New Grant Proposal/Application
Before a Department/agency may apply for the grant/award on behalf of Augusta Richmond County,they must first obtain approval
signature from the Administrator and the Finance Director.The Administrator will obtain information on the grant program and
requirements from the funding agency and review these for feasibility to determine if this grant/award will benefit Augusta
Richmond County.The Finance Director will review the funding requirement to determine if the grant will fit within our budget
structure and financial goals.
Proposal Project No. Project Title
PR000040 TRANSIT 5307 CAPITAL AND OPERATING ASSISTANCE RtCtfYtu
Requesting Capital grant from the Federal Transit Administration for the ADMISTRATOWSOFRCE_._. ____
following:
1. Lease-Replacement-Capital Bus-Scope: 111-00;AU: 11.16.40(Rebuild AM 8 20S
Spare Parts/Associated Capital Maintenance Items. $200,000.00
2. Engineering&Design-Scope: 113-00;ALI: 11.31.11(Terminal,intermodal AUGUSTA-RICHMOND COUNTY
(Intercity Bus) S256,151.00
3. Surveillance/Security Equipment-Scope: 113-00;ALI: 11.32.07
(Acquisition of Security Equipment)550,544.00
4. Construction Bus Operations/Maintenance Facility-Scope: 114-00:
AL1: 11.43.03(Admin/Maint Facility)$3,297,728.00
5. Operating Assistance up to 50%Federal Share-Scope: 300-00:
AL1: 30.09.01 (Operating Assistance)$2,000,000.00
Cash Match: 20% Cash match funding source is from
54709-1216-3911101 -Op Tsfr from General Fund
EEO required(Y/N): No
EEO Department Notified: No
Start Date: 09/01/2016 End Date: 12/31/2020
Submit Date: 07/28/2016 Department: 091 Transit Cash Match?
Total Budgeted Amount: 5,804,423.00 Total Funding Agency: 4,043,538.00 Total Cash Match: 1,760,885.00
Sponsor: GM0005 Fed Transit Adm
Sponsor Type: F Federal
Purpose: 20 Public Transit Flow Thru ID:
Contacts
Type ID Name Phone
GMI015 pottery,Sharon (706)821-1818
Approvals
Type Date �
FA PAT STEPHENS 08/04/2016 Dept.Signature: .i.I /,J C ci s
Grant Coordin r Signature:
User: SDI 1404-SHARON DOTTERY Page Comma Date: 08/05/2016
Report: GM 1000_PROPOSAL-GM 1000:Grants Management:1 Carreat Time: 121:18:18
•
AUGUSTA,GEORGIA
New Grant Proposal/Application
Before a Department/agency may apply for the grant/award on behalf of Augusta Richmond Comity,they must first obtain approval
signature from the Administrator and the Finance Director.The Administrator will obtain information on the grant program sad
requirements from the funding agency and review these for feasibility to determine if this grant/award will benefit Augusta
Richmond County.The Finance Director wW review the finding requirement to determine if the grant will fit within our budget
structure and financial goab.
Proposal Project No. Project Title
1.) I have reviewed the Grant application and enclosed materials and:
d ind the grant/award to be feasible to the needs of Augusta Richmond County
° Deny the request
/QMMz/9 WJ LcG/)tA eY-c--'l co
Finance Director Date
2.) i reviewed the Grant application and enclosed materials and:
Approve the Department Agency to move forward with the application
° I lily the request 1
I�`
I �i�.,.� l q i i .
A. IP'strator Date
Tb orm will also be used to Ovide the external auditors with information on all grants for compliance sad
certification requirements as required by the State and Federal Government. .
User: SD11404-SHARON DOTTERY Pare Current Date: 08/05/2016
Report: GM 1000_PROPOSAL-GM 1000:Grants Management:2 Carnal Tine: I2:08:18
View Print Page 1 of 12
DOT FTA
U.S. Department of Transportation Federal Transit Administration
Application
Federal Award Identification Number(FAIN) 2016-2016-2
Temporary Application Number 2016-2016-2
Application Name FY14 and FY15 Capital and Operating Assistance
Application Status Transmitted/Ready for FTA Review
Application Budget Number 0
Part 1 : Recipient Information
Name: Augusta-richmond, County Of
Recipient ID Recipient OST Type Recipient Alias Recipient DUNS
2016 City AUGUSTA RICHMOND COUNTY GEORGIA 073438418
Location Type Address City State Zip
Headquarters 535 TELFAIR ST AUGUSTA GA 309012371
Physical Address 535 TELFAIR ST AUGUSTA GA 30901
Mailing Address DONNA WILLIAMS AUGUSTA GA 30901
Union Information
Union Name NONE
Address 1
Address 2
City
State
Zipcode
Contact Name NONE
Telephone
Fax
E-mail
Website
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 2 of 12
Part 2: Application Information
Title: FY14 and FY15 Capital and Operating Assistance
FAIN Application Status Application Date Last Updated From
Type Created Date TEAM?
