City of Augusta
250510 -
"WRIGHTSBORO RD /CR 1501 FM JIMMIE DYESS TO BARTON CHAPEL RD"
DISTRIBUTION FACILITY RELOCATION
This AGREEMENT, made and entered into as of the day of j 2 e /
20 , by and between Augusta, Georgia (hereinafter referred to as the "City "),
and GEORGIA POWER COMPANY (hereinafter referred to as the "Company "). This Agreement may refer to
either City or Company, or both, as a "Party" or "Parties."
WITNESSETH:
WHEREAS, the City proposes under the above written Project to construct the "WRIGHTSBORO RD /CR
1501 FM JIMMIE DYESS TO BARTON CHAPEL RD " (hereinafter referred to as the "Project "); and
WHEREAS, due to the construction of this Project, it will become necessary for the Company to remove,
relocate, or make certain adjustments to the Company's existing facilities (facilities includes electrical and
communications facilities and is referred to herein collectively as the "Facilities" or the "Facility "), in accordance
with the estimate of ONE MILLION, NINE HUNDRED SIXTY FIVE THOUSAND, ONE HUNDRED FOUR
Dollars ($1,965,104.00) (the "Estimate "), a copy of which estimate is attached hereto, and incorporated into this
Agreement as Exhibit "A ". The Estimate is limited: (a) to the costs of removing, relocating or adjusting those
Facilities, which are physically in place and in conflict with the proposed construction and/or maintenance, (b)
where replacement is necessary, to the costs of replacement in kind and such cost excludes the proportion of the
costs representing improvement or betterment in a Facility, except to the extent that such improvement or betterment
is made necessary by the construction and/or maintenance, and (c) to the costs incurred in acquiring additional
easements or private rights of way, including, without limitation, easements for lines, access, tree trimming, guy
wires, anchors and other devices, appliances and other equipment, and any and all other such easements and
property rights as may be reasonably necessary for the Company's installation, operation and maintenance of its
Facilities. The proportion of the costs representing improvement or betterment in a Facility while excluded from the
Estimate, except to the extent that such improvement or betterment is made necessary by the construction and/or
maintenance, shall be shown on the Estimate; and
WHEREAS, the Company has presented evidence to the City that it contends supports its claim that it
acquired property interests and utilized such property interests for the placement of its Facilities prior in time to
acquisition of the road right of way(s), all as involved in said Project; and
WHEREAS, the City agrees to bear TWELVE AND TWENTY TWO ONE HUNDREDTHS percent
(12.22 %) of the actual costs of said relocation expenses, which is estimated to be TWO HUNDRED FORTY
THOUSAND, ONE HUNDRED FIFTY THREE Dollars ($240,153.00), subject to the City's reasonable approval
(not to be unreasonably withheld) of the evidence presented by the Company supporting its claim for prior rights,
which may include any documents or information demonstrating the location of the Facilities in relationship to those
property interests, the relationship of those property interests to current and previous road right -of -way, and any
other information or documents reasonably required by the City to verify the Company's claim, and subject to
further City's reasonable approval (not to be unreasonably withheld) should actual expenses exceed the Estimate;
and
WHEREAS, the City will use its best efforts to make a determination regarding the Company's claim for
prior rights prior to the Company being required to commence the removal, relocation, or adjustment of its
Facilities, and shall provide its determination in writing along with the written support for any such determination.
If the City determines that the Company's presented information is insufficient to make a determination, the City
will provide the Company the basis for such insufficiency, and request that the Company provide additional
information. If a determination, however, cannot be made prior to the time the Company's Facilities need to be
removed, relocated, or adjusted in order for the Project not to be delayed (provided that the City certifies in writing
to the Company that such Project is time - sensitive due to construction scheduling with the possibility of damages for
delay, safety concerns, or critical funding deadlines), the Company will remove, relocate, or adjust its Facilities
1
without a determination having been made and neither Party's rights, claims, or defenses with regard to the issue of
property interests, compensable interest or prior rights will be waived or affected in any manner. In such instance,
the City will make such determination regarding the Company's claim for prior rights no later than six (6) months
from the date of City's receipt of information sufficient for the City to make a determination (which determination
shall be in writing accompanied by written support) or otherwise the Company's claim for prior rights will be
deemed approved by the City.
NOW, THEREFORE, in consideration of the promises and the mutual covenants of the Parties hereinafter
set forth, the receipt and sufficiency of which are hereby acknowledged by the Parties, it is agreed:
Section 1. The Company, with its regular construction or maintenance crews and personnel, at its standard schedule
of wages and working hours (as may be applicable from time to time during this Agreement), and working in
accordance with the terms of its agreements with such employees, will make such changes in its Facilities as
previously agreed upon with the City. The Company may elect to contract any portion of the work contemplated.
Section 2. Prior to the Company commencing any of its removal, relocation or adjustment work, including
obtaining any easements, City will provide written assurances (including information on the property rights
acquired) to Company that it has acquired the necessary new road right -of -way.
Section 3. Upon the completion by the Company of the work contemplated herein, the City will pay the Company a
sum equal to the lesser of ONE HUNDRED percent (100 %) of: (a) the Company's actual cost of the total Project
relocation expenses or (b) the Estimate, subject to the reasonable acceptance by the City (not to be unreasonably
withheld) of the evidence presented by the Company supporting its claim for prior rights. Pursuant to the Franchise
Agreement (as defined below), in particular its Sections 4 and 8, the Company will exercise its rights to have the
City pay the Company its relocation costs associated with this Project.
Section 4. The City will neither be bound to pay any costs related to the Facilities' removal, relocation, or
adjustment which are in excess of the reimbursable portion of the Estimate, nor for any items of relocation work not
provided for in said Estimate, except as shall be specifically approved in writing by the City. In the event there is a
change in the Project, including, without limitation, a change in scope, design, plans, service, property interests to be
acquired or engineering, due to events or circumstances beyond Company's reasonable control, Company will notify
City of such change and the Parties will negotiate in good faith a mutually agreeable agreement or amendment to
this Agreement to address such change.
Section 5. The recitals set forth in the Whereas clauses of this Agreement are a material part of this Agreement and
binding upon the Parties hereto.
Section 6. The Company shall make a reasonable effort to provide signing and other traffic control measures during
construction as contemplated under this Agreement in accordance with PART VI of the U. S. Department of
Transportation Manual on Uniform Traffic Control Devices, current edition, all at the expense of the City.
Section 7. The covenants herein contained, including the covenants contained in the "Whereas" clauses hereto,
shall, except as otherwise provided, accrue to the benefit of and be binding upon the successors and assigns of the
Parties hereto.
Section 8. It is mutually agreed between the Parties hereto that this Agreement shall be deemed to have been
executed in Georgia.
Section 9.
9.1 The Parties agree they will in good faith share information with each other related to the issue of prior rights.
Should the Company disagree with the City's determination with regard to the Company's claim for prior rights
and if the Parties are unable to settle the issue through informal negotiations, then, at the request of either Party,
the Parties agree to escalate the matter pursuant to Section 9.2 below.
9.2 Except as otherwise set forth in this Agreement, any controversy or claim arising out of or relating to this
Agreement, or the breach thereof, will be settled: (a) first, by good faith efforts to reach mutual agreement of the
Parties; and (b) second, if mutual agreement is not reached within thirty (30) calendar days of a written request
by a Party to resolve the controversy or claim, each of the Parties will appoint a designated representative who
has authority to settle the dispute (or who has authority to recommend to the governing body a settlement of the
2
dispute) and who is at a higher level of management than the persons with direct responsibility for
administration of this Agreement. The designated representatives will meet as often as they reasonably deem
necessary in order to discuss the dispute and negotiate in good faith in an effort to resolve such dispute. The
specific format for such discussions will be left to the discretion of the designated representatives provided,
however, that all reasonable requests for relevant information made by one Party to the other Party will be
honored if such information is reasonably available. If the Parties are unable to resolve issues related to the
dispute within thirty (30) days after the Parties' appointment of designated representatives or City's City
Council fails to approve any tentative agreement reached, the Parties agree to participate in non - binding
mediation pursuant to Section 9.3 below. It being understood, however, that nothing herein will diminish or
relieve either Party of its rights or obligations under this Section 9.
9.3 If the Parties are unable to resolve a dispute through informal negotiations or pursuant to Section 9.2, the Parties
agree to participate in non - binding mediation by an impartial, third party mediator mutually agreed upon by the
Parties, at a mutually convenient location, with each Party being responsible for its own attorneys' fees and
expenses and for providing its own information and documentation applicable to the dispute to such mediator.
The Parties agree that a potential mediator's experience in prior rights and real estate law will be relevant
factors in selecting a mediator. All other agreed upon costs of the mediation will be apportioned equally to each
Party. Any dispute not so resolved by negotiation, escalation or mediation may then be submitted to a court of
competent jurisdiction, and either Party may invoke any remedies at law or in equity. (Nothing contained
herein, however, will preclude the Parties from first seeking temporary injunctive or other equitable relief).
Section 10.
10.1 If the Company chooses to submit progress payments, the City will pay them within thirty (30) days from
receipt of the invoice, subject to Verification (as defined below) thereof by the City. Upon completion of
the work, the Company shall submit a final bill to the City and the City shall make a final payment within
thirty (30) days from receipt of the final bill, subject to Verification of the final bill by the City.
10.2 For purposes of this Section 10.1, "Verification" means that the City has reasonably determined that there
is a material discrepancy between the Company's invoiced charges and the City's calculation of charges
owed, which invoiced charges are subject to a bona fide dispute; provided, however, City agrees to provide
the Company with written notice, including supporting documentation, illustrating the basis for such bona
fide dispute, within sixty (60) days of receipt of the invoice in dispute. Should the City fail to provide such
documentation within the specified time period, the City must pay the disputed amount. The City must pay
any undisputed portion of the invoice total within thirty (30) days after its receipt of the invoice. The City
must pay any disputed portion of the invoice total within thirty (30) days of the date the dispute is resolved,
to the extent the dispute is resolved in favor of the Company.
10.3 At any time within thirty-six (36) months after the date of the fmal payment, the City, at its sole expense,
may audit the cost records, support documentation, and accounts of the Company pertaining to this Project
to solely assess the accuracy of the invoices submitted by the Company and notify the Company of any
amount of any unallowable expenditure made in the final payment of this Agreement, or, if no unallowable
expenditure is found, notify the Company of that fact in writing. Any such audit will be conducted by
representatives of the City or, if applicable, the Georgia Department of Transportation or the Federal
Highway Administration, after reasonable advance written notice to the Company and during regular
business hours at the offices of the Company in a manner that does not unreasonably interfere with the
Company's business activities and subject to the Company's reasonable security requirements. As a
prerequisite to conducting such audit, City or, if applicable, the Georgia Department of Transportation or
the Federal Highway Administration, will sign the Company's Nondisclosure Agreement. The Company
may redact from its records provided to City information that is confidential and irrelevant to the purposes
of the audit. The Company will reasonably cooperate in any such audit, providing access to the Company
records that are reasonably necessary to enable the City to test the accuracy of the invoices to which the
audit pertains, provided that the City or, if applicable, the Georgia Department of Transportation or the
Federal Highway Administration, may only review, but not copy, such records. If the Company agrees
with the audit results and does not pay any such bill within ninety (90) days of receipt of the bill from the
City (based on the mutually agreed upon audit results), the City may set off the amount of such bill against
the amounts owed the Company on any then - current contract between the Company and the City. If,
following the audit, the Parties are unable to resolve any dispute concerning the results of the audit through
informal negotiation, the provisions of Sections 9.2 and 9.3 will govern the resolution of the dispute. The
City may not perform an audit pursuant to this Agreement more frequently than once per calendar year and
may not conduct audits twice within any six (6) months.
3
Section 11. Duplicate originals of this Agreement will be executed, each of which will be deemed an original but
both of which together will constitute one and the same instrument. This Agreement may be modified only by an .
amendment executed in writing by a duly authorized representative for each Party. This Agreement contains the
entire agreement of the Parties and there are no oral or written representations, understandings or agreements
between the Parties respecting the subject matter hereof which are not fully expressed herein. This Agreement
neither will supersede nor is in conflict with that certain Ordinance Granting Franchise (the "Franchise
Agreement "). This Agreement will be governed by and construed in accordance with the laws of the State of
Georgia. This Agreement will be of no force and effect and the offer contained herein will be withdrawn unless the
Agreement is executed by City of Augusta and delivered to company on or before November 1, 2013.
[SIGNATURES ON THE FOLLOWING PAGE]
4
IN WITNESS WHEREOF, this instrument has been and is executed on behalf of the CITY OF
AUGUSTA being duly authorized to do so by their authorized representatives. The parties to those present
have executed this Contract in two (2) counterparts, each of which shall be deemed an original in the year and day
first above mentioned.
,11ttili
'1 ' Signed, sealed and delivered this day ``` Oy�.I M j o 1/1 1 #
of j 0 20/3, in the presence of
.,____W-a,,e -61 T S, ;;; lQ
NiirceNnisig,iwpws On Docentber inn, 2014
S, �
• O �.
i,',, , O I NI1 %, • %
� ) ZtJ y - ,e?az
/.aat o. MUNICIP CLERK
[Signatures continue onto next page.]
AUGUSTA
ATTEST:
APPROVED AS TO FORM:
44tidi
City Attorney
FEIN 3 q� �. Q L f a- 7 1
MFG.?;
13y
V-P
ATTEST
By:
Laura 1. Patterson
Title: Assistant Secretary
- 2
Witness:
Notary.
Give proper title of each person executing Agreement.
Project Number: 250510
(SEAL)
6
GEORGIA POWER COMPANY
By:
JEF GOOLSB
Title: Distribution Resource Manager
Date: Z- Zs 1 3
2u i o
Attach seal as required.
•
(SEAL)
EXHIBIT A
Total Relocation Cost of Facilities
$ 1,965,104.00
Job Estimating &Tracking System - JETS
FACE SHEET REPORT
Headquarters : CENTRALIZED DISTR. SVCS W.O. Number : GP892H02011
Customer : GDOT RICHMOND COUNTY P.E. : 7030 01 WR# : 0
Address : PI #250510- WRIGHTSBORO ROAD FM BOBBY JONES TO J Job Reference : 2947608
Town :AUGUSTA Job Type : H- HIGHWAY RELOCATIONS OH / UD
Rep Allow : No Blanket : No
Home Phone Substation
Map Number Circuit
Type Customer : DOT PROJECTS OH /UD REIMBURSIBLE & NONREIMB Charge Account : H02011- GP892- 300 -00000
Estimate Name : ORIGINAL 08 -30 -10 Credit Account : H02011- GP892- 300 -99992
Engineer : GRIFFIN,KRISTI B. Date Last Est : 17-OCT-2012
CSS Bill Acct#
Committed Service Date .
Job Description
Driving Directions
Permits /Notification(s) .
Total Estimated External Charges Included Below:
Billing: Fixed
MANHOURS:
Company
Contractor
Total Net Cost :
Rate :
TVM Amount : $0
Total Bill Amount :
Approvals
Auth :
Close :
relocations for road widening project
Revenue: $0
Loc Cost: $0
CPS Amount :
Georgia Power Company
Distribution Work Order
Type Construction: OVERHEAD
$0
Onsite
9,403.28
3,889.02
Company Labor $347,916 $1,659
Contract Labor $317,500 $0
Company Material $181,420 $45,425
Contractor Material $0 $0
Company Equipment $187,876 $896
Contractor Equipment $0 $0
Engr Supv OH $548,398 $0
Subtotal $1,583,110 $47,980
Blanket
Salvage $30,530 $31,337
Total $1,552,580 $16,643
Total WO Bill
Date
$0
Joint Use
$0
Travel
1,411.49
0.00
Labor Multiplier : 1.25 Comment : DOT
Travel : 0.00 HQ : 0.00 EOH Labor : 0.00 EOH Mati : 0.00
Cost Summary Plant Transformers Meters Maint Removal
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total Ratio : 0.00
Local Ratio : 0.00
Sales Tax : $0
Completed By
$37,612
$0
$20,311
$0
$57,929
$57,929
Date: 01- Nov -2012 09:52:22 AM
Out Of Ratio Customer Contribution
$0
Headquarters
470.22
0.00
Total Estimated:
$6
$0
$0
Profit :
$143,431
$0
$0
$0
$77,452
$0
..._....._...
