall include damages, losses and expenses arising out of or resulting from any insured loss or incurred in the repair or replacement of any insured property (including but not limited to fees and charges of PROFESSIONALs, architects, attorneys and other PROFESSIONALs). If not covered under the "all risk" insurance or otherwise provided in the Supplementary Conditions, CONTRACTOR shall purchase and maintain similar property insurance on portions of the Work stored on and off the site or in transit when such portions of the Work are to be included in an Application for Payment. 5.7. OWNER shall purchase and maintain such boiler and machinery insurance or additional property insurance as may be required by the Supplementary Conditions or Laws and Regulations which will include the interests of OWNER, CONTRACTOR, Subcontractors, PROFESSIONAL AND PROFESSIONAL's consultants in the Work, all of whom shall be listed as insured or additional insured parties. GC-12 Revision Date August 2001 5.8. All the policies of insurance (or the certificates or other evidence thereof) required to be purchased and maintained by OWNER in accordance with paragraphs 5.6 and 5.7 will contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least thirty days prior written notice has been given to CONTRACTOR by certified mail and will contain waiver provisions in accordance with paragraph of 5.11.2. 5.9. OWNER shall not be responsible for purchasing and maintaining any property insurance to protect the Interests of CONTRACTOR, Subcontractors or others in the Work to the extent of any deductible amounts that are provided in the Supplementary Conditions. The risk of loss within the deductible amount will be borne by CONTRACTOR, Subcontractor or others suffering any such loss, and if any of them wishes property insurance coverage within the limits of such amounts, each may purchase and maintain it at the purchaser's own expense. 5.10. If CONTRACTOR requests in writing that other special insurance be included in the property insurance policy, OWNER shall, if possible, include such insurance, and the cost thereof will be charged to CONTRACTOR by appropriate Change Order or Written Amendment. Prior to commencement of the Work at the site, OWNER shall in writing advise CONTRACTOR whether or not such other insurance has been procured by OWNER. Waiver of Rights: 5.11.1. OWNER and CONTRACTOR waive all rights against each other for all losses and damages caused by any of the perils covered by the policies of insurance provided in response to paragraphs 5.6 and 5.7 and other property insurance applicable to the Work, and also waive all such rights against the Subcontractors, PROFESSIONAL, PROFESSIONAL's consultants and all other parties named as insureds in such policies for losses and damages so caused. As required by paragraph 6.11, each subcontract between CONTRACTOR and a Subcontractor will contain similar waiver provisions by the Subcontractor in favor of OWNER, CONTRACTOR, PROFESSIONAL, PROFESSIONAL's consultants and all other parties named as insureds. None of the above waivers shall extend to the rights that any of the insured parties may have to the proceeds of insurance held by OWNER as trustee or otherwise payable under any policy so issued. 5.11.2. OWNER and CONTRACTOR intend that policies provided in response to paragraphs 5.6 and 5.7 shall protect all of the parties insured and provide primary coverage for all losses and damages caused by the perils covered thereby. Accordingly, all such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurer will have no rights of recovery against any of the parties named as insureds or additional insureds, and if the insurers require separate waiver forms to be signed by PROFESSIONAL or PROFESSIONAL's consultant, OWNER will obtain the same, and if such waiver forms are required of any Subcontractor, CONTRACTOR will obtain the same. Receipt and Application of Proceeds: 5.12. Any insured loss under the policies of insurance required by paragraphs 5.6 and 5.7 will be adjusted with OWNER and made payable to OWNER as trustee for the insureds, as their interests may appear, subject to the requirements of any applicable mortgage clause and of paragraph 5.13. OWNER shall deposit in a separate account any money so received and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached, the damaged Work shall be repaired or replaced, the moneys so received applied on account thereof, and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment. Receipt and Application of Insurance Proceeds 5.13. OWNER, as trustee, shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within fifteen days after the occurrence of loss to OWNER's exercise of this power. If such objection be made, OWNER, as trustee, shall make settlement with the insurers in accordance with such agreement as the parties in interest may reach. If required in writing by any party in interest, OWNER as trustee shall, upon the occurrence of an insured loss, give bond for the proper performance of such duties. GC-13 Revision Date August 2001 Acceptance of Insurance: 5.14. If OWNER has any objection to the coverage afforded by or other provisions of the insurance required to be purchased and maintained by CONTRACTOR in accordance with paragraphs 5.3 and 5.4 on the basis of its not complying with the Contract Documents, OWNER shall notify CON- TRACTOR in writing thereof within ten days of the date of delivery of such certificates to OWNER in accordance with paragraph 2.7. If CONTRACTOR has any objection to the coverage afforded by or other provisions of the policies of insurance required to be purchased and maintained by OWNER in accordance with paragraphs 5.6 and 5.7 on the basis of their not complying with the Contract Documents, CONTRACTOR shall notify OWNER in writing thereof within ten days of the date of delivery, of such certificates to CONTRACTOR in accordance with paragraph 2.7. OWNER and CONTRACTOR shall each provide to the other such additional information in respect of insurance provided by each as the other may reasonably request. Failure by OWNER or CONTRACTOR to give any such notice of objection within the time provided shall constitute acceptance of such insurance purchased by the other as complying with the Contract Documents. Partial Utilization-Property Insurance: 5.15. If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work, such use or occupancy may be accomplished in accordance with paragraph 14.10 provided that no such use or occupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected the changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or lapse on account of any such partial use or occupancy. Indemnification 5.16.1. CONTRACTOR shall indemnify and hold harmless OWNER, PROGRAM MANAGER, and its employees and agents from and against all liabilities, claims, suits, demands, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from the performance of its Work, provided that any such liability, claim, suit, demand, damage, loss, or expense (a) is attributable to bodily injury, sickness, disease or death, or injury to or destruction of tangible property, including the loss of use resulting therefrom and (b) is caused in whole or in part by an act or omission of CONTRACTOR, any Subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, whether or not it is caused in whole or in part by the negligence or other fault of a party indemnified hereunder. 5.16.2. In any and all claims against OWNER or any of its agents or employees by any employee of CONTRACTOR, any SUBCONTRACTOR, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation under the previous paragraph shall not be limited in any way as to the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any SUBCONTRACTOR under workmen's compensation acts, disability benefit acts, or other employee benefit acts. 5.16.3. CONTRACTOR shall indemnify and hold harmless OWNER and anyone directly or indirectly employed by it from and against all claims, suits, demands, damages, losses expenses (including attorneys' fees) arising out of any infringement on patent or copyrights held by others and shall defend all such claims in connection with any alleged infringement of such rights. GC-14 Revision Date August 2001 ARTICLE 6--CONTRACTOR'S RESPONSIBILITIES 6.1. CONTRACTOR shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of others in the design or specification of a specific means, method, technique, sequence or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CONTRACTOR shall be responsible to see that the finished Work complies accurately with the Contract Documents. 6.2. CONTRACTOR shall keep on the Work, at all times during its progress, a competent resident superintendent, who shall not be replaced without written notice to OWNER and PROFESSIONAL except under extraordinary circumstances. The superintendent will be CONTRACTOR's representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications to the superintendent shall be as binding as if given to CONTRACTOR. Labor, Materials and Equipment: 6.3. CONTRACTOR shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the site. Except in connection with the safety or protection of persons or the Work or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all Work at the site shall be performed during regular working hours, and CONTRACTOR will not permit evening work or the performance of Work on Saturday, Sunday or any legal holiday without OWNER's written consent given after prior written notice to PROFESSIONAL. 6.4. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals whether temporary or permanent necessary for the execution, testing, initial operation, and completion of the Work as required by the Contract Documents. 6.5. All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Documents. If required by PROFESSIONAL, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provision of any such instructions will be effective to assign to PROFESSIONAL, or any of PROFESSIONAL's consultants, agents or employees, any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.14 or 9.15. Adjusting Progress Schedule: 6.6. CONTRACTOR shall submit to PROFESSIONAL for acceptance to the extent indicated in paragraph 2.9 adjustments in the progress schedule to reflect the impact thereon of new developments; these will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto. Substitutes or"Or-Equal"Items: 6.7.1. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the naming of the item is intended to establish the type, function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other Suppliers may be accepted by PROFESSIONAL if sufficient information is submitted by CONTRACTOR to allow PROFESSIONAL to determine that the material or equipment proposed is equivalent or equal to that named. The procedure GC-15 Revision Date August 2001 for review by PROFESSIONAL will include the following as supplemented in the General Requirements. Requests for review of substitute items of material and equipment will not be accepted by PROF- ESSIONAL from anyone other than CONTRACTOR. If CONTRACTOR wishes to furnish or use a substitute item of material or equipment, CONTRACTOR shall make written application to PROFESSIONAL for acceptance thereof, certifying that the proposed substitute will perform adequately the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application will state that the evaluation and acceptance of the proposed substitute will not prejudice CONTRACTOR's achievement of Substantial Completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service will be indicated. The application will also contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs of redesign and claims of other contractors affected by the resulting change, all of which shall be considered by PROFESSIONAL. In evaluating the proposed substitute, PROFESSIONAL may require CONTRACTOR to furnish, at CONTRACTOR's expense, additional data about the proposed substitute. 6.7.2. If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, sequence, technique or procedure of construction acceptable to PROFESSIONAL, if CONTRACTOR submits sufficient information to allow PROFESSIONAL to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedure for review by PROFESSIONAL will be similar to that provided in paragraph 6.7.1 as applied by PROFESSIONAL and as may be supplemented in the General Requirements. 6.7.3. PROFESSIONAL will be allowed a reasonable time within which to evaluate each proposed substitute. PROFESSIONAL will be the sole judge of acceptability and no substitute will be ordered, installed or utilized without PROFESSIONAL's prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. OWNER may require CONTRACTOR to furnish, at CONTRACTOR's expense, a special performance guarantee or other surety with respect to any substitute. PROFESSIONAL will record time required by PROFESSIONAL and PROFESSIONAL's consultants in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract Documents occasioned thereby. Whether or not PROFESSIONAL accepts a proposed substitute, CONTRACTOR shall reimburse OWNER for the charges of PROFESSIONAL and PROFESSIONAL's consultants for evaluating each proposed substitute. Concerning Subcontractors, Suppliers and Others: 6.8.1. CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization (including those acceptable to OWNER and PROFESSIONAL as indicated in paragraph 6.8.2) whether initially or as a substitute, against whom OWNER or PROFESSIONAL may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier or other person or organization to furnish or perform any of the Work against whom CONTRACTOR has reasonable objection. 6.8.2. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers or other persons or organizations including those who are to furnish the principal items of materials and equipment to be submitted to OWNER prior to the Effective Date of the Agreement for acceptance by OWNER and PROFESSIONAL and if CONTRACTOR has submitted a list thereof in accordance with the Supplementary Conditions, OWNER's or PROFESSIONAL's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the bidding documents or the Contract Documents) of any such Subcontractor, Supplier or other person or organization so identified may be revoked on the basis of reasonable objection after due investigation, in which case CONTRACTOR shall submit an acceptable substitute, the Contract Price will be increased by the difference, and the cost occasioned by such substitution and an appropriate Change Order will be issued GC-16 Revision Date August 2001 or Written Amendment signed. No acceptance by OWNER or PROFESSIONAL of any such Subcontractor, Supplier or other person or organization shall constitute a waiver of any right of OWNER or PROFESSIONAL to reject defective Work. 6.9. CONTRACTOR shall be fully responsible to OWNER and PROFESSIONAL for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR just as CONTRACTOR is responsible for CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create any contractual relationship between OWNER or PROFESSIONAL and any such Subcontractor, Supplier or other person or organization, nor shall it create any obligation on the part of OWNER or PROFESSIONAL to pay or to see to the payment of any moneys due any such Subcontractor, Supplier or other person or organization except as may otherwise be required by Laws and Regulations. 6.10. The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. 6.11. All Work performed for CONTRACTOR by a Subcontractor will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor which specifically binds the Subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and PROFESSIONAL and contains waiver provisions as required by paragraph 5.11. CONTRACTOR shall pay each Subcontractor a just share of any insurance moneys received by CONTRACTOR on account of losses under policies issued pursuant to paragraphs 5.6 and 5.7. Patent Fees and Royalties: 6.12. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. CONTRACTOR shall indemnify and hold harmless OWNER and PROFESSIONAL and anyone directly or indirectly employed by either of them from and against all claims, damages, losses and expenses including attorneys' fees and court and arbitration costs arising out of any infringement on patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product or device not specified in the Contract Documents, and shall defend all such claims in connection with any alleged infringement of such rights. Permits: 6.13. CONTRACTOR shall obtain and pay for all construction permits, licenses, governmental charges and inspection fees, and all public utility charges which are applicable and necessary for the execution of the Work. All permit costs shall be included in the base bid. Permits, if any, that are provided and paid for by OWNER are listed in the Supplementary Conditions. Any delays associated with the permitting process will be considered for time extensions only and no damages or additional compensation for delay will be allowed. Laws and Regulations: 6.14.1. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to furnishing and performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor PROFESSIONAL shall be responsible for monitoring CONTRACTOR's compliance with any Laws or Regulations. 6.14.2. If CONTRACTOR observes that any of the Contract Documents are contradictory to such laws, rules, and regulations, it will notify the Project Manager promptly in writing. Any necessary changes shall then be adjusted by an appropriate Change Order. If CONTRACTOR performs any Work that it knows or should have known to be contrary to such laws, ordinances, rules, and regulations and without such notice to the Project Manager, it shall bear all related costs. GC-17 Revision Date August 2001 Taxes: 6.15. CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. Use of Premises: 6.16. CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by Laws and Regulations, rights-of-way, permits and easements. CONTRACTOR shall not unreasonably encumber the premises with construction equipment or other materials or equipment. Any loss or damage to CONTRACTOR's or any Subcontractor's equipment is solely at the risk of CONTRACTOR. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the OWNER or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the Work. Should any claim be made against OWNER or PROFESSIONAL by any such OWNER or occupant because of the performance of the Work, CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations, indemnify and hold OWNER harmless from and against all claims, damages, losses and expenses (including, but not limited to, fees of PROFESSIONALs, architects, attorneys and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any such other party against OWNER to the extent based on a claim arising out of CONTRACTOR's performance of the Work. 6.17. During the progress of the Work, CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris or contaminants resulting from the Work. At the completion of the Work, CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery, and surplus materials, and shall leave the site clean and ready for occupancy by OWNER. CONTRACTOR shall restore to original condition all property not designated for alteration by the Contract Documents. 6.18. CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger them. Record Documents: 6.19. Contractor shall keep at the site and in good order one record copy of the Contract Documents and all Drawings and Specifications. These documents shall be annotated on a continuing basis to show all changes made during the construction process. These shall be available to PROFESSIONAL and the Project Manager and shall be submitted with the Application for Final Payment. Safety and Protection: 6.20. CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall assume all risk of loss for stored equipment or materials, irrespective of whether CONTRACTOR has transferred the title of the stored equipment or materials to OWNER. CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 6.20.1. all employees on the Work and other persons and organizations who may be affected thereby; 6.20.2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and 6.20.3. other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, GC-18 Revision Date August 2001 pavements, roadways, structures, utilities and Underground Facilities not designated for removal, relocation or replacement in the course of construction. CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify OWNERs of adjacent property and of Underground Facilities and utility OWNERs when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraph 6.20.2 or 6.20.3 caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or PROFESSIONAL or anyone employed by either of them or anyone for whose acts either of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR). CONTRACTOR's duties and responsibilities for the safety and protection of the Work shall continue until such time as all the Work is completed and PROFESSIONAL has issued a notice to OWNER and CONTRACTOR in accordance, with paragraph 14.13 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.21. CONTRACTOR shall designate a responsible member of its organization whose duty shall be the prevention of accidents at the site. This person shall be CONTRACTOR's superintendent unless otherwise designated in writing by CONTRACTOR to the Project Manager. Emergencies: 6.22. In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, CONTRACTOR, without special instruction or authorization from PROFESSIONAL or OWNER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give PROFESSIONAL prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If PROFESSIONAL determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Work Change Directive or Change Order be issued to document the consequences of the changes or variations. 6.22.1. CONTRACTOR shall immediately notify PROFESSIONAL of all events involving injuries to any person on the Site, whether or not such person was engaged in the construction of the Project, and shall file a written report on such person(s) and any other event resulting in property damage of any amount within five(5) days of the occurrence. 6.22.2. If PROFESSIONAL determines that a change in the Contract Documents is required because of the action taken by CONTRACTOR in response to such an emergency, a Change Order will be issued to document the consequences of such action. Shop Drawings and Samples: 6.23. After checking and verifying all field measurements, CONTRACTOR shall promptly submit to PROFESSIONAL for approval, in accordance with the accepted schedule of submittals, all submittals and samples required by the Contract Documents. All submittals and samples shall have been checked by and stamped with the approval of CONTRACTOR and identified as PROFESSIONAL may require. The data shown on or with the submittals will be complete with respect to dimensions, design criteria, materials and any other information necessary to enable PROFESSIONAL to review the submittal as required. At the time of each submission, CONTRACTOR shall give notice to PROFESSIONAL of all deviations that the submittal or sample may have from the requirements of the Contract Documents. 6.24. PROFESSIONAL shall review and approve submittals and samples. Professional's review and approval shall be only for conformance with the design concept of the Project and compliance with the information given in the Contract Documents. The approval of a separate item as such will not GC-19 Revision Date August 2001 indicate approval of the assembly in which the item functions. CONTRACTOR will make any corrections required by PROFESSIONAL and resubmit the required number of corrected copies until approved. CONTRACTOR's stamp of approval on any submittal or sample shall constitute its representation to PROFESSIONAL and OWNER that CONTRACTOR has determined and verified all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data, and that each submittal or sample has been reviewed or coordinated with the requirements of the Work and the Contract Documents. 6.24.1. No Work requiring a submittal or sample submission shall commence until the submission has been approved by PROFESSIONAL. A copy of each approved submittal and each approved sample shall be kept in good order by CONTRACTOR at the site and shall be available to PROFESSIONAL and OWNER. Any delays associated with the submittal process will be considered for time extensions only, and no damages or additional compensation for delay will be allowed. 6.24.2. Before submission of each Shop Drawing or sample, CONTRACTOR shall have determined and verified all quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto and reviewed or coordinated each Shop Drawing or sample with other Shop Drawings and samples and with the requirements of the Work and the Contract Documents. 6.24.3. At the time of each submission, CONTRACTOR shall give PROFESSIONAL specific written notice of each variation that the Shop Drawings or samples may have from the requirements of the Contract Documents, and, in addition, shall cause a specific notation to be made on each Shop Drawing submitted to PROFESSIONAL for review and approval of each such variation. 6.26. PROFESSIONAL will review and approve with reasonable promptness Shop Drawings and samples, but PROFESSIONAL's review and approval will be only for conformance with the design concept of the Project and for compliance with the information given in the Contract Documents and shall not extend to means, methods, techniques, sequences or procedures of construction (except where a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 6.27. PROFESSIONAL's approval of submittals or samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has, in writing, called PROFESSIONAL's attention to each such variation at the time of submission and the OWNER has given written approval to the specific deviation; any such approval by PROFESSIONAL shall not relieve CONTRACTOR from responsibility for errors or omissions in the submittals. 6.28. Where a shop drawing or sample is required by the Contract Documents or the schedule of shop drawings and sample submissions accepted by PROFESSIONAL as required, any related work performed prior to PROFESSIONAL's review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR. Continuing the Work: 6.30. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.6 or as CONTRACTOR and OWNER may otherwise agree in writing. Cleaning Up: 6.31. CONTRACTOR shall maintain the site free from accumulations of waste materials, rubbish, and other debris or contaminants resulting from the work on a daily basis or as required. At the completion of the work, CONTRACTOR shall remove all waste materials, rubbish, and debris from the site as well as all tools, construction equipment and machinery, and surplus materials and will leave the GC-20 Revision Date August 2001 Site clean and ready for occupancy by OWNER. All disposal shall be in accordance with applicable Laws and Regulations. In addition to any other rights available to OWNER under the Contract Documents, CONTRACTOR's failure to maintain the site may result in withholding of any amounts due CONTRACTOR. CONTRACTOR will restore to original condition those portions of the site not designated for alteration by the Contract Documents. Indemnification: 6.32. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, PROGRAM MANAGER and PROFESSIONAL and their consultants, agents and employees from and against all claims, damages, losses and expenses, direct, indirect or consequential (including but not limited to fees and charges of PROGRAM MANAGER, PROFESSIONALs, architects, attorneys and other PROFESSIONALs and court and arbitration costs) arising out of or resulting from the performance of the Work, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) including the loss of use resulting therefrom and (b) is caused in whole or in part by any negligent act or omission of CONTRACTOR, any Subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder or arises by or is imposed by Law and Regulations regardless of the negligence of any such party. 6.33. In any and all claims against OWNER, PROGRAM MANAGER or PROFESSIONAL or any of their consultants, agents or employees by any employee of CONTRACTOR, any Subcontractor, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.32 shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any such Subcontractor or other person or organization under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts. 6.34. The obligations of CONTRACTOR under paragraph 6.32 shall not extend to the liability of PROFESSIONAL, PROFESSIONAL's consultants, agents or employees arising out of the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifications. GC-21 Revision Date August 2001 ARTICLE 7---OTHER WORK Related Work at Site: 7.1. OWNER may perform other work related to the Project at the site by OWNER's own forces, have other work performed by aided OWNERs or let other direct contracts therefor which shall contain General Conditions similar to these. If the fact that such other work is to be performed was not noted in the Contract Documents, written notice thereof will be given to CONTRACTOR prior to starting any such other work, and, if CONTRACTOR believes that such performance will involve additional expense to CONTRACTOR or requires additional time and the parties are unable to agree as to the extent thereof, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. 7.1.2. CONTRACTOR shall afford each utility OWNER and other contractor who is a party to such a direct contract for OWNER, if OWNER is performing the additional work with OWNER's employees, proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate the Work with theirs. CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of PROFESSIONAL and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility OWNERs and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility OWNERs and other contractors. 7.2. If any part of CONTRACTOR's Work depends for proper execution or results upon the work of any such other contractor or utility OWNER (or OWNER), CONTRACTOR shall inspect and promptly report to PROFESSIONAL in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. CONTRACTOR's failure so to report will constitute an acceptance of the other work as fit and proper for integration with CONTRACTOR's Work except for latent or nonapparent defects and deficiencies in the other work. Coordination: 7.4. If OWNER contracts with others for the performance of other work on the Project at the site, the person or organization who will have authority and responsibility for coordination of the activities among the various prime contractors will be identified in the Supplementary Conditions, and the specific matters to be covered by such authority and responsibility will be itemized, and the extent of such author- ity and responsibilities will be provided in the Supplementary Conditions. Unless otherwise provided in the Supplementary Conditions, neither OWNER nor PROFESSIONAL shall have any authority or responsibility in respect of such coordination. GC-22 Revision Date August 2001 ARTICLE 8---OWNER'S RESPONSIBILITIES 8.1. Except as otherwise provided in these General Conditions, OWNER shall issue all communications to CONTRACTOR through the PROGRAM MANAGER or PROFESSIONAL. 8.2. In case of termination of the employment of PROFESSIONAL, OWNER shall appoint a PROFESSIONAL against whom CONTRACTOR makes no reasonable objection, whose status under the Contract Documents shall be that of the former PROFESSIONAL. Any dispute in connection with such appointment shall be subject to arbitration. 