2016- Transmitted/Ready for FTA Grant 7/28/2016 7/28/2016 No
2016-2 Review
Application Executive Summary
This grant is for the use of 5307 FY14$3,281,192 and FY15$2,523,230. The total amount of FTA funds
applied for in this grant is$5.804.423.Augusta Public Transit Department(APT) is in the process of re-
locating its current Administration and Bus maintenance Facility to a South Augusta location at 2844
Regency Blvd and 2413 Jennings Road. APT has hired the Engineering&Architectural Firm Wendel Co. of
Richmond VA for the designed of the facility.This a design, bid and build project estimated to cost
approximately$14,000,000. This grant will be used in combination with previously approved grants, GA-90-
X300-00, GA-90-X307-00, GA-90-X320-00, GA-90-X330-00 and GA-04-0034-00 and GA-90-X343-00. All of
the previous grants along with this grant will provide for the total funding of the project including the 20%
match.
1. Estimated: Start Date: September 1, 2016; End Date: December 31, 2018.
2. This application does not include funds for Research and/or Development Activities.
3. Indirect Cost will not be applied to this application and its scope of work.
4. The Application Section 5307 Federal Assistance is allocated to the Recipient,the Designated Recipient
has assigned these funds to the Recipient and have attached the Split Letter illustrating which of the funds
are allocated to Augusta and which to Lower Savannah COG.
5. Source of Local Funds: 20%and 50% match funds will be allocated through Augusta's General Fund.
Delinquent Federal Debt
No, my organization does not have delinquent federal debt.
Requires E.O. 12372 Review
No, this application does not require E.O. 12372 Review.
Subject to Pre-Award Authority
Yes, this application is subject to Pre-Award Authority.
Application Point of Contact Information
First Name Last Name Title E-mail Address Phone
Christopher White Christopher.White@dot.gov (404)865-5619
Sharon Dottery transit contract manger sdottery@augustaga.gov 706-821-1818
Valencia Williams valencia.williams@dot.gov (404)865-5634
Application Budget Control Totals
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula(FY2013 5307-2A 20507 $4,043,538
and forward)
Local $1,760,885
Local/In-Kind $0
State $0
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 3 of 12
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $5,804,423
Application Budget
Project Budget Item FTA Amount Non-FTA Total Eligible Quantity
Number Amount Amount
2016-2016- 111-
2-P1 00 BUS-ROLLING STOCK $160,000.00 $40,000.00 $200,000.00 0
(111-)
2016-2016- 11.16.40 LEASE ASSOC CAP $160,000.00 $40,000.00 $200,000.00 0
2-P1 MAINT ITEMS
2016-2016- 113- BUS-
2-P1 00 STATION/STOPS/TERMINALS $245,356.00 $61,339.00 $306,695.00 100
(113-)
2016-2016- TERMINAL,
2-P1 11.31.11 INTERMODAL $204,921.00 $51,230.00 $256,151.00 0
(INTERCITY BUS)
2016-2016- ACQUIRE-
2-P1 11.32.07 SURVEIL/SECURITY $40,435.00 $10,109.00 $50,544.00 100
EQUIP
2016-2016- 114- BUS: SUPPORT EQUIP AND
2-P1 00 FACILITIES $2,638,182.00 $659,546.00 $3,297,728.00 0
(114-)
2016-2016- CONSTRUCT-
2-P1 11.43.03 ADMIN/MAINT $2,638,182.00 $659,546.00 $3,297,728.00 0
FACILITY
2016-2016- 300-
2-P1 00 OPERATING ASSISTANCE $1,000,000.00 $1,000,000.00 $2,000,000.00 0
(300-)
2016-2016- 30.09.01 UP TO 50% $1,000,000.00 $1,000,000.00 $2,000,000.00 0
2-P1 FEDERAL SHARE
Earmark and Discretionary Allocations
This application does not contain earmarks or discretionary allocations.
Sources of Federal Financial Assistance
This application does not contain any sources of federal financial assistance.