$117,069
$337,952
ROE:
Net Present Val :
$0
$337,952
0.00
0
Date
$0
Total
11,284.99
3,889.02
15,174.01
Total
$530,618
$317,500
$226,851
$0
$286,535
$0
$665,467
$2,026,971
$0
$61,867
$1,965,104
$0
$1,965,104
Date : 01- Nov -2012 09:52 AM
Job Ref #
Applicant Name
Estimate Name
Estimate Description
Work Special
Function Processing
** Work Location : 1.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 2.00
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
TRANSFER NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
* ** Work Location : 3.00
: 2947608
: GDOT RICHMOND COUNTY
: ORIGINAL 08 -30 -10
: RELOCATIONS FOR ROAD WIDENING PROJECT
Local
Cost Unit Identification
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HIG
SETUP
TV/
Description :
Inst Dsgn Volt Num • 25
Energized : Y
S1 /OTPAC
G11HIG
PN33974/0C
PNDV3L
SETUP
SS1 /0
G11HIG
PN33971/0C
PNC3L
S1 /OTPAC
Inst Op Volt Num • 12
Inaccessible : N
Work Location Summary Report
ALL LOCATIONS
Qty Ret Ind Description
2
4
3
4
152
Description •
Inst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
SPREADPHASES3NONTAN
G
G11HG
G11HIG
PL503SG
PN33971/0C
PNC3L
1
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour • 3 81
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
2,670 N TREE WORK - USE "TREE CONTRACTORS" OR "TREE CONT -HIGH
TRIM" IF NOT GPC
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 77.42
2 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
8 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
154 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
OVERHEAD SEC CONDUCTOR SPLICE FOR #1/0 ACSR
N
N
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
152 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 58.48
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
N GUY ANCH HELIX 11M W' GUARD
3 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
215 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL "C" SUSPENSION 3 PH,
4/0 & LARGER CONDUCTOR
Page : 1
Work Order # : GP892H02011
Job Address : PI #250510- WRIGHTSBORO ROAD FM
BOBBY JONES TO JIMMY DYESS
Contractor Name
Est Cont ManHours : 3,337.50
TREE CONTRACTORS
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER TA25
* ** Work Location 3.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
TRANSFER
Work Location : 4.00
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
SD1 1 N SEC DEADEND ONE WIRE
SPREADPHASES3 1 N
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SVCONNOH
SVTP2S
Description
Inst Dsgn Volt Num
Energized': Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL553SG
PN33974/OC
PNTV3F
POLESTAKE
SCONNOH
SETUP
ST1
TA25
Description :
Inst Dsgn Volt Num : 2
Energized: Y
PLCUT
SETUP
S1 /OTPAC
G11HIG
PN33971/OC
PNC3L
POLEFIXTURE
SD1
SVCONNOH
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num 12
Inaccessible : N
Inaccessible
1
4
99
3
188 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W SECT GND
188 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC TANGENT 1 WIRE
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
99
1
INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 48.07
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 1
Rock/Swamp N Est Co ManHour • 20 4
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
Y
ONE SET OF POLE FIXTURES. USE WHEN ATTACHING TO NON GPC OR
TRANS POLE
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 2
Est Cont ManHours : 6.70
DOT SUPPORT
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 4.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 4.02
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location : 5.00
SVTP2S
SVTP2S
Description :
Inst Dsgn Volt_Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
OHFLAGTRAFF
PL603G
PN33974/0C
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SDD1
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
G11HIG
PL355
SDD1
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE OHFLAGTRAFF
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W' GUARD
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 60 FT CLASS 3 W' GROUND
263 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
250 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS ANY SIZE
1 N SEC DBL DEADEND 1 WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Inst Op Volt Num : 12
Inaccessible N
EASEMENT 1
20 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock /Swamp : N Est Co ManHour : 52.44
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 10.27
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 35 FT CLASS 5
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num • 12
Inaccessible : N
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 38.47
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 3
Est Cont ManHours : 1.44
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
NONE
NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
rk Location 5.01
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
PLCUT
SETUP
S4DPXC
PN33971/0C
PNT3S
POLEFIXTURE
NONE
4
174
174
1
SCONNOH
SDD1
SR11 /0
SVCONNOH
TA15
SVTP2S
Description
Inst Dsgn * Volt Num
Energized' •'Y
DISTEASEMENT
EASEMENT
G11HG
PL355
POLESTAKE
SDD1
SETUP
SVCONNOH
SVTP2S
Description :
nst Dsgn Volt Num
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
S4DPXC
DSALB
G11HG
1
1
1
100
Rmv D'"g.111116.1EN,utullf25
Rock/S N
Inst Op. Volt Num
Inaccessible •
1,000
Op Volt Num •
Inaccessible : N
10
1
4
94
1
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE -ACSR DUPLEX #4
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y ONE SET OF POLE FIXTURES. USE WHEN ATTACHING TO NON GPC OR
TRANS POLE
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 35 FT CLASS 5
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
100 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num •
Rock/Swamp : N
Rmv Op Volt Num : 12'
Est Co ManHour • 12.47
i v Op Volt Nu : 12
Est Co ManHour : 42.39
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE -ACSR DUPLEX #4
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N GUY ANCH HELIX 11M W GUARD
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 4
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
TRANSFER
REMOVE TRANSFER
Work Location : 6.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
* Work Location 6. 02
INSTALL
INSTALL
INSTALL
INSTALL
EXCLUDE STAT
NONE
NONE
NONE
G11HIG
PN144C
PN33971/0C
PND1
PNT3F
Energ
POLEFIXTURE
REMOVE NONE S4DPXC
NONE SCONNOH
SD1
SDD1
LTHPS142DIR
S4DPXC
Description
Inst Dsgn Volt Nu
Energized : Y
DISTEASEMENT
EASEMENT 1
G11HG
OHFLAGTRAFF
PL355
POLESTAKE
SCONNOH
SDD1
SETUP
LTHPS142DIR
S4DPXC
S1 /OTPAC
DISTEASEMENT
DSALB
EASEMENT
Inst Op Volt Nui
Inaccessible : N
1,000
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
94 Y 1PH PRI- NEUTRAL (1- 4ACSR &1 - 4ACSR)
143 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
1 Y ONE SET OF POLE FIXTURES. USE WHEN ATTACHING TO NON GPC OR
TRANS POLE
20 Y SEC WIRE -ACSR DUPLEX #4
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
1 N SEC DBL DEADEND 1 WIRE
1 Y DIR SECURITY LIGHT 14000L 150W 120/ 240V W 15IN X 2IN
BKT,LAMP * * *NO PC * **
108 Y SEC WIRE -ACSR DUPLEX #4
1
10
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DIR SECURITY LIGHT 14000L 150W 120/ 240V W 15IN X 2IN
BKT,LAMP * * *NO PC * **
108 Y SEC WIRE -ACSR DUPLEX #4
3
1
1
2
1
Op Volt Num : 1
Inaccessible : N
153
300
1
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
Rmv Dsgn Volt Nu
Rock/Swamp : N
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
Page : 5
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp ::N Est Co ManHour 26.60 Est Cont ManHours : 5.38
Rmv Op Volt Num
Co ManHour :53.75
DOT SUPPORT
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 35 FT CLASS 5
DOT SUPPORT
Cont ManHours 5 29
DOT SUPPORT
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Work Location
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
TRANSFER
TRANSFER
Work Location :. 7.01
GSP11I
OHFLAGTRAFF
PL553SG
PN33974/0C
PND1
PNTV3F
POLESTAKE
S4DPXC
SDD1
SETUP
Description :
:nst Dsgn Volt Num
Energized • Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
PHPF
PL453G
PN122C
PN33971/0C
PND3STL5
PNT3F
S4DPXC
SCONNOH
SD1
SVCONNOH
SVTP2S
S1 /OTPAC
SVTP2S
gn Volt Nu
Energized : Y
INSTALL EXCLUDE STAT S1 /OTPAC
1
10
1
153
1
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
105 Y SEC WIRE -ACSR DUPLEX #4
1 N SEC DBL DEADEND 1 WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
t Op Volt Num' 12
Inaccessible : N
10
4
152
1
1
69
152
1
1
111
3
2
27
69
71
t Op Volt YNy r
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp . N Est Co ManHour : 46.41
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Page : 6
Est Cont ManHours : OAO
N BRKT JUMPER PIN FOR STEEL CROSSARM
Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1- 2ACSR)
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 3 PH W' 5FT STL ARM
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Y SEC WIRE -ACSR DUPLEX #4
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
n Volt Num : 25 4, Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour: 49.55
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Cont ManHours : S
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
rk Loa
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
8.00
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PL453SG
PN11 /01 /OC
PND1
POLESTAKE
S1 /OTPAC
SDD1
SETUP
SR11 /0
SS1 /0
LTHPS452DIR
TA37
Work Location 7.50 Description
Inst Dsgn Volt Num : 2
Energized .:. Y
SCONNOH
SVCONNOH
S1 /OTPAC
SVTP2S
PL355
SD1
LTHPS452DIR
Description :
Dsgn Volt Nu
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3NONTAN
G
1,000 Y
1 Y
2 N
10 N
1 Y
105 Y
1 N
3 N
160 Y
1
4
1
3 N
1 Y
1
Op Volt Num
Inaccessible : N
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
69 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
71 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1
1
gist Op Volt Num • 12
naccessible • N
4
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
POLE WOOD CCA 45 FT CL 3 W SECT GND
1PH PRI- NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
PRI & NEUTRAL DEADEND 1 PH
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
OVERHEAD SEC CONDUCTOR SPLICE FOR #1/0 ACSR
DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
v Op Num : 12
Rock/Swamp : N Est Co ManHour : 13.80
Y POLE WOOD CCA 35 FT CLASS 5
N SEC DEADEND ONE WIRE
Y DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
ock/Swamp - N Est Co ManHour 67 60
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Page : 7
DOT SUPPORT
Rmv Op Volt Num • 12
DOT SUPPORT
Est Cont ManHours : 0.00
Est Cont ManHours ; :'`'0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
Work Location : 8.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
TRANSFER
pork Location : 9.00 Des
Inst Dsgn crip V o l t Num'
ergized : Y
OHFLAGTRAFF
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
PL453SG
PNT3F
SCONNOH
SD1
SPREADPHASES3NONTAN
G
SR11 /0
LTHPS452DIR
REMOVE NONE
TA37
Description :
Inst Dsgn Volt Nu
Energized: Y
DISTEASEMENT
EASEMENT
GSP11I
PL553G
PN33974/OC
PND1
PNDV3
PNTV3F
POLESTAKE
SCONNOH
SD1
SETUP
LTHPS452DIR
PLCUT
SETUP
DSGLBDELTA
PL453G
1
1
1
1
Inst Op Volt Num : 12,
Inaccessible • N
1,000
1
1
160
1
1
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12;
Rock/Swamp - N Est Co ManHour • 44 44
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI -NEUT DEADEND VERTICALS PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
1
1
4
1
naccessible N
10
1
4
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
Y:.Op.Volt Num : 12"
ck/Swamp • N Est Co ManHour 68.22
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DELTA SW * * *5 -20080 IS OBSOLETE - USE ANOTHER GO SW FOR
TRANSFER OR REMOVE
Y POLE WOOD CCA 45 FT CLASS 3 W' GROUND
DOT SUPPORT
DOT SUPPORT
Page : 8
Est Cont ManHou
DOT SUPPORT
: 5.38
Cont Man ours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
Work Location 9.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PN33971/0C
PND3L
SDD1
SVCONNOH
SVTP2S
SVTP2S
SVTP2S
:ription
n Volt Nu
Energized Y
270 Y 3PH PRI - NEUTRAL (3- 397ACSR &1 -1 /OACSR)
2 N PRI AND NEUTRAL DEAD -END 3PH 1 350 -750AL 1
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
30 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
40 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Page : 9
Description
Inst Dsgn Volt Num : 25
Energized.: Y
DISTEASEMENT
EASEMENT
G11HG
OHFLAGTRAFF
PL355
POLESTAKE
SDD1
SETUP
SVCONNOH
Inst Op Volt Num
Inaccessible : N
500 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W' GUARD
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 35 FT CLASS 5
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
40 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
DISTEASEMENT
DSGLBVERT
EASEMENT
LA -1
P2HCONN397
PL553SG
PN33974/0C
PNDDV3L
POLESTAKE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 24.56 Est Cont Mani-lours . 5.31
DOT SUPPORT
Rmv. Dsgn Volt Num • 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour : 73.35
Inst Op Volt Jum
Inaccessible.: N
500 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW -GANG OPERATED LOAD BREAK 25KV 900AMP VERTICAL
MOUNT
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
DOT SUPPORT
o L ocation : 9.02
Est Cont ManHours : 5
DOT SUPPORT
DOT SUPPORT
3 Y LIGHTNING ARRESTER & CUT -OUT BRKT 1 PH
1 N TUBULAR TO FLAT CONN 336/397 A
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
151 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI DOUBLE DEAD -END VERTICAL 3PH 350 -750AL PRI .
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
INSTALL NONE
INSTALL TRANSFER
* ** Work Location : 10.00
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
TRANSFER
* ** Work Location: 10.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location 11.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SETUP
S1 /OTPAC
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP 4
S2TPAC 132
G11HG
PL405G
PN122C
PNC1
PN122C
Description :
inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALB
EASEMENT
OHFLAGTRAFF
PL553SG
PN33974/0C
PND1
PNTV3F
POLESTAKE
SETUP
PN122C
Description :
Inst Dsgn Volt Num : 25
Energized . Y
PN122C
PND1
SETUP
SR11 /0
4
100 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Ina . Op Volt Num : 12
Inaccessible : N
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 30.59
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
140 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL C SUSPENSION 1 PH
100 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Page : 10
Est Cont ManHours : 0.00
Inst Op Volt Num : 12
Inaccessible : N
1
153
1
4
100
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp :'N
Est Co ManHour : 46.53
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp • N Est Co ManHour 36 11
199 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
DOT SUPPORT
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* Work Location .: 12.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
SVCONNOH
TA25
PN222C
PND2STL6
SR21 /0
SVCONNOH
TBO3710
Description :
Inst Dsgn Volt Num • 25
Energized': Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3
PL453G
PN122C
PN33971/OC
PND1
PNT3S
SPREADPHASES3
** * Work Location 13.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
Description :
Inst Dsgn Volt Nu
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
DSALB
G11HG
PL405G
PN122C
PNDD1
PN122C
2
1
114
1
1
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y 2P11 PRI- NEUTRAL (2- 2ACSR &1 - 2ACSR)
N PRI & NEUTRAL DEADEND 2 PH W' 6FT STL ARM
N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF BANK OPEN DELTA 120/240V 37 & 10 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
1
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 53.4
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
74 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
179 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
2 N PRI & NEUTRAL DEADEND 1 PH
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
1 N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
Page : 11
Est Cont Mani : 0.00
Inst Op Volt Num
Inaccessible : N
10
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num •• 12
Rock/Swamp :.N Est Co ManHour.: 33.47
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 N GUY ANCH HELIX 11M W GUARD
1 Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
6 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
91 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Est Cont ManHours : 0.00
* ** Work Location : 13.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 14.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
NONE
NONE
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 14.01
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE DISTEASEMENT 500 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
DSALB
EASEMENT
INSTALL NONE G11HIG
OHFLAGTRAFF
PL553SG
PN33971/0C
PNDD1
PNTV3F
INSTALL NONE POLESTAKE
INSTALL NONE SETUP
INSTALL TRANSFER PN122C
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
Sl/OTPAC
PL453G
PN33971/0C
PNT3F
SD1
SVCONNOH
SVTP2S
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
Inst Op Volt Num : 12
Inaccessible : N Rock /Swamp : N
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
2
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : -12
N GUY ANCH HELIX 11M W GUARD & 1 FGLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
180 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1
N PRI & NEUTRAL DBL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
4
91 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 32.96
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 12.22
Est Co ManHour : 57.91 Est Cont ManHours : 5.31
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
95 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
95 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
1 N SEC DEADEND ONE WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
20 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
62 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
DOT SUPPORT
Page : 12
Est Cont ManHours : 0.00
Est Cont ManHours 5 38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SI IPPORT CONTRACTOR- * *TNVFNTORY n01 1 ARS PAM***
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
EASEMENT
G11HG
PL355
POLESTAKE
S1 /OTPAC
SDD1
SETUP
SVCONNOH
SVTP2S
ork Location :15,00 •'° Description
Est Dsgn Volt Num :
Energized : Y
OHFLAGTRAFF
PLCUT
PN122C
PS2
SETUP
SPREADPHASES3
SS2
PN122C
PL453SG
PN33971/OC
PND1
PNT3S
S4 /OTPXC
SCONNOH
SD1
SPREADPHASES3
SR11 /0
.................... . . . . ._
TA25
PN122C
1
1
3
103
1
4
1
62
Inst Op Volt Num
Inaccessible : N
10
1
84
1
4
1
1
107
1
46
1
1
46
1
1
1
1
1
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 35 FT CLASS 5
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
N OVERHEAD PRI SPLICE FOR #2 ACSR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour 57.96 Est Cont ManHours : 0.00
OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y SEC WIRE ACSR TRIPLEX #4/0
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
107 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Page : 13
DOT SUPPORT
DOT SUPPORT
* ** Work Location : 15.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 16.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 16.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP 4
SR11 /0 1
TA25 1
Description
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL453G
PN122C
PN33971/0C
PND1
PNT3F
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALB
EASEMENT
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
95 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1
3
127
2
1
Inst Op Volt Num : 12
Inaccessible : N
259
Inst Op Volt Num : 12
Inaccessible : N
1,000
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num: 12
Rock /Swamp : N Est Co ManHour : 44.50
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour 44.93
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
79 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 66.97
Page : 14
Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
TRANSFER NONE
* ** Work Location : 17.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
G11HIG
OHFLAGTRAFF
PL553SG
PN33974/0C
PNDD1
PNTV3F
POLESTAKE
SETUP
PN122C
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock /Swamp : N Est Co ManHour : 24.84
OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
167 Y SEC WIRE ACSR TRIPLEX #4/0
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DBL DEADEND 1 WIRE
SETUP
G11HG
PL305
S4 /OTPXC
SCONNOH
SDD1
* ** Work Location : 18.00 Description :
Inst Dsgn Volt Num : 25
Energized • Y
INSTALL NONE G11HG
INSTALL NONE SD1
INSTALL NONE SETUP
REMOVE NONE G11HG
REMOVE NONE SD1
* ** Work Location : 19.00
EASEMENT
G11HIG 1
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
285 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 15
150 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Est Cont ManHours : 0.00
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25
Inaccessible • N Rock /Swamp : N
1 N GUY ANCH HELIX 11M W' GUARD
1 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD
N SEC DEADEND ONE WIRE
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock/Swamp : N Est Co ManHour : 3.31 Est Cont ManHours : 1.44
DISTEASEMENT 1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Rmv Op Voit Num 12
Est Co ManHour: 5.33 Est Cont ManHours : 0.00
* ** Work Location : 20.00
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
INSTALL
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 21.00
INSTALL NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
TRANSFER
* ** Work Location : 21.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PN122C
PND1
SETUP
S4DPXC
G11HIG
PN122C
PND1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
DSALB
PL453SG
PN122C
PN33971/0C
PNDD1
PNT3CTS
LTAHPS278
Description :
Inst Dsgn Volt Num : 25
Energized : Y
S2TPAC
DISTEASEMENT
DSALB
EASEMENT
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1
1
148
1
4
67
1
67
1
Inst Op Volt Num : 12
Inaccessible • N
Inst Op Volt Num : 12
Inaccessible : N
73
1,000
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock /Swamp : N Est Co ManHour : 32.74
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y
N PRI & NEUTRAL DEADEND 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE -ACSR DUPLEX #4
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 54.78
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
118 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
282 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT & CT
1 Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP & 8 FT BRKT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 84 35
Est Cont ManHours : 1.44.
DOT SUPPORT
Page : 16
Est Cont ManHours : 0.00
Est Cant ManHours : 5.38
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 22.00
Work Location 23.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
G11HIG
OHFLAGTRAFF
PL553SG
PN122C
PN33974/0C
PNC3L
PND1
POLESTAKE
SDD1
SETUP
SVCONNOH
SVTP2S
LTAHPS278
Description
t
Dsgn Volt Nu
Energized : Y
G11HIG
PND1
SETUP
G11HIG
PND1
Description
Inst Dsgn Vol
Energized : Y'
OHFLAGTRAFF
SETUP
G11HG
PL305
S1 /OTPAC
SDD1
SVCONNOH
SVTP2S
4 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
73 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
292 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
2 N PRI & NEUTRAL DEADEND 1 PH
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N SEC DBL DEADEND 1 WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
90 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP & 8 FT BRKT
Op Volt Num`. 12
Inaccessible : N
1
1
2
1
Inst Op Volt Num • 12
Inaccessible_: N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 11.24
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num • 12
Rock/Swamp : N Est Co ManHour 23.52
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
122 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Page : 17
Est Cont ManHours : 0.00
Est Cont ManHours • 0.00 .m
* ** Work Location : 24.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
NONE
NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
GSP11I
PL453G
PN33971/0C
PNT3CTS
S1 /OQPXC
SCONNOH
SR21 /0
SVCONNOH
SVTP2S
TBO2510
S1 /OQPXC
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 24.01
* ** Work Location : 24.02
Inaccessible : N
154
1
130
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
PL553G
PN222C
PN33974/OC
PNC3L
PNDV2
POLESTAKE
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y(
INSTALL NONE DISTEASEMENT
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY SPAN 11M W' 1 FIBRE GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
194 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
60 Y SEC WIRE -ACSR QUADRAPLEX #1 /0
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Inst Op Volt Num : 12
Inaccessible : N
1
113
159
1
1
3
Inst Op Volt Num : 12
Inaccessible : N
Rock /Swamp : N Est Co ManHour : 51.42
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y TRANSF BANK OPEN DELTA 120/240V 25 & 10 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT -N
Y SEC WIRE -ACSR QUADRAPLEX #1 /0
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 43.05
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 2PH PRI - NEUTRAL (2- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
N PRI -NEUT DEADEND VERTICAL 2 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 47.75
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Page : 18
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 5.38
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
Work Location
INSTALL NONE
INSTALL
REMOVE
REMOVE
NONE
NONE
NONE
Work Location : 26.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
EASEMENT
G11HIG
OHFLAGTRAFF
PL453SG
PND2STL6
POLESTAKE
SCONNOH
SD1
SETUP
SR21 /0
TB02510
S1 /OQPXC
SETUP
G11HIG
PL305
Description .