8.3. OWNER shall furnish the data required of OWNER under the Contract Documents promptly and shall make payments to CONTRACTOR promptly after they are due as provided in paragraphs 14.4 and 14.13. 8.4. OWNER's duties in respect of providing lands and easements and providing Engineering surveys to establish reference points are set forth in paragraphs 4.1 and 4.4. Paragraph 4.2 refers to OWNER's identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and in existing structures which have been utilized by PROFESSIONAL in preparing the Drawings and Specifications. 8.5. OWNER's responsibilities in respect of purchasing and maintaining liability and property insurance are set forth in paragraphs 5.5 through 5.8. 8.6. OWNER is obligated to execute Change Orders as indicated in paragraph 10.3. { 8.7. OWNER's responsibility in respect of certain inspections, tests and approvals is set forth in paragraph 13.4. 8.8. In connection with OWNER's right to stop Work or suspend Work, see paragraphs 13.10 and 15.1. Paragraph 15.2 deals with OWNER's right to terminate services of CONTRACTOR under certain circumstances. GC-23 Revision Date August 2001 ARTICLE 9---PROFESSIONAL'S STATUS DURING CONSTRUCTION OWNER's Representative: 9.1. PROFESSIONAL will be OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of PROFESSIONAL as OWNER's representative during construction are set forth in the Contract Documents and shall not be extended without written consent of OWNER and PROFESSIONAL. Visits to Site: 9.2. PROFESSIONAL will make visits to the site at intervals appropriate to the various stages of construction to observe the premises and quality of the executed Work and to determine, in general, if the Work is proceeding in accordance with the Contract Documents. PROFESSIONAL will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. PROFESSIONAL's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations as an experienced and qualified design PROFESSIONAL, PROFESSIONAL will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defects and deficiencies in the Work. Project Representation: 9.3. If OWNER and PROFESSIONAL agree, PROFESSIONAL will furnish a Resident Project Representative to assist PROFESSIONAL in observing the performance of the Work. The duties, responsibilities and limitations of authority of any such Resident Project Representative and assistants will be as provided in the Supplementary Conditions. If OWNER designates another agent to represent OWNER at the site who is not PROFESSIONAL's agent or employee, the duties, responsibilities and limitations of authority of such other person will be as provided in the Supplementary Conditions. Clarifications and Interpretations: 9.4. PROFESSIONAL shall issue such written clarifications or interpretations of the Contract Documents (in the form of Drawings or otherwise) as may be determined necessary, or as reasonably requested by CONTRACTOR, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. If CONTRACTOR believes that a written clarification and interpretation entitles it to an increase in the Contract Price and/or Contract Time, CONTRACTOR may make a claim as provided for in Articles 11 or 12. Authorized Variations in Work: 9.5. PROFESSIONAL may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are consistent with the overall intent of the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR who shall perform the Work involved promptly. If CONTRACTOR believes that a Field Order justifies an increase in the Contract Price or an extension of the Contract Time and the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in Article 11 or 12. Rejecting Defective Work: 9.6. PROFESSIONAL will have authority to disapprove or reject Work which PROFESSIONAL believes to be defective and will also have authority to require special inspection or testing of the Work as provided in paragraph 13.9, whether or not the Work is fabricated, installed or completed. GC-24 Revision Date August 2001 Shop Drawings, Change Orders and Payments: 9.7. In connection with PROFESSIONAL's responsibility for Shop Drawings and samples, see paragraphs 6.23 through 6.29 inclusive. 9.8. In connection with PROFESSIONAL's responsibilities as to Change Orders, see Articles 10, I11 and 12. 9.9. In connection with PROFESSIONAL's responsibilities in respect of Applications for Payment, etc., see Article 14. Determinations for Unit Prices: 9.10. PROFESSIONAL will determine the actual quantities and classifications of Unit Price Work performed by CONTRACTOR. PROFESSIONAL will review with CONTRACTOR PROFESSIONAL's preliminary determinations on such matters before rendering a written decision thereon (by recommen- dation of an Application for Payment or otherwise). PROFESSIONAL's written decisions thereon will be final and binding upon OWNER and CONTRACTOR, unless, within ten days after the date of any such decision, either OWNER or CONTRACTOR delivers to the other party to the Agreement and to PROFESSIONAL written notice of intention to appeal from such a decision. Decisions on Disputes: 9.11. PROFESSIONAL will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the Work and claims under Articles 11 and 12 in respect of changes to the Contract Price or Contract Time will be referred initially to PROFESSIONAL in writing with a request for a formal decision in accordance with this paragraph, which PROFESSIONAL will render in writing within a reasonable time. Written notice of each such claim, dispute and other matter will be delivered by the claimant to PROFESSIONAL and the other party to the Agreement promptly (but in no event later than thirty days after the occurrence of the event giving rise thereto) and written supporting data will be submitted to PROFESSIONAL and the other party within sixty days after such occurrence unless PROFESSIONAL allows an additional period of time to ascertain more accurate data in support of the claim. 9.12. When functioning as interpreter and judge under paragraphs 9.10 and 9.11, PROFESSIONAL will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by PROFESSIONAL pursuant to paragraphs 9.10 and 9.11 with respect to any such claim, dispute or other matter (except any which have been waived by the making or acceptance of final pay- ment as provided in paragraph 14.16) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim, dispute or other matter. Limitations on PROFESSIONAL's Responsibilities: 9.13. Neither PROFESSIONAL's authority to act under this Article or elsewhere in the Contract Documents nor any decision made in good faith to exercise such authority shall give rise to any duty or responsibility of PROFESSIONAL to CONTRACTOR, any Subcontractor, any of their agents or employees. 9.14. PROFESSIONAL shall not be responsible for the construction means, methods, techniques, sequences, or procedures or the safety precautions and programs used. PROFESSIONAL shall not be responsible for CONTRACTOR's failure to perform the Work in accordance with the Contract Documents. 9.15. PROFESSIONAL shall not be responsible for the acts or omissions of CONTRACTOR, GC-25 Revision Date August 2001 any Subcontractors, any agents or employees, or any other persons performing any of the Work. i I I GC-26 Revision Date August 2001 ARTICLE 10--CHANGES IN THE WORK 10.1. Without invalidating the Contract, OWNER may at any time or from time to time order additions, deletions, or revisions in the Work. The OWNER shall provide CONTRACTOR with a proposal request, identifying the Work to be added, deleted or revised. Upon receipt, CONTRACTOR shall promptly submit a written proposal for the changed work prepared in accordance with Articles 11 and 12. If the proposal request calls only for the deletion of Work, the OWNER may order the partial suspension of any Work related to the proposed deletion, in which case CONTRACTOR must cease performance as directed; CONTRACTOR shall not be entitled to claim lost profits on deleted work. All changed Work shall be executed under the applicable conditions of the Contract Documents. 10.2. Additional Work performed by CONTRACTOR without authorization of a Change Order will not entitle CONTRACTOR to an increase in the Contract Price or an extension of the Contract Time, except in the case of an emergency as provided in Article 6. The effect of this paragraph shall remain paramount and shall prevail irrespective of any conflicting provisions contained in these Contract Documents. 10.3. Upon agreement as to changes in the Work to be performed, Work performed in an emergency as provided in Article 6, and any other claim of CONTRACTOR for a change in the Contract Time or the Contract Price, PROFESSIONAL will prepare a written Change Order to be signed by PROFESSIONAL and CONTRACTOR and submitted to OWNER for approval. 10.4. In the absence of an agreement as provided in 10.3, OWNER may, at its sole discretion, issue a Work Change Directive to CONTRACTOR. Pricing of the Work Change Directive will be in accordance with Section 11.3. The Work Change Directive will specify a price, and if applicable a time extension, determined to be reasonable by OWNER. If CONTRACTOR fails to sign such Work Change Directive , CONTRACTOR may submit a claim in accordance with Articles 11 and 12, but CONTRACTOR shall nevertheless be obligated to fully perform the work as directed by the Work Change Directive. 10.5. CONTRACTOR shall proceed diligently with performance of the Work as directed by OWNER, regardless of pending claim actions, unless otherwise agreed to in writing. 10.6. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. GC-27 Revision Date August 2001 ARTICLE 11-CHANGE OF CONTRACT PRICE 11.1. The Contract Price constitutes the total compensation (subject to written authorized adjustments) payable to CONTRACTOR for performing the Work. All duties, responsibilities and obligations assigned to or undertaken by CONTRACTOR shall be at CONTRACTOR's expense without change in the Contract Price. 11.2. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any claim for an increase or decrease in the Contract Price shall be based on written notice delivered by the party making the claim to the other party and to PROFESSIONAL promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after such occurrence (unless PROFESSIONAL allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accompanied by claimant's written statement that the amount claimed covers all known amounts (direct, indirect and consequential) to which the claimant is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Price shall be determined by PROFESSIONAL in accordance with paragraph 9.11 if OWNER and CONTRACTOR cannot otherwise agree on the amount involved. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph 11.2. 11.3. The value of any Work covered by a Change Order or of any claim for an adjustment in the Contract Price will be determined by the following procedures: 11.3.1. Designated Unit Price (Field Measure). CONTRACTOR and OWNER recognize and acknowledge that the quantities shown for those items designated in the Bid Proposal as unit price items are approximations prepared by OWNER for bid purposes and that the actual compensation payable to CONTRACTOR for the utilization of such items is based upon the application of unit prices to the actual quantities of items involved as measured in the field and required to complete the Work as originally defined in the Contract Documents. 11.3.2. When it is determined by OWNER that an addition, deletion, or revision to the Work, as defined in these Contract Documents, is required and affects the quantities required for items designed in the Bid Proposal as unit price items, CONTRACTOR and OWNER agree that the compensation payable to CONTRACTOR for such unit price items shall be adjusted accordingly by a Change Order based upon the application of the appropriate unit prices shown in the Bid Proposal to the quantity of the unit price item required to complete the Work as defined in the Contract Documents. 11.3.3. Other Unit Prices. For items not designated in the bid proposal as unit prices, OWNER and CONTRACTOR may establish unit prices as agreed on by Change Order. 11.3.4. Lump Sum. When it is determined by OWNER that an addition, deletion or revision to the Work is required which results in a change in Work designated in the Bid Proposal as a lump sum item, the amount of increase or decrease in the lump sum price shall be established by mutual agreement of the parties. 11.3.5. If the pricing methods specified in 11.3 are inapplicable, or if the parties are unable to agree on a price for the changed work, a reasonable price for the same shall be established by OWNER in accordance with 11.4 and 11.5. OWNER shall then process a unilateral Change Order, specifying the said reasonable price, in accordance with 11.4 through 11.6. CONTRACTOR shall perform the Work as directed in the Change Order. 11.3.6. Failure on the part of CONTRACTOR to construct any item to plan or authorized dimensions within the specification tolerances shall result in: reconstruction to acceptable tolerances at no additional costs to OWNER; acceptance at no pay; or acceptance at reduced final pay quantity or reduced unit price, all at the discretion of OWNER. Determinations of aggregate monetary change for items identified as lump sum quantities shall be made by OWNER based upon an analysis of the scope of CONTRACTOR's failure to construct to plan or authorized dimensions. GC-28 Revision Date August 2001 Cost of the Work: 11.4. The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in paragraph 11.5: 11.4.1. Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the Work under schedules of job classifications agreed upon by OWNER and CONTRACTOR. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing Work after regular working hours, on Saturday, Sunday or legal holidays, shall be included in the above to the extent authorized by OWNER. 11.4.2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. Trade discounts, rebates and refunds and all returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained. 11.4.3. Payments made by CONTRACTOR to the Subcontractors for Work performed by Subcontractors. If required by OWNER, CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to CONTRACTOR and shall deliver such bids to OWNER who then determines, with the advice of PROFESSIONAL, which bids will be accepted. If a subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work Plus a Fee, the Subcontractor's Cost of the Work shall be determined in the same manner as CONTRACTOR's Cost of the Work. All subcontracts shall be subject to the other provisions of the Contract Documents insofar as applicable. 11.4.4. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys and accountants) employed for services specifically related to the Work. 11.4.5. Supplemental costs including the following: 11.4.5.1. The proportion of necessary transportation, travel and subsistence expenses of CONTRACTOR's employees incurred in discharge of duties connected with the Work. 11.4.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost less market value of such items used but not consumed which remain the property of CONTRACTOR. 11.4.5.3. Rentals of all construction equipment and machinery and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of PROFESSIONAL, and the costs of transportation, loading, unloading, installation, dismantling and removal thereof-all in accordance with terms of said rental agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work. 11.4.5.4. Sales, consumer, use or similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations. 