Part 3: Project Information
Project Title: Capital/Operational Assistance Grant
Project Number Temporary Project Number Date Created Start Date End Date
2016-2016-2-P1 2016-2016-2-P1 7/28/2016 9/1/2016 12/31/2018
file:///C JUsers/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 4 of 12
Project Description
This project contains five (5)projects to aid and assist APT in its operations. The funds will be used to
purchase Surveillance and Security Equipment. Assist in construction of the new Bus
Administration/Maintenance Facility, A/E for the Intermodal Terminal, Operation assistance and Lease
Replacement Capital Bus to Rebuild spare parts, engines, associated capital maintenance items. Useful life
of 200,000 to 250,000 miles per replacements. All purchases will be separate contracts.
Project Benefits
The Project will involve construction of a new Operations and Maintenance Facility for APT which will
accommodate a growing fleet of buses and allow for future expansion and maintenance of those buses.
The proximity of this location is ideal when considering the anticipated growth of APT, and the location
within the established light industrial area (former mall area)will conform with existing zoning and the use of
an underutilized property, coupled with impacts to surrounding uses being minimal.
Additional Information
APT strives to enhance their image in the community and provide efficient and reliable transportation service.
By working to improve the correlation between service levels and current demand, service should increase.
Location Description
APT's new transit facility will be located at 2844 Regency Boulevard,Augusta GA 30904. Once complete, the
facility will
encompass a total of 30,124 square feet, of which 20,783 square feet will be comprised of bus maintenance
operations, 2,325 square feet designated for administrative and office space use, 1,885 square feet for
operations, and 5,130 square feet in shared area use. There will be space to accommodate 40 buses to be
housed on site, and additional space to accommodate 9 transit support vehicles. Employee parking will total
86 spaces, with 4 visitor parking spaces for a total of 90 parking stalls on the site. The lot size located at 2844
Regency Boulevard is 4.9 acres in size.
Security
Yes--our organization will expend at least 1%of the 5307 funds in this application for security-related
projects
Project Location (Urbanized Areas)
UZA Code Area Name
139540 Augusta-Richmond County, GA-SC
Congressional District Information
State District Representative
Georgia 2 Sanford D Bishop
Georgia 9 Doug Collins
Project Control Totals
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula(FY2013 5307-2A 20507 $4,043,538
and forward)
Local $1,760,885
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 5 of 12
Transportation Development Credit $0
Total Eligible Cost $5,804,423
Project Budget
Project Budget Item FTA Amount Non-FTA Total Eligible Quantity
Number Amount Amount
2016- 111-
2016-2- 00 BUS-ROLLING STOCK $160,000.00 $40,000.00 $200,000.00 0
P1 (111-)
2016- LEASE ASSOC CAP
2016-2- 11.16.40 MAINT ITEMS $160,000.00 $40,000.00 $200,000.00 0
P1
2016- 113- BUS-
P016 2 (113-) STATION/STOPS/TERMINALS $245,356.00 $61,339.00 $306,695.00 100
12016- TERMINAL,
2016-2- 11.31.11 INTERMODAL $204,921.00 $51,230.00 $256,151.00 0
P1 (INTERCITY BUS)
2016- ACQUIRE-
2016-2- 11.32.07 SURVEIUSECURITY $40,435.00 $10,109.00 $50,544.00 100
P1 EQUIP
2016- 114- BUS: SUPPORT EQUIP AND
2116-2 00 4-) FACILITIES $2,638,182.00 $659,546.00 $3,297,728.00 0
2016- CONSTRUCT-
2016-2- 11.43.03 ADMIN/MAINT $2,638,182.00 $659,546.00 $3,297,728.00 0
P1 FACILITY
2016- 300-
2016-2- 00 OPERATING ASSISTANCE $1,000,000.00 $1,000,000.00 $2,000,000.00 0
P1 (300-)
2016- UP TO 50%
2016-2- 30.09.01 FEDERAL SHARE $1,000,000.00 $1,000,000.00 $2,000,000.00 0
P1
Project Budget Activity Line Items
Budget Activity Line Item: 30.09.01 -UP TO 50% FEDERAL SHARE
Scope Name I Code Line Item Custom Item Name Activity Quantity
OPERATING ASSISTANCE UP TO 50% FEDERAL OPERATING
(300-00) 30.09.01 SHARE ASSISTANCE 0
Extended Budget Description
This line activity item will aid in operational cost of Augusta Public Transit for a period of two years January 1,
2017 -December 31,2017.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 6 of 12
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula (FY2013
5307-2A 20507 $1,000,000
and forward)
Local $1,000,000
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $2,000,000
Milestone Name Est. Completion Description
Date
This line activity item will aid in operational cost of
Start Date 1/1/2017 Augusta Public Transit for a period of two years January
1,2017-December 31,2017.