: nst Dsgn Volt Nurn
Energized': Y
OHFLAGTRAFF
Description
Inst Dsgn Volt Nurn
Energized Y
OHFLAGTRAFF
PLCUT
PN122C
PS2
SETUP
SS2
G11HIG
PDDJUMPER1
PL405G
PN33971/OC
PNDD1
PNT3S
Page : 19
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
1 N PRI &NEUTRAL DEADEND 2 PH W 6FT STL ARM
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF BANK OPEN DELTA 120/240V 25 & 10 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
130 Y SEC WIRE -ACSR QUADRAPLEX #1 /0
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 21.58 Est Cont ManHours : 0.00
10
1
1
Op Volt Num 12
naccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
Y 1PH PRI - NEUTRAL (1- 2ACSR &1- 2ACSR)
N OVERHEAD PRI SPLICE FOR #2 ACSR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DBL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
1
50
1
4
1
1
1
1
169
1
1
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 30 FT CLASS 5
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12'
Rock/Swamp : N Est Co ManHour : 49.75
Est Cont ManHours : 0.00
REMOVE TRANSFER
* ** Work Location : 26.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
TRANSFER
TRANSFER
* ** Work Location : 26.50
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 27.00
INSTALL NONE
PN122C 200 Y 1PH PRI-NEUTRAL (1-2ACSR&1-2ACSR)
Description
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALBT
EASEMENT
FL50
PDDJUMPER1
PL553SG
PN33974/OC
PNDD1
PNTV3F
POLESTAKE
SETUP
PN122C
PN144C
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock /Swamp : N Est Co ManHour : 18.38
PLCUT 1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DISC SW CUTOUT FOR DSRD PRI VOLT
SETUP
CO
FL50
G11HIG
PDDJUMPER1
PL355SG
PN122C
PN144C
PNDD1
PN144C
Description :
Inst Dsgn Volt Num : 25 -
Energized : Y
OHFLAGTRAFF
: Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 39.22
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW ASSY 1 -100A LB CUTOUT & 1 1 PH T -BRKT
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 N FUSE -LINE LINK FITALL TYPE KS 50 AMP
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
141 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
200 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
100 Y 1PH PRI - NEUTRAL (1- 4ACSR &1 - 4ACSR)
4
1
1 N FUSE -LINE LINK FITALL TYPE KS 50 AMP
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 35 FT CL 5 W' SECT GND
15 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
35 Y 1PH PRI - NEUTRAL (1- 4ACSR &1 - 4ACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
100 Y 1PH PRI - NEUTRAL (1- 4ACSR &1 - 4ACSR)
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour . 40.66
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Page : 20
Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
PLCUT
SETUP
PL405SG
PN33971/0C
PNT3S
S2TPAC
SCONNOH
SD1
SR11 /0
TA15
1
4
1
174
1
76
1
1
1
1
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Page : 21
** Work Location : 27.01
EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Work Location : 28.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
Description
Inst Dsgn Volt Nut
Energized : Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S2TPAC
SCONNOH
SD1
SETUP
SR11 /0
TA15
Description :
Inst Dsgn Volt Num
Energized : Y
SETUP
SVCONNOH
SVCONNOH
Op Volt Num:: 12
I naccessible : N
141
1,000
1
141 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1
3
128
1
2
4
1
Inst Op Volt Nu
Inaccessible : N
2
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt. Num ;.12
Rock/Swamp : N
Co ManHour : 33.76 Est Cont ManHours : 5.38
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Est Cont ManHou
Rmv Dsg Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 2.99
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N CONNECTORS & MHR FOR OH SVC ANY SIZE *
SERVICE * * * **
1 PER
0.00
Work Location : 29.00 Description
Inst Dsgn Volt Num : 25
Energized ..Y
OH FLAGTRAFF
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* *; Work Location : 29.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL NONE
NONE
NONE
NONE
NONE
PLCUT
SETUP
S1 /OTPAC
G11HIG
PL405G
PN222C
PN33971/0C
PNDV2
PNT3S
SD1
SVCONNOH
SVTP1 /0S
SVTP2S
Description
Inst Dsgn Volt Num : 25
Energized Y
DISTEASEMENT
EASEMENT
G11HIG
PL553G
PN322C
PN33974/0C
PNDV3
PNTV3F
POLESTAKE
SDD1
SETUP
SVCONNOH
Inst Op Volt Num : 12
Inaccessible : N
1
212
1
1
1
Inst Op Volt Num
Inaccessible : N
1,000
135 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1
153
152
1
N
N SEC DEADEND ONE WIRE
1
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
135 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 2PH PRI- NEUTRAL (2- 2ACSR &1 - 2ACSR)
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
97 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
97 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
4
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour : 49.08
N PRI -NEUT DEADEND VERTICAL 2 PH
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Rmv Dsgn Volt Num : 25 Rmv Op Volt..Num : 12
Rock/Swamp : N . Est Co ManHour 49.57
Page : 22
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
DOT SUPPORT
INSTALL NONE
0.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
REMOVE
REMOVE
REMOVE
REMOVE TRANSFER
TRANSFER NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
p ork Location :
NONE
NONE
NONE
k Location`. 31.00
NONE
NONE
NONE
NONE
NONE
NONE
TRANSFER
TRANSFER
NONE
NONE
SVTP2S
Description
Inst Dsgn Volt Num
Energized : Y
PL453G
PN322C
PNT3F
DISTEASEMENT
EASEMENT
SD1
SETUP
SVCONNOH
LTAHPS272
PL355
SD1
SVCONNOH
LTAHPS272
S4DPXC
Description
Inst Dsgn Volt Num
Energized : Y
G11HIG
PL453SG
PND3STL6
SETUP
SR21 /0
SVCONNOH
LTA72
SVQP1 /0S
G11HIG
PL453SG
143 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y
Y
Y
1
1
1
91 Y 3PH PRI- NEUTRAL (3- 2ACSR &1- 2ACSR)
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP &2FTBRKT
1 Y POLE WOOD CCA 35 FT CLASS 5
1 N SEC DEADEND ONE WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP & 2 FT BRKT
91 Y SEC WIRE -ACSR DUPLEX #4
Inst Op Volt Num 12
Inaccessible • N
1
1
1
4
1
1
TB02515 1
1
50
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour : 27.84
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
POLE WOOD CCA 45 FT CLASS 3 W GROUND
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock/Swamp' N Est Co ManHour • 59 55
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF BANK OPEN DELTA 120/240V 25 & 15 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
Y STREET LIGHT LUM -MV 7000L 175W 120V W /PE, LAMP & 2 FT BRKT
N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Est Cont ManHours :
DOT SUPPORT
DOT SUPPORT
Page : 23
Est Cont ManHours • 0 00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
PND3DW8
SR21 /0
SVCONNOH
TBO2515
LTA72
SVQP1 /0S
1
1
1
1
50
N PRI & NEUTRAL DEADEND 3 PH W DOUBLE8 FOOT WOOD ARM
N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF BANK OPEN DELTA 120/240V 25 & 15 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
Y STREET LIGHT LUM -MV 7000L 175W 120V W /PE, LAMP & 2 FT BRKT
N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
Page : 24
Work Location : 32.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
NONE
scription
Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
G11HIG
PL405SG
PN33971/0C
PNT3CTS
S2TPAC
SCONNOH
SD1
SR11 /0
TA25
LTAHPS144
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
NONE
INSTALL
INSTALL
INSTALL
INSTALL NONE
NONE
NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized . Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
G11HIG
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
nst Op Volt Num
Inaccessible : N
10
1
4
127
1
1
127
1
113
2
1
1
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 43.14
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
Y 3PH PRI- NEUTRAL (3-397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT & CT
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y STREET LIGHT LUM -HPS 14500L 150W 120V,COBRA DROP, W /PE,
LAMP &4FTBRKT
t Op Volt Numi : , Rmv Dsgn Volt Num : 25 Rmv Op Volt Num :
naccessible • N Rock /Swamp N Est Co ManHour* 52
224 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1,000
1
224
1
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y
Y
N
Est Cont ManHours
DOT SUPPORT
DOT SUPPORT
POLE WOOD CCA 55 FT CL 3 W SECT GND
3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
anHours • 0.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location : 33.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
* ** Work Location : 34.00
INSTALL NONE
INSTALL
INSTALL
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
NONE
* ** Work Location : 35.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
S1 /OTPAC
SCONNOH
SETUP
SR11 /0
TA25
LTAHPS144
Description ;
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
POLESTAKE
SD1
SETUP
SD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S2TPAC
PL453G
PN33971/0C
PNT3CTS
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
P1 /OAXNC
TN36T
168
2
4
1
1
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC DEADEND ONE WIRE
1
3
1
2
Inst Op Volt Num . 12
Inaccessible • N
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120 /240V CPT W /CO & LA BKT & FUSE
Y STREET LIGHT LUM -HPS 14500L 150W 120V,COBRA DROP, W /PE,
LAMP & 4 FT BRKT
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 4.71
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 30.98
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
Page : 25
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
4
78
1
78
1
Inst Op Volt Num' : 12
Inaccessible : N
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num "12
Rock /Swamp : N Est Co ManHour : 46.65
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
44 Y PRI CABLE #1 /0 AXN 25KV JACKETED W' CONCENTRIC NEUTRAL
44 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
NONE
Location::
INSTALL NONE
INSTALL NONE
DSALBU
FL25
P1 /0AXNC
PL453SG
1
1
35
1
PN33971/0C 187
PNTV3P 1
PRS11 /0CS
LTAHPS142
1
Y DISC SW ASSY 1 -100A LDBUST CUTOUT,ARRESTER &T HANGER -1PH
POTHEAD
N FUSE -LINE LINK FITALL TYPE KS 25 AMP
Y PRI CABLE #1 /0 AXN 25KV JACKETED W CONCENTRIC NEUTRAL
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN VERT 3 PH W /PTP & 2 -1POST
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE- 1 PHASE
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W /PE,
LAMP & 2 FT BRKT
Page : 26
* * Work Location: 35.01 Description :
nst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALBU
EASEMENT
FL25
G11HIG
P1 /OAXNC
PDDJUMPER3
PL553SG
PN33974/OC
PNDDV3B1L
POLESTAKE
PRS11 /0CS
PS1 /ORJKHS
SETUP
TN36T
TNSPLICEPIT
LTAHPS142
t Op Volt Num
Inaccessible : N
1,000
Description
Inst Dsgn Volt Nu
Energized :-Y_
OHFLAGTRAFF
PLCUT
1
2
45
1
1
220
1
3
1
1
4
1
1
Op Volt Num';$;
naccessible'' N
10
Rmv Dsgn, Volt Num 25 Rmv Op Volt Num - 12
Rock/Swamp : N Est Co ManHour 67.87 Est Cont ManHours : 5.38
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LDBUST CUTOUT,ARRESTER & T HANGER -1PH
POTHEAD
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 25 AMP
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y PRI CABLE #1 /0 AXN 25KV JACKETED W' CONCENTRIC NEUTRAL
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
N POLE STAKING BY SURVEYOR- USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE- 1 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
10 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W /PE,
LAMP & 2 FT BRKT
n Volt Num : 25 Rmv Op Volt Nur.,
Rock/Swamp • N Est Co ManHour: 50.21
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
Cont ManHours : 0.00';
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
REMOVE TRANSFER
Work Location': 36.01
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
INSTALL NONE
INSTALL TRANSFER
Work Loca
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SETUP
S1 /OTPAC
P21 /0C
PL453G
PN122C
PN33971/0C
PND1
PNDV2
PNTV3P
SVCONNOH
SVTP2S
LT74
Description :
Inst Dsgn Volt Num :
Energized : Y
DISTEASEMENT
EASEMENT
PL503G
POLESTAKE
S1 /OTPAC
SD1
SETUP
SVCONNOH
SVTP2S
LT712
7.00 Description :
nst Dsgn Volt Num • `.
Energized : Y
PL553SG
PLCUT
PNTV2PS
SETUP
SPREADPHASES2
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
113 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
113 Y PRI WIRE 2PH BARE ACSR #1 /0
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
157 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
168 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI -NEUT DEADEND VERTICAL 2 PH
1 N P &N TAN VERT 3PH W /PTP & 2 -1POST
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
72 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y STREET LIGHT LUM -MV 7000L 175W 120/240V CONSTWATTAGE
BALLAST W /1000W PE W/1
Inst Op Volt Num 12
Inaccessible • N
3
Inst Op Volt Nu
naccessible • N
1
124 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1
1
4
Rock/Swamp • N
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour 1183
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
2 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
45 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y STREET LIGHT LUM -MV 7000L 175W 120/240V CONSTWATTAGE
BALLAST W /1000W PE W/1
Rmv Op Volt Nu
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N P &N TAN VERT 2 PH W /PTP & 1 POST BKT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 27
Co ManHour • 51 Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
Work Location : 37.10
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
SR11 /0
SVCONNOH
TA25
PN21 /01 /0C
SVTP1 /0S
PL405SG
PNTV2PS
SPREADPHASES2
SR11 /0
SVCONNOH
TA25
PN21 /01/0C
SVTP1 /0S
Description
inst Dsgn Volt Nu
Energized • Y
G11HIG
OHFLAGTRAFF
PDDJUMPER1
PDDJUMPER3
PL553G
PN11 /01 /OC
PN21 /01 /OC
PN33974/0C
PND1
PNDDV3B1L
PNDV2
POLESTAKE
SETUP
SPREADPHASES2
SPREADPHASES2
1
Inst Op Volt Num
Inaccessible • N
3
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 25 KVA 120 /240V CPT W /CO & LA BKT & FUSE
140 Y 2PH PRI- NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
30 N SERVICE -3 WIRE TRIPLEX 1 /OAL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
1 Y POLE WOOD CCA 40 FT CL 5 W SECT GND
1 N P &N TAN VERT 2 PH W /PTP & 1 POST BKT
1 N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
140 Y 2PH PRI - NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
30 N SERVICE -3 WIRE TRIPLEX 1 /OAL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Page : 28
2
1
1
242
31
224
1
1
3
4
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nur
Rock/Swamp • N Est Co ManHour : 97.62 Est Cont ManHours : 3.94
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 1PH PRI - NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
Y 2PH PRI - NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
N PRI -NEUT DEADEND VERTICAL 2 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
** *'Work Location 38.00 Description
nst Dsgn Volt Num
Energized : Y
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
REMOVE TRANSFER
REMOVE TRANSFER
Work Location 38.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
..... .....
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
NONE
NONE
NONE
NONE
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
PL453G
PN122C
PN33971/0C
PND1
PNT3S
S1 /OTPAC
SVCONNOH
SVTP2S
LTAHPS82
PN122C
Inst Op Volt Num • 12
Inaccessible • N
4
120
1
45
120
1
1
53
1
Description
Inst Dsgn Volt Num
Energized . Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
G11HIG
PL553G
PN33974/0C
PNC3L
PND1
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
LTAHPS82
1,000
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour ::40.13
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Y POLE WOOD CCA 45 FT CLASS 3 W' GROUND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI- NEUTRAL (3-397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
97 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
50 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Est Cont ManHours : 0.00
Ip Volt Num • 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
naccessible : N Rock/Swamp : N Est Co:ManHour : 44.32 Est Cont ManHours : 5.38
134
1
3
1
134
1
1
3
104
1
1
4
1
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
N PRI & NEUTRAL DEADEND 1 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
Page : 29
DOT SUPPORT
INSTALL TRANSFER
* ** Work Location : 39.00
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
* ** Work Location : 39.01
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
INSTALL NONE
* ** Work Location : 40.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
PN122C 50 Y 1PH PRI-NEUTRAL (1-2ACSR&1-2ACSR)
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL305
SD1
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
PL355
POLESTAKE
SDD1
SETUP
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL453SG
PN33971/0C
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 24.62
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE- FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
2 N SEC DEADEND ONE WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
55 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 11.47
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- **INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) USE DOT CONTR
OR CONTRACTOR BID
1
1
3
2
2
1
35 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
N
Y
N
N
N
GUY ANCH HELIX 11M W GUARD
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
2 N GUY ANCH HELIX 11M W GUARD
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
155 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
Page : 30
POLE WOOD CCA 35 FT CLASS 5
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
SEC DBL DEADEND 1 WIRE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour : 44.35
Est Cant ManHours : 0.00
Est Cont ManHours 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
**
Work Location 40.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
k L ocation
PNT3S
SR11 /0
SVCONNOH
SVTP2S
TA25
LTHPS8S2
Description :
Inst Dsgn Volt Num
Energized : Y
DISTEASEMENT
EASEMENT
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
SR11 /0
SVCONNOH
SVTP2S
TA25
LTHPS8S2
•cription :
[nst D$gn Volt Num : 25
Energized;''. Y
DISTEASEMENT
EASEMENT
PL355
POLESTAKE
1
1
Op Volt Num: 12
Inaccessible • N
1,000
240 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
1 Y STREET LIGHT - SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
1
1
134
1
Inst Op Volt Num : 12
Inaccessible : N
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 38.69
DOT SUPPORT
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
118 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE ""1 PER
SERVICE * * * **
140 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y STREET LIGHT - SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour • 8 29
: COnt ManHou
DOT SUPPORT
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 Y POLE WOOD CCA 35 FT CLASS 5
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Page : 31
Est Cont ManHours : 5.38
• 5.38
INSTALL NONE
INSTALL NONE
INSTALL NONE
TRANSFER NONE
Icgs
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
rk Location 41.00
INSTALL NONE
NONE
NONE
NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
REMOVE TRANSFER
REMOVE TRANSFER
* ** Work Location 42.00
SDD1
SETUP
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 2
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES1
S4DPXC
DSALB
FL15
G11HIG
PDDJUMPER1
PL453SG
PN122C
PN33971/0C
PNDD1
PNT3S
SPREADPHASES1
LTAHPS82
PN122C
Description
Inst DsgnV
Energized 'Y
PLCUT
SETUP
CO
G11HG
PDDJUMPER1
PL405SG
PNDD1
Inst Op Volt Num
Inaccessible : N
10
Inst Op Volt Num
Inaccessible N
1
4
1
1
1
1
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1
4
1
36 Y
1 Y
1 N
1 N
1 N
1
36
118
1
1 N
1
1 Y
200 Y
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 54.66
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 1 PH
SEC WIRE -ACSR DUPLEX #4
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
FUSE -LINE LINK FITALL TYPE KS 15 AMP
GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DBL DEADEND 1 PH
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
1 PH
STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Page : 32
Est Cant ManHours : 0.00
Rmv Dsgn Volt Num 25'. -;`. Rmv Op Volt Num • 12 anHour • 17 24
Rock/Swamp N Est O
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DISC SW CUTOUT FOR DSRD PRI VOLT
N GUY ANCH HELIX 11M W GUARD
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
N PRI & NEUTRAL DBL DEADEND 1 PH
Est Cont ManHours : 0.00
REMOVE TRANSFER
REMOVE TRANSFER
Work Locati on 42.01
INSTALL NONE
INSTALL NONE DSALB
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE SPREADPHASES1NONTAN
G
INSTALL
INSTALL
ork Location 42.54
NONE
NONE
PN 11 /01 /0C
SVTP2S
50
100 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Description
Inst Dsgn Volt Num :
Energized, : Y
EASEMENT
PN11/01/0C
PN122C
_. - __ ........... .......... .
SVTP2S
Energized
SETUP
T37
DISTEASEMENT
PDDJUMPER1
PL553SG
PN122C
PN33974/0C
PND1
PNTV3F
POLESTAKE
PS2
S1 /OTPAC
SCONNOH
SDD1
SETUP
SPREADPHASES1NONTAN
G
SS2
LTAHPS82
Inst Op Volt Num
Inaccessible : N
1,000
1
1
40 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
126 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
2
1
3
1
140
1
1
4
1
Inst Op Volt Nur
Inaccessible ▪ N
1
1
Y 1PH PRI- NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
Y
Y
Rmv Dsgn Volt Num
Rock/Swamp : N Est Co ManHour : 65.51 Est Cont ManHours : 5.38
v Op Volt Num : 12
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
DOT SUPPORT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N OVERHEAD PRI SPLICE FOR #2 ACSR
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
N OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
50 Y 1PH PRI - NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
200 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
100 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
1PH VERT & DEADEND
Page : 33
Description •
Inst Dsgn Volt Nu
Rmv DsgnhVolt Num 25 Rmv Op Volt Num
Rock/Swamp : N' Est Co ManHour : 2.8
• SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y XFMR OH 1 PH 37 KVA FOR DSRD PRI VOLT 120 SEC VOLT
nt : 0.00
REMOVE NONE T25
* ** Work Location : 43.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
* ** Work Location : 44.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 44.01
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
OHFLAGTRAFF
SD1
SETUP
SD1
Description :
Inst Dsgn Volt Num : 25
Energized . Y
OHFLAGTRAFF
PLCUT
SETUP
PL405SG
PN33971/0C
PNT3S
S1 /OTPAC
S4DPXC
SCONNOH
SD1
SR11 /0
SVCONNOH
SVTP2S
TA25
LTAHPS82
Description :
Inst Dsgn Volt Num : 25
Energized : Y
1
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W' GUARD
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC DEADEND ONE WIRE
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
38 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
119 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
57 Y SEC WIRE -ACSR DUPLEX #4
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
2 N SEC DEADEND ONE WIRE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
98 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
1 Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
DISTEASEMENT
Inst Op Volt Num : 12
Inaccessible N
Y XFMR OH 1 PH 25 KVA FOR DSRD PRI VOLT 120 SEC VOLT
Rmv Dsgn Volt Num 25 Rmv Op Volt Num: 12
Rock /Swamp : N Est Co ManHour : 19.72
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 38.07
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour • 45 47
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Page : 34
Est Cont ManHours : 1.44
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
INSTALL NONE
INSTALL NONE
INSTALL NONE
EASEMENT
G11HIG
PL553G
PN322C
PN33974/0C
PNDV3
PNTV3F
POLESTAKE
SETUP
LTAHPS82
1
3
1
155
126
1
* Work Location : 45.00
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
NONE
NONE
NONE
NONE
NONE
NONE
Work Location : 45.01
Description :
nst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
FL25
G11HIG
P31 /OAXNC
PL453SG
PND3STL6
PRS31 /0CS
Description :
Inst Dsgn Voit
Energized : Y'
DSALBU3
INSTALL NONE FL25
INSTALL NONE G11HIG
DISTEASEMENT
1
3
4
1
nst Op Volt Num : 12
Inaccessible : N
Op Vol Num
Inaccessible : N
1,000
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
63 Y PRI UD CABLE -3 PH 1/0 AXN
63 N TRENCHING 36 " DEEP AND PROPER BACKFILL 30" COVER
1 Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
3 N FUSE -LINE LINK FITALL TYPE KS 25 AMP
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
35 Y PRI UD CABLE -3 PH 1/0 AXN
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
1 N PRI & NEUTRAL DEADEND 3 PH W' 6FT STL ARM
1 N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
1
EASEMENT 1
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3- 2ACSR &1- 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour 41.79 Est Cant ManHours : 0.00
Rock/Swamp : N Est Co ManHour : 44.34
N FUSE -LINE LINK FITALL TYPE KS 25 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Page : 35
DOT SUPPORT
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Cont ManHours : 5.38
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
ork Location : 47.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
P31 /OAXNC
PL453SG
PND3STL6
POLESTAKE
PRS31 /OCS
PS1 /ORJKHS
SETUP
TNSPLICEPIT
* ** Work Location : 46.00 Description
Inst DsgnMVolt Nu
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
PDDJUMPER3
PHP
PHPF13
PL453G
PN322C
PN33971/OC
PND3STL6
PNT3F
,cription
Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
DSALB
FL25
PL453SG
PN122C
PN33971/0C
PND1
PNT3S
35
1
1
3
1
3
4
nst Op Volt Num 12
naccessible N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 N PRI - HORIZONTAL POST INSUL TIE TOP
1 N FIBERGLASS STANDOFF 13" JUMPER PIN BRACKET
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
57 Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
118 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Op Volt Nu
Inaccessible • N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 N FUSE -LINE LINK FITALLTYPE KS 25 AMP
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
55 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
111 Y 3PH PRI-NEUTRAL (3-397ACSR&1-1/OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N P &N TAN 3PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Rmv Dsgn Volt Num 25 Rmv Op Volt Num 12
Rock/Swamp • N Est Co ManHour 46 11
2mv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp N Est Co ManHour ; 39 29
Page : 36
Est Cont ManHours : 0.00
Cont ManHours 0 00
* ** Work Location : 47.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 48.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 49.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 49.01
INSTALL EXCLUDE STAT
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
PL553G
PN122C
PN33974/0C
PNDS1
PNTV3F
S1 /OTPAC
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
18 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
181 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI -NEUT DEADEND SLACKSPAN 1 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
POLESTAKE
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PDDJUMPER1
PNDS1
SETUP
PDDJUMPER1
PND1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
PL405G
PN122C
PN33971/0C
PND1
Inst Op Volt Num : 12
Inaccessible : N
1
1
4
1
Inst Op Volt Num : 12
Inaccessible : N
1
4
142
1
69
142
1
PNT3S 1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 23.30
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 9.41
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI -NEUT DEADEND SLACKSPAN 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 37.51
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 62.99
454 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Page : 37
Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours • 5 38
Page : 38
INSTALL NONE DISTEASEMENT 1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
INSTALL NONE EASEMENT
INSTALL NONE OHFLAGTRAFF
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE PND1
INSTALL NONE
REMOVE NONE
* ** Work Location : 51.00
* ** Work Location : 52.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
PDDJUMPER1
PL553G
PN122C
PN33974/OC
PND1
PNTV3F
POLESTAKE
SETUP
* ** Work Location : 50.00 Description :
Inst Dsgn Volt Num : 25
Energized : Y
SETUP
PND1
Description :
Inst Dsgn Volt Num • 25
Energized : Y
Description
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
10
1 N
1
214
240
1
1 N
3 N
Y
N
N
S2TPAC 91
SCONNOH 3
Inst Op Volt Num : 12
Inaccessible : N
1
2
Inst Op Volt Num : 12
Inaccessible : N
OR CONTRACTOR BID
Rock /Swamp : N
Rock/Swamp : N
INSTALL NONE S2TPAC 55 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
INSTALL NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
INSTALL NONE SD1 1 N SEC DEADEND ONE WIRE
INSTALL NONE SETUP 4
REMOVE NONE S2TPAC 55
REMOVE NONE SCONNOH 1
REMOVE NONE SD1 1
Inst Op Volt Num • 12
Inaccessible: N
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 1PH PRI- NEUTRAL (1-2ACSR &1- 2ACSR)
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
PRI &NEU TANG VERT 3 PH W/ 3-1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num . 25 Rmv Op Volt Num : 12
N PRI & NEUTRAL DEADEND 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Est Co ManHour : 6.71 Est Cont ManHours : 0.00
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 24.76
Est Co ManHour : 6.56 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Est Cont ManHours : 0.00
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
Work Location : 53.00 Description
Inst Volt Num • 25
Energized : Y
OHFLAGTRAFF
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
Work Location : 53.01
NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
TRANSFER NONE
NONE
NONE
NONE
NONE
PL355
S1 /OTPAC
SCONNOH
SDD1
PLCUT
SETUP
S2TPAC
PL453SG
PN122C
PN33971/0C
PND1
PNT3F
S2TPAC
SCONNOH
SR11 /0
TA37
Description
t Dsgn Volt Num 25
Energized • Y
DISTEASEMENT
EASEMENT
G11HG
PL355
POLESTAKE
SDD1
SETUP
S2TPAC
1
60
1
Inst Op Volt Nu
Inaccessible : N
10
4
206
1
92
206
1
78
2
1
1
Inst Op Volt Num
Inaccessible N
1,000
1
3
2
2
50
N
Y
Y
N
Y
N
N
& FUSE.
