HomeMy WebLinkAboutCHANGE ORDER #1 TO CONTRACT BEWEEN AUGUSTA REGIONAL AIRPORT AND REEVES CONSTRUCTION CO FOR CREDIT CARD LOT REPAIRS • CHANGE ORDER NUMBER 1 OWNER: { Augusta Regional Airport CONTRACTOR: Reeves Construction Company 1501 Aviation Way P.O. Box 1120 Augusta, Georgia 30906 Augusta, GA 30903 PROJECT NAME4 Credit Card Lot Repairs CONTRACT DATE: August 20, 2014 PROJECT NUMBER: NO WORK COV 1' ED BY THIS CHANGE ORDER MAY PROCEED UNTIL CONTRACTOR IS IN RECEIPT OF A COPY FULLY EXECUTED BY E CONTRACTOR, THE OWNER AND THE ENGINEER. IF CONTRACTOR IS IN AGREEMENT WITH THIS CHANGE, CON ° ACTOR SHOULD EXECUTE ALL COPIES AND RETURN ALL COPIES TO THE CONSTRUCTION PROJECT MANAGER WITH SEVEN (1) CALENDAR DAYS. THIS CHANGE WILL INCREASE OR DECREASE THE CONTRACT AMOUNT AND TIME TO CO . PLETE BY THE AMOUNT SHOWN BELOW. THE GENERAL, SUPPL1NTARY AND OTHER CONDITIONS OF THE CONTRACT HALL APPLY TO THIS CHANGE ORDER UNLESS EXPRESSLY MODIFIED BY THIS CHANGE. DESCRIPTION OF, CHANGE: Changes to the project are for equipment that was purchased by the Airport for installation by the Contractor. Additional Items include conduits for future connections to minimize disturbance of the area In the future. Additional Inf , mutton has be - n attached. •.s, MRut421t1,;t '00 OT PRICE , •336100.°0 APPROVED • 4 T •. • NS . D. 10 S TO DATE NINIMMIMINME 0:00 AMOU OF TH S. CH rE.• ° DER 26 .2 , 4 LEVI . - •� �1 .60 iZa... ; 2 i • " CHANGE BORDER • . ,0 °us IN P • NTINACT PRICE 3, e TOTAL • ° D..E - ° « A C E OF ORIGIN : CONTRACT -PRICE 8.00% b ° GINAL TO A. 0 • NT CT CALENDAR DAYS 45 IETZLina ft *A .1 113 • •,. 8 '• 0N8 'PREVIOUS CHANGE ORDERS p CALENDAR DAY A • b1TMONS •. t 'ETIONS THIS CHANGE ORDER 5 REVISED TOTA CONTRACT CALENDAR D YS so CONTRACTOR 'CKNOWLEDGES, BY ITS EXECUTION AND ACCEPTANCE OF THIS CHANGE ORDER, THAT THE ADJUSTMENTS 1 CONTRACT PRICE AND TIME SHOWN HEREON CONSTITUTES FULL AND COMPLETE COMPENSATION AND SATISFACTION F R ALL COSTS AND MODIFICATIONS OF PERFORMANCE TIME INCURRED BY THE OONTRACTOR AS A RESULT OF THIS; CHANGE ORDER. NO OTHER CLAIM FOR INCREASED COST OF PERFORMANCE OR MODIFICATIONS OF • TIME WILL BE GRKNTED BY THE OWNER FOR THIS WORK COVERED BY THIS CHANGE. THE CONTRACTOR HEREBY WAIVES AND RELEASE ANY FURTHER CLAMS FOR COST OR TIME AGAINST THE OWNER ARISING FROM OR RELATING TO THE MATTERS OF WORK SET FORTH OR CONTEMPLATED BY THIS CHANGE ORDER. CO • R'S CCEPTANCE Contra < or: A 4 : Construction Company q /� Ii_. -low • .VA/ Ls _ { �o SIg atur - Date 4 Vtw 1"'1 u , (t. Printed Name the AIE RECOMMENE ED FOR APPROVAL Engineer. Mead & Hunt, Inc. c �3 .20 Gary Slo, ed. P.E. Proiet Manaoer Typed This I AIRPORT'S ACCEPTANCE Engineer: Au Ainp Comm oh Signature Date • Doug Uv J v Aviation Commission Chair Typed Nee Title CHANGE ORDER NUM 1 OWNER: Augusta Regional Air CONTRACTOR: Reeves Construction Company 1501 Av Way P.O Box 1129 Augusta, Geor 30906 Augusta, Constr