This line activity item will aid in operational cost of
End Date 12/29/2017 Augusta Public Transit fora period of two years January
1, 2017-December 31,2017.
Budget Activity Line Item: 11.43.03-CONSTRUCT-ADMIN/MAINT FACILITY
Scope Name/Code Line Item Custom Item Name Activity Quantity
BUS: SUPPORT EQUIP CONSTRUCT- CONSTRUCTION OF BUS
AND FACILITIES(114-00) 11.43.03 ADMIN/MAINT SUPPORT EQUIP/FACIL 0
FACILITY
Extended Budget Description
Augusta Public Transit Administration/Maintenance Buildings will be relocating to a South Augusta site at
2844 Regency Blvd and 2413 Jennings Road located behind the old Regency Mall. The useful life of the
building is 40 years.
The Project will involve construction of a new Operations and Maintenance Facility for APT which will
accommodate a growing fleet of buses and allow for future expansion and maintenance of those buses. The
proximity of this location is ideal when considering the anticipated growth of APT, and the location
within the established light industrial area(former mall area)will conform with existing zoning and the use of
an underutilized property, coupled with impacts to surrounding uses being minimal.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula (FY2013 5307-2A 20507 $2,638,182
and forward)
Local $659,546
Local/In-Kind $0
State $0
State/In-Kind $0
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 7 of 12
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $3,297,728
Milestone Name Est.Completion Description
Date
Start Date 12/31/2017 Estimated start of the utilization of funds for the Bus
Administrative/Maintenance Facility.
End Date 5/18/2018 Estimated completion of project.
Budget Activity Line Item: 11.32.07-ACQUIRE-SURVEIL/SECURITY EQUIP
Scope Name/Code Line Custom Item Name Activity Quantity
Item#
BUS- ACQUIRE- ACQUISITION -BUS
STATION/STOPS/TERMINALS 11.32.07 SURVEIUSECURITY STATIONS/TERMINALS 100
(113-00) EQUIP
Extended Budget Description
This will be used to purchase security keypads to points of entry/exit for the APTs Administration
Building/Maintenance Facility and Transfer Facility. Estimated life expectancy is 6 years.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula (FY2013 5307-2A 20507 $40,435
and forward)
Local $10,109
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $50,544
Milestone Name Est.Completion Description
Date
This will be used to purchase security keypads to points
Start Date 3/31/2017 of entry/exit for the APT's Administration
Building/Maintenance Facility and Transfer Facility.
Estimated life expectancy is 6 years.
Estimated completion of purchase of security keypads to
End Date 12/31/2017 points of entry/exit for the APTs Administration
Building/Maintenance Facility and Transfer Facility.
Estimated life expectancy is 6 years.
Budget Activity Line Item: 11.31.11 -TERMINAL, INTERMODAL(INTERCITY BUS)
Scope Name 1 Code Custom Item Name Activity Quantity
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 8 of 12
Line
Item#
BUS- TERMINAL, ENGINEERING& DESIGN -
STATION/STOPS/TERMINALS 11.31.11 INTERMODAL BUS STATION 0
(113-00) (INTERCITY BUS) STOPS/TERMINALS
Extended Budget Description
Engineering/Design work will be needed for plans to relocate the current Transfer Facility to Closer proximity
to the downtown area.
Augusta Public Transit current Transfer facility is in the process of trying to relocate to an area loser to the
central business district in downtown Augusta. The present site area is being redeveloped and Engineering
and Design work will be needed to help with this transition. The activities included in the Engineering and
Design are hiring a firm, performing soil analysis, conducting an environmental assessment, designing the
facilities and locating a site. The design will be for Augusta's Terminal to have a useful life of 30-40 years.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
Funding Source Section of CFDA Amount
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula (FY2013 5307-2A 20507 $204,921
and forward)
Local $51,230
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $256,151
Milestone Name Est.Completion Description
Date
Start Date 12/31/2017 Estimated date to start project.
End Date 6/30/2018 Estimated completion of first part of process.
Budget Activity Line Item: 11.16.40-LEASE ASSOC CAP MAINT ITEMS
Scope Name I Code Line Item Custom Item Name Activity Quantity
BUS- ROLLING LEASE ASSOC CAP LEASE - REPLACEMENT-
STOCK(111-00) 11.16.40 MAINT ITEMS CAPITAL BUS 0
Extended Budget Description
Rebuilding of engines, transmission and other major capital expenses. Useful life of 200,000 to 250,000 miles
per replacements. All purchases will be separate contracts.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
Propulsion Fuel Type Vehicle Condition Vehicle Size(ft.)