Y POLE WOOD CCA 35 FT CLASS 5
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 46.81
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI- NEUTRAL (3-397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
Rmv Dsgn Volt Num 25 Rmv Op Volt Num
Rock/Swamp • N Est Co ManHour • 9 75
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
GUY ANCH HELIX 11M W GUARD
POLE WOOD CCA 35 FT CLASS 5
POLE STAKING BY SURVEYOR USE DOT SUPPORT CONTRACTOR
SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Page : 39
Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
l ork Location 54 00 Description
Inst DsgnVolt
Energized : Y
INSTALL NONE OHFLAGTRAFF
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
f ork Lo
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PLCUT
SETUP
DSALB
FL15
G11HIG
PDDJUMPER1
PL405G
PN122C
PNDD1
Inst Op Volt Num
Inaccessible • N
10
1
1
1
1
1
1
1
105
1
Description :
nst Dsgn Volt Nu
Energized Y
DISTEASEMENT
EASEMENT
G11HIG
PDDJUMPER1
PL453SG
PN122C
PNDD1
POLESTAKE
SD1
SETUP
SL6UDAC
SR11 /0
SRS2
SS6UDA
TA37
TN18LT
TNSPLICEPIT
Inst Op Volt Num : 12
Inaccessible
3
1 N
4 N
65 Y
1 N
1 N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
111 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
1 N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co MsnHour :34.64
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N FUSE -LINE LINK FITALL TYPE KS 15 AMP
N
N
Y
Y
N PRI & NEUTRAL DBL DEADEND 1 PH
GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
POLE WOOD CCA 40 FT CLASS 5 W GROUND
1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Dsgn Volt Num : 25 Rmv:Op Volt Num : 12
Rock/Swamp :.' N Est Co ManHour 35.9
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
SEC DEADEND ONE WIRE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
STREET LIGHT CABLE #6 AL UD DUPLEX
SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
SEC RISER SHIELD 2 IN.
SERVICE SPLICE #6 UDA
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
35 N TRENCH FOR STREET LIGHT CABLE AT 18"
1 N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Est Cant ManHours : 0.00
Est Cont ManHours : 5.3
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 40
INSTALL NONE
REMOVE NONE
ocation : 55.00
INSTALL NONE
INSTALL
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
rk Location : 55.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
FL15
P31 /OAXNC
PL453SG
PN33971/0C
PNT3S
PRS31 /0CS
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num
Energized • Y
DISTEASEMENT
DSALBU3
EASEMENT
FL15
P31 /OAXNC
PL553SG
PN33974/OC
PNTV3F
POLESTAKE
PRS31 /OCS
PS1 /ORJKHS
SETUP
TNSPLICEPIT
Inst Op Volt Num 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Nur
Inaccessible : N Rock/Swamp : N Est Co ManHour : 48.72 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
95 Y PRI UD CABLE -3 PH 1/0 AXN
95 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
1 Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
3 N FUSE -LINE LINK FITALL TYPE KS 15 AMP
35 Y PRI UD CABLE -3 PH 1/0 AXN
1
204
1
1
Op Volt Num : 12
Cnaccessible • N
1,000
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
32 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1
1
3
1
1
1
3
4
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour : 49.03
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 15 AMP
45 Y PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
240 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
DOT SUPPORT
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Cont ManHours : 5.38
* ** Work Location • 56 00 Description
Dsgn Volt Num
INSTALL NONE
NONE
INSTALL
INSTALL
REMOVE ABANDON
NONE
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
NONE
REMOVE NONE
REMOVE NONE
Energized : Y
OHFLAGTRAFF
S4 /OUQA
SR31 /0
SRS3
SVQP1 /0S
TBY37
Work Location 56.01 Description •
nst Dsgn Volt Num • 2
Energized : Y
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Page : 42
PLCUT
SETUP
S4 /OUQA
TNSV
PL453SG
PN33971/0C
PNT3F
SVCONNOH
DISTEASEMENT
EASEMENT
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S4 /OUQA
SETUP
SR31 /0
SRS3
SS4 /OUQAHEAT
SVCONNOH
Inst Op Volt Nu
I naccessible : N
10
1
4
Rmv Dsgn Volt Num . 25 Rmv Op Volt Num • 12
Rock/Swamp : N Est Co ManHour 46.23 Est Cont ManHours : 0.00
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
290 Y SECONDARY 4/0 UQA MCM AL UD (NOT SERVICE) USE WHEN
RUNNING TO SVC PEDESTAL
290 N TRENCHING FOR SERVICE
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
135 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N
Op Volt Num
Inaccessible • N
1,000
PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
140 Y SECONDARY 4/0 UQA MCM AL UD (NOT SERVICE) USE WHEN
RUNNING TO SVC PEDESTAL
1 N SEC RISER (3) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 N SEC RISER SHIELD 3 IN.
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
60 N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
1 Y TRANSF BANK WYE 120/208V 3- 37.5KVA NO TAPS CPT W' CLUST MTN
3CO3LAANDC
1
1
206 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
430 Y SECONDARY 4/0 UQA MCM AL UD (NOT SERVICE) USE WHEN
RUNNING TO SVC PEDESTAL
4
1
1
v Dsgn Volt Num : 2
Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 61.95
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER (3) XFMR BANK 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N SEC RISER SHIELD 3 IN.
t Cont ManHours : 5.3
DOT SUPPORT
4 N SERVICE SPLICE -4/0 UQA HEAT SHRINK
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
INSTALL NONE SVQP1 /0S
INSTALL NONE TBY37
INSTALL NONE TNSV
* ** Work Location : 57.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 58.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
NONE
** Work Location : 58.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HIG
PDDJUMPER1
PNDD1
SETUP
G11HIG
PNT1
Description :
Inst Dsgn Volt Num : 25
Energized • Y
OHFLAGTRAFF
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
FL40
G11HIG
P31 /OAXNC
PL405SG
PND3STL5
PRS31 /0CS
Description
Inst Dsgn Volt Num : 25
Energized : Y
50 N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
1 Y TRANSF BANK WYE 120/208V 3- 37.5KVA NO TAPS CPT W CLUST MTN
3CO3LA AND C
290 N TRENCHING FOR SERVICE
Inst Op Volt Num : 12
Inaccessible : N
1
2
1
Inst Op Volt Num : 12
Inaccessible : N
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
52 Y PRI UD CABLE -3 PH 1/0 AXN
52 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
1 Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
3 N FUSE -LINE LINK FITALL TYPE KS 40 AMP
1 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
35 Y PRI UD CABLE -3 PH 1/0 AXN
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
1 N PRI & NEUTRAL DEADEND 3 PH W' 5FT STL ARM
1 N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
DISTEASEMENT
DSALBU3
EASEMENT
FL40
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 15.97
N PRI & NEUTRAL DBL DEADEND 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL TANGENT 1 PH
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 41.59
Inst Op Volt Num : 12
Inaccessible : N
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 44.34
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 40 AMP
Page : 43
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Work Location 59.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
G11HIG
P31 /OAXNC
PL453SG
PND3STL6
POLESTAKE 3
PRS31 /OCS 1
PS1 /ORJKHS
SETUP
TNSPLICEPIT
Description
Inst Dsgn Volt Nu
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
2
35
1
1
3
4
Inst Op Volt Num 12
Inaccessible : N
FL40
P31 /OAXNC
PL453SG
PN31 /01 /0C
PNT3F
35 Y
1
15
1
PRS31 /0CS
1
Description
nst Dsgn Volt Num 25
Energized : Y
DISTEASEMENT
EASEMENT
FL40
G11HIG
nst Op:Volt Nu
Inaccessible • N
1,000
DSALBU3 1
OHFLAGTRAFF 10
P31 /OAXNC
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N PRI RISER& COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
345 Y PRI UD CABLE -3 PH 1/0 AXN
345 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
1 Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
3 N FUSE -LINE LINK FITALL TYPE KS 40 AMP
PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
ck/Swamp N Est Co ManHour 59.35
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
35 Y PRI UD CABLE -3 PH 1/0 AXN
DOT SUPPORT
Page : 44
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 38.24 Est Cont ManHours : 0.00
Est Cont ManHours : 5.38 r`.
DOT SUPPORT
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 40 AMP
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 60.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 60.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 61.00
PL453SG
PND3STL6
POLESTAKE
PRS31 /OCS
PS1 /ORJKHS
SETUP
TNSPLICEPIT
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL453G
PN31 /01 /0C
PN33971/0C
PND3STL5
PNT3CTS
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
PL553G
PN31 /01 /0C
PN33974/OC
PNDV3
PNTV3F
POLESTAKE
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE OHFLAGTRAFF
1
1
3
1
3
4
1
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
60 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
270 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 3 PH W 5FT STL ARM
1 N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
N POLE STAKING BY SURVEYOR USE DOT SUPPORT CONTRACTOR
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Inst Op Volt Num : 12
Inaccessible • N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 50.98
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N
Est Co ManHour : 36.55
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
105 Y 3PH PRI- NEUTRAL(3- 1 /OACSR &1- 1 /OACSR)
206 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI -NEUT DEADEND VERTICAL 3 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock /Swam • N Est Co ManHour • 33 39
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
DOT SUPPORT
Page : 45
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
INSTALL
INSTALL
INSTALL TRANSFER
NONE
NONE
NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
NONE
NONE
NONE
PLCUT
SETUP
PN33971/OC
PNT3F
POLEFIXTURE
CB113F600
*** Work Location • 61 01 Description •
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL553G
PN31/01/0C
PN33974/0C
PNDV3
PNTV3F
POLESTAKE
SETUP
CB113F600
PLCUT
SETUP
GSP11I
PL405SG
PN33971/0C
PNT3CTS
S1/OTPAC
SCONNOH
SD1
SR11/0
1
4
205
1
Inst Op Volt Num. 12 Rmv Dsgn Volt Num . 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 54.81
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- **INVENTORY DOLLARS PAID***
1 Y AGENTS COST OF OBTAINING EASEMENT-($850) - USE DOT CONTR
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
162 Y 3PH PRI-NEUTRAL (3-1/OACSR&1-1/OACSR)
Y 3PH PRI-NEUTRAL (3-397 ACSR&1-4/OACSR)
1 N PRI-NEUT DEADEND VERTICAL 3 PH
1 N PRI&NEU TANG VERT 3 PH W/ 3-1 PH FIBER- GLASS BKT-SO. ELE.
STANDARD (B-9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y FIXED CAP BANK UNIT 600 KVAR W/ 3-200 KVAR UNITS 11.4KV
164
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 3P1 PRI-NEUTRAL (3-397ACSR&1-1/OACSR)
N PRI&NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT-SO. ELE. STANDARD (B
-9445)
Y ONE SET OF POLE FIXTURES. USE WHEN ATTACHING TO NON GPC OR
TRANS POLE
Y FIXED CAP BANK UNIT 600 KVAR W/ 3-200 KVAR UNITS 11.4KV
*** Work Location if 62.00 Description:
Inst Dsgn Volt Num *25 Inst Op Volt Num • 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num: 12
Energized : Y = -- Inaccessible N ROCk/SWarnp : N Est Co ManHour . . 40.85 - _ _ Est Cont ManHours : 0.00
INSTALL NONE OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY SPAN 11M W' 1 FIBRE GLASS STRAIN INSUL
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
111 Y 3PH PRI-NEUTRAL (3-397ACSR&1-1/OACSR)
1 N P&N TAN 3 PH W/ PTP & 2 POST BKT & CT
95 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER-WP CU #1/0 7STR
Page : 46
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
REMOVE NONE
* ** Work Location : 62.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 63.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
TA15
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
SR11 /0
TA15
1
1
168
1
3
88
1
1
4
1
1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
SETUP
G11HG
PL305
Inst Op Volt Num : 12
Inaccessible • N
2
1
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25
Inaccessible : N Rock/Swamp : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 20.83
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 30 FT CLASS 5
Rmv Op Volt Num : 12
Est Co ManHour . 32.35 Est Cont ManHours : 5.38
* ** Work Location : 64.00 Description
Inst Dsgn Volt Num : 25 Inst Op Volt Num • 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock /Swamp : N Est Co ManHour : 51.37
INSTALL NONE OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
INSTALL NONE PLCUT 1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
INSTALL NONE SETUP 4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
INSTALL NONE SPREADPHASES1 1 N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 1 PH
REMOVE NONE DSALB 1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
REMOVE NONE FL50 1 N FUSE -LINE LINK FITALL TYPE KS 50 AMP
REMOVE NONE GI1HIG 1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
REMOVE NONE PL405SG 1 Y POLE WOOD CCA 40 FT CL 5 W SECT GND
Page : 47
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE TRANSFER
* ** Work Location : 64.01
INSTALL TRANSFER
* ** Work Location : 65.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 66.00
INSTALL NONE
PN33971/0C
PND1
PNT3S
SPREADPHASES1
PN122C
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PL553G
PN122C
PN33974/0C
PND1
PNTV3F
POLESTAKE
PS2
SETUP
SS2
PN122C
Description :
Inst Dsgn Volt Num : 25
Energized • Y
SCONNOH
SD1
SETUP
SCONNOH
SD1
Description
Inst Dsgn Volt Num : 25
Energized • Y
OHFLAGTRAFF
208
1
1
1
Inaccessible : N
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 1 PH
152 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Inst Op Volt Num : 12
Inaccessible : N
1 N OVERHEAD PRI SPLICE FOR #2 ACSR
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
152 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Inst Op Volt Num : 12
Inaccessible N
1
1
2
1
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Page : 48
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp . N Est Co ManHour : 51.27
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
27 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
210 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour : 4.91
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
Rock/Swamp : N Est Co ManHour : 42.03
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
Work Location : 67.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PLCUT
SETUP
PL405SG
PN33971/0C
PNT3S
S1 /OTPAC
SCONNOH
SD1
SR11 /0
TA25
S1 /OTPAC
* ** Work Location : 66.01 Description
Inst Dsgn Volt Num': 25
Energized : Y
DISTEASEMENT
EASEMENT
PL553SG
PN33974/OC
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
SR11 /0
TA25
S1 /OTPAC
Description :
I nst Dsgn Volt Num : 25
Energized . Y
G11HG
OHFLAGTRAFF
PL355
SDD1
SETUP
1
4
1
187
1
107
1
1
1
1
130
nst Op Vo
Inaccessible : N
1,000
1
248
1
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
3
142
1
1
4
1
1
130
1
1
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num ; 12
Rock/Swamp : N Est Co ManHour : 39.53
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
en Ds n Volt Num : 25
Rock/Swamp : N
N GUY ANCH HELIX 11M W GUARD
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 35 FT CLASS 5
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 49
Est Cont ManHours : 5.38
DOT SUPPORT
Rmv Op Volt Nunn : 12
Est Co ManHour 35.63 Est Cant ManHours : 0.00
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER LTHPS8S2
REMOVE TRANSFER
Work Location 68.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SVCONNOH
LTHPS8S2
SVTP2S
PL305
SDD1
SVCONNOH
SVTP2S
Rmv
Description
Inst Dsgn! Volt Num'
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
DSALB
FL10
G11HIG
PL405SG
PN144C
PN33971/0C
PND1
PNT3S
Description
Inst Dsgn Volt Num
Energized : Y
1
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL553G
PN122C
PN33974/0C
PND1
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y STREET LIGHT - SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y STREETLIGHT- SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N FUSE -LINE LINK FITALL TYPE KS 10 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
Y 1PH PRI- NEUTRAL (1- 4ACSR &1 - 4ACSR)
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
4
1
1
1
1
164
187
1
nst Op Volt Nur
naccessible • ▪ N
1,000
1
1 0
1
203
248
1
Y POLE WOOD CCA 30 FT CLASS 5
n Volt Num : 25 Rmv Op Volt Num
Roc amp : N Est Co ManHour 45.18
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
DOT SUPPORT
Page : 50
Cont ManHours • 0 00
Rmv Dsgn.Volt Num , 25 Rmv Op Volt Num : 12
Co ManHour : 49.27 Est Cont ManHours : 5.38
INSTALL NONE
INSTALL NONE
INSTALL NONE
*** Work Location : 69.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 70.00
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
EXCLUDE STAT
PNTV3F
POLESTAKE
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HIG
PND1
SETUP
G11HIG
PND1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S2TPAC
PL453SG
PN33971/0C
PNT3S
S1 /OTPAC
SCONNOH
SD1
SR11 /0
TA25
* ** Work Location : 70.10
Description :
Inst Dsgn Volt Num : 25
Energized ' Y
DISTEASEMENT
EASEMENT
PL553SG
1
Inst Op Volt Num : 12
Inaccessible N
1
1
2
1
Inst Op Volt Num : 12
Inaccessible • N
PNTV3F
POLESTAKE
S1 /OTPAC
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR USE DOT SUPPORT CONTRACTOR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Inaccessible : N Rock /Swamp : N Est Co ManHour : 37.55
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
98 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
98 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
111 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25
Rock /Swamp : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
DOT SUPPORT
Page : 51
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 11.24
Rmv Op Volt Num : 12
Est Co ManHour : 20.49
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 70.50
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
NONE
SCONNOH
SD1
SETUP
SR11 /0
TA25
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HG
PL355
POLESTAKE
S1 /OTPAC
SDD1
SETUP
1
1
4
1
1
Inst Op Volt Num : 12
Inaccessible . N
1
1
3
170
1
* ** Work Location : 70.51
NONE
NONE
NONE
NONE
* ** Work Location :71.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HG
PL355
S1 /OTPAC
SDD1
Description :
Inst Dsgn Volt Num 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
PL453SG
PN33971/0C
PNT3S
PUDD
SD1
SVCONNOH
SVTP2S
DSAPKR3PHRECL
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
10
1 N
4 N
1 Y
123 Y
1 N
3 N
1
1
45
1 Y
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
N
Y
N
Y
N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 9.08
1
1
150
1 N SEC DBL DEADEND 1 WIRE
Page : 52
GUY ANCH HELIX 11M W GUARD
POLE WOOD CCA 35 FT CLASS 5
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 35 FT CLASS 5
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Est Co ManHour : 7.01
Est Cont ManHours : 3.94
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 55.54
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
TOP ANY SIZE POLE TO MAKE SHORTER POLE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
POLE WOOD CCA 45 FT CL 3 W SECT GND
3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
PRI DOUBLE DEAD END MID SPAN 1 INSUL USED W /100A LINE
SWITCHES (CUTOUTS)
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
PKR (3), ALL BKTS , LA (6) FOR 3 PH RECLOSERS
Est Cont ManHours : 0.00
REMOVE TRANSFER
REMOVE TRANSFER
Work Location : 71.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL EXCLUDE STAT
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
k Location!: 71.02
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
OCRL100NEW3UNITS
TCSRECL
Description :
Inst Dsgn Volt Num
Energized : Y
PHPF13
PL553SG
PN33974/OC
PNTV3F
POLESTAKE
SETUP
DSAPKR3PHRECL
OCRL100NEW3UNITS
TCSRECL
Description
Inst Dsgn Volt Nu
Energized : Y
S1 /OTPAC
S2TPAC
OHFLAGTRAFF
PDDJUMPER1
PDDJUMPER3
PL553G
PN122C
PN33974/OC
PND1
PNDV3L
PNTV3F
INSTALL NONE POLESTAKE
INSTALL NONE SD1
INSTALL NONE
SETUP
1
Y RECLOSER -1 PH TYPE L 100A -THREE UNITS
N BRKT- CLUSTER MOUNT FOR 3 SINGLE PH RECLOSERS (SAME AS XFR
CLUSTER MT)
Page : 53
Inst Op Volt Num
Inaccessible : N
2
1
1
3
4
1
1
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num . 25 Rmv Op Volt Num . 12
Rock/Swamp : N ` Est Co ManHour 39.24
N FIBERGLASS STANDOFF 13" JUMPER PIN BRACKET
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
Cant ManHours : 3.94
20 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y PKR (3), ALL BKTS , LA (6) FOR 3 PH RECLOSERS
Y RECLOSER -1 PH TYPE L 100A -THREE UNITS
N BRKT - CLUSTER MOUNT FOR 3 SINGLE PH RECLOSERS (SAME AS XFR
CLUSTER MT)
Wo
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour ,: 82.19
288 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
256 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Est Cont ManHours : 3.94
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
137 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
407 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
2 N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
* ** Work Location : 72.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* * * Work Location : 73.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 74.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Description
Inst Dsgri Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3
S1 /OTPAC
G11HIG
PL453G
PN33971/0C
PNT3S
SPREADPHASES3
Description :
Inst Dsgn Volt Num : 25
Energized • Y
OHFLAGTRAFF
PLCUT
SETUP
PL503G
PN33971/0C
PNDV3L
PNTV3CTS
S1 /OTPAC
SCONNOH
SD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
Inst Op Volt Num • 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1
4
152
3
1
152
1
Inst Op Volt Num : 12
Inaccessible : N
1
4
1
131
1
1
152
1
Inst Op Volt Num : 12
Inaccessible : N
PLCUT 1
SETUP 4
PL405SG 1
PN33971/0C 162
PNT3F 1
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N
Y
N
Y
Y
N
N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour 50.03
INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
POLE WOOD CCA 45 FT CLASS 3 W GROUND
3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 40.37
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
N P &N TAN VERT 3PH W/3 1 POST BKTS & CT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour : 38.85
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Page : 54
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE
NONE
REMOVE NONE
* ** Work Location : 74.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 76.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
SR11 /0
SVCONNOH
TA15
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
PL553G
PN33974/0C
PNTV3F
POLESTAKE
SETUP
Description;';:,
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
PL305
1
Inst Op Volt Num : 12
Inaccessible : N
1,000
2
1
250
1
3
* ** Work Location : 75.00 Description
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12
Energized : Y Inaccessible : N
INSTALL NONE OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
INSTALL NONE PLCUT 1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
INSTALL NONE SETUP 4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
REMOVE NONE G11HIG 1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
REMOVE NONE PL453G 1 Y POLE WOOD CCA 45 FT CLASS 3 W' GROUND
REMOVE NONE PN33971/0C 158 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
REMOVE NONE PNT3CTS 1 N P &N TAN 3 PH W/ PTP & 2 POST BKT & CT
REMOVE NONE S1 /OTPAC 43 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
REMOVE NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
REMOVE NONE SD1
Inst Op Volt Num : 12
Inaccessible : N
1
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 32.46
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour : 22.43
Est Co ManHour : 38.54 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 30 FT CLASS 5
Page : 55
Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
REMOVE NONE
* ** Work Location 77.00
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
* ** Work Location : 77.01
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
* ** Work Location : 78.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
SD1
Description:
Inst Dsgn Volt Num : 25
Energized : Y
SCONNOH
SD1
SETUP
SCONNOH
SD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
PL453SG
PND1
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
SR11 /0
TA25
Description :
`Tnst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
PL453SG
PN33971/OC
PNT3F
CB723S600
1
N SEC DEADEND ONE WIRE
Inst Op Volt Num : 12
Inaccessible : N
1
1
2
1
1
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour: 4.91
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
Rmv Dsgn Volt Num : 25
Rock /Swamp : N
Rmv Op Volt Num : 12
Est Co ManHour : 23.21
1 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
1 N PRI & NEUTRAL DEADEND 1 PH
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
70 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num • 12