GA 30903 PROJECT PR NAME: Credit Card Lo Repairs CON DATE: August 20, 2014 OJECT NUMBER: Description of Quant Changes, Cost C hanges tif • CHANGES Jus TO EXISTIN I TEMS B BID 1 Base Bid De — Gate Contro materials and furnished by Airpo ADD / (DELETE) : 1 LS @ ($58,282.00) COST ADDITION / (DELETION): ($58,282.00) Justification: The Airport had procured the equipment for installation prior to the biddi of the work. 2. Place Gate Controllers (owner supplied materials). ADD / (DELETE): 1 LS @ $6,300.00 COST ADDITION / (DELETION): $6,300.00 Justification: This is an adjustment to allow for the Contractor to separate the cost of in of the Owner supplied equipment identified in Item 1 above. NEW ITEMS BASE BID 1. Add approximately 500 LF of 2" Schd 80 PVC Conduit with Pull Boxes & Pull String for Additional Key Pad. ADD / (DELETE): 1 LS @ $17,200.00 COST ADDITION / (DELETION): $17,200.00 Justification: The Airport desires the ability to connect the gate arm equipment to the access control system located at Gate 0. This will give the Airport the ability to connect this equipment in the future. 2. Install 2 runs of CMP /CL3P/FPLP 18 awg 6 conductor copper & two runs of CMP /CL3P 16 awg 2 conductor copper In conduit in conduit shown above & furnish 4 Diteck DTK- GPK1(instalied by others) ADD / (DELETE): 1 LS @ $5,065.00 COST ADDITION / (DELETION): $5,065.00 Justification: The Airport desires the ability to connect the gate arm equipment to the access control system located at Gate 0. This will give the Airport the ability to connect this equipment in the future. 3. Install 2 gate arms and 2 ticket dispensers at east and west entrances to the long term parking lot. ADD / (DELETE): 1 LS @ $2,335.00 COST ADDITION / (DELETION): $2,335.00 Justification: The existing equipment Is in poor shape and In need of replacement. There is an economy of scale to perform this work during the timeframe of other work associated with this project. • CHANGE ORDER NUMBER 1 OWNER: Augusta Regional Airport CONTRACTOR: Reeves Construction Company 1501 Aviation Way P.O. Box 1129 Augusta, Georgia 30906 Augusta, GA 30903 PROJECT NAME: Credit Card Lot Repairs CONTRACT DATE: August 20, 2014 PROJECT NUMBER: 4. Increase demolition and repaving area around entrance Island to the credit card lot. ADD / (DELETE): 1 LS $500 COST ADDITION / (DELETION): $500 Justification: The current plan would remove approximately 75% of the existing pavement around the entrance Island. Removal and replacement of the remaining 25% will provide a more aesthetic entrance and will reduce future maintenance costs. AUGUSTA RICHMOND COUNTY L.C e c-----________ ,40 Deke S. Copenhaver, Mayor //501( _� • ATT ' 'g.•••....e.ej.e Ca i ' Cr e e i •® �' �ii • 9 // of c ® �. 0 f 4 % ', 4 -itif,1 3 -` A: el ' &LAW „(itaiht ,; Lena : °#� ner, ' rer' ,- Approved as to Form: aii4,04/ Je. hide i/ ' '-/ Andrew Mackenzie, Esq. 1