N/A N/A N/A
Funding Source Amount 1
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 9 of 12
Section of CFDA
Statute Number
49 USC 5307-(MAP 21) Urbanized Area Formula (FY2013 5307-2A 20507 $160,000
and forward)
Local $40,000
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $200,000
Milestone Name Est.Completion Description
Date
Rebuilding engines, transmissions and other major capital
RFP/IFB Issue Date 9/1/2016 expenses. Useful life of 200,000 to 250,000 miles per
replacements.
Rebuilding engines, transmissions and other major capital
Contract Award Date 12/30/2016 expenses. Useful life of 200,000 to 250,000 miles per
replacements.
Rebuilding engines, transmissions and other major capital
Initial Delivery Date 4/30/2017 expenses. Useful life of 200,000 to 250,000 miles per
replacements.
Rebuilding engines, transmissions and other major capital
Final Delivery Date 8/31/2017 expenses. Useful life of 200,000 to 250,000 miles per
replacements.
Contract Completion Rebuilding engines, transmissions and other major capital
Date 12/31/2018 expenses. Useful life of 200,000 to 250,000 miles per
replacements.
Project Environmental Findings
Finding: Class II(c)-Categorical Exclusions(C-List)
Class Level Description
Class II(c)consists of projects called categorical exclusions(CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 05:Activities, including repairs, replacements, and rehabilitations, designed to promote transportation
safety, security, accessibility and effective communication within or adjacent to existing right-of-way, such
as: the deployment of Intelligent Transportation Systems and components; installation and improvement of
safety and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles, facilities or structures, or
upgrading to current standards.
Date Description Date
Class Ilc CE Approved
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 10 of 12
Scope Name/Code Line Item Line Item Name Quantity FTA Total Eligible
Number Amount Cost
BUS-ROLLING 11.16.40 LEASE ASSOC CAP 0 $160,000.00 $200,000.00
STOCK(111-00) MAINT ITEMS
Finding: Class 11(c)-Categorical Exclusions(C-List)
Class Level Description
Class 11(c)consists of projects called categorical exclusions(CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 05:Activities, including repairs, replacements, and rehabilitations, designed to promote transportation
safety, security, accessibility and effective communication within or adjacent to existing right-of-way, such
as:the deployment of Intelligent Transportation Systems and components; installation and improvement of
safety and communications equipment, including hazard elimination and mitigation; installation of passenger
amenities and traffic signals; and retrofitting existing transportation vehicles,facilities or structures, or
upgrading to current standards.
Date Description Date
Class Ilc CE Approved
Scope Name/Code Line Item Line Item Name Quantity FTA Total
Number Amount Eligible Cost
BUS- TERMINAL,
STATION/STOPS/TERMINALS 11.31.11 INTERMODAL 0 $204,921.00 $256,151.00
(113-00) (INTERCITY BUS)
Finding: Class II(c)-Categorical Exclusions(C-List)
Class Level Description
Class II(c)consists of projects called categorical exclusions(CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 07:Acquisition, installation, rehabilitation, replacement, and maintenance of vehicles or equipment,
within or accommodated by existing facilities,that does not result in a change in functional use of the
facilities, such as: equipment to be located within existing facilities and with no substantial off-site impacts;
and vehicles, including buses, rail cars, trolley cars, ferry boats and people movers that can be
accommodated by existing facilities or by new facilities that qualify for a categorical exclusion.
Date Description Date
Class Ilc CE Approved
Line Item FTA Total
Scope Name/Code Number Line Item Name Quantity Amount Eligible
Cost
BUS- ACQUIRE-
STATION/STOPS/TERMINALS 11.32.07 SURVEIL/SECURITY 100 $40,435.00 $50,544.00
(113-00) EQUIP
file:///C:/Users/sd 11404/Documents/TRANSIT%20C ONTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 11 of 12
Finding: Class II(c)-Categorical Exclusions(C-List)
Class Level Description
Class II(c)consists of projects called categorical exclusions(CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 09:Assembly or construction of facilities that is consistent with existing land use and zoning
requirements(including floodplain regulations)and uses primarily land disturbed for transportation use,such
as: buildings and associated structures; bus transfer stations or intermodal centers; busways and streetcar
lines or other transit investments within areas of the right-of-way occupied by the physical footprint of the
existing facility or otherwise maintained or used for transportation operations; and parking facilities.