11.4.5.5. Deposits lost for causes other than negligence of CONTRACTOR, any Subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. GC-29 Revision Date August 2001 11.4.5.6. Losses and damages (and related expenses), not compensated by insurance or otherwise, to the Work or otherwise sustained by CONTRACTOR in connection with the performance and furnishing of the Work (except losses and damages within the deductible amounts of property insurance established by OWNER in accordance with paragraph 5.6) provided they have resulted from causes other than the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR's Fee. If, however, any such loss or damage requires reconstruction and CONTRACTOR is placed in charge thereof, CONTRACTOR shall be paid for services a fee proportionate to that stated in paragraph 11.6.2. 11.4.5.7. The cost of utilities, fuel and sanitary facilities at the site. 11.4.5.8. Minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the Work. 11.4.5.9. Cost of premiums for additional Bonds and insurance required because of changes in the Work and premiums of property insurance coverage within the limits of the deductible amounts established by OWNER in accordance with paragraph 5.6. 11.5. The term Cost of the Work shall not include any of the following: 11.5.1. Payroll costs and other compensation of CONTRACTOR's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expeditors, timekeepers, clerks and other personnel employed by CONTRACTOR whether at the site or in CONTRACTOR's principal or a branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.4.1 or specifically covered by paragraph 11.4.4-all of which are to be considered administrative costs covered by CONTRACTOR's Fee. 11.5.2. Expenses of CONTRACTOR's principal area branch offices other than CONTRACTOR's office at the site. 11.5.3. Any part of CONTRACTOR's capital expenses, including interest on CONTRACTOR'S capital used for the Change Order Work and charges against CONTRACTOR for delinquent payments. 11.5.4. Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same (except for the cost of premiums covered by subparagraph 11.4.5.9 above). 11.5.5. Costs due to the negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly, employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied and making good any damage to property. 11.5.6. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in paragraph 11.4. CONTRACTOR's Fee: 11.6. CONTRACTOR's Fee allowed to CONTRACTOR for overhead and profit shall be determined as follows: 11.6.1. a mutually acceptable fixed fee, or if none can be agreed upon; 11.6.2. a fee based on the following percentages of the various portions of the Cost of the Work: 11.6.2.1. for costs incurred under paragraphs 11.4.1 and 11.4.2, CONTRACTOR's Fee shall be GC-30 Revision Date August 2001 Ififteen percent, 11.6.2.2. for costs incurred under paragraph 11.4.3, CONTRACTOR's Fee shall five percent; and I if a subcontract is on the basis of Cost of the Work Plus a Fee, the maximum allowable to CONTRACTOR on account of overhead and profit of all Subcontractors shall be fifteen percent, I11.6.2.3. no fee shall be payable on the basis of costs itemized under paragraphs 11.4.4, 11.4.5 and 11.3, 11.6.2.4. the amount of credit to be allowed by CONTRACTOR to OWNER for any such change which results in a net decrease in cost will be the amount of the actual net decrease plus a deduction in CONTRACTOR's Fee by an amount equal to ten percent of the net decrease, and I 11.6.2.5. when both additions and credits are involved in any one change, the adjustment in CONTRACTOR's Fee shall be computed on the basis of the net change in accordance with paragraphs 11.6.2.1 through 11.6.2.4, inclusive. I 11.7. For all changes, CONTRACTOR shall submit an itemized cost breakdown, together with supporting data in such detail and form as prescribed by the Project Manager. When a credit is due, the amount of credit to be allowed by CONTRACTOR to OWNER for any such change which results in a net decrease in cost will be the amount of the actual net decrease in direct cost as determined by the Project Manager, plus the applicable reduction in overhead and profit. When both additions and credits are involved in any change, the combined overhead and profit shall be calculated on the basis of the net change, whether an increase or decrease. In any event, the minimum detail shall be an itemization of all man-hours required by discipline/trade with the unit cost per man-hour and total labor price, labor burden, equipment hours and rate for each piece of equipment, material by units of measure and price per unit, other costs specifically itemized, plus the overhead and profit markup. ICash Allowances: 11.8. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be done by such Subcontractors or Suppliers and for such sums within the limit of the allowances as may be acceptable to PROFESSIONAL CONTRACTOR agrees that: I11.8.1. The allowances include the cost to CONTRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the site and all applicable taxes; and 11.8.2. CONTRACTOR's costs for unloading and handling on the site, labor, installation costs, overhead, profit and other expenses contemplated for the allowances have been included in the Contract I Price and not in the allowances. No demand for additional payment on account of any thereof will be valid. Prior to final payment, an appropriate Change Order will be issued as recommended by PROFESSIONAL to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. Unit Price Work: 11.9.1. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit prices for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by PROFESSIONAL in accordance with Paragraph 9.10. GC-31 I Revision Date August 2001 11.9.2. Each unit price will be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR's overhead and profit for each separately identified item. 11.9.3. Where the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement and there is no corresponding adjustment with respect to any other item of Work and if CONTRACTOR believes that CONTRACTOR has incurred additional expense as a result thereof, CONTRACTOR may make a claim for an increase in the Contract Price in accordance with Article 11 if the parties are unable to agree as to the amount of any such increase. I GC-32 Revision Date August 2001 ARTICLE 12--CHANGE OF CONTRACT TIME 12.1. The Contract Time may only be changed by a Change Order. Any request for an extension in the Contract Time shall be made in writing and delivered to PROFESSIONAL and OWNER within seven (7) calendar days of the occurrence first happening and resulting in the claim. Written supporting data will be submitted to PROFESSIONAL and OWNER within fifteen (15) calendar days after such occurrence unless the OWNER allows additional time. All claims submitted by CONTRACTOR for adjustments to the Contract Time must set forth in detail the reasons for and causes of the delay and clearly indicate why the subject delay was beyond CONTRACTOR's control or fault. 12.2. If CONTRACTOR is delayed at any time in the performance, progress, commencement, or completion of the Work by any act or neglect of OWNER or PROFESSIONAL, or by an employee of either, or by any separate CONTRACTOR employed by OWNER, or by changes ordered in the Work, or by labor disputes, fire, unavoidable casualties, utility conflicts which could not have been identified or foreseen by CONTRACTOR using reasonable diligence, or any causes beyond CONTRACTOR's control or fault, then the Contract Time shall be extended by Change Order for such reasonable time as OWNER may determine. CONTRACTOR shall be entitled to an extension of time for such causes only for the number of days of delay which OWNER may determine to be due solely to such causes and only to the extent such occurrences actually delay the completion of the Work and then only if CONTRACTOR shall have strictly complied with all the requirements of the Contract Documents. Provided, however, notwithstanding anything in the Contract Documents to the contrary, no interruption, interference, inefficiency, suspension or delay in the performance, progress, commencement or completion of the Work for any cause whatsoever, including those for which OWNER or PROFESSIONAL may be responsible in whole or in part, shall relieve CONTRACTOR of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONTRACTOR's sole and exclusive remedy against OWNER for interruption, interference, inefficiency, suspension or delay of any aspect of the Work shall be the right to seek an extension to the Contract Time in accordance with the procedures set forth herein. GC-33 Revision Date August 2001 ARTICLE 13--WARRANTY AND GUARANTEE; TESTS AND INSPECTIONS: CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK Warranty and Guarantee: 13.1. CONTRACTOR warrants and guarantees to OWNER that all materials and equipment will be new unless otherwise specified and that all work will be of good quality, performed in a workmanlike manner, free from faults or defects, and in accordance with the requirements of the Contract Documents and any inspections, tests, or approvals referred to in this Article. All unsatisfactory Work, all faulty Work and all Work not conforming to the requirements of the Contract Documents or such inspections, tests, approvals, or all applicable building, construction and safety requirements shall be considered defective. Notice of all defects shall be given to CONTRACTOR by PROFESSIONAL. All defective work, whether or not in place, may be rejected, corrected, or accepted as provided in this Article. Access to Work: 13.2. For the duration of the Work, PROFESSIONAL and its representatives, other designated representatives of OWNER, and authorized representatives of any regulatory agency shall at all times be given access to the Work. CONTRACTOR shall provide proper facilities for such access and observation of the Work and also for any inspection or testing by others. Tests and Inspections: 13.3. If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any Work to specifically be inspected, tested, or approved by someone other than CONTRACTOR, CONTRACTOR shall give PROFESSIONAL timely notice of readiness therefore. 13.4. The testing firm(s) (if assigned by OWNER to this Work) and all such inspections, tests, or approvals provided for by OWNER shall be identified in writing by PROFESSIONAL to CONTRACTOR. All other inspections, tests or approvals shall be at CONTRACTOR's expense including additional expenses for inspection and tests required as a result of delays by CONTRACTOR or hours worked in excess of 40 hours per week. For all required inspections, tests, and approvals on any Work prepared, performed, or assembled away from the site, CONTRACTOR will furnish PROFESSIONAL with the required Certificates of Inspection, testing, or approval. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organizations as may be required by law or the Contract Documents. Materials or Work in place that fail to pass acceptability tests shall be retested at the direction of PROFESSIONAL and at CONTRACTOR's expense. 13.5. All inspections, tests or approvals other than those required by Laws or Regulations of any public body having jurisdiction shall be performed by organizations acceptable to OWNER and CONTRACTOR (or by PROFESSIONAL if so specified). 13.6. If any Work (including the work of others) that is to be inspected, tested or approved is covered without written concurrence of PROFESSIONAL, it must, if requested by PROFESSIONAL, be uncovered for observation. Such uncovering shall be at CONTRACTOR's expense unless CONTRACTOR has given PROFESSIONAL timely notice of CONTRACTOR's intention to cover the same and PROFESSIONAL has not acted with reasonable promptness in response to such notice. 13.7. Neither observations by PROFESSIONAL or Project Manager nor inspections, tests, or approvals by persons other than CONTRACTOR shall relieve CONTRACTOR of its obligations to perform the Work in accordance with the requirements of the Contract Documents. Uncovering Work: 13.8. If any Work required to be inspected, tested or approved is covered prior thereto without the prior written approval of PROFESSIONAL, or if any Work is covered contrary to the request of GC-34 Revision Date August 2001 PROFESSIONAL, the Work shall, if requested by PROFESSIONAL, be uncovered for observation, inspection, testing or approval and replaced at CONTRACTOR's expense. 13.9. If PROFESSIONAL considers it necessary or advisable that covered Work be observed by PROFESSIONAL or inspected or tested by others, CONTRACTOR, at PROFESSIONAL's request, shall uncover, expose or otherwise make available for observation, inspection or testing as PROFESSIONAL may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, CONTRACTOR shall bear all direct and consequential costs of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction (including but not limited to fees and charges of PROFESSIONALs, architects, attorneys and other PROFESSIONALs), and OWNER shall be entitled to an appropriate decrease in the Contract Price and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction, and, if the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. OWNER May Stop the Work: 13.10. When Work is defective or when CONTRACTOR fails to supply sufficient skilled workmen or suitable materials or equipment or make prompt payments to Subcontractors for labor, materials, or equipment or if CONTRACTOR violates any provisions of these Contract Documents, OWNER may order CONTRACTOR to stop the Work until the cause for such order has been eliminated. However, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR or any other party. CONTRACTOR shall have no right to claim an increase in the Contract Price or Contract Time or other damages for a stop work order under this paragraph. Correction or Removal of Defective Work: 13.11. When directed by PROFESSIONAL, CONTRACTOR shall promptly, without cost to OWNER and as specified by PROFESSIONAL, either correct the defective Work whether fabricated, installed, or completed, or remove it from the site and replace it with non-defective Work. If CONTRACTOR does not correct such defective Work or remove and replace such defective Work within a reasonable time, as specified in a written notice from PROFESSIONAL, OWNER may have the deficiency corrected. All direct and indirect costs of such correction shall be paid by CONTRACTOR or deducted from payment to CONTRACTOR. CONTRACTOR will also bear the expense of correcting or removing and replacing all Work of others destroyed or damaged by the correction, removal, or replacement of the defective Work. One Year Correction Period: 13.12. If, after approval of final payment and prior to the expiration of one year after the date of substantial completion or such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents, any Work or materials are found to be defective, incomplete, or otherwise not in accordance with the Contract Documents, CONTRACTOR shall promptly, without cost to OWNER and in accordance with OWNER's written instructions, either correct such defective Work or if it has been rejected by OWNER, remove it from the Site and replace it with non- defective Work. If CONTRACTOR does not promptly comply with the terms of such instructions, OWNER may have the defective Work corrected, removed, or replaced. All direct, indirect and consequential costs of such removal and replacement (including but not limited to fees and charges of engineers, architects, attorneys and other professionals)will be paid by CONTRACTOR. Acceptance of Defective Work: 13.13. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to PROFESSIONAL's recommendation of final payment, PROFESSIONAL) prefers to accept it, OWNER may do so. CONTRACTOR shall bear all direct, indirect and consequential costs attributable GC-35 Revs sssn Date August 2001 to OWNER's evaluation of and determination to accept such defective Work (such costs to be approved by PROFESSIONAL as to reasonableness and to include but not be limited to fees and charges of engineers, architects, attorneys and other professionals). If any such acceptance occurs prior to PROFESSIONAL's recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. OWNER May Correct Defective Work: 13.14. If CONTRACTOR fails within a reasonable time after written notice of PROFESSIONAL to proceed to correct defective Work or to remove and replace rejected Work as required by PROFESSIONAL in accordance with paragraph 13.11, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days' written notice to CONTRACTOR, correct and remedy any such deficiency. In exercising the rights and remedies under this paragraph, OWNER shall proceed expeditiously, to the extent necessary to complete corrective and remedial action. OWNER may exclude CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend CONTRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER's representatives, agents and employees such access to the site as may be necessary to enable OWNER to exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs of OWNER in exercising such rights and remedies will be charged against CONTRACTOR in an amount approved as to reasonableness by PROFESSIONAL, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. Such direct, indirect and consequential costs will include, but not be limited to, fees and charges of engineers, architects, attorneys and other professionals, all court costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of CONTRACTOR's defective Work. CONTRACTOR shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by OWNER of OWNER's rights and remedies hereunder. Neglected Work by CONTRACTOR 13.15. If CONTRACTOR neglects to execute the Work in accordance with the Contract Documents, including any requirements of the progress schedule, PROFESSIONAL may direct CONTRACTOR to submit a recovery plan and take specific corrective actions including, but not limited to, employing additional workmen and/or equipment, and working extended hours and additional days, all at no cost to OWNER in order to put the Work back on schedule. If CONTRACTOR fails to correct the deficiency or take appropriate corrective action, OWNER may terminate the contract or CONTRACTOR's right to proceed with that portion of Work and have the Work done by others. The cost of completion under such procedure shall be charged against CONTRACTOR. A Change Order shall be issued incorporating the necessary revisions in the Contract Documents, including an appropriate reduction in the Contract Price. If the payments due CONTRACTOR are not sufficient to cover such amount, CONTRACTOR shall pay the difference to OWNER. 13.16. Should CONTRACTOR work overtime, weekends or holidays to regain the schedule, all costs to OWNER of associated inspection, construction management and resident engineers shall be identified to CONTRACTOR and the Contract Price reduced by a like amount via Change Order. GC-36 Revision Date August 2001 ARTICLE 14-PAYMENTS TO CONTRACTOR AND COMPLETION Schedule of Values: 14.1. The schedule of values established as provided in 2.9 will serve as the basis for progress payments and will be incorporated into a form of application for Payment acceptable to Project Manager. Progress payments on account of Unit Price Work will be based on the number of units completed. Application for Progress Payment: 14.2. At least twenty (20) calendar days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to PROFESSIONAL for review an application for Payment filled out and signed by CONTRACTOR covering the work completed as of the date of the application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice or other documentation warranting that OWNER has received the materials and equipment free and clear of all liens and evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect OWNER's interest therein, all of which will be satisfactory to OWNER. Payment is subject to a ten percent (10%) retainage that will be held until the final payment or acceptance by OWNER. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. CONTRACTOR's Warranty of Title: 14.3. CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens. Review of Applications for Progress Payment: 14.4. PROFESSIONAL will, within ten (10) calendar days after receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the application to OWNER, or return the application to CONTRACTOR indicating in writing PROFESSIONAL's reasons for refusing to recommend payment. In the latter case, CONTRACTOR may make the necessary corrections and resubmit the application. OWNER shall, within thirty-one calendar days of presentation to him of the application for payment with PROFESSIONAL's recommendation of the amount for payment, pay CONTRACTOR amount recommended. 14.5. PROFESSIONAL's recommendation of any payment requested in an Application for Payment will constitute a representation by PROFESSIONAL to OWNER, based on PROFESSIONAL's on-site observations of the Work in progress as an experienced and qualified design PROFESSIONAL and on PROFESSIONAL's review of the Application for Payment and the accompanying data and schedules, that the Work has progressed to the point indicated; that, to the best of PROFESSIONAL's knowledge, information and belief, the quality of the Work is in accordance with the Contract Documents subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.10, and to any other qualifications stated in the recommendation; and that CONTRACTOR is entitled to payment of the amount recommended. However, by recommending any such payment, PROFESSIONAL will not thereby be deemed to have represented that exhaustive or continuous on-site inspections have been made to check the quality or the quantity of the Work beyond the responsibilities specifically assigned to PROFESSIONAL in the Contract Documents or that there may not be other matters or issues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or OWNER to withhold payment to CONTRACTOR. 14.6. PROFESSIONAL's recommendation of final payment will constitute an additional representation by PROFESSIONAL to OWNER that the conditions precedent to CONTRACTOR's being GC-37 Revision Date August 2001 entitled to final payment as set forth in paragraph 14.13 have been fulfilled. 14.7. PROFESSIONAL may refuse to recommend the whole or any part of any payment if, in PROFESSIONAL's opinion, it would be incorrect to make such representations to OWNER. PROFESSIONAL may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or tests, nullify any such payment previously recommended, to such extent as may be necessary in PROFESSIONAL's opinion to protect OWNER from loss because: 14.7.1. the Work is defective, or completed Work has been damaged requiring correction or replacement. 14.7.2. the Contract Price has been reduced by Written Amendment or Change Order. 14.7.3. OWNER has been required to correct defective Work or complete Work in accordance with paragraph 13.14. or 14.7.4. of PROFESSIONAL's actual knowledge of the occurrence of any of the events enumerated in paragraphs 15.2.1 through 15.2.9 inclusive. OWNER may refuse to make payment of the full amount recommended by PROFESSIONAL because claims have been made against OWNER on account of CONTRACTOR's performance or furnishing of the Work or Liens have been filed in connection with the Work or there are other items entitling OWNER to a off-set against the amount recommended, but OWNER must give CONTRACTOR immediate written notice (with a copy to PROFESSIONAL)stating the reasons for such action. Substantial Completion: 14.8. When CONTRACTOR considers the entire Work ready for its intended use, CONTRACTOR shall notify OWNER and PROFESSIONAL in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that PROF- ESSIONAL issue a certificate of Substantial Completion. Within a reasonable time thereafter, OWNER, CONTRACTOR and PROFESSIONAL shall make an inspection of the Work to determine the status of completion. If PROFESSIONAL does not consider the Work substantially complete, PROFESSIONAL will notify CONTRACTOR in writing giving the reasons therefor. If PROFESSIONAL considers the Work substantially complete, PROFESSIONAL will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment. OWNER shall have seven days after receipt of the tentative certificate during which to make written objection to PROFESSIONAL as to any provisions of the certificate or attached list. If, after considering such objec- tions, PROFESSIONAL concludes that the Work is not substantially complete, PROFESSIONAL will, within fourteen days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing stating the reasons therefor. If, after consideration of OWNER's, objections, PROFESSIONAL considers the Work substantially complete, PROFESSIONAL will within said fourteen days execute and deliver to OWNER and CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) reflecting such changes from the tentative certificate as PROFESSIONAL believes justified after consideration of any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion, PROFESSIONAL will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, heat, utilities, insurance and warranties. Unless OWNER and CONTRACTOR agree otherwise in writing and so inform PROFESSIONAL prior to PROFESSIONAL's issuing the definitive certificate of Substantial Completion, PROFESSIONAL's aforesaid recommendation will be binding on OWNER and CON- TRACTOR until final payment. 14.9. OWNER shall have the right to exclude CONTRACTOR from the Work after the date of Substantial Completion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list. GC-38 IRevision Date August 2001 Partial Utilization: 14.10. Use by OWNER at OWNER's option of any substantially completed part of the Work which (i) has specifically been identified in the Contract Documents, or (ii) OWNER, PROFESSIONAL, and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR's performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following: 14.10.1. OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees, CONTRACTOR will certify to OWNER and PROFESSIONAL that said part of the Work is substantially complete and request PROFESSIONAL to issue a certificate of Substantial Completion for that part of the Work. CONTRACTOR at any time may notify OWNER and PROFESSIONAL in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substantially complete and request PROFESSIONAL to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR and PROFESSIONAL shall make an inspection of that part of the Work to determine its status of completion. If PROFESSIONAL does not consider that part of the Work to be substantially complete, PROFESSIONAL will notify OWNER and CONTRACTOR, in writing, giving the reasons therefor. If PROFESSIONAL considers that part of the Work to be substantially complete, the provisions of paragraphs 14.8 and 14.9 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. 14.10.2. OWNER may at any time request CONTRACTOR, in writing, to permit OWNER to take over operation of any such part of the Work although it is not substantially complete. A copy of such request will be sent to PROFESSIONAL and, within a reasonable time thereafter, OWNER, CONTRACTOR and PROFESSIONAL shall make an inspection of that part of the Work to determine its status of completion, and PROFESSIONAL will prepare a list of the items remaining to be completed or corrected thereon before final payment. If CONTRACTOR does not object in writing to OWNER and PROFESSIONAL that such part of the Work is not ready for separate operation by OWNER, PROFESSIONAL will finalize the list of items to be completed or corrected and will deliver such list to OWNER and CONTRACTOR together with a written recommendation as to the division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, utilities, insurance, warranties and guarantees for that part of the Work which will become binding upon OWNER and CONTRACTOR at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writing and so informed PROFESSIONAL). During such operation and prior to Substantial Completion of such part of the Work, OWNER shall allow CONTRACTOR reasonable access to complete or correct items on said list and to complete other related Work. 14.10.3. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of paragraph 5.15 in respect of property insurance. 14.10.4. OWNER, may at its discretion, reduce the amount of retainage subject to Beneficial Occupancy. Final Inspection: 14.11. Upon written notice from CONTRACTOR that the entire Work or an agreed upon portion thereof is complete, PROFESSIONAL will make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to remedy such deficiencies. Final Application for Payment: 14.12. After CONTRACTOR has completed all such corrections to the satisfaction of PROFESSIONAL and OWNER and delivered in accordance with the Contract Documents all GC-39 Revision Date August 2001 maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance required by 5.2, certificates of inspection, marked-up record documents and other documents, CONTRACTOR may make application for final payment following the procedure for progress payments. The final Application for Payment shall be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required, (ii) consent of the surety, if any, to final payment, and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all liens arising out of or filed in connection with the Work. In lieu of such releases or waivers of liens and as approved by OWNER, CONTRACTOR may furnish receipts or release in full and an affidavit of CONTRACTOR that (i) the releases and receipts include all labor, services, material and equipment for which a lien could be filed, and (ii) all payrolls, material and equipment bills and other indebtedness connected with the Work for which OWNER or OWNER's property might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or supplier fails to furnish such a release or receipt in full, CONTRACTOR may furnish a bond or other collateral satisfactory to OWNER to indemnify OWNER against any lien. 14.12.1. No application for final payment will be accepted by OWNER until approved as-built documents by CONTRACTOR are accepted and approved by PROFESSIONAL. 14.12.2. Notwithstanding any other provision of these contract documents to the contrary, OWNER and PROFESSIONAL are under no duty or obligation whatsoever to any vendor, materials provider, Subcontractor, laborer or other party to ensure that payments due and owing by CONTRACTOR to any of them are or will be made. Such parties shall rely only on CONTRACTOR's surety bonds for remedy of nonpayment by him. CONTRACTOR agrees to defend and resolve all claims made by Subcontractors, indemnifying OWNER and PROFESSIONAL for all claims arising from or resulting from Subcontractor or supplier or material men or laborer services in connection with this project. 14.12.3. General Indemnity: CONTRACTOR shall indemnify OWNER and PROFESSIONAL for any damages sustained, including lost profits, resulting from CONTRACTOR's failure or refusal to perform the work required by these contract documents. Final Payment and Acceptance: 14.13. If, on the basis of PROFESSIONAL's observation of the Work during construction and final inspection and PROFESSIONAL's review of the final Application for Payment and accompanying documentation as required by the Contract Documents, PROFESSIONAL is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fulfilled, PROFESSIONAL will, within ten (10) working days after receipt of the final Application for Payment, indicate in writing PROFESSIONAL's recommendation of payment and present the Application to OWNER for payment. At the same time PROFESSIONAL will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of 14.6. Otherwise, PROFESSIONAL will return the application to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application. After the presentation to OWNER of the application and accompanying documentation, in appropriate form and substance and with PROFESSIONAL's recommendation and notice of acceptability, the amount recommended by PROFESSIONAL will become due and will be paid by OWNER to CONTRACTOR. 