Inaccessible • N
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 35.08
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
147 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Y SW CAP BANK UNIT 600 KVAR W/ 3 -200 KVAR UNITS 7.2KV
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
Page : 56
DOT SUPPORT
Est Cont ManHours : 0.00
* ** Work Location : 78.01
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE DISTEASEMENT 1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
INSTALL NONE EASEMENT 1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
INSTALL NONE G11HIG 2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
INSTALL NONE PL652SG 1 Y POLE WOOD CCA 65 FT CL 2 W SECT GND
- - - -. -. - --
INSTALL NONE PN33974/0C 262 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
INSTALL NONE PNTV3F 1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
INSTALL NONE POLESTAKE 3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
INSTALL NONE SETUP 4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
INSTALL TRANSFER CB723S600 1 Y SW CAP BANK UNIT 600 KVAR W/ 3 -200 KVAR UNITS 7.2KV
* ** Work Location : 79.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
** *Work Location : 80.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL405SG
PN33971/0C
PNT3CTS
S1 /OTPAC
SCONNOH
SR11 /0
TA25
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
LTHPS8S2
PL405
SDD1
SCCONNOH
Inst Op Volt Num : 12
Inaccessible : N Rock /Swamp : N
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
157 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
79 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num : 12
Inaccessible : N
2
1
1
1
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Est Co ManHour : 37.53 Est Cont ManHours : 5.38
Rm Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 41.15
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock /Swamp • N
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y STREET LIGHT - SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
Y POLE WOOD CCA 40 FT CLASS 5
N SEC DBL DEADEND 1 WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 57
Est Cont ManHours : 0.00
Est Co ManHour : 10.93 Est Cont ManHours : 0.00
REMOVE NONE SVTP2S 60 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
* ** Work Location : 81.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 81.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location : 82.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock /Swamp • N Est Co ManHour : 29.10
OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
6 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI -NEUT DEADEND SLACKSPAN 1 PH
50 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
PLCUT
SETUP
PDDJUMPER1
PL405G
PN122C
PND1
PNDS1
PN122C
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALB
EASEMENT
FL25
G11HIG
PL553G
PN33974/0C
PND1
PNTV3F
POLESTAKE
SETUP
PN122C
Description :
Inst Dsgn Volt Num:: 25
Energized Y
OHFLAGTRAFF
Inst Op Volt Num : 12
Inaccessible : N
1,000
1
1
1
1
220
1
1
4
Inst Op Volt Num : 12
Inaccessible : N
PLCUT 1
SETUP 4
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 37.05
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 25 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR- USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
50 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Dsgn Volt'NUm • 25 Rmv Op Volt Num • 12
Est Co ManHour • 40 42 Est Cont ManHours : 0.00
Rock /Swamp N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 58
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Work Location : 83.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Work Location:
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
DSALB
FL25
PL405SG
PN122C
PN33971/0C
PNDS1
PNT3S
Description
rest Dsgn Volt Num : 25
Energized . Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES1NONTAN
G
S6CUC
DSALB
nst Op Volt Num
naccessible . N
10
1
225
1
1
1
1
146
1
FL15
G11HG
PL453SG
PN33971/0C
PND1
PNT3S
SPREADPHASES1NONTAN
G
SR11 /0 1
TA10 1
Dsgn Volt
Energized : Y
S2C
DISTEASEMENT
EASEMENT
G11HIG
P2C
PL553G
PN33974/0C
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 N FUSE -LINE LINK FITALL TYPE KS 25 AMP
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
82 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
144 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI -NEUT DEADEND SLACKSPAN 1 PH
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 57.11
1
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
Y SEC WIRE -BARE COPPER #6 - NON MAPPABLE
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N FUSE -LINE LINK FITALL TYPE KS 15 AMP
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y
3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3PH W/ PTP & 2 POST BKT STEEL (B 9440)
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
1PH VERT & DEADEND
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 10 KVA 120/240V CPT W /CO & LA BKT & FUSE
1
Inst Op Volt Num
Inaccessible : N
248
1,000
1
1
v Dsgn Volt Nu
ock/Swamp :
23
1
167
Page : 59
Est Cont ManHours : 0.00
01 Description
Num . 25
Rmv Op Volt Num
Est Co ManHour : 32.55 Est Cont ManHours : 5.38
Y NEUTRAL WIRE -BARE ACSR #2 NON MAPABLE
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y PRI WIRE -BARE ACSR #2
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location 84.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
Work Location
INSTALL NONE
INSTALL
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
REMOVE NONE
PND1
PNTV3F
POLESTAKE
PS2
SETUP
SS2
Description
Inst Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
PL305
SD1
OHFLAGTRAFF
PLCUT
SETUP
S1 /OPACC
G11HG
PL453SG
PN33971/0C
PNT3S
S2TPAC
SCONNOH
SD1
SR11 /0
SVCONNOH
SVTP2S
TA37
1
4
Op Volt Num • 12
[ naccessible : N
10
2
1
1
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num
Energized Y Inaccessible • N
4
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N OVERHEAD PRI SPLICE FOR #2 ACSR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 22.43
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 44.78
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
159 Y SEC WIRE -ACSR PARALLEL AERIAL CABLE 1/03 COND
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
159 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
151 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
2 N SEC DEADEND ONE WIRE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Page : 60
Est Cont ManHours • 0 00
Est Cont ManHours 0.00
* ** Work Location : 85.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
NONE
INSTALL
INSTALL
INSTALL NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location87.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description:
Inst Dsgn Volt Num : 25
Energized : Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
S2TPAC
SCONNOH
SETUP
SR11 /0
TA37
Description
Inst Dsgn Volt Num : 25
Energized : Y
GSP11I
OHFLAGTRAFF
PDDJUMPER3
PL553SG
PLCUT
PND1
PNDDV3B1L
S1 /OTPAC
SCONNOH
Inst Op Volt Num : 12
Inaccessible • N
141 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
141 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /0ACSR)
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
51 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
* ** Work Location : 86.00 Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible . N Rock/Swamp : N Est Co ManHour : 4.91
INSTALL NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
INSTALL NONE SD1 1 N SEC DEADEND ONE WIRE
INSTALL NONE SETUP 2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
REMOVE NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
REMOVE NONE SD1 1 N SEC DEADEND ONE WIRE
Inst Op Volt Num : 12
Inaccessible : N
103
Rock /Swamp : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 122.15
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
1
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
1 N PRI & NEUTRAL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Page : 61
Est Co ManHour : 30.52 Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
► ark Location ; :.,>
INSTALL NONE
INSTALL NONE
SETUP
SPREADPHASES3NONTAN
G
SVCONNOH
DSALB
PN122C
SVTP2S
GSP11I
PL453SG
PND1
PNT3S
S1 /OTPAC
SCONNOH
SPREADPHASES3NONTAN
G
SVCONNOH
DSALB
PN122C
SVTP2S
* ** Work Location : 88.00 Description :
nst Dsgn Volt Num : 25 Inst Op Volt Num
Energized : Y Inaccessible : N
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL305
S1 /OTPAC
SCONNOH
SDD1
Description
Energized • Y
Gi1HIG
OHFLAGTRAFF
t „ Op Volt Nu
Inaccessible N
10
4
1
1
1 Y
100 Y
50 N
N
1 Y
1 N
1
61
1
1
1 N
1 Y
100 Y
50 N
10
2
1
1
43
1
1
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
POLE WOOD CCA 45 FT CL 3 W SECT GND
PRI & NEUTRAL DEADEND 1 PH
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour : 24.32
Page : 62
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 30 FT CLASS 5
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
: 0.00
rest Dsgn Volt Num 2
v Dsgn Volt Num • 25 Rmv Op Volt Num 1
Rock/Swamp • N Est Co ManHour 29.34
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Est Cont ManHou
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
TRANSFER NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
PL355
POLESTAKE
SCONNOH
SDD1
SETUP
S1 /OTPAC
Work Location 89.00
Description :.
INSTALL
INSTALL
REMOVE
REMOVE NONE LT72
NONE
NONE
Inst Dsgn Volt Num
Energized Y
PLCUT
SETUP
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
NONE G11HG
Work Location 92.00
PL305
S2TPAC
SDD1
SVCONNOH
SVTP2S
Description
I nst Dsgn Vol
Energized':'Y
OHFLAGTRAFF
PDDJUMPER1
PDDJUMPER3
PL553SG
PN33974/0C
PND1
PNDDV3B1L
S1 /OTPAC
SCONNOH
SETUP
SPREADPHASES3NONTAN
G
DSALB
PN166CUC
Rp Volt Num
Inaccessible : N '!
1 Y POLE WOOD CCA 35 FT CLASS 5
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
50 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1
2
1
1
Rmv Dsgn Volt Num 25,. Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour :;11.01
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD
Y STREET LIGHT LUM -MV 7000L 175W 120/240V CONSTWATTAGE
BALLAST W /1000W PE 2FT
1 Y POLE WOOD CCA 30 FT CLASS 5
109 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
53 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Op Volt Num •
Inaccessible : N
10
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour : 145.76
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
224 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
2 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI.
107 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
100 Y 1 PH PRI - NEUTRAL (1 -6 BARE CU AND 1 -6 BARE CU)
Page : 63
Est Cont ManHours : 0.00
Cont ManHours : 0.00
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
S1 /OTPAC
GSP11I
PL453SG
PN33971/0C
PND1
PNT3F
S1 /OTPAC
SCONNOH
SPREADPHASES3NONTAN 1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
G PH VERT & DEADEND
DSALB 1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Work Location 93.00
* * * Work Location';: 93.01
PN166CUC
S1 /OTPAC
Description :
Inst Dsgn Volt Num
Energized' Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL355
SDD1
SVCONNOH
SVTP2S
ption :
Inst Dsgn Volt Nur
Energized : Y
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL355
POLESTAKE
SDD1
SETUP
100
2
1
190
1
1
69
1
st Op Volt Nu
Inaccessible:: N
1,000
100 Y 1 PH PRI - NEUTRAL (1 -6 BARE CU AND 1 -6 BARE CU)
100 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Inst Op Volt Num 12'
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 35 FT CLASS 5
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
92 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N GUY SPAN 11M W' 1 FIBRE GLASS STRAIN INSUL
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 24.87
Rmv Dsgn Volt Num • 25 Rmv Op Volt Nurn
Rock/Swamp : N EstCo "ManHour. :i 22.96
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 35 FT CLASS 5
Page : 64
Est Cont ManHours : 0.00
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Cant ManHours : 5.38
DOT SUPPORT
INSTALL NONE
INSTALL NONE
* Work Location : 94.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
SVCONNOH
SVTP2S
: nption
Dsgn Volt Num ' 2l
Energized ' Y
OHFLAGTRAFF
PLCUT
SETUP
P1 /OAXNC
TN36T
DSALBU
FL30
G11HIG
P1 /OAXNC
PL453SG
PND1
PRS11 /0CS
rk Location : 94.01 Description
Inst Dsgn Volt Num : 25
Energized : Y
S1 /OTPAC
DISTEASEMENT
DSALBU
EASEMENT
FL30
G11HIG
OHFLAGTRAFF
P1 /OAXNC
PDDJUMPER3
PL603SG
PN122C
PN33974/OC
PND1
Inst Op Volt Num
Inaccessible : N
10
1
4
62
62
1
1
35
1
1
1
Inst Op Volt Nul
Inaccessible N
1
N
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
290 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LDBUST CUTOUT,ARRESTER & T HANGER -1PH
POTHEAD
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
3
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
70
1
1
143
290
1
Rmv Dsgn Volt Num . 25 Rmv Op Volt Nurr
Rock/Swamp : N Est Co ManHour 34.29
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y PRI CABLE #1 /0 AXN 25KV JACKETED W' CONCENTRIC NEUTRAL
N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
Y DISC SW ASSY 1 -100A LDBUST CUTOUT,ARRESTER & T HANGER -1PH
POTHEAD
N FUSE -LINE LINK FITALL TYPE KS 30 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y PRI CABLE #1 /0 AXN 25KV JACKETED W' CONCENTRIC NEUTRAL
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 1 PH
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE- 1 PHASE
n Volt Num • 25' Rmv Op Volt Nurn ' 12
Roc amp : N Est Co ManHour 103•59 Est Cont ManHours : 538
N FUSE -LINE LINK FITALL TYPE KS 30 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y PRI CABLE #1 /0 AXN 25KV JACKETED W CONCENTRIC NEUTRAL
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 60 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1- 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
Page : 65
Est Cont ManHours : 0.00
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE
REMOVE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PNDDV3B1L
POLESTAKE
PRS11 /OCS
PS1 /ORJKHS
S2TPAC
SETUP
TN36T
TNSPLICEPIT
Work Location !: 95.00
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Work Loca
TRANSFER
TRANSFER
Description
Inst Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3NONTAN
G
S1 /OTPAC
DSALB
P1 /OC
P4C
PDDJUMPER1
PL453SG
PN33971/0C
PNDD1
PNT3S
S6CUC
SDD1
SPREADPHASES3NONTAN
G
P4C
S6CUC
1
3
1
1
270
4
30
1
Inst Op Volt Num
Inaccessible : N
10
4 N
1 N
175 Y
1 Y
56 Y
Description •
Inst Dsgn Volt Nu
Energized - Y
DISTEASEMENT
DSALB
EASEMENT
1 N
35 Y
1 N
Inst Op Volt Num
Inaccessible • N
1,000
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE- 1 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 85.84
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
PRI WIRE -BARE ACSR #1/0
35 Y PRI WIRE -BARE ACSR #4
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
119 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
2 N PRI & NEUTRAL DBL DEADEND 1 PH
P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
SEC WIRE -BARE COPPER #6 - NON MAPPABLE
SEC DBL DEADEND 1 WIRE
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
100 Y PRI WIRE -BARE ACSR #4
100 Y SEC WIRE -BARE COPPER #6 - NON MAPPABLE
1
Rmv Dsgn:Volt Num 2 v Op Volt Num . _ ..
Rock/Swamp N Est Co ManHour • 26 70
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
DOT SUPPORT
Page : 66
Est Cont ManHours : 0.00
Est Cont ManHours - 5 38
DOT SUPPORT
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
TRANSFER NONE
Work Location ": 97.00 Description
Inst Dsgn Volt Num : 25
Energized Y
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
W ork Location : 97.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
NONE
FL30
G11HIG
PDDJUMPER1
PL453G
PNDD1P
POLESTAKE
SETUP
S6CUC
P4C
OHFLAGTRAFF
PLCUT
SETUP
GSP11I
PL453SG
PN33971/0C
PNT3S
S2TPAC
SR11 /0
TA25
Description
Inst Dsgn Volt
Energized . Y'
S1 /OTPAC
G11HIG
OHFLAGTRAFF
PDDJUMPER3
PL553G
PN33974/OC
PNDDV3B1L
G
1 N FUSE -LINE LINK FITALL TYPE KS 30 AMP
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
1 N PRI &NEUTRAL DOUBLE DEADEND 1 PH W POLE TOP PIN
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
100 Y SEC WIRE -BARE COPPER #6 - NON MAPPABLE
100 Y PRI WIRE -BARE ACSR #4
POLESTAKE
SETUP
SPREADPHASES3NONTAN
Inst Op Volt Num 12
Inaccessible : N
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
159 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3PH W/ PTP & 2 POST BKT STEEL (B 9440)
270 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120 /240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num 12
Inaccessible : N
4
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 42.52
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12'
Rock/Swamp : N Est Co ManHour : 105.34
87 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
6 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
87 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
Page : 67
Est Cant`ManHours : 0.00
Est Cont ManHou
PRI.
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE- FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
REMOVE NONE
* ** Work Location`: 98.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 99.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SPREADPHASES3NONTAN
G
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
S1 /OTPAC
SCONNOH
SETUP
S1 /OTPAC
SCONNOH
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL305
SDD1
SVCONNOH
1
Inst Op Volt Num : 12
Inaccessible : N
10
156
1
4
125
1
N
Y
N
N
Y
N
Inst Op Volt Num : 12
Inaccessible : N
* ** Work Location : 99.01
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
PL355
POLESTAKE
SDD1
SETUP
SVCONNOH
Inst Op Volt Num : 12
Inaccessible • N
1,000
1
Y
Y
N
Y
N
N
N
N
1
1
3
1
2
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Rmv Dsgn Volt Num : 25
Rock /Swamp : N
Rmv Op Volt Num : 12
Est Co ManHour : 21.14
OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
SET UP TIME PER POLE- FOR LARGE JOBS ONLY
SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 24.85
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
89 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 9.59
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
GUY ANCH HELIX 11M W GUARD
POLE WOOD CCA 35 FT CLASS 5
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
SEC DBL DEADEND 1 WIRE
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 68
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
INSTALL NONE SVTP2S 42 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
* ** Work Location : 100.00
Description :
Inst Dsgn Volt Num : 25
Energized : Y
Inst Op Volt Num • 12
Inaccessible • N
INSTALL NONE OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
INSTALL NONE S1 /OTPAC 105 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
INSTALL NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
INSTALL NONE SETUP 4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
REMOVE NONE S1 /OTPAC 57 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
REMOVE NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
* ** Work Location : 101.00
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE OHFLAGTRAFF 10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 101.10
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PLCUT
SETUP
PL305
SDD1
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
PL355
POLESTAKE
SDD1
SETUP
SVCONNOH
SVTP2S
Inst Op Volt Num : 12
Inaccessible N
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y POLE WOOD CCA 30 FT CLASS 5
1 N SEC DBL DEADEND 1 WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
70 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
3
1
2
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock/Swamp : N Est Co ManHour : 20.40
Rmv .Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 24.09
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co Mani - lour : 7.47
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
Y
OR CONTRACTOR BID
Y POLE WOOD CCA 35 FT CLASS 5
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SEC DBL DEADEND 1 WIRE
N
N
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
25 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Page : 69
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
* ** Work Location : 102.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 103.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 104.00
INSTALL NONE OHFLAGTRAFF
INSTALL NONE SETUP
INSTALL NONE SVCONNOH
REMOVE NONE SVCONNOH
* Work Location : 104.50
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL NONE
NONE
Description :
Inst Dsgn Volt Num 25
Energized • Y
OHFLAGTRAFF
PLCUT
SETUP
PL305
S1 /OTPAC
SCONNOH
SDD1
Inst Op Volt Num : 12
Inaccessible : N
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
S1 /OTPAC
SCONNOH
SETUP
S1 /OTPAC
SCONNOH
Description :
Inst Dsgn Volt Num • 25
Energized : Y
Description :
Inst Dsgn Volt Num : 25
Energized • Y
S1 /OTPAC
DSALB
OHFLAGTRAFF
PN122C
SCONNOH
SETUP
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y POLE WOOD CCA 30 FT CLASS 5
113 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DBL DEADEND 1 WIRE
Inst Op Volt Num : 12
Inaccessible • N
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num • 12
Inaccessible : N
219
1
10
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 24.86
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 21.39
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
184 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
79 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 18.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num • 12
Rock /Swamp : N Est Co ManHour • 51 27
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
219 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 70
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
INSTALL NONE
INSTALL NONE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
EXCLUDE STAT
NONE
** *' Work Location : 105.00
INSTALL NONE
REMOVE NONE
INSTALL NONE
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
Work Location : 106.00
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
SPREADPHASES1NONTAN
G
SVCONNOH
S1 /OTPAC
P2C
SCONNOH
SPREADPHASES1NONTAN
G
SR11 /0
TA37
Description
inst Dsgn Vol
Energized : Y',
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
DSALB
P2C
PD -1
PL355SG
PNT1
SVCONNOH
SVTP2S
Description :
nst Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
Gi1HIG
P2C
PDDJUMPER1
PL355G
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
N CONNECTORS & MHR FOR 01-1 SVC ANY SIZE * * * *1 PER
SERVICE * * * **
86 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
86 Y PRI WIRE -BARE ACSR #2
1
1
Inst Op Volt Num
Inaccessible : N
10
1
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12'.
Rock/Swamp : N
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
94 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 Y
94 Y
1 N PRI DEADEND 1 PH
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
PRI WIRE -BARE ACSR #2
Est Co ManHour 31 04
1 Y POLE WOOD CCA 35 FT CL 5 W' SECT GND
1 N PRI & NEUTRAL TANGENT 1 PH
1 N CONNECTORS & MHR FOR 01-1 SVC ANY SIZE * * * *1 PER
SERVICE * * * **
47 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Page : 71
Est Cont ManHours • 0.00
Op Volt Nu
Inaccessible - N
10
1
4
40
2
40
1
my Dsgn';VQlt.,Num
Rock/Swamp . N Est Co ManHour -
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y PRI WIRE -BARE ACSR #2
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 35 FT CLASS 5 W GROUND
w Op Volt Nu
52 Est Cont ManHours : 0.0
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 106.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 108.00
INSTALL NONE
PNDD1
SVCONNOH
SVTP2S
Description :
Inst Dsgn Volt Num : 25
Energized • Y
DISTEASEMENT
EASEMENT
G11HIG
PDDJUMPER1
PL405SG
PNDD1
POLESTAKE
SCONNOH
SETUP
SPREADPHASES1NONTAN
G
SR11 /0
SVCONNOH
SVTP2S
TA37
SPREADPHASES1NONTAN
G
* ** Work Location : 107.00 Description •
Inst Dsgn Volt Num : 25
Energized . Y
SETUP
LTHPS8S2
PL305
SD1
escri tion :
Inst Dsgn Volt Num : 25
Energized : Y
SETUP
1 N PRI & NEUTRAL DBL DEADEND 1 PH
3 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
107 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num 25
Rock /Swamp : N
Rmv Op Volt Num • 12
Est Co ManHour • 43 78
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
2 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
1 N PRI & NEUTRAL DBL DEADEND 1 PH
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
40 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
1PH VERT & DEADEND
Inst Op Volt Num • 12
Inaccessible • N
2
Inst Op Volt Num : 12
Inaccessible • N
2
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
' Rock /Swamp : N Est Co ManHour • 8 03
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y STREET LIGHT- SECURITY LUM -HPS 8500L 100W 120VW /2FT
BKT.,LAMP * * *NO PC * **
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 1.30
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 72
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE S4DPXC
REMOVE NONE SCONNOH
* ** Work Location : 109.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 110.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 111.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PDDJUMPER3
PN33974/0C
PNDD3STL6L
SETUP
SPREADPHASES3NONTAN
G
PN33971/0C
PNT3S
SPREADPHASES3NONTAN
G
Description .