Date Description Date
Class Ilc CE Approved
Scope Name/Code Line Item Line Item Name Quantity FTA Amount Total Eligible
Number Cost
BUS: SUPPORT EQUIP CONSTRUCT-
AND FACILITIES(114- 11.43.03 ADMIN/MAINT 0 $2,638,182.00 $3,297,728.00
00) FACILITY
Finding: Class II(c) -Categorical Exclusions(C-List)
Class Level Description
Class II(c)consists of projects called categorical exclusions(CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 04: Planning and administrative activities which do not involve or lead directly to construction, such as:
training, technical assistance and research; promulgation of rules, regulations, directives, or program
guidance; approval of project concepts; engineering; and operating assistance to transit authorities to
continue existing service or increase service to meet routine demand.
Date Description Date
Class llc CE Approved
Scope Name/Code Line Item Line Item Name Quantity FTA Amount Total Eligible
Number Cost
OPERATING 30.09.01 UP TO 50% 0 $1,000,000.00 $2,000,000.00
ASSISTANCE(300-00) FEDERAL SHARE
Part 4: Fleet Details
No fleet data exists for this application.
Part 5: FTA Review Comments
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 12 of 12
Application Review Comments
Comment By Valencia Williams
Comment Type FTA Post Review Comments for Grantee
Date 9/9/2016
Address the following oversight comment:
Comment 11.16.40-LEASE ASSOC CAP MAINT ITEMS
Please specify whether or not any items over$5K are anticipated for purchase, and if so,
specify useful life.
file:///C:/Users/sd 11404/Documents/TRANSIT%20C ONTRACT%20MANAGER/2016%... 9/23/2016
•
AUGUSTA,GEORGIA
New Grant Proposal/Application
Before a Department/agency may apply for the grant/award on behalf of Augusta Richmond County,they mast first obtain approval
signature from the Administrator and the Finance Director.The Administrator will obtain information on the grant program and
requirements from the funding agency and review these for feasibility to determine if this grant/award will benefit Augusta
Richmond County.The Finance Director will review the funding requirement to determine if the grant will fit within our budget
structure and financial goals.
Proposal Project No. Project Tide RID
PR000041 TRANSIT 5339 CAPITAL GRANT AmbeNsTRATars OFFS
Requesting Capital grant from the Federal Tranesit Administration for the
building of APT's Bus Operations and Maintenance Facility
AUG 20111
Cash Match: 20% Cash match funding source is from 54709-1217-3911101 -Op 8
Tsfr from General Fund AA'���++',MAn' g�ymm COUNT/EEO required(Y/N): No AUGUSWRICHMOND COUN /
EEO Department Notified: No
Start Date: 09/01/2016 End Date: 12/31/2020
Submit Date: 08/04/2016 Department: 091 Transit Cub Match? Y
Total Budgeted Amount: 1,151,728.00 Total Funding Agency:
921,382.00 Total Cash Match: 230,346.00
Sponsor: GM0005 Fed Transit Adm
Sponsor Type: F Federal
Purpose: 20 Public Transit Flow Thru ID:
Contacts
Type_ II) Name Phone
1 GM1015 pottery,Sharon (706)821-1818
Approvals
Type Date
FA PAT STEPHENS 08/04/2016 Dept.Signature. ..�,
Grant Coordin Signature: j Z-it
1.) I have reviewed the Grant application and enclosed materials and:
and the grant/award to be feasible to the needs of Augusta Richmond County
o Deny the request
civL•xbef(.sr1•..Q(G."4 &-*--i(.
Finance Director Date
2.) 1 have reviewed the Grant application and enclosed materials and:
Approve the Department Agency to move forward with the application
onyzesl
___Z. ti.j........_
A nistrator Date
T orm will also be used to provide the external auditors with information on all grants for compliance and
e ficadon requirements as required by the State and Federal Government.