14.14. If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed and if PROFESSIONAL so confirms, OWNER shall, upon receipt of CONTRACTOR's final Application for Payment and recommendation of PROFESSIONAL and without terminating the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Contract and if bonds have been furnished as required in Article 5, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by CONTRACTOR to PROFESSIONAL with the application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. GC-40 ' Revision Date August 2001 CONTRACTOR's Continuing Obligation: I 14.15. CONTRACTOR's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. Neither recommendation of any progress or final payment by PROFESSIONAL, nor the issuance of a certificate of Substantial Completion, nor any payment by OWNER to CONTRACTOR under the Contract Documents, nor any use or occupancy of the Work or any part thereof by OWNER, nor any act of acceptance by OWNER nor any failure to do so, nor any review and approval of a Shop Drawing or sample submission, nor the issuance of a notice of acceptability by PROFESSIONAL pursuant to paragraph 14.13, nor any correction of defective Work by OWNER will con- stitute an acceptance of Work not in accordance with the Contract Documents or a release of CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents (except as provided in paragraph 14.16). Waiver of Claims: 14.16. The making and acceptance of final payment will constitute: 14.16.1. A waiver of all claims by OWNER against CONTRACTOR, except claims arising from unsettled liens, from defective Work appearing after final inspection pursuant to 14.11, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from ICONTRACTOR's continuing obligations under the Contract Documents; and 14.16.2. A waiver of all claims by CONTRACTOR against OWNER other than those previously made in writing and still unsettled. GC-41 Revision Date August 2001 ARTICLE 15--SUSPENSION OF WORK AND TERMINATION OWNER May Suspend Work: 15.1. OWNER may, at any time and without cause, suspend the Work or any portion thereof for a period of not more than ninety days by notice in writing to CONTRACTOR and PROFESSIONAL which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the date so fixed. CONTRACTOR shall be allowed an adjustment in the Contract Price or an extension of the Contract Time, or both, directly attributable to any suspension if CONTRACTOR makes an approved claim therefor as provided in Articles 11 and 12. Termination For Cause: 15.2. Upon the occurrence of any one or more of the following events: 15.2. 1. if CONTRACTOR commences a voluntary case under any chapter of the Bankruptcy Code (Title 11, United States Code), as now or hereafter in effect, or if CONTRACTOR takes any equivalent or similar action by filing a petition or otherwise under any other federal or state law in effect at such time relating to the bankruptcy or insolvency; 15.2.2. if a petition is filed against CONTRACTOR under any chapter of the Bankruptcy Code as now or hereafter in effect at the time of filing, or if a petition is filed seeking any such equivalent or similar relief against CONTRACTOR under any other federal or state law in effect at the time relating to bankruptcy or insolvency; 15.2.3. if CONTRACTOR makes a general assignment for the benefit of creditors; 15.2.4. if a trustee, receiver, custodian or agent of CONTRACTOR is appointed under applicable law or under contract, whose appointment or authority to take charge of property of CONTRACTOR is for the purpose of enforcing a Lien against such property or for the purpose of general administration of such property for the benefit of CONTRACTOR's creditors; 15.2.5. if CONTRACTOR admits in writing an inability to pay its debts generally, as they become due; 15.2.6. if CONTRACTOR fails to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2.9 as revised from time to time); 15.2.7. if CONTRACTOR disregards Laws or Regulations of any public body having jurisdiction; 15.2.8. if CONTRACTOR disregards the authority of PROFESSIONAL; or 15.2.9. if CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Documents, OWNER may, after giving CONTRACTOR (and the surety, if there be one) seven days'written notice and to the extent permitted by Laws and Regulations, terminate the services of CONTRACTOR, exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTOR's tools, appliances, construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct, indirect and consequential costs of completing the Work (including but not limited to fees and charges of PROFESSIONALs, architects, attor- GC-42 Revision Date August 2001 ineys and other PROFESSIONALs and court and arbitration costs) such excess will be paid to CONTRACTOR. If such costs exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such costs incurred by OWNER will be approved as to reasonableness by PROFESSIONAL and incorporated in a Change Order, but when exercising any rights or remedies under this paragraph, OWNER shall not be required to obtain the lowest price for the Work performed. 15.3. In the event OWNER terminates the contract for cause and it is subsequently judicially determined that there was no cause for termination, the termination for convenience provision will be the means for disposition of the balance of the contract obligations. Termination for Convenience 15.4. Upon seven working days' written notice to CONTRACTOR and PROFESSIONAL, OWNER may, without cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Contract. In such case, CONTRACTOR shall be paid (without duplication of any items): I 15.4.1. For completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 15.4.2. For expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; 15.4.3. For all claims, costs, losses and damages incurred in settlement of terminated contracts with Subcontractors, suppliers and others; and I15.4.4. For reasonable expenses directly attributable to termination. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other economic Iloss arising out of or resulting from such termination. 15.5. Where CONTRACTOR's services have been so terminated by OWNER, the termination I will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR from liability. CONTRACTOR May Stop Work or Terminate: 15.6. If through no act or fault of CONTRACTOR, the Work is suspended for a period of more than ninety calendar days by OWNER or under an order of court or other public authority, or PROFESSIONAL fails to act on any Application for Payment within thirty days after it is submitted or OWNER fails for thirty-one days to pay CONTRACTOR any sum finally determined to be due, then CONTRACTOR may upon seven working days' written notice to OWNER and PROFESSIONAL and provided OWNER or PROFESSIONAL did not remedy such suspension or failure within that time, terminate the Agreement and recover from OWNER payment on the same terms as provided in 15.2. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if PROFESSIONAL has failed to act on an Application for Payment within thirty days after it is submitted or OWNER has failed for thirty-one calendar days after it is submitted to pay CONTRACTOR any sum finally determined to be due, CONTRACTOR may upon seven days' written notice to OWNER and PROFESSIONAL stop the Work until receipt of payment of all such amounts due CONTRACTOR, including interest thereon. The provisions of this paragraph are not intended to preclude CONTRACTOR from making claim under Articles 11 and 12 for an increase in Contract Price or Contract Time or otherwise for expenses or damage directly attributable to CONTRACTOR's stopping Work as permitted by this paragraph. The provisions of this paragraph shall not relieve CONTRACTOR of the obligations under paragraph 6.30 to carry on the Work in accordance with the progress schedule and without delay during disputes and disagreements with OWNER. GC-43 I Revision Date August 2001 ARTICLE 16--DISPUTE RESOLUTION 16.1. All disputes arising under this Contract or its interpretation whether involving law or fact or I both, or extra work, and all claims for alleged breach of contract shall within ten (10) working days of the commencement of the dispute be presented by CONTRACTOR to OWNER for decision. All papers pertaining to claims shall be filed in quadruplicate. Such notice need not detail the amount of the claim I but shall state the facts surrounding the claim in sufficient detail to identify the claim, together with its character and scope. In the meantime, CONTRACTOR shall proceed with the Work as directed. Any claim not presented within the time limit specified in this paragraph shall be deemed to have been waived, except that if the claim is of a continuing character and notice of the claim is not given within ten (10) I working days of its commencement, the claim will be considered only for a period commencing ten (10) working days prior to the receipt by OWNER of notice thereof. Each decision by OWNER will be in writing and will be mailed to CONTRACTOR by registered or certified mail, return receipt requested, directed to his last known address. 16.2 All claims, disputes and other matters in question between OWNER and CONTRACTOR arising out of, or relating to, the Contract Documents or the breach thereof shall be decided under Georgia Law in the Superior Court of Richmond County, Georgia. CONTRACTOR by execution of the Contract consents to jurisdiction and venue in the Superior Court of Richmond County, Georgia, and waives any right to contest same. I I I I I I GC-44 Revision Date August 2001 ARTICLE 17-MISCELLANEOUS Giving Notice: 17.1. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. Computation of Time: 17.2.1. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. 17.2.2. A calendar day of twenty-four hours measured from midnight to the next midnight shall constitute a day. General: 17.3. Should OWNER or CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the other party or of any of the other party's employees or agents or others for whose acts the other party is legally liable, claim should be made in writing to the other party within a reasonable time of the first observance of such injury or damage. The provisions of this paragraph 17.3 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or repose. 17.4. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by paragraphs 6.32, 13.1, 13.12, 13.14, 14.3 and 15.2 and all of the rights and remedies available to OWNER and PROFESSIONAL thereunder, are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. All representations, warranties and guarantees made in the Contract Documents will survive final payment and termination or completion of the Agreement. 17.5. CONTRACTOR shall keep adequate records and supporting documentation applicable to this Work and Contract. Said records and documentation shall be retained by CONTRACTOR for a minimum of five (5) years from the date of final completion or termination of this Contract. OWNER shall have the right to audit, inspect, and copy all such records and documentation as often as OWNER deems necessary during the period of the Contract and for a period of five (5) years thereafter provided, however, such activity shall be conducted only during normal business hours. OWNER, during this period of time, shall also have the right to obtain a copy of and otherwise inspect any audit made at the direction of CONTRACTOR as concerns the aforesaid records and supporting documentation. 17.6. The Contract Documents are intended by the Parties to, and do, supersede any and all provisions of the Georgia Prompt Pay Act, O.C.G.A. Section 13-11-1, et seq. In the event any provision of the Contract Documents are inconsistent with any provision of the Prompt Pay Act, this provision of the Contract Documents shall control. 17.7. Notwithstanding any provision of the law to the contrary, the parties agree that no interest shall be due Contractor on any sum held as retainage pursuant to the Contract Documents and CONTRACTOR specifically waives any claim to same. GC-45 Revision Date August 2001 Substitutions: 17.8. Notwithstanding any provision of these general conditions, there shall be no substitutions of materials that are not determined to be equivalent to those indicated or required in the contract documents without an amendment to the contract. Sanitary Sewer Overflow Prevention: 17.9. Procedures to Prevent Overflows During Sanitary Sewer Construction: 17.9.1 The CONTRACTOR is hereby notified that the discharge of any untreated wastewater to waters of the State is a violation of Georgia Water Quality Regulations and is prohibited. 17.9.2 The CONTRACTOR will submit an Emergency Response Plan prior to beginning work. This plan will include a list of key personnel with 24-hour contact information who will respond during an emergency situation. The ERP will include estimates of mobilization time for a response crew to arrive onsite. Any changes to the Emergency Response Plan will be submitted to the RESIDENT PROJECT REPRESENTATIVE prior to implementation. 17.9.3 In the event bypass pumping is required to facilitate new sewer construction, bypassing plans and supporting calculations must be submitted to the Augusta Utilities Department for review prior to establishment of the bypass. All bypass systems will include complete redundancy in pumping systems, if failure of the primary pumping system could result in a discharge of untreated wastewater to waters of the State. 17.9.4 Bypass pumping will be monitored continuously by a person knowledgeable in pump operation and maintenance if the failure of the bypass pump could result in the discharge of untreated wastewater to waters of the State. 17.9.5 In the event of a discharge of untreated wastewater, the CONTRACTOR will take the following actions: 1. Take immediate steps to eliminate or minimize the discharge of untreated wastewater. 2. Immediately notify the Utilities Department dispatcher (706.796.5000) and the RESIDENT PROJECT REPRESENTATIVE (contact information will be provided at the preconstruction conference). 3. Maintain a chronicle of relevant information regarding the incident including specific actions taken by the CONTRACTOR and estimates of the discharge volume. 17.9.6 The RESIDENT PROJECT REPRESENTATIVE will coordinate notification of the Georgia Environmental Protection Division (800.241.4113) and the Augusta Emergency Management Agency if appropriate. 17.9.7 If, in the opinion of the RESIDENT PROJECT REPRESENTATIVE and the OWNER, the CONTRACTOR is not responding to an emergency situation in an appropriate manner, the Utilities Department will undertake necessary actions to abate an overflow situation. The cost of these actions will be the responsibility of the CONTRACTOR. 