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
P1305
SD1
Description :
Inst Dsgn Volt Num : 25
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
DSG600A
GSP11I
PL453SG
PN33971/0C
PNT3S
42 Y SEC WIRE -ACSR DUPLEX #4
1
Inst Op Volt Num : 12
Inaccessible : N
1
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 99.34
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
202 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI DOUBLE DEAD -END 3PH W /6FT STEEL ARM 350 -750AL
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
117 Y 3PH PRI-NEUTRAL (3-397ACSR&1-1/OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N
Est Co ManHour : 23.05 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
1 N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock/Swamp : N Est C ManHour : 57.21
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y
DISC SW -GANG OPERATED 25KV 600A ARM MOUNTED (REMOVAL
ONLY)
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
187 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN 3PH W/ PTP & 2 POST BKT STEEL (B 9440)
Page : 73
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE S1 /OTPAC 48 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
REMOVE NONE SCONNOH
* ** Work Location : 111.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSGLBVERT
EASEMENT
OHFLAGTRAFF
PDDJUMPER3
PL553SG
PN33974/OC
PNDDV3L
POLESTAKE
SETUP
Inst Op Volt Num : 12
Inaccessible : N
1
1
188
1
* * * Work Location : 112.00
* ** Work Location : 113.00
Description
Inst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
GSP11I
PL405G
PN33971/0C
PNC3L
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE PLCUT
INSTALL NONE SETUP
REMOVE NONE G11HG
REMOVE NONE PL355
OHFLAGTRAFF
OHFLAGTRAFF
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW -GANG OPERATED LOAD BREAK 25KV 900AMP VERTICAL
MOUNT
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
3
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 89.00
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH 350 -750AL PRI .
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 37.49
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1
4
1
1
115
1
Inst Op Volt Num : 12
Inaccessible : N
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY SPAN 11M W' 1 FIBRE GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
Page : 74
Est Cont ManHours : 5.38
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 22.13 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE- FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 35 FT CLASS 5
ork;Location :114.00
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
REMOVE TRANSFER
** Work Location : 114.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
Description
Z nst Dsgn Volt Nu
Energized Y
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
= Op Volt Nu .,
Ina ccessible N
1
4
50
50
1
FL10
G11HIG
P31 /OAXNC
PL405SG
PND1
PND3STL5
PRS31 /0CS
PN122C
Description
Inst Dsgn Volt Num :
Energized : Y
DISTEASEMENT
DSALBU3
EASEMENT
FL10
G11HIG
P31 /OAXNC
PDDJUMPER1
PL453SG
PND1
PND3STL6
POLESTAKE
PRS31 /OCS
PS1 /ORJKHS
SETUP
TN36T
TNSPLICEPIT
PN122C
2
35
1
Inst Op Volt Num
Inaccessible : N
1,000
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI & NEUTRAL DEADEND 3 PH W' 5FT STL ARM
1 N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
100 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
3
2
85
1
1
1
1
3
1
3
4
50
1
100
Rock/Swamp • N
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y PRI UD CABLE -3 PH 1/0 AXN
N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
N FUSE -LINE LINK FITALL TYPE KS 10 AMP
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
sgn Volt Num • 25
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N FUSE -LINE LINK FITALL TYPE KS 10 AMP
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y PRI UD CABLE -3 PH 1/0 AXN
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 1 PH
N PRI & NEUTRAL DEADEND 3 PH W' 6FT STL ARM
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Dsgn Volt Num : 25 Rmv Op Volt. Num : 12
Rock/Swamp : N Est Co ManHour :' 55.80
Rmv Op Volt Nu
Est Co ManHour 32.42 Est Cont ManHours : 0.00
Page : 75
Est Cont ManHours : 5.38
DOT SUPPORT
ork Location : 115.00
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
NONE
NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
ork Location :115.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE POLESTAKE
INSTALL NONE SETUP
Description .
Inst Dsgn Volt
Energized : Y'
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3NONTAN
G
CO
FL20
PL405SG
PN122C
PN322C
PN33971/OC
PND1
PND3STL6
PNT3S
SPREADPHASES3NONTAN
G
Description
nst Dsgn Volt Num
Energized : Y
DISTEASEMENT
DSALB
EASEMENT
INSTALL NONE FL20
INSTALL NONE OHFLAGTRAFF
PL553SG
PN122C
PN322C
PN33974/0C
PND1
PNDV3
PNTV3F
Inst Op Volt Num _: 1
Inaccessible : N
Op Volt Num
Inaccessible : N
1,000
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp N Est Co ManHour : 89.47 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
4
3
1
75
212
136
N
Y
Y
Y
Y
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
3 N FUSE -LINE LINK FITALL TYPE KS 20 AMP
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
81 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
190 Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
268 Y 3PH PRI - NEUTRAL (3-397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI -NEUT DEADEND VERTICAL 3 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Y DISC SW CUTOUT FOR DSRD PRI VOLT
FUSE -LINE LINK FITALL TYPE KS 20 AMP
POLE WOOD CCA 40 FT CL 5 W' SECT GND
1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour 71.72 Est Cont ManHours : 5.38
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
DOT SUPPORT
DOT SUPPORT
Page : 7
* ** Work Location : 116.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 117.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 118.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL305
Inst Op Volt Num : 12
Inaccessible : N
SD1
Description:
Inst Dsgn Volt Num • 25
Energized : Y
OHFLAGTRAFF
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
PLCUT 1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
SETUP 4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
GSP11I 1 N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
PL453SG 1 Y POLE WOOD CCA 45 FT CL 3 W SECT GND
PN33971/0C 168 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
PNT3CTS 1 N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
S1 /OTPAC 59 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
S2TPAC 150 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
SCONNOH 2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
SR11 /0 1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Description :
Inst Dsgn Volt Num : 25
Energized : Y
SD1
SETUP
SVCONNOH
SD1
SVCONNOH
Inst Op Volt Num 12
Inaccessible : N Rock /Swamp . N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
1 N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 43.88
TA37 1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
1 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 N SEC DEADEND ONE WIRE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 77
Est Co ManHour : 23.05 Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Co ManHour : 4.91 Est Cont ManHours : 0.00
* ** Work Location : 119.00
INSTALL
INSTALL
INSTALL
REMOVE
REMOVE
* ** Work Location : 119.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
* ** Work Location : 119.02
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description.:
Inst Dsgn Volt Num : 25
Energized : Y
SCONNOH
SD1
SETUP
SCONNOH
SD1
Description :
Inst Dsgn Volt Num 25
Energized : Y
S4DPXC
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PL553SG
PN33974/0C
PNDDV3B1L
POLESTAKE
S1 /OTPAC
S4DPXC
SCONNOH
SD1
SETUP
SR14 /0
TA50
Description °:
Inst Dsgn Volt Num : 25
Energized Y
DISTEASEMENT
EASEMENT
G11HIG
Inst Op Volt Num • 12
Inaccessible • N
1
1
2
1
Inst Op Volt Num : 12
Inaccessible : N
4
PDDJUMPER3 1
1
3
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour ` 4.91
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 94.47
176 Y SEC WIRE -ACSR DUPLEX #4
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
176 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
454 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
65 Y SEC WIRE -ACSR DUPLEX #4
3 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 50KVA AND LARGER -WP CU # 4/0 7STR
1 Y TRANSF ASSY 1 PH 1- 50 KVA 120/240V NO TAPS CPT W /CO LA BKT &
FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 54.46
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 78
Est Cont ManHours : 5.38
NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
INSTALL
INSTALL
INSTALL
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
LA-3
LTAH PS45 MONGOOSE
OHFLAGTRAFF
PL553G
PN33974/0C
PNTV3F
POLESTAKE
SD1
SETUP
SVCONNOH
1
4
1
*** Work Location : 120.00 Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Ritiv Dsgn Volt Num : 25 Rmv Op Volt Num: 12
Energized : Y Inaccessible : N Rock/Swamp : N Est Co Mani-lour : 41.70 Est Cont Mantiours : 0.00
OHFLAGTRAFF
PLCUT
SETUP
S1/OTPAC
PL405SG
PN33971/0C
PNT3CTS
S2TPAC
S4DPXC
SCONNOH
SD1
SR11/0
TA37
** Work Location : 121.00 - - Description :
Inst Dsgn Volt Num: 25 Inst Op Volt Num: 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Nurtl : 12
Energized * Y Inaccessible • N Rock/Swamp N Est Co Maoliou
INSTALL NONE G11HG 1 N GUY ANCH HELIX 11M W GUARD
NONE SD1
SETUP
SVCONNOH
SVTP1/0S
1 Y LIGHTNING ARRESTER ASSY-3ARRESTERS ON 1-3PH BKT
1 Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
230 Y 3PH PRI-NEUTRAL (3-397 ACSR&1-4/OACSR)
1 N PRI&NEU TANG VERT 3 PH W/ 3-1 PH FIBER- GLASS BKT-SO. ELE.
STANDARD (B-9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
160 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
160 Y 3PH PRI-NEUTRAL (3-397ACSR&1-1/OACSR)
1 N P&N TAN 3 PH W/ PTP & 2 POST BKT & CT
103 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
110 Y SEC WIRE-ACSR DUPLEX #4
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER-WP CU #1/0 7STR
1 Y TRANSF ASSY 1 PH 1-37.5 KVA 120/240V NO TAPS CPT W/CO & LA BKT
& FUSE.
1
2
1
82
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE ****1 PER
SERVICE*****
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE ****1 PER
SERVICE*****
N SERVICE-3 WIRE TRIPLEX 1/0AL **ADDMONALLY USE SVOH3W FOR
EA SVC**
Page : 79
Est Cont MariHdurs 0 00
REMOVE NONE SD1
* ** Work Location : 122.00
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
INSTALL NONE
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
LA -3
LTAHPS45MONGOOSE
PL453SG
PN33971/OC
PNT3CTS
ST1
SVCONNOH
Inst Op Volt Num : 12
Inaccessible . N
10
1 N
4 N
209 Y
1 Y
1 Y
1 Y
209 Y
1 N
1 N
1
112
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 43.53
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
TOP ANY SIZE POLE TO MAKE SHORTER POLE
SET UP TIME PER POLE- FOR LARGE JOBS ONLY
SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
LIGHTNING ARRESTER ASSY- 3ARRESTERS ON 1 -3PH BKT
400 W MONGOOSE LT WITH BKT & PC
POLE WOOD CCA 45 FT CL 3 W SECT GND
3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
P &N TAN 3 PH W/ PTP & 2 POST BKT & CT
SEC TANGENT 1 WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 80
Est Cant ManHours : 0.00
* ** Work Location : 123.00
NONE
NONE
NONE
NONE
* ** Work Location : 123.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SVTP2S
.Description
Inst Dsgn Volt Num : 25
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
PL305
SD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
S4DPXC
DISTEASEMENT
EASEMENT
G11HIG
LTAH PS45MONGOOSE
OHFLAGTRAFF
Inst Op Volt Num : 12
Inaccessible • N
1
2
1
Inst Op Volt Num,: 12
Inaccessible • N
241
1,000
1
1
PDDJUMPER1 2
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 22.43
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 98.91
Y SEC WIRE -ACSR DUPLEX #4
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL NONE
TRANSFER NONE
NONE
* ** Work Location 124.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
NONE
NONE
NONE
NONE
NONE
NONE
PDDJUMPER3
PL553G
PN222C
PN33974/OC
PNDV2
PNDV3
PNTV3F
POLESTAKE
SD1
SETUP
PN322C
Description :
Inst Dsgn'Volt "Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
PL305
Description
nst Dsgn Volt Nu
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S4DPXC
GSP11I
LTAHPS45MONGOOSE
PL503G
PN222C
PN322C
PN33971/0C
PNC3L
PNDV2
PNDV3
S1 /OTPAC
1
1
241
231
1
1
1
4
142
Op Volt Num 12
Inaccessible : N
Work Location :125.00
Inst Op Volt Num •
Inaccessible : N
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 2PH PRI- NEUTRAL (2- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI -NEUT DEADEND VERTICAL 2 PH
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 22.1
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
129 Y SEC WIRE -ACSR DUPLEX #4
2 N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
140 Y 2PH PRI - NEUTRAL (2- 2ACSR &1 - 2ACSR)
107 Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
129 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
1 N PRI -NEUT DEADEND VERTICAL 2 PH
1 N PRI -NEUT DEADEND VERTICAL 3 PH
85 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Page : 81
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num ' 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour • 60.81 Est Cont ManHours : 0.00
REMOVE NONE SCONNOH
* ** Work Location : 126.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
TRANSFER NONE
* Work Location : 127.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
NONE
* ** Work Location : 127.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PNDV2
SDI
SETUP
PNDV2
PN222C
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S2TPAC
G11HIG
GSP11
LTAHPS45MONGOOSE
PL503SG
PN33971/0C
PNTV3CTS
SCONNOH
SR11/0
TA15
Description :
Inst Dsgn Volt Num : 25
Energized : Y
S2TPAC
PL503SG
PN33974/0C
PNT3F
POLESTAKE
PUDDL
SETUP
ST1
Inst Op Volt Num : 12
Inaccessible : N
1
1
2
1
241
Inst Op Volt Num : 12
Inaccessible : N
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
107 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N GUY SPAN 11M
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
107 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N P &N TAN VERT 3PH W/3 1 POST BKTS & CT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC RISER 1 XFMR 37.SKVA AND SMALLER -WP CU #1/0 7STR
1 Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Inst Op Volt Num : 12
Inaccessible : N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
39
1
39
1
3
4
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
Rmv Dsgn Volt Num . 25 " °'Rmv Op Volt Num : 12
Rock /Swamp : N
N PRI -NEUT DEADEND VERTICAL 2 PH
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRI -NEUT DEADEND VERTICAL 2 PH
Y 2PH PRI - NEUTRAL (2- 2ACSR &1- 2ACSR)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 41.86
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 57.98
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y POLE WOOD CCA 50 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI DOUBLE DEAD END MID -SPAN INSULS FOR LARGE CONDUCTORS
(350 -750 KCMIL)
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC TANGENT 1 WIRE
Page : 82
Est Co ManHour : 22.00 Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 3.94
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
Work Location :128.00
NONE
REMOVE NONE
REMOVE NONE
TRANSFER NONE
TRANSFER NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
RECLELEC3PHASSY
Description :
nst Dsgn Volt Num : 25
Energized - Y
DSALB
OHFLAGTRAFF
PL503SG
PLCUT
PN33974/0C
PND1
PNTV3F
*A Work Location :129.00 Description :
Dsgn Volt Num
Energized : Y
POLESTAKE
S4DPXC
SCONNOH
SD1
SETUP
SPREADPHASES1NONTAN
G
S4DPXC
DSALB
FL50
G11HIG
PDDJUMPER1
PL405SG
PN122C
PNDD1
SPREADPHASES1NONTAN
G
LTAHPS142 1
PN122C 100 Y 1PH PRI-NEUTRAL (1-2ACSR&1-2ACSR)
OHFLAGTRAFF
PLCUT
SETUP
1
Inst Op Volt Num 12
Inaccessible : N
1
p.,Volt Num
[ naccessble : N
Y RECLOSER 3PH ELEC- W/ CONTROLS, CABLES,LAS, PKRS, BKTS **
(NOT INTELLITEAM)
Rmv Dsgn VOlt Num
Rock/Swamp: N
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
168 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
168 Y SEC WIRE -ACSR DUPLEX #4
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
6 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
126 Y SEC WIRE -ACSR DUPLEX #4
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 N FUSE -LINE LINK FITALL TYPE KS 50 AMP
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 Y POLE WOOD CCA 40 FT CL 5 W SECT GND
126 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DBL DEADEND 1 PH
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W /PE,
LAMP &2FTBRKT
Rmv Dsgn V
Rock/Swamp N
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 83
Rmv Op Volt Num : 12
Est Co ManHour 89.71 Est Cont ManHours : 3.94
v Op Volt Num.
Co ManHour • 78 53 Est Cont ManHours . 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
NONE
NONE
Work Location 129.01 Description
Inst Dsgn Volt Num
Energized • Y
S2TPAC
G11HIG
LTAHPS45MONGOOSE
PDDJUMPER3
PL553G
PN33974/0C
PNDDV3B1L
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
30.00
G11HIG
LTAHPS45MONGOOSE
LTHPS452DIR
PDDJUMPER3
PL553G
PN33971/0C
PN33974/OC
PNDV3L
S1 /OTPAC
SCONNOH
SVCONNOH
SVTP2S
scription
st Dsgn Volt Num
Energized • Y
OHFLAGTRAFF
PLCUT
Inst Op Volt Num 12
Inaccessible : N
194
6
1
1
1
194
1
PNDV3L
POLESTAKE
SCONNOH
SD1
SETUP
SPREADPHASES3NONTAN
G
SPREADPHASES3NONTAN
G
3 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
242 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
329 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
3 N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
60 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
60 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
3
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
2
4
1
1
Op Volt Num.
Inaccessible • N
10
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp . N Est Co ManHour 110.96
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y 400 W MONGOOSE LT WITH BKT & PC
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI.
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Rmv Dsgn Volt *Nuni - 25 Rmv Op Volti.Num 12
Co MariHour • 24 48
- Rock/Swamp , '
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
Page : 84
Cont ManHours : 3.94
Est Cont ManHours • 0 00
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
* ** Work Location 130.01
INSTALL EXCLUDE STAT
INSTALL
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
SETUP
G11HG
PL305
SD1
SVCONNOH
SVTP2S
Description :
Inst; Dsgn Volt Num : 25
Energized : Y
NONE
NONE
NONE
NONE
NONE
NONE
NONE
SVTP2S
TA37
Work Location 130.02 Description
Inst Dsgn Vol
Energized''•
INSTALL NONE
INSTALL NONE
S4DPXC
DISTEASEMENT
EASEMENT
LTAHPS45MONGOOSE
OHFLAGTRAFF
PL553SG
PN33974/OC
PNTV3F
POLESTAKE
S1 /OTPAC
SCONNOH
SDD1
SETUP
SR11 /0
SVCONNOH
DISTEASEMENT
EASEMENT
nst Op Volt Num
Inaccessible : N
155
1,000
naccessible N
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD
1 Y POLE WOOD CCA 30 FT CLASS 5
1 N SEC DEADEND ONE WIRE
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
140 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25
Volt Num
Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 56.85
Y SEC WIRE -ACSR DUPLEX #4
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
155 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
131 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DBL DEADEND 1 WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
130 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
Rmv Dsgn Volt Nu 25 Rm m 12
Rock/Swamp • N Est Co Op ManHou Nu r 9 27
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
Page : 85
Cont ManHours : 5.38
Est Cont ManHours • 5 38
DOT SUPPORT
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Work Location : 131.00 Description
Inst Dsgn Volt Num : 2!
Energized • Y
OHFLAGTRAFF
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 131.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
G11HG
LTHPS452DIR
PL355
POLESTAKE
SD1
SETUP
SVCONNOH
PLCUT
SETUP
PL355
SD1
SVCONNOH
LTHPS452DIR
Description
Inst Dsgn Volt Num .