User: SDI 1404-SHARON DOTTERY Page Correa(Dote: 08A4r2016
Report: GM 1000_PROPOSAL-GM 1000:Grants Management:i Current lime: 18:11:07
View Print Page 1 of 6
DOT FTA
U.S. Department of Transportation Federal Transit Administration
Application
Federal Award Identification Number(FAIN) 2016-2016-1
Temporary Application Number 2016-2016-1
Application Name FY 13, 14, 15, 16 5339 CAPITAL GRANT ASSISTANCE
Application Status Transmitted/Ready for FTA Review
Application Budget Number 0
Part 1 : Recipient Information
Name: Augusta-richmond, County Of
Recipient ID Recipient OST Type Recipient Alias Recipient DUNS
2016 City AUGUSTA RICHMOND COUNTY GEORGIA 073438418
Location Type Address City State Zip
Headquarters 535 TELFAIR ST AUGUSTA GA 309012371
Physical Address 535 TELFAIR ST AUGUSTA GA 30901
Mailing Address DONNA WILLIAMS AUGUSTA GA 30901
Union Information
Union Name NONE
Address 1
Address 2
City
State
Zipcode
Contact Name NONE
Telephone
Fax
E-mail
Website
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 2 of 6
Part 2: Application Information
Title: FY 13, 14, 15, 16 5339 CAPITAL GRANT ASSISTANCE
FAIN Application Status Application Date Last Updated From
Type Created Date TEAM?
2016- Transmitted/Ready for FTA Grant 7/28/2016 7/28/2016 No
2016-1 Review
Application Executive Summary
This grant is for 5339 FY13, $323,215; FY14, $339,594; FY15, $248,344 and FY16, $240,576 for a total of
$1,151,728. The FY 13 is lapsing funds. The Federal Share is$$921,383 and the Local Share is$230,346.
The Capital Assistance Grant will be used to build an Administrative/Maintenance Facility. The Facility will be
located at 2844 Regency Blvd and 2413 Jennings Road behind the Old Regency Mall.
1. Estimated: Start Date: March 1, 2017; End Date: May 31, 2018.
2. This application does not include funds for Research and/or Development Activities.
3. Indirect Cost will not be applied to this applications and its scope of work.
4. The Application Section 5339 Federal Assistance is allocated to the Recipient,the Designated Recipient
has assigned these funds to the Recipient and have attached the Split Letter illustrating which of the funds
are allocated to Augusta and which to Lower Savannah COG.
5. Source of Local Funds: 20% match funds will be allocated through Augusta's General Fund.
Delinquent Federal Debt
No, my organization does not have delinquent federal debt.
Requires E.O. 12372 Review
No, this application does not require E.O. 12372 Review.
Subject to Pre-Award Authority
Yes, this application is subject to Pre-Award Authority.
Application Point of Contact Information
First Name Last Name Title E-mail Address Phone
Christopher White Christopher.White@dot.gov (404)865-5619
Sharon Dottery transit contract manger sdottery@augustaga.gov 706-821-1818
Valencia Williams valencia.williams@dot.gov (404)865-5634
Application Budget Control Totals
Funding Source Section of CFDA Amount
Statute Number
49 USC 5339-(MAP 21) Bus and Bus Facilities Formula 5339-1 20526 $921,382
(FY2013& Fwd)
Local $230,346
Local/in-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 3 of 6
(Total Eligible Cost $1,151,728 1
Application Budget
Project Number Budget Item FTA Non-FTA Total Eligible Quantity
Amount Amount Amount
114- BUS: SUPPORT EQUIP
2016-2016-1-P1 00 AND FACILITIES $921,382.00 $230,346.00 $1,151,728.00 0
(114-)
CONSTRUCT
2016-2016-1-P1 11.43.03 ADMIN/MAINT $921,382.00 $230,346.00 $1,151,728.00 0
FACILITY
Earmark and Discretionary Allocations
This application does not contain earmarks or discretionary allocations.
Sources of Federal Financial Assistance
This application does not contain any sources of federal financial assistance.
Part 3: Project Information
Project Title: Administrative/Maintenance Facility Construction
Project Number Temporary Project Number Date Created Start Date End Date
2016-2016-1-P1 2016-2016-1-P1 7/28/2016 3/1/2017 5/31/2018
Project Description
Augusta Public Transit Administration/Maintenance Buildings will be relocating to a South Augusta site at
2844 Regency Blvd and 2413 Jennings Road located behind the old Regency Mall. The useful life of the
building is 40 years
Project Benefits
The Project will involve construction of a new Operations and Maintenance Facility for APT which will
accommodate a growing fleet of buses and allow for future expansion and maintenance of those buses.
The proximity of this location is ideal when considering the anticipated growth of APT, and the location
within the established light industrial area(former mall area)will conform with existing zoning and the use
of an under utilized property, coupled with impacts to surrounding uses being minimal.
Additional Information
APT strives to enhance their image in the community and provide efficient and reliable transportation service.
By working to improve the correlation between service levels and current demand, service should increase.