17.9.8 Following a discharge of untreated wastewater, a downstream inspection will be conducted by the Utilities Department to assess potential mitigation measures that may be required of the CONTRACTOR. PROGRAM MANAGER: 17.10 The PROGRAM MANAGER for the project is Augusta Utilities Department, Engineering Division. The presence or duties of PROGRAM MANAGER's personnel at the construction site, whether as onsite representatives or otherwise, do not make PROGRAM MANAGER or PROGRAM MANAGER's personnel GC-46 I Revision Date August 2001 in any way responsible for those duties that belong to OWNER and / or the CONTRACTOR or other entities, and do not relieve the CONTRACTOR or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, ' and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction Contract Documents and any health and safety precautions required by such construction work. PROGRAM MANAGER and PROGRAM MANAGER's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty of inspecting, noting, observing, correcting, or I reporting on health or safety deficiencies of the CONTRACTOR(s) or other entity or any other persons at the site except PROGRAM MANAGER's own personnel. I The presence of PROGRAM MANAGER's personnel at the construction site is for the purpose of providing to OWNER a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). ' PROGRAM MANAGER neither guarantees the performance of the construction contractor(s) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents. IFor this AGREEMENT only, construction sites include places of manufacture for materials incorporated into the construction work, and construction contractors include manufacturers of materials incorporated into the construction work I I I I I I I I GC-47 I I SECTION SC-0 INDEX TO SUPPLEMENTARY CONDITIONS I ' SECTION SC-01 Scope of the Work SC-02 List of Drawings SC-03 Bonds SC-04 Contractor's Liability Insurance I SC-05 Project Sign SC-06 Protection of the Environment SC-07 Temporary Toilets I SC-08 Plans and Specifications Furnished SC-09 Record Drawings SC-10 Shop Drawings I SC-11 Existing Structures SC-12 Salvage Material SC-13 Referenced Specifications SC-14 Traffic Control SC-15 Surveys SC-16 Construction Order and Schedule I SC-17 Consulting Engineers SC-18 Inspection and Testing of Work SC-19 Site Access ISC-20 Tree Save SC-21 Georgia Prompt Pay Act SC-22 City Acceptance ISC-23 Disputes SC-24 Specified Materials I SC-25 Interest Not Earned on Retainage SC-26 Basis of Payment SC-27 Compliance with Laws, Codes, Regulations, Etc. SC-28 Equivalent Materials ISC-29 After Hours Inspection SC-30 Supplement to the Agreement I I I Sc-I I ISECTION SC SUPPLEMENTARY CONDITIONS I -01. SCOPE OF THE WORK: IThe project consists of excavating at the discharge location of observed leakage, "chasing" the leak by excavating along its pathway, and plugging the leak pathway as close to the canal as I possible. The excavated material will be removed from the site and replaced with compacted select backfill. After the leakage repair is completed, a stabilization berm of compacted select fill will be paced on the existing slope. I -02. LIST OF DRAWINGS: I The following drawings,prepared by Cranston Engineering Group, P.C. for The Augusta Utilities Department comprise the plans for the project. I SHEET DATE NO. TITLE ORIGINAL REVISED 1 Cover Sheet 08/07/13 03/11/15 I2 Notes& Specifications 08/07/13 09/05/14 3 Plan Sheet 08/07/13 03/11/15 4 Miscellaneous Sections & Details 08/07/13 09/05/14 5 ES&PC Notes 08/07/13 6 ES&PC Notes 08/07/13 7 ES&PC Notes 08/07/13 8 Initial ES&PC 08/07/13 09/05/14 9 Intermediate ES&PC 08/07/13 09/05/14 10 Final ES&PC 08/07/13 11 ES&PC Details 08/07/13 I -03. BONDS: I The Contractor will include in the lump sum payment for Lump Sum Construction the cost of his performance and payment bonds. I -04. CONTRACTOR'S LIABILITY INSURANCE: Insurance shall be written with limits of liability shown below or as required by law, whichever Iis greater: Commercial General Liability(per occurrence) Each Occurrence $ 1,000,000 I General Aggregate $ 2,000,000 Products $ 2,000,000 Personal &Adv Injury $ 1,000,000 IFire Damage $ 500,000 SC-2 i Automobile Liability (any auto) Combined Single Limit $ 1,000,000 Excess Liability(any auto) Each Occurrence $ 5,000,000 I Workers Compensation Statutory Limits Employer Liability $ 1,000,000 I -05. PROJECT SIGN: The Contractor will provide and install one (1) project sign at prominent location on the I construction site as directed by the Engineer. The sign will carry in a prominent manner the name of the project, the Owner, and the name of the Contractor and the Engineer and a 24-hour phone number for the Contractor in 4-inch letters. The sign shall be constructed and erected on wood posts in a substantial manner 7-feet above the ground. The full size stencil shall be approved along with colors before fabrication. The Contractor shall include the cost of the project sign in the Total Base Bid. I -06. PROTECTION OF THE ENVIRONMENT: The Contractor will carefully schedule his work so that a minimum amount of the exposed earth will be subject to erosion by rainfall or wind, and he will provide means satisfactory to the Engineer to minimize the transportation of silt and other deleterious material from the project Iarea onto adjacent properties or into adjacent water courses. All chemicals used during project construction or furnished for project operation, whether herbicide,pesticide, disinfectant, polymer, reactant or of other classification, must show approval of either EPA or USDA. Use of all such chemicals and disposal of residues shall be in conformance with printed instructions. -07. TEMPORARY TOILETS: IContractor shall provide temporary toilet facilities on the site for workmen employed in the construction work. Toilets shall be adequate for the number of men employed and shall be maintained in a clean and sanitary condition. Workmen shall be required to use only these toilets. At completion of the work, toilets used by Contractor shall be removed and premises left in the condition required by the Contract. -08. PLANS AND SPECIFICATIONS FURNISHED: The Contractor will be furnished, free of charge, by the Owner up to five (5) sets of direct black line prints together with a like number of complete bound specifications for construction purposes. Additional sets of plans and/or specifications will be furnished to the Contractor at the cost of reproduction upon his written request. -09. RECORD DRAWINGS: The Contractor will maintain in his office one complete set of drawings (including any supplemental sketches) pertaining to the project upon which, at the end of each day's work any deviations from the construction lines shown thereon and all changes ordered by the Engineer will be shown accurately in red pencil. If necessary, supplemental drawings will be made to SC-3 i show details of deviations or changes, and these will be kept with the marked set. The drawings will be available to the Engineer for inspection during construction and at the completion of I construction. Prior to submitting his estimate for final payment, as-built drawings are to be prepared and submitted by the contractor to the engineer. As-built drawings shall include tap locations and manholes located to a minimum of two separate surface features. ' -10. SHOP DRAWINGS: The Contractor shall submit to the Engineer for his review shop drawings, cuts, diagrams, bar lists, steel details and other descriptive data on every item, where shown on the drawings or specified herein. The Contractor shall check all submittals and so indicate on each copy thereof. Five copies of such shop drawings shall be submitted to the Engineer before ordering of the material. Submittals which have not been checked by the Contractor will not be reviewed by the Engineer. Reviews by the Engineer of submittals will cover only general conformity with the I project requirements, while responsibility for detailed conformity shall remain with the Contractor. The Contractor will be notified by mail of the results of the submittal reviews within ten(10) days of the receipt by the Engineer thereof. -11. EXISTING STRUCTURES: I Where sidewalks, street signs, private signs, walls, sidewalks, fences, pipelines, etc. are removed in accomplishing the work, each and every item will be replaced in the same or better manner or condition than that in which it was before construction began. The Contractor will protect and hold harmless the Owner from any suit, action, or dispute whatever arising from the Contractor's work adjacent to private property. I -12. SALVAGE MATERIAL: All existing installations to be removed, including but not limited to masonry and concrete Irubble, asphalt,pipe, etc. will be disposed of at an approved location by the Contractor. -13. REFERENCED SPECIFICATIONS: IWhere specifications or standards of trade organizations and other groups are referenced in these specifications, they are made as much a part of these specifications as if the entire standard or specification were reprinted herein. The inclusion of the latest edition or revision of the referenced specification or standard is intended. I -14. TRAFFIC CONTROL: I Traffic control shall conform to the Manual on Uniform Traffic Control Devices (MUTCD) of the Federal Highway Administration, latest edition. The Contractor shall give prior written notification to and shall obtain the approval of the Augusta Fire Department, Police Department, Emergency Medical Services, and the Augusta Traffic Engineering Department of any street closures. I SC-4 i -15. SURVEYS: I The Engineer has established base lines for locating the principal component parts of the work, together with a suitable number of bench marks adjacent to the work. From the information thus provided, the Contractor shall develop and make all detail surveys needed for construction lines I and elevations. The Contractor shall employ only Registered Land Surveyors or Registered Professional Engineer to perform all detail surveys. The Contractor will diligently preserve and maintain the position of all stakes, reference points and bench marks after they are set and, in I case of willful or careless destruction, he shall be charged with the resulting expense and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance. -16. CONSTRUCTION ORDER AND SCHEDULE: A. The Contractor shall be responsible for the detailed order, schedule, and methods of construction activities within the general guidelines specified for maintenance and protection of highway and pedestrian, traffic; utility lines; drainage ways; adjacent properties; and as otherwise specified. B. After notice to proceed and prior to the first payment on the contract the Contractor shall submit the following for review: (1) Breakdown of contract price into units of cost for each item required to complete the total work; this breakdown will be the basis for judging the percentage I complete at any time. (2) A statement of the order of procedure to be followed that will result in the required protection and completion of the work within the overall contract time. (3) A bar chart showing the percentage of each item schedules against time and so scheduled that Contractor's order of construction is clearly shown. C. With each request for payment the Contractor shall submit two copies of the bar chart clearly marked to show the work completed at the date of the payment requested. D. Progress Schedule Requirements (1) Bar Chart Schedule: Prepare on maximum 11 inch by 17 inch sheet size for each Iseparate stage of Work as specified and shown,to include at least: (a) Identification and listing in chronological order of those activities reasonably required to complete work, including, but not limited to, subcontract work, major equipment design, factory testing and startup activities, project close out and cleanup and specified work sequences, constraints, and milestones, including Substantial Completion date(s). Listings to be identified by Specification section number. (b) Identify: (i) horizontal time frame by year, month, and week, (ii) duration, early-start, and completion of each activity and sub-activity and (iii) critical activities and Project float. (c) Provide sub-schedules to further define critical portions of the work. SC-5 I I (d) Monthly schedule submissions: show overall percent complete, projected and actual, and completion progress by listed activity and sub-activity. I (e) Identify the critical path on the schedule. (2) General: I (a) Schedule(s) shall reflect work logic sequences, restraints, delivery windows, review times, contract times and milestones set forth in the I Agreement, and shall begin with the date of Notice to Proceed and conclude with the date of Final Completion. (b) The schedule requirement herein is the minimum required. Contractor I may prepare a more sophisticated schedule if such work will aid Contractor in execution and timely completion of work. (c) Base schedule on standard 5-day work week. I (d) When bar chart or network analysis schedules are specified, use Primavera Project Planner, latest version, SureTrak latest version or a compatible and approved software. I (e) Adjust or confirm schedules on a monthly basis as follows: Contractor shall submit to Engineer for acceptance proposed adjustments in the progress schedule that will not change the contract times (or I milestones). Such adjustments will conform generally to the progress schedule then if effect and additionally will comply with any provisions of the General Requirements applicable thereto. IProposed adjustments in the progress scheduled that will change the contract times (or milestones)may only be a Change Order. IUse of float suppression techniques such as preferential sequencing or logic, special lead/lag logic restraints, and extended activity times are I prohibited, and use of float time disclosed or implied by use of alternate float-suppression techniques shall be shared to proportionate benefits to Owner and Contractor. IPursuant to above float-sharing requirement, no time extensions will be granted nor delay damages paid until a delay occurs which (i) impacts Iproject's critical path, (ii) extends work beyond contract completion date. -17. CONSULTING ENGINEERS: IThe Owner has g engaged consultingengineers to assist the Director of Utilities, defined herein as the Engineer, by preparing plans and specifications for the work and by providing certain Iservices during the bidding and construction phases of the project. The consulting engineer, Cranston Engineering Group, P.C. is authorized to represent the Director of Utilities within the I limits of the various duties delegated and assigned to the firm by the Director. Nevertheless the Director of Utilities remains the final authority hereunder and is the "Engineer" as used throughout the Contract Documents. SC-6 i The presence or duties of Consulting Engineer's personnel at the construction site, whether as onsite representatives or otherwise, do not make personnel in any way responsible for those duties that belong to Owner and/or the Contractor or other entities, and do not relieve the Contractor or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction Contract Documents and any health and safety precautions required by such construction work. The Consulting Engineer's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty of inspecting, noting, observing, correcting, or reporting on health or safety deficiencies of the Contractor(s) or other entity or any other persons at the site except Consulting Engineer's own personnel. The presence of the Consulting Engineer's personnel at the construction site is for the purpose of providing to Owner a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). Consulting Engineer neither guarantees the performance of the construction contractor(s) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents. For this Agreement only, construction sites include places of manufacture for materials incorporated into the construction work, and construction contractors include manufacturers or materials incorporated into the construction work. -18. INSPECTION AND TESTING OF WORK: The Owner shall provide sufficient competent engineering personnel for the technical observation and testing of the work. The Engineer and his representatives shall at all times have access to the work whenever it is in preparation or progress, and the Contractor shall provide proper facilities for such access, and for inspections. Inspectors shall have the power to stop work on account of a workman's incompetency, p Y, drunkenness, or willful negligence or disregard of orders. An inspector may stop the work entirely if there is not a sufficient quantity of suitable and approved materials or equipment on the ground to carry it out properly or for any good and sufficient cause. Inspectors may not accept on behalf of the Owner any material or workmanship which does not conform fully