Energized
DISTEASEMENT
EASEMENT
G11HIG
GSP11I
OHFLAGTRAFF
PDDJUMPER3
PL553G
PN33974/0C
PNDDV3B1L
POLESTAKE
SD1
SETUP
1
1
1
3
1
2
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible • N Rock/Swamp : N Est Co ManHour 23.85
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
2
1
1
1
1
N
1
Rmv Dsgn Volt Num : 25
Inst Op Volt Num: 12
Inaccessible : N Rock/Swamp : N Est Co ManHour 75.90
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1
10
1
1
221
1
1
N GUY ANCH HELIX 11M W GUARD
Y DIR SECURITY LIGHT 45000L 400W 120V W 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
Y POLE WOOD CCA 35 FT CLASS 5
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 35 FT CLASS 5
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y DIR SECURITY LIGHT 45000L 400W 120V W' 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
Page : 86
Est Cont'ManHours : 0.00
Rmv Op, Volt Num : 12
Est Cont Mani : 5.38
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
INSTALL TRANSFER
Work Location : 132.00 Description
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
NONE
NONE
REMOVE EXCLUDE STAT
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Location
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
TRANSFER NONE
LTHPS452DIR
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3
S3CUC
S4DPXC
LTAHPS45MONGOOSE
P2C
PL405G
PN33971/0C
PNC3L
PND1
S4DPXC
SPREADPHASES3
PDDJUMPER1
PL453G
PNDV2
POLESTAKE
SETUP
SPREADPHASES1
SPREADPHASES1
GSP11
1
Inst Op Volt Num 12
Inaccessible : N
10
1
4
58
125
1
116
1
125
1
1
75 Y SEC WIRE -ACSR DUPLEX #4
1
2.01 Description :
[nst Dsgn Volt Num : 25 Inst Op Volt Nut
Energized : Y Inaccessible : N
DISTEASEMENT 1,000
EASEMENT
OHFLAGTRAFF
1
10
1
2
3
4
1
1
1
Y DIR SECURITY LIGHT 45000L 400W 120V W' 15 IN X 2 IN BKT, LAMP
* * *NO PC * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 51.63
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
Y SEC WIRE -BARE COPPER #3 NON MAPPABLE
Y SEC WIRE -ACSR DUPLEX #4
Y 400 W MONGOOSE LT WITH BKT & PC
Y PRI WIRE -BARE ACSR #2
Y POLE WOOD CCA 40 FT CLASS 5 W' GROUND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
N PRI & NEUTRAL DEADEND 1 PH
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock/Swamp .: N : Est Co ManHour 43.97
Est Cont ManHours : 5.38
DOT SUPPORT
Est Cont ManHours : 0.00
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
N PRI -NEUT DEADEND VERTICAL 2 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 1 PH
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 1 PH
N GUY SPAN 11M
Page : 87
TRANSFER NONE
TRANSFER NONE
* ** Work Location 133.00 Description :
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
NONE
NONE
P2C
S3CUC
Inst Dsgn Vol
Energized : Y
OHFLAGTRAFF
F ork Location 133.01 Description
`sg n'Volt Nu
Energized . Y
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PLCUT
SETUP
SPREADPHASES3NONTAN
G
S1 /OTPAC
DSALB
FL15
LTAHPS45MONGOOSE
PL405SG
PN144C
PN33971/0C
PND1
PNTV3F
S1 /OTPAC
SCONNOH
SD1
SPREADPHASES3NONTAN
G
SR11 /0
TA25
S4DPXC
DISTEASEMENT
Inst Op Volt Nu
Inaccessible : N
10
Inaccessible : N
126
1,000
EASEMENT
G11HIG
LTAHPS45MONGOOSE
OHFLAGTRAFF
INSTALL NONE PDDJUMPER1
100 Y PRI WIRE -BARE ACSR #2
100 Y SEC WIRE -BARE COPPER #3 NON MAPPABLE
Rmv Dsgn Volt Num 25 w Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 83.54 Est Cont ManHours : 0.00
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
141 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 N FUSE -LINE LINK FITALL TYPE KS 15 AMP
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
58 Y 1PH PRI- NEUTRAL (1- 4ACSR &1 - 4ACSR)
141 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
163 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
2 N SEC DEADEND ONE WIRE
2
1
STANDARD (B -9438
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
nst Op Volt Num 12 Rmv Dsgn: Volt Num • 25
ock/Swamp'.
Y SEC WIRE -ACSR DUPLEX #4
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Rmv Op Volt Num • 12
Est Co ManHour : 953
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Page : 88
Cont ManHours : 5.
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
NONE
NONE
INSTALL
INSTALL
INSTALL
INSTALL
TRANSFER NONE
NONE
NONE
NONE
NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
k
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
on: 134.00
PDDJUMPER3
PL603SG
PN122C
PN222C
PN33974/0C
PNDD1
PNDDV3B1L
PNDV2
POLESTAKE
SD1
* Work Location : 133.02 Description :
Inst Dsgn Volt Nu
Energized Y
1
1
126
165
152
1
1
SETUP 4
PN144C 200
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PL453SG
PND1
POLESTAKE
S1 /OTPAC
SCONNOH
SD1
SETUP
SR11 /0
TA25
option :
D5gn Volt Nurn • 25'
Energized : Y
SCONNOH
SETUP
SCONNOH
Inaccessible : N
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 60 FT CL 3 W' SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 2PH PRI-NEUTRAL (2-2ACSR&1-2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DBL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
N PRI -NEUT DEADEND VERTICAL 2 PH
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
1 N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 1PH PRI- NEUTRAL (1- 4ACSR &1- 4ACSR)
Rmv Op Volt Num : 12
DOT SUPPORT
Inst Op Volt Num:: 12 Rmv Dsgn Volt Num
Rock/Swamp : N Est Co ManHour 40.28 Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1
10
1
1
3
95
2
1
4
1
p Volt Nui
[naccessible , :'N
1
2
1
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 1 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120 /240V CPT W /CO & LA BKT & FUSE
n Volt Num 25 .,, ' Rmv Op Volt Num
ock/Swamp=„ N Est Co ManHour * 2.99
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
DOT SUPPORT
Page : 89
Est Cont ManHours
0.0
* ** Work Location : 135.00
INSTALL NONE
INSTALL TRANSFER
REMOVE TRANSFER
* ** Work Location : 136.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
* ** Work Location : 136.01
INSTALL EXCLUDE STAT
Description :
Inst Dsgn Volt Num : 25
Energized : Y
SETUP
PD
PD
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3NONTAN
G
S4DPXC
DSALB
LTAHPS45MONGOOSE
PDDJUMPER1
PDDJUMPER3
PL453SG
PN122C
PN322C
PN33971/0C
PND1
PNDV3
PNTV3PCTS
S1 /OTPAC
S2TPAC
SCONNOH
SPREADPHASES3NONTAN
G
SVCONNOH
SVTP2S
S1 /OTPAC
Inst Op Volt Num : 12
Inaccessible : N
2
3
Inst Op Volt Num • 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 104.99
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Y SEC WIRE -ACSR DUPLEX #4
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y 400 W MONGOOSE LT WITH BKT & PC
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Description :
Inst Dsgn Volt Num : 25
Energized • Y
4
281
1
1
1
1
1
63
186 Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
281 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1
1
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRI DEAD -END FOR DSRD PRI VOLT
N PRI DEAD -END FOR DSRD PRI VOLT
N PRI & NEUTRAL DEADEND 1 PH
N PRI -NEUT DEADEND VERTICAL 3 PH
1 N P &N TAN VERT 3 PH W /PTP & 2 -1 POST BKTS &CLAMP TOP INS
140 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
136 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 11.96
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock /Swamp : N Est Co ManHour : 63.49
156 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Page : 90
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours • 5 38
INSTALL NONE DISTEASEMENT
INSTALL NONE DSALB
INSTALL NONE EASEMENT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
TRANSFER NONE
NONE
INSTALL
INSTALL
LTAHPS45MONGOOSE
PDDJUMPER1
PDDJUMPER3
PL553G
PN322C
PN33974/OC
PNDl
PNDV3
PNTV3F
POLESTAKE
SD1
SETUP
PN122C
Work Location:: 136.02 Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
DISTEASEMENT
EASEMENT
LTAHPS45MONGOOSE
NONE
NONE
OHFLAGTRAFF
PL553SG
PN33974/0C
PNTV3F
Page : 91
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1
1
1
1
248
156
1
1
1
3
1
4
100
Inst Op Volt Num
Inaccessible : N
1,000
1
10
INSTALL NONE POLESTAKE 3
INSTALL NONE S1 /OTPAC 362
INSTALL NONE SCONNOH 4
INSTALL NONE SD1 1
INSTALL NONE SETUP 4
INSTALL NONE SR11 /0 1
INSTALL NONE TA25 1
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y 400 W MONGOOSE LT WITH BKT & PC
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Dsgri Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour : 61.35 Est Cant ManHours : 5.38
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y 400 W MONGOOSE LT WITH BKT & PC
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
DOT SUPPORT
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
1
236 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
* ** Work Location 137.00 Description :
Inst Dsgn Volt Nu
Energized : Y
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
Work Location 138.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location :139.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
SD1
SETUP
SVCONNOH
SD1
SVCONNOH
nst Op Volt Nu
[ naccessible : N
1
2
1
Description
Inst Dsgn Volt Num : 25
Energized ,: Y
G11HG
OHFLAGTRAFF
SCONNOH
SD1
SETUP
SVCONNOH
G11HG
SCONNOH
SD1
SVCONNOH
Description
Inst Dsgn Volt Num
Energized Y .
OH FLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
DSGLBVERT
Inst Op Volt Num : 12
Inaccessible : N
1
1 0
1
1
2
1
1
1
1
1
Inst OP Volt Num
naccessible : N
10
4
120
1
LTAHPS45MONGOOSE 1
PDDJUMPER3
PL503G
PN33971/0C
PNDDV3L
1
1
120
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn Volt Num
Rock/Swamp : N
v Op Volt Num : 12
Est Co ManHour : 24.34 Est Cont ManHours : 0.00
N GUY ANCH HELIX 11M W GUARD
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N GUY ANCH HELIX 11M W GUARD
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn' Volt`Num 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : "62.50
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
Y DISC SW -GANG OPERATED LOAD BREAK 25KV 900AMP VERTICAL
MOUNT
Y 400 W MONGOOSE LT WITH BKT & PC
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI DOUBLE DEAD -END VERTICAL 3PH 350-750AL PRI .
Page :
92
Est Co ManHour : 4.91 Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE NONE S1 /OTPAC 135 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
REMOVE NONE SCONNOH 2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
* ** Work Location :140.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 141.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
Description
Inst Dsgn Volt Num : 25
Energized : Y
SD1
SETUP
SVCONNOH
SD1
SVCONNOH
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
1
1
Inst Op Volt Num : 12
Inaccessible • N
PLCUT 1
SETUP
SPREADPHASES3NONTAN
G
S1 /OTPAC
LTAHPS45MONGOOSE
P1 /0C
PDDJUMPER1
PDDJUMPER3
PL405G
PN31 /01 /OC
PN33971/OC
PND1
PNDV3
PNTV3CTS
SDD1
SPREADPHASES3NONTAN
G
4
* ** Work Location : 141.01 Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12
Energized : Y Inaccessible : N
Inst Op Volt Num • 12
Inaccessible : N Rock /Swamp : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
1 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Est Co ManHour : 4.91 Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp N d Est Co ManHour : 86.40
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
252 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 Y 400 W MONGOOSE LT WITH BKT & PC
180 Y PRI WIRE -BARE ACSR #1 /0
1 N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
53 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
72 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI -NEUT DEADEND VERTICAL 3 PH
1 N P &N TAN VERT 3PH W/3 1 POST BKTS & CT
1 N SEC DBL DEADEND 1 WIRE
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 58.69
INSTALL EXCLUDE STAT S2TPAC 128 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
INSTALL EXCLUDE STAT S4 /OTPXC 234 Y SEC WIRE ACSR TRIPLEX #4/0
Page : 93
Est Cont ManHours : 0.00
Est Cont ManHours : 3.94
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
TRANSFER NONE
* Work Location ;142.00 Descriptic
Inst Dsgn Volt Num
Energized : Y
INSTALL NONE
INSTALL NONE
REMOVE NONE
TRANSFER NONE
TRANSFER NONE
ation: 143.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
G11HIG
P1 /0C
PDDJUMPER1
PDDJUMPER3
PL553G
PN33974/0C
PND1
PNDV3
PNTV3F
POLESTAKE
SCONNOH
SETUP
PN31 /01 /0C
SCONNOH
SETUP
SCONNOH
- - - -- - - - - - --
PD
SD1
1
234
1
1
1
128
1
1
Inst Op Volt Num
Inaccessible : N
1
2
1
1
1
Description
Inst Dsgn, Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
LTAHPS45MONGOOSE
PL503SG
PN33971/OC
PNT3CTS
SD1
CBASSY3S1200
Inst Op Volt Nur
naccessible : N
10
4
1
1
145
1
1
1
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
Y PRI WIRE -BARE ACSR #1/0
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W' GROUND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
2 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
100 Y 3PH PRI - NEUTRAL (3-1 /OACSR &1- 1 /OACSR)
Rmv Dsgn V
Rock/Swamp : N Est Co ManHour 10.18
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N PRI DEAD -END FOR DSRD PRI VOLT
N SEC DEADEND ONE WIRE
Rrnv Dsgn VQIt Num : ZS Rmv Op ;Volt Num : 12
Rock/Swamp.: N Est Co Mani-lour : 42,91
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3PH W/ PTP & 2 POST BKT & CT
N SEC DEADEND ONE WIRE
Y SWITCHED CAP BANK ASSY FOR DESIRED VOLTAGE W /3- 400KVAR
UNITS, W /RACK 3 LGTN ARR,3 CUTOUTS,3 VAC SW & BKT
DOT SUPPORT
Page : 94
v Op Volt Num : 12
Cont ManHours : 0.00
Est Cont ManHours : 0.00
* ** Work Location : 143.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location ; 144.00
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
ABANDON
ABANDON
NONE
NONE
NONE
NONE
NONE
NONE
NONE
TRANSFER
* ** Work Location : 144.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
S2TPAC
LTAHPS45MONGOOSE
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
SETUP
ST1
CBASSY3S1200
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
P31 /OAXNC
TN36T
DSALBU3
FL80
P31 /OAXNC
PL453SG
PN33971/0C
PNT3S
PRS31 /0CS
LTAHPS45MONGOOSE
Description :
Inst Dsgn Volt Num • 25
Energized : Y
S2TPAC
DSALBU3
FL80
P31 /OAXNC
PHPF13
Inst Op Volt Num : 12
Inaccessible N
81
1
1
81
1
4
1
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 30.83
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC TANGENT 1 WIRE
Y SWITCHED CAP BANK ASSY FOR DESIRED VOLTAGE W /3- 400KVAR
UNITS, W /RACK 3 LGTN ARR,3 CUTOUTS,3 VAC SW & BKT
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour :50.37
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
40 Y PRI UD CABLE -3 PH 1/0 AXN
40 N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
1 Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
N FUSE -LINE LINK FITALL TYPE KS 80 AMP
3
35
1
228
1
1
Inst Op Volt Num : 12
Inaccessible : N
1
3
50
2
Y PRI UD CABLE -3 PH 1/0 AXN
Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3PH W/ PTP & 2 POST BKT STEEL (B 9440)
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
Y 400 W MONGOOSE LT WITH BKT & PC
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 51.36
148 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y DISC SW ASSY 3 -100 A LB CO, ARR & 3PHT BKT FOR 3PH POTHEAD
INSTALLATION
N FUSE -LINE LINK FITALL TYPE KS 80 AMP
Y PRI UD CABLE -3 PH 1/0 AXN
N FIBERGLASS STANDOFF 13" JUMPER PIN BRACKET
Page : 95
Est Cont ManHours : 3.94
Est Cont ManHours : 0.00
Est Cont ManHours . 3.94
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* Work Lo
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
* Work Location : 144.02 Description
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
NONE
NONE
NONE
45.00
PL553SG
PN33974/0C
PNTV3F
POLESTAKE
PRS31 /OCS
PS1 /ORJKHS
SCONNOH
SETUP
ST1
TN36T
TNSPLICEPIT
LTAHPS45MONGOOSE
S2TPAC
DISTEASEMENT
DSGLBVERT
EASEMENT
LTAHPS45MONGOOSE
PDDJUMPER3
PL553SG
PN33974/OC
PNDDV3L
POLESTAKE
SD1
SETUP
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11HG
G11HIG
1
148
1
3
1
3
1
4
1
10
1
Inst Op Volt Num':'
Inaccessible : N
261 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW -GANG OPERATED LOAD BREAK 25KV 900AMP VERTICAL
MOUNT
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CL 3 W' SECT GND
261 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI DOUBLE DEAD -END VERTICAL 3PH 350 -750AL PRI .
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
1 N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3P1-1 PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N PRI RISER & COLD SHRINK TERM WITHOUT CABLE - 3 PHASE
N 1/0 25KV U.D. MOLDED RUBBER SPLICE W /HEAT SHRINK ZIP JACKET
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC TANGENT 1 WIRE
N TRENCHING 36 " DEEP AND PROPER BACKFILL - 30" COVER
N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
Y 400 W MONGOOSE LT WITH BKT & PC
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N
DOT SUPPORT
Page : 96
Est Co ManHour 84.14 Est Cont ManHours 5.38
tescr iption~:
Inst Dsgn Volt Num : 2
Inst Op Volt Num : 12
',:gInaccessibleiqzX
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock/Swamp N Est Co ManHour 58.36
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL
INSTALL
LTAHPS45MONGOOSE
PL553G
PN33971/0C
PNDV3L
PNTV3S
SVCONNOH
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
129
1
1
1
REMOVE NONE
REMOVE TRANSFER
Work Location : 145 01
INSTALL EXCLUDE STAT
INSTALL NONE
NONE
NONE
NONE
INSTALL TRANSFER
NONE
NONE
SVTP2S
PN33971/0C
Description :
Inst Dsgn Volt Num
Energized : Y
S2TPAC
DISTEASEMENT
EASEMENT
G11HIG
LTAHPS45MONGOOSE
PL553G
PN33971/0C
PN33974/0C
PNDV3L
PNTV3F
POLESTAKE
PS397
SCONNOH
SETUP
SS1 /0
ST1
SVCONNOH
PN33971/0C
Description
nst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
SERVICE * * * **
90 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
280 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
Inst Op Volt Num:: 12
Inaccessible : N
105
1,000
1
1
40
105
1
3
1
4
1
1
280
nst Op Volt Num : 1
Inaccessible : N
1
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
N P &N TAN VERT 3PH W/3 1 POST BKTS
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
Rmv DsgnVolt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 66.62
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Est Cont ManHours :
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N OVERHEAD PRI SPLICE FOR 397MCM ACSR
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N OVERHEAD SEC CONDUCTOR SPLICE FOR #1 /0 ACSR
N SEC TANGENT 1 WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
Page : 97
p ork Location • 147 00
Rmv Dsgn Vol tT N um ' 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
0.47 Est Cont ManHours : 0.00
REMOVE
REMOVE
REMOVE
NONE
NONE
NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
* * Work;Location 1
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
PL305
SDD1
SVCONNOH
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SVTP2S
LTHPS1402DIR
S2TPAC
SVTP2S
Work Location': 147.01 Description
Inst Dsgn; Volt Num 25
Energized : Y
OHFLAGTRAFF
PL305
POLESTAKE
S2TPAC
SDD1
SETUP
SVCONNOH
SVTP2SPLS
LTHPS1402DIR
S2TPAC
SVTP2S
ribbon'
Inst Dsgn Volt
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
SPREADPHASES3NONTAN
G
S2TPAC
DSALB
G11HIG
1
1
18
1
140
108'°
Inst Op Volt Num : 12
Inaccessible : ;N
1
Inst Op Volt Num
naccessible : N
10
1
4
1
35
1
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DBL DEADEND 1 WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y DIRECTIONAL SECURITY LT HPS 140,000 LUMEN 1000W W' BKT,
LAMP, * * *NO PC * **
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 13.95
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nurr
Rock/Swamp : N Est Co ManHour : 98.97
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Page : 98
Est Cont ManHours : 3.94
1 Y POLE WOOD CCA 30 FT CLASS 5
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
16 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N SEC DBL DEADEND 1 WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SVC WIRE SPLICE - #2 TRIPLEX * *INVENTORY BY FT** - INV SPLICES
SEPARATELY
Y DIRECTIONAL SECURITY LT HPS 140,000 LUMEN 1000W W BKT,
LAMP, * * *NO PC * **
140 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
108 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Est Cont ManHours • 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
Work Location;:
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
TRANSFER NONE
TRANSFER NONE
NONE
NONE
50.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
LTAHPS45MONGOOSE
PDDJUMPER1
PDDJUMPER3
PL503SG
PN122C
PN31/01/0C
PN33971/0C
PND1
PNDV3
PNTV3F
SPREADPHASES3NONTAN
G
Description
InstDsgn Volt Num : 25
Energized : Y
S2TPAC
LTAHPS45MONGOOSE
OHFLAGTRAFF
PDDJUMPER1
PDDJUMPER3
PL553G
PN31 /01 /OC
PN33974/0C
PND1
PNDV3
PNTV3F
POLESTAKE
SD1
SETUP
SPREADPHASES3NONTAN
G
ST1
SPREADPHASES3NONTAN
G
PN122C
S2TPAC
1
1
1
1
35
137
198
1
1
Inst Op Volt Nurr
Inaccessible N
180
1
10
Y 400 W MONGOOSE LT WITH BKT & PC
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 50 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
Y 3PH PRI- NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI -NEUT DEADEND VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour 10945
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y 400 W MONGOOSE LT WITH BKT & PC
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
174 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
180 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
1 N PRI -NEUT DEADEND VERTICAL 3 PH
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
1 N SEC TANGENT 1 WIRE
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
100 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
100 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Page : 99
Est Cont- ManHours : 3.94
Work Location 151.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
ription :
n Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL453SG
PNDD3STL6
POLESTAKE
SETUP
SPREADPHASES3
GSP11I
S4DPXC
SR11 /0
SVTP2S
TA37
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER TA37
PL405SG
PNT3CTS
SPREADPHASES3
GSP11I
S4DPXC
SR11/0
SVTP2S
TRANSFER NONE PN31 /01 /0C
n : 152.00 Description
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
GSP11I
LTAHPS45MONGOOSE
Inst Op Volt Num
Inaccessible : N
1,000 Y
1 Y
10
nst Op Volt Num
Inaccessible .:N
10
1 Y
1 N
3 N
4 N
1 N
50 Y SEC WIRE -ACSR DUPLEX #4
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
1 N P &N TAN 3 PH W/ PTP & 2 POST BKT & CT
1 N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
1 N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
50 Y SEC WIRE -ACSR DUPLEX #4
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
100 Y
4
2
Page : 100
Rmv Dsgn Volt Num.: 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 88.89 Est Cont ManHours : 5.38
DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
POLE WOOD CCA 45 FT CL 3 W SECT GND
PRI -NEUT DBL DEADEND 3 PH W /6FT 6IN STLARM
POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
& FUSE.
3PH PRI- NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY SPAN 11M W 1 FIBRE GLASS STRAIN INSUL
Y 400 W MONGOOSE LT WITH BKT & PC
DOT SUPPORT
xry Dsgn Volt Num : 25 Rmv Op Volt Nurr
Rock/Swamp N' Co " "ManHour : 50.67 Est Cont ManHours : 0.00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL
INSTALL
INSTALL
Work Location :152.0;
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
NONE
NONE
NONE
PL503G
PN33971/0C
PN33974/0C
PNDV3L
PNTV3S
S2TPAC
SCONNOH
SD1
Description :
nst Dsgn Volt
Energized : Y
S2TPAC
LTAH PS45MONGOOSE
PL55CONC
PLCONCSELFSPTLABOR
PN33974/0C
PNDSV3
PNTV3F
POLESTAKE
SCONNOH
SETUP
Op Volt Num
Inaccessible : N
151
1 Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
142 Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
65 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
1 N P &N TAN VERT 3PH W/3 1 POST BKTS
83 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
1
188
1
1
Rmv Dsgn Volt Num 25 Rmv Op Volt Num • 12
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE- CONCRETE 55 FT- NO MAT DOLLARS - * * * * * ** USE EXTERNAL
CHARGES * * * **
N LABOR ONLY - TO SET SELF SUPPORTING CONC POLE. INVENTORY
CONC POLE SEPARATELY
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI -NEUT DEADEND SLACKSPAN VERTICAL 3 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Page : 101
Est Cont ManHours : 3.94
DOT SUPPORT
* Work Location : 152.02
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL
INSTALL NONE
INSTALL NONE
Description
nst Dsgn Volt Num
Energized Y
DISTEASEMENT
EASEMENT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
G11HIG
PDDJUMPER3
PHPF13
PL503G
PNDSV3
PNDV3L
POLESTAKE
SETUP
SPREADPHASES3NONTAN
nst Op Volt Nu
Inaccessible : N
1,000
1
3
1
1
1
3
4
1
G
v`Op Volt Num : 12
Rock/Swamp : N Est Co ManHour; 76.90
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Est Cont ManHours : 5.38
DOT SUPPORT
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
N FIBERGLASS STANDOFF 13" JUMPER PIN BRACKET
Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
N PRI -NEUT DEADEND SLACKSPAN VERTICAL 3 PH
N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
REMOVE NONE
TRANSFER NONE
* ** Work Location : 153.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* * * Work Location 154.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
SPREADPHASES3NONTAN
G
PN33974/0C
Description :
Inst Dsgn Volt Num : 25
Energized: Y'
OHFLAGTRAFF
PLCUT 1
SETUP
G11HG
PL305
SD1
* ** Work Location : 154.00 Description .
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
DSGLBHORZ
G11HIG
LTAHPS45MONGOOSE
PL453SG
PN33971/0C
S2TPAC
Description:
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
LTAHPS45MONGOOSE
OHFLAGTRAFF
PL55CONC
Inst Op Volt Num : 12
Inaccessible : N
2
1
1
PN33974/0C
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
100 Y 3PH PRI- NEUTRAL (3-397 ACSR &1- 4 /OACSR)
Rmv Dsgn, Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 23.05
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DEADEND ONE WIRE
Page : 102
Est Cont ManHours : 0.00
1
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
PLCONCSELFSPTLABOR 1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 48.59 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y DISC SW- HORIZONTAL- GANG- LB 25KV 900A
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
102 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
35 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N
68 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
Est Co ManHour : 59.44
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE - CONCRETE 55 FT- NO MAT DOLLARS - * * * * * ** USE EXTERNAL
CHARGES * * * **
N LABOR ONLY TO SET SELF SUPPORTING CONC POLE. INVENTORY
CONC POLE SEPARATELY
Est Cont ManHours : 5.38
DOT SUPPORT
DOT SUPPORT
INSTALL NONE PNTV3F 1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
INSTALL NONE POLESTAKE 3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
INSTALL NONE SCONNOH 1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
INSTALL NONE SD1 2 N SEC DEADEND ONE WIRE
INSTALL NONE SETUP 6 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
TRANSFER NONE S2TPAC 50 Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
* ** Work Location : 154.02
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 155.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 155.01
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSGLBVERT
EASEMENT
PDDJUMPER3
PL553SG
PN33974/0C
PNDDV3
POLESTAKE
SETUP
Description
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
INSTALL EXCLUDE STAT S1 /OTPAC
PLCUT
SETUP
G11HG
LTAHPS45MONGOOSE
PL453G
PN31 /01 /OC
PN33971/0C
PNDV3
PNTV3PCTS
Description :
Inst Dsgn Volt Num : 25
Energized . Y
Inst Op Volt Num : 12
Inaccessible N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1
1
70
1
3
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
Page : 103
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 67.52
Est Cont ManHours : 5.38
Y DISC SW -GANG OPERATED LOAD BREAK 25KV 900AMP VERTICAL
MOUNT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397 ACSR &1- 4 /OACSR)
N PRI -NEUT DOUBLE DEADEND VERTICAL 3 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num 12
Rock /Swamp : N Est Co ManHour : 45.39
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 Y POLE WOOD CCA 45 FT CLASS 3 W GROUND
136 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
100 Y 3P1 PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI -NEUT DEADEND VERTICAL 3 PH
1 N P &N TAN VERT 3 PH W /PTP & 2 -1 POST BKTS &CLAMP TOP INS
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 66.71
170 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Est Cont Mani : 0.00
Est Cont ManHours : 5.38
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL
INSTALL NONE
DISTEASEMENT
EASEMENT
G11HIG
LTAHPS45MONGOOSE
OHFLAGTRAFF
PL553G
PN31 /01 /0C
PN33974/OC
PNDV3
PNTV3F
POLESTAKE
SD1
SETUP
SVCONNOH
p ork Location : 156.00
Work Location , :157.00
NONE
SVTP2S
Description
Inst Dsgn Volt Num
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
PND3STL6
POLESTAKE
SETUP
G11HIG
PND3STL6
PLCUT
SETUP
Page : 104
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
161 Y
170 Y
1 N
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
85 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num 12
Inaccessible : N
1
1 Y 400 W MONGOOSE LT WITH BKT & PC
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
1
3
4
1
In Op Volt Num : y
Inaccessible • N
10
3PH PRI- NEUTRAL (3- 1 /OACSR &1- 1 /OACSR)
3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
PRI -NEUT DEADEND VERTICAL 3 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 24.71 Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
DOT SUPPORT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
Description •
Inst Dsgn Volt N 2
Energized : Y
OHFLAGTRAFF
Rmv Dsgn Volt Num : 25
v Op Volt Num
Rock/Swamp : N Est Co.ManHour 46.41 Est Cont ManHours : 0.00
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* * *, Work Location : 157.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
LTAHPS45MONGOOSE
PL405SG
PN33971/0C
PNT3S
SD1
SR11 /0
SVCONNOH
SVTP1 /0S
SVTP2S
TA15
Description
Inst Dsgn Volt Num : 25
Energized : Y
S1 /OTPAC
DISTEASEMENT
EASEMENT
PNTV3F
POLESTAKE
SCONNOH
SETUP
SR11 /0
SVCONNOH
TA15
nst D n Volt sg olt Nu : 25
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S4DPXC
1
1
241
1
1
1
Inst Op Volt Num
Inaccessible : N
230
1,000
LTAHPS45MONGOOSE 1
PL553SG 1
PN33974/0C 230
1
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
120 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1
4
1
nst Op Volt Num
i accessible : N
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N P &N TAN 3 PH W/ PTP & 2 POST BKT STEEL (B 9440)
N SEC DEADEND ONE WIRE
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num • 25 Rmv Op Volt Nurr
Rock /Swamp : N ` Est Co ManHour : 40.13
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
* *; Work Location :158.00 Description
I
Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour 32.30 Est Cont ManHours : 0.00
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
82 Y SEC WIRE -ACSR DUPLEX #4
Page : 105
Est Cant ManHours : 5.38
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
LTAHPS45MONGOOSE
PL405G
PN33971/OC
PNT3F
* ** Work Location : 158.01
* ** Work Location : 159.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
SCONNOH
SD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
Description:
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12
Energized : Y Inaccessible : N
OHFLAGTRAFF 10
PLCUT
SETUP
SPREADPHASES3NONTAN
G
S2TPAC
G11HIG
G11SPI1
LTAHPS45MONGOOSE
PDDJUMPER3
PL405G
PN122C
PN33974/0C
PND1
PNDDV3L
SPREADPHASES3NONTAN
1
1
82
1
1
1
Y 400 W MONGOOSE LT WITH BKT & PC
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 3PH PRI- NEUTRAL (3- 397ACSR &1- 1 /OACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 P11 F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DEADEND ONE WIRE
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25
Inaccessible : N Rock/Swamp : N
1
4
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 86.61
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
Y SEC WIRE TRIPLEX #2 ALUMINUM ALLOY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N GUY SPAN 11M W /INS- 1 GUY ON THE POLE
Y 400 W MONGOOSE LT WITH BKT & PC
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1- 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
Page : 106
Rmv Op Volt Num : 12
Est Co ManHour : 0.00 Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 159.01
G
SVCONNOH
SVTP2S
Description
Inst Dsgn Volt Num 25
Energized : Y
DISTEASEMENT
15
2
2
1
1
1
119
15
1
1
Inst Op Volt Num • 12
Inaccessible • N
N PRI & NEUTRAL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH 350 -750AL PRI .
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
100 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock/Swamp : N Est Co ManHour : 60.26
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
TRANSFER NONE
Work Location : 160.00 Description :
Inst Dsgn Volt Num'
Energized - Y
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
NONE
NONE
NONE
NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
REMOVE TRANSFER
ork Location 160.01
INSTALL NONE
INSTALL NONE
EASEMENT
G11HIG
LTAHPS45MONGOOSE
PDDJUMPER3
PL503G
PN33974/0C
PNDV3L
POLESTAKE
SCONNOH
SD1
SETUP
SVCONNOH
SVTP2S
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL405SG
PND1
SRS3
SVCONNOH
SVUTAI /OS
LTAHPS45MONGOOSE
SR11 /0
TA15
Description :
Inst Dsgn Volt Num
Energized . r
DISTEASEMENT
Page : 107
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
3 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
129 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
3 N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
100 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
Inst Op Volt Num': 12
Inaccessible * N
10
1
4
2
1
1
1
1
35
1
1
Op V
I naccessible
1,000
EASEMENT 1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num • 12
Rock/Swamp - N Est Co ManHour 35 02
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
N PRI & NEUTRAL DEADEND 1 PH
N SEC RISER SHIELD 3 IN.
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N SERVICE 3 WIRE 1/0 RESIDENTIAL UD CABLE * *ADDITIONALLY USE
SVUD3W FOR EACH SERVICE * **
Y 400 W MONGOOSE LT WITH BKT & PC
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
s t Cont ManHours : 0.00
Rmv Dsgn Volt Num :25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 41.24
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
nt ManHours • 5 38
DOT SUPPORT
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
* ** Work Location':162.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
TRANSFER NONE
G11HIG
PL503SG
PND3STL6L
POLESTAKE
SETUP
SRS3
SS1 /0- 4 /OUTAHEAT
SVCONNOH
SVUTAI /OS
TNSPLICEPIT
TNSV
LTAHPS45MONGOOSE
SR11 /0
TA15
Description
Inst Dsgn Volt Num
Energized • Y
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PDDJUMPER3
PNDDV3B1L
POLESTAKE
SDD1
SETUP
SPREADPHASES3NONTAN
G
G11HIG
PNTV3F
SDD1
SPREADPHASES3NONTAN
G
PN33974/0C
3
1
1
3
4
1
1
1
Op Volt Num 12
Inaccessible • N
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 50 FT CL 3 W SECT GND
N PRI DEAD -END 3PH W /6FT -6 STL ARM 1 350 -750AL PRI 1
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER SHIELD 3 IN.
N SERVICE SPLICE -1 /0 THRU 4/0 UTA - HEAT SHRINK
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 108
50 N SERVICE 3 WIRE 1/0 RESIDENTIAL UD CABLE * *ADDITIONALLY USE
SVUD3W FOR EACH SERVICE * **
1 N SPLICE PIT - NO SHORING - DIGGING & FILLING -INV EACH(3X3X4)
10 N TRENCHING FOR SERVICE
1 Y 400 W MONGOOSE LT WITH BKT & PC
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF ASSY 1 PH 1- 15 KVA 120 /240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
ock/Swamp • N Est Co ManHour • 113 32
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
6 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI .
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N SEC DBL DEADEND 1 WIRE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
2 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
1 N SEC DBL DEADEND 1 WIRE
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
100 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
DOT SUPPORT
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE
REMOVE
NONE
NONE
EXCLUDE STAT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
TRANSFER
Work, Location 166.00
NONE
NONE
NONE
NONE
NONE
NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
i tion • 165.00
ription :
Inst Dsgn Volt Num
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
S1 /OTPAC
DSALB
G11HIG
PHPF
PL553SG
PN122C
PN33974/0C
PNDD1
PNDDV3L
SD1
LTAHPS14
Description
Inst Dsgn Volt
Energized : Y
OHFLAGTRAFF
PLCUT
SETUP
G11SPI1
PL503SG
PN33974/0C
PNT3F
SVTP1 /0S
LTAHPS14
RECLELEC3PHASSY
Inst Op Volt Nur
Inaccessible : N
10
1
4
290
1
2
3
1
71
219
1
1
2
1
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
[ nst Op Volt Num': 12
Inaccessible : N
3 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY SPAN 11M W /INS- 1 GUY ON THE POLE
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
267 Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
101 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
1 Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W/ &
LAMP * * *NO PC * * *,
1 Y RECLOSER 3PH ELEC- W/ CONTROLS, CABLES,LAS, PKRS, BKTS **
(NOT INTELLITEAM)
SD1 1
SVCONNOH 1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 62.77
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Page : 109
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N BRKT JUMPER PIN FOR STEEL CROSSARM
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1- 2ACSR)
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DBL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH 350 -750AL PRI .
N SEC DEADEND ONE WIRE
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W/ &
LAMP * * *NO PC * * *,
Est Cont ManHours : 0.00
Rrnv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour 67.20
Est Cont ManHours : 0.00
* ** Work Location : 166.01
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
* ** Work Location : 166.02
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
* ** Work Location : 166.03
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HIG
OHFLAGTRAFF
PL503G
PN33974/OC
PNDD3STL5L
POLESTAKE
S1 /OTPAC
SD1
SETUP
SVCONNOH
LTAHPS14
Description
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
PNT3F
SETUP
PNT3F
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
OHFLAGTRAFF
PL355
POLESTAKE
S1 /OTPAC
Inst Op Volt Num : 12
Inaccessible : N
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
2 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1
290
1
3
63
1
3
1
Inst Op Volt Num : 12
Inaccessible : N
3
Inst Op Volt Num : 12
Inaccessible •`N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 59.68
Est Cont ManHours : 5.38
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 50 FT CLASS 3 W GROUND
Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI DOUBLE DEAD -END 3PH W /5FT STEEL ARM 350 -750AL
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W/ &
LAMP * * *NO PC * * *,
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 13.16 Est Cont ManHours : 0.00
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 8.30
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
1 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
3
Y POLE WOOD CCA 35 FT CLASS 5
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
63 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Page : 110
INSTALL NONE
INSTALL NONE
INSTALL NONE
Work Lo
INSTALL NONE
INSTALL
INSTALL
REMOVE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
NONE
NONE
NONE
NONE
NONE
Work Location 167.01
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL
INSTALL
INSTALL
NONE
NONE
NONE
INSTALL NONE
INSTALL
INSTALL TRANSFER
NONE
INSTALL TRANSFER
SDD1
SETUP
SVTP1 /0S
7.00 Description
Dsgn V
Energized Y
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL405SG
PN122C
PND1
S1 /OTPAC
SCONNOH
SR11 /0
TA25
PN122C
:ription
Dsgn Volt Num : 25
Energized Y
S1 /OTPAC
DISTEASEMENT
DSALB
EASEMENT
OHFLAGTRAFF
PL503SG
PND1
PNT3F
POLESTAKE
SETUP
LTAHPS14
PN122C
1
2
: nst Op Volt Num
Inaccessible : N
80
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
44 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Inst Op Volt Num 12
Inaccessible • N
3
1
1
3
Rmv Dsgn Volt Num : 25 Rmv Op Volt Nu
Rock/Swamp : N Est Co ManHour • 26.00
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 40 FT CL 5 W' SECT GND
6 Y 1PH PRI-NEUTRAL (1-2ACSR&1-2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
81 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
233 Y 1PH PRI-NEUTRAL (1-2ACSR&1-2ACSR)
Rmv Dsgn Volt Num . 25
Rock/Swamp : N
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
v Op Volt Num : 12
Est Co ManHour . 28.07
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
3 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Y POLE WOOD CCA 50 FT CL 3 W SECT GND
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W/ &
LAMP * * *NO PC * * *,
80 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Page : 111
Est Cont ManHours : 0.00
Est Cont ManHours • 5.38
* ** Work Location : 167.20
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 167.30 Description :
Inst Dsgn Volt Num : 25
Energized : Y
REMOVE NONE PL305
REMOVE NONE SDD1
REMOVE NONE SVTP1 /0S
* ** Work Location : 167.50
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Energized : Y Inaccessible : N Rock /Swamp : N Est Co ManHour : 10.24 Est Cont ManHours : 5.38
DISTEASEMENT 1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
EASEMENT
G11HG
G11SPI1
PL355
POLESTAKE
SETUP
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
PDDJUMPER1
PL453SG
PNDD1
POLESTAKE
SD1
SETUP
SR11 /0
SVCONNOH
SVTP1 /0S
TA25
PN122C
1
1
1
3
3
Inst Op Volt Num : 12
Inaccessible : N
1
1
1
20 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Inst Op Volt Num : 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 28.40
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 45 FT CL 3 W SECT GND
N PRI & NEUTRAL DBL DEADEND 1 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1
3
1
3
1
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD
N GUY SPAN 11M W /INS 1 GUY ON THE POLE
Y POLE WOOD CCA 35 FT CLASS 5
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Rmv Dsgn Volt Num : 25
Rock /Swamp : N
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DBL DEADEND 1 WIRE
35 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
147 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
Rmv Op Volt Num : 12
Est Co ManHour : 6.23
DOT SUPPORT
DOT SUPPORT
DOT SUPPORT
Page : 112
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
'' Work Location : 201.00
INSTALL NONE
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE
REMOVE
NONE
NONE
REMOVE TRANSFER
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 202.00
* ** Work Location : 203.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 203.10
INSTALL NONE
INSTALL NONE
REMOVE NONE
Description
Inst Dsgn Volt Num : 25
Energized : Y
PNT3F
PN31 /02C
PNT3F
S4DPXC
SCONNOH
SR11 /0
TA37
PN31 /02C
Description •
Inst Dsgn Volt Num : 25
Energized : Y
SETUP
LTAHPS14
PL305
SD1
SVCONNOH
Description :
Inst Dsgn Volt Num : 25
Energized • Y
OHFLAGTRAFF
PLCUT
SETUP
G11HIG
PL403G
PN122C
PNDD1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
G11HIG
Inst Op Volt Num : 12
Inaccessible : N
1 N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
Y 3PH PRI- NEUTRAL (3- 1 /OACSR &1- 2ACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
54 Y SEC WIRE -ACSR DUPLEX #4
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
165 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 2ACSR)
164
1
Inst Op Volt Num : 12
Inaccessible : N
2
1
1
Inst Op Volt Num : 12
Inaccessible • N
4
1
1
241
1
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 8.26
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y STREET LIGHT LUM -HPS 14500L 150W 120V, COBRA DROP, W/ &
LAMP * * *NO PC * * *,
Y POLE WOOD CCA 30 FT CLASS 5
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
3 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Y POLE WOOD CCA 40 FT CLASS 3 W GROUND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
N PRI & NEUTRAL DBL DEADEND 1 PH
Page : 113
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 29.01 Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num ::12
Rock/Swamp • N Est Co ManHour 23 42 Est Cont ManHours : 0.00
Inst Op Volt Num : 12
Inaccessible N
1
4
1
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num • 12
Rock/Swam • N Est Co ManHour • 15 5
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Est Cont Mani • 0 00
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PL405G
PND1
SR11 /0
TA25
1
Work Location 204.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE ABANDON
REMOVE ABANDON
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
ork Location 2 041
De scr ip t i on :
Inst Dsgn Volt Num
Energized : Y'
OHFLAGTRAFF
1
1
PLCUT
SETUP
SVUTAI /OS
Inst Op Volt Num 12
[naccessible : N
3
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
10 N SERVICE 3 WIRE 1/0 RESIDENTIAL UD CABLE * *ADDITIONALLY USE
SVUD3W FOR EACH SERVICE * **
N TRENCHING FOR SERVICE
TNSV
G11SPI2
PB1
PHP
PL503SG
PN122C
PND1
PNTV3F
SR31 /0
SRS2
SVCONNOH
SVTP1 /0S
TA15
TB037CM15
Description :
Inst Dsgn Volt Num . 25
Energized • Y
DISTEASEMENT
EASEMENT
G11SPI1
OHFLAGTRAFF
10
1
1
1
1
36
1
1
1
1
1
Inst Op Volt Nu
Inaccessible : N
1,000
1
Y POLE WOOD CCA 40 FT CLASS 5 W GROUND
N PRI & NEUTRAL DEADEND 1 PH
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp • N Est Co ManHour 47.35
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N GUY SPAN 11M W /INS- 2 GUYS ON THE POLE
N PRI BRKT ONE POST
PRI - HORIZONTAL POST INSUL TIE TOP
N
Y POLE WOOD CCA 50 FT CL 3 W SECT GND
Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
N SEC RISER (3) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
N SEC RISER SHIELD 2 IN.
3 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
46 N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Y TRANSF ASSY 1 PH 1- 15 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y TRANSF BK OPEN DELTA 120/240V 37.5 & 15 KVA NO TAPS CPT W /CL
MTN 2 CO 2 LA
PN31 /02C 164 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 2ACSR)
Rmv Dsgn Volt Num 2 Rmv Op Vplt Nurr
Rock/Swamp : N ` ".Est Co ManHour`:'54.99
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
N GUY SPAN 11M W /INS- 1 GUY ON THE POLE
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
Page : 114
Est Cont ManHours 0.00
Est Cont ManHours : 5.38
DOT SUPPORT
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
INSTALL NONE PDDJUMPER3
INSTALL NONE PL503SG
INSTALL NONE PNDDV3
INSTALL NONE POLESTAKE
INSTALL NONE SCONNOH
INSTALL NONE SETUP
INSTALL NONE SR11 /0
INSTALL NONE TA37
INSTALL TRANSFER
* ** Work Location : 205.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 206.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
REMOVE NONE
REMOVE TRANSFER
* ** Work Location : 209.00
PN31 /02C
Description :
Inst Dsgn Volt Num : 25
Energized : Y
OHFLAGTRAFF
SETUP
G11HIG
PL305
S1 /OTPAC
SDD1
Description:
Inst Dsgn Volt Num : 25
Energized : Y
G11HIG
S1 /OTPAC
SD1
SVTP1 /0SPLS
S1 /OTPAC
SD1
S1 /OTPAC
Description :
Inst Dsgn Volt Num : 25
Energized : Y
INSTALL TRANSFER