Location Description
APT's new transit facility will be located at 2844 Regency Boulevard,Augusta GA 30904.The facility will
encompass a total of 30,124 square feet, of which 20,783 square feet will be comprised of bus maintenance
operations, 2,325 square feet designated for Administrative and office space use,1,885 square feet for
operations, and 5,130 square feet in shared area use. There will be space
to accommodate 40 buses to be housed on site, and additional space to accommodate 9 transit support
vehicles. Employee parking will total 86 spaces, with 4 visitor parking spaces for a total of 90 parking stalls on
the site.
Project Location (Urbanized Areas)
file:///C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 4 of 6
UZA Code Area Name
139540 Augusta-Richmond County, GA-SC
Congressional District Information
State District Representative
Georgia 2 Sanford D Bishop
Georgia 9 Doug Collins
Project Control Totals
Funding Source Section of CFDA Amount
Statute Number
49 USC 5339-(MAP 21) Bus and Bus Facilities Formula 5339-1 20526 $921,382
(FY2013& Fwd)
Local $230,346
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $1,151,728
Project Budget
Project Number Budget Item FTA Non-FTA Total Eligible Quantity
Amount Amount Amount
114- BUS: SUPPORT EQUIP
2016-2016-1-P1 00 AND FACILITIES $921,382.00 $230,346.00 $1,151,728.00 0
(114-)
CONSTRUCT
2016-2016-1-P1 11.43.03 ADMIN/MAINT $921,382.00 $230,346.00 $1,151,728.00 0
FACILITY
Project Budget Activity Line Items
Budget Activity Line Item: 11.43.03-CONSTRUCT-ADMINIMAINT FACILITY
Scope Name/Code Line Item Custom Item Name Activity Quantity
CONSTRUCT-
BUS: SUPPORT EQUIP CONSTRUCTION OF BUS
AND FACILITIES (114-00) 11.43.03 ADMIN/MAINT SUPPORT EQUIP/FACIL 0
FACILITY
file:///C:/Users/sd 11404/Documents/TRANS IT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 5 of 6
Extended Budget Description
Augusta Public Transit Administration/Maintenance Buildings will be relocating to a South Augusta site at
2844 Regency Blvd and 2413 Jennings Road located behind the old Regency Mall. The useful life of the
building is 40 years.
The Project will involve construction of a new Operations and Maintenance Facility for APT which will
accommodate a growing fleet of buses and allow for future expansion and maintenance of those buses. The
proximity of this location is ideal when considering the anticipated growth of APT, and the location
within the established light industrial area (former mall area)will conform with existing zoning and the use of
an under utilized property, coupled with impacts to surrounding uses being minimal.
Will 3rd Party contractors be used to fulfill this activity line item?
No, 3rd Party Contractors will not be used for this line item.
Funding Source Section of CFDA Amount
Statute Number
49 USC 5339-(MAP 21) Bus and Bus Facilities Formula 5339-1 20526 $921,382
(FY2013&Fwd)
Local $230,346
Local/In-Kind $0
State $0
State/In-Kind $0
Other Federal $0
Transportation Development Credit $0
Total Eligible Cost $1,151,728
Milestone Name Est.Completion Description
Date
Start Date 3/1/2017 Estimated start of the utilization of funds for the Bus
Administrative/Maintenance Facility.
End Date 5/31/2018 Estimated completion of the Bus
Administrative/Maintenance Facility.
Project Environmental Findings
Finding: Class II(c)-Categorical Exclusions(C-List)
Class Level Description
Class II(c)consists of projects called categorical exclusions (CEs)which are known not to have, either
individually or cumulatively, a significant environmental impact on the human or natural environment and are
therefore categorically excluded from the requirement to prepare an environmental assessment or an
environmental impact statement. Class II(c)does not require documentation.
Categorical Exclusion Description
Type 09: Assembly or construction of facilities that is consistent with existing land use and zoning
requirements(including floodplain regulations)and uses primarily land disturbed for transportation use, such
as: buildings and associated structures; bus transfer stations or intermodal centers; busways and streetcar
lines or other transit investments within areas of the right-of-way occupied by the physical footprint of the
existing facility or otherwise maintained or used for transportation operations; and parking facilities.
Date Description Date
Class Ilc CE Approved
file:/I/C:/Users/sd 11404/Documents/TRANSIT%2000NTRACT%20MANAGER/2016%... 9/23/2016
View Print Page 6 of 6
Part 4: Fleet Details
No fleet data exists for this application.
Part 5: FTA Review Comments
There are no review comments to display at this time.