to the requirements of the contract and they shall give no orders or directions under any possible circumstances not in accordance with the Specifications. The Contractor shall furnish the inspector with all required assistance to facilitate thorough inspection or the culling over or removal of defective materials or for any other purpose requiring discharge of their duties for which service no additional allowance shall be made. The inspector shall, at all times, have full permission to take samples of the materials that may or may not be used in the work. SC-7 I Any inspection provided by the Engineers is for the purpose of determining compliance with provisions of the contract specifications and is in no way a guarantee of the methods or appliances use by the Contractor, nor for the safety of the job. If the specifications, the Engineer's instructions, laws, ordinances, or any public authority require any work to be specially tested or approved, the Contractor shall give the Engineer timely notice of its readiness for inspection, and if the inspection is by an authority other than the Engineer, of the date fixed for such inspection. Inspections by the Engineer shall be made promptly, and where practicable at the source of supply. If any work should be covered up without review or consent of the Engineer, it must, if required by the Engineer, be uncovered for examination and properly restored at the Contractor's expense. Re-examination of any work may be ordered by the Engineer, and, if so ordered, the work must be uncovered by the Contractor. If such work is found to be in accordance with the Contract Documents, the Owner shall pay the cost of re-examination and replacement. If such work is not in accordance with the Contract Documents,the Contractor shall pay such cost. The Owner will employ a qualified materials testing laboratory, hereinafter referred to as the Laboratory, to monitor more fully on the Owner's behalf the quality of materials and work, and to perform such tests as may be required under the Contract Documents as conditions for acceptance of materials and work. The Laboratory will be solely responsible to and paid separately by the Owner. The timing of the work of the Laboratory will be coordinated by the Engineer through his duly authorized inspector. The Owner will bear the cost of testing a particular material or area of the work once. Where retesting is required following corrective measures or under other circumstances, the Contractor shall reimburse the Owner for the cost of additional testing. -19. SITE ACCESS: In order to minimize damage to existing paving and landscaping, access to the site for the contractor's personnel and equipment will be restricted to the routes designated by the Owner. The contractor will be required to use on those routes unless written approval is given by the owner. -20. TREE SAVE: Prior to beginning grading operations, the Contractor is to notify the Owner and the Engineer so that those trees which are to be saved can be marked in the field. Once these trees are marked, the Contractor shall take every precaution, including tree protection fence, to save these trees. -21. GEORGIA PROMPT PAY ACT: This Agreement is intended by the Parties to, and does, supersede any and all provisions of the Georgia Prompt Pay Act, O.C.G.A. Section 13-11-1, et seq. In the event any provision of this Agreement is inconsistent with any provision of the Prompt Pay Act, the provision of this Agreement shall control. SC-8 I -22. CITY ACCEPTANCE: Notwithstanding any other obligations of the Contractor, he shall complete the work to the full satisfaction of the Augusta Utilities Department and the Engineer. This provision shall not relieve the Contractor of his responsibilities for guarantees. -23. DISPUTES: All claims, disputes and other matters in question between the Owner and the Contractor arising out of or relating to the Agreement, or the breach thereof, shall be decided in the Superior Court of Richmond County, Georgia. The Contractor, by executing this Agreement, specifically consents to venue in Richmond County and waives any right to contest the venue in the Superior Court of Richmond County, Georgia. -24. SPECIFIED MATERIALS: Attention is drawn to the specification of certain brands or manufacturers of construction materials on the drawings. Unless the phrase "or equal" appears in the specification thereon, no substitution or deviation from the product specified will be allowed. Notwithstanding any provision of the general conditions, there shall be no substitution of materials that are not determined to be equivalent to those indicated or required in the contract documents without an amendment to the contract. -25. INTEREST NOT EARNED ON RETAINAGE: Notwithstanding any provision of the law to the contrary, the parties agree that no interest shall be due to the Contractor on any sum held as retainage pursuant to this Agreement and Contractor specifically waives any claim to same. I -26. BASIS OF PAYMENT: As explained in the section "Instructions to Bidders" and in the "General Conditions," payment will be made based on the per cent complete per the contractor's breakdown. -27. COMPLIANCE WITH LAWS, CODES,REGULATIONS,ETC.: Supplementing the provision of the GENERAL CONDITIONS, the successful bidder awarded this contract by signing the contract acknowledges the following, however, this is not to be Iconstrued as all inclusive or being these only: 1. Underground Gas Pipe Law: The Contractor signing the contract acknowledges that he is fullyaware of the contents g g g and requirements of "Georgia Laws 1969, Pages 50 and the following, and any amendments and regulations pursuant thereto", and the Contractor shall comply therewith. SC-9 i 2. High Voltage Act: I The Contractor by signing the contract acknowledges that he is fully aware of the contents and requirements of "Act No. 525, Georgia law 1960, and any amendments thereto, and Rules and Regulations of the commissioner of Labor pursuant thereto" (the I preceding requirements within quotation marks being hereinafter referred to as the "high voltage act"), and the Contractor shall comply therewith. The signing of Contract shall also confirm on behalf of the Contractor that he: IA. has visited the premises and has taken into consideration the location of all electrical power lines on and adjacent to all areas onto which the contract I documents require to permit the Contract either to work, to store materials, or to stage operations, and I B. that the Contractor has obtained from the Owner of the aforesaid electric power lines advice in writing as to the amount of voltage carried by the aforesaid lines. I The Contractor agrees that he is the "person or persons responsible for the work to be done" as referred to in the high voltage act and that accordingly the Contractor is solely "responsible for the completion of the safety measures which are required by Section 3 of I the high voltage act before proceeding with any work." The Contractor agrees that prior to the completion of precautionary measures required by the high voltage act he will neither bring nor permit the bringing of any equipment onto the site (or onto any area or I areas onto which the contract documents require or permit the Contractor to work, to store materials, or to stage operations) with which it is possible to come within eight feet of any high voltage line or lines pursuant to operations arising out of performance of the I Contract. The foregoing provisions apply to power lines located (a) on the site and (b) on any area or areas onto which the contract documents require or permit the Contractor either to work, to store materials, or to stage operations, or (c) within working distance I for equipment or materials, being used on (a) and (b) above. These provisions of the Contract do not limit or reduce the duty of the Contractor otherwise owed to the Owner, to other parties, or to both. The Contractor agrees that the foregoing provisions I supplement provisions of the General Conditions. The Contractor agrees and acknowledges that any failure on his part to adhere to the high voltage act shall not only be a violation of law but shall also be a breach of contract and specific violation of the Iprovisions of the General Conditions which pertains to safety precautions. 3. Occupational Safety& Health Act: IThe Contractor by signing the contract acknowledges that he is fully aware of the provisions of the Williams-Steiger Occupational Safety and Health Act of 1970 and he Ishall comply therewith. -28. EQUIVALENT MATERIALS: Notwithstanding any provision of the general conditions, there shall be no substitution of materials that are not determined to be equivalent to those indicated or required in the contract documents without an amendment to the contract. SC-10 i -29. AFTER HOURS INSPECTION: If the Contractor opts to work before or after normal working hours, 8 a.m. to 5 p.m., Monday through Friday, or on Augusta, Georgia Legal Holidays, then the Contractor must pay for the cost of inspection by the City of Augusta, Georgia and follow all necessary procedures listed in I "Section 15, Right-of-way Encroachment Guidelines, Part E, Outside of Normal Working Hours," of the Augusta-Richmond County Planning Commission Development Documents dated September, 1999, or latest version. If inspectors of Augusta-Richmond County are needed to work outside normal business hours, Augusta-Richmond County needs to be notified in advance. -30. SUPPLEMENT TO THE AGREEMENT: Ia) Defective pricing I To the extent that the pricing provided by CONTRACTOR is erroneous and defective, the parties may, by agreement, correct pricing errors to reflect the intent of the parties. b) Specified excuses for delay or non-performance CONTRACTOR is not responsible for delay in performance caused by hurricanes, tornadoes, floods, and other severe and unexpected acts of nature. In any such event, the contract price and Ischedule shall be equitably adjusted. c) Termination of the contract for default Failure of the CONTRACTOR, which has not been remedied or waived, to perform or otherwise comply with a material condition of the Agreement shall constitute default. Augusta, Georgia Imay terminate this contract is part or in whole upon written notice to the CONTRACTOR pursuant to this term. Id) Prohibition against contingent fees There shall be no contingent fees allowed under this contract. Ie) An acknowledgement by all parties contracting with Augusta, Georgia as follows: "Contractor acknowledges that this contract and any changes to it by amendment, modification, change order or other similar document may have required or may require the legislative authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, Contractor is deemed to possess knowledge concerning Augusta, Georgia's ability to assume contractual obligations and the consequences of Contractor's provision of goods or services to Augusta, Georgia under an unauthorized contract, amendment, modification, change order or other similar document, including the possibility that the Contractor may be precluded from recovering payment for such unauthorized goods or services. Accordingly, Contractor agrees that if it provides goods or services to Augusta, Georgia under a contract that has not received proper legislative authorization or if the Contractor provides goods or services to Augusta, Georgia in excess of the any contractually authorized goods or services, as required by Augusta, Georgia's Charter and Code, Augusta, Georgia may withhold payment for any unauthorized goods or Iservices provided by Contractor. Contractor assumes all risk of non-payment for the provision of sc-i i i Iany unauthorized goods or services to Augusta, Georgia, and it waives all claims to payment or to other remedies for the provision of any unauthorized goods or services to Augusta, Georgia, I however characterized, including, without limitation, all remedies at law or equity." This acknowledgement shall be a mandatory provision in all Augusta, Georgia contracts for goods and services, except revenue producing contracts. f) Use of Augusta, Georgia Landfill All contracts for contractors performing demolition and/or construction projects for Augusta, IGeorgia shall contain a provision requiring that all debris, trash and rubble from the project be transported to and disposed of at the Augusta, Georgia Solid Waste Landfill in accordance with local and state regulations. The contractor shall provide evidence of proper disposal through Imanifests, which shall include the types of material disposed of, the name and location of the disposal facility, date of disposal and all related fees. g) Federal Work Authorization Program All contractors and subcontractors entering into contracts with Augusta, Georgia for the physical I performance of services shall be required to execute an Affidavit verifying its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with Augusta, Georgia has registered with and is participating in a federal work Iauthorization program. All contractors and subcontractors must provide their E-Verify number and must be in compliance with the electronic verification of work authorized programs operated by the United States Department of Homeland Security or any equivalent federal work Iauthorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of I 1986 (IRCA), P.L. 99-603, in accordance with the applicability provisions and deadlines established in O.C.G.A. § 13-10-91 and shall continue to use the federal authorization program throughout the contract term. All contractors shall further agree that, should it employ or I contract with any subcontractor(s) in connection with the physical performance of services pursuant to its contract with Augusta, Georgia the contractor will secure from such subcontractor(s) each subcontractor's E-Verify number as evidence of verification of compliance I with O.C.G.A. § 13-10-91 on the subcontractor affidavit provided in Rule 300-10-01-.08 or a substantially similar form. All contractors shall further agree to maintain records of such compliance and provide a copy of each such verification to Augusta, Georgia at the time the subcontractor(s) is retained to perform such physical services. h) Owner Inspections IAll contracts shall provide that Augusta, Georgia may, at reasonable times, inspect the part of the plant,place of business, or work site of a contractor or subcontractor or subunit thereof which is Ipertinent to the performance of any contract awarded or to be awarded by Augusta, Georgia. i) Local Small Business In accordance with Chapter 10B of the AUGUSTA, GA. CODE, Contractor expressly agrees to collect and maintain all records necessary to for Augusta, Georgia to evaluate the effectiveness of its Local Small Business Opportunity Program and to make such records available to Augusta, IGeorgia. The requirements of the Local Small Business Opportunity Program can be found at SC-12 I www.augustaga.gov. In accordance with AUGUSTA, GA. CODE § 1-10-129(d) (7), for all contracts where a local small business goal has been established, the contractor is required to provide local small business utilization reports. Contractor shall report to Augusta, Georgia the total dollars paid to each local small business on each contract, and shall provide such payment affidavits, regarding payment to subcontractors as may be requested by Augusta, Georgia. Such documents shall be in the format specified by the Director of minority and small business opportunities, and shall be submitted at such times as required by Augusta, Georgia. Failure to provide such reports within the time period specified by Augusta, Georgia shall entitle Augusta, I Georgia to exercise any of the remedies set forth, including but not limited to, withholding payment from the contractor and/or collecting liquidated damages. I I I I I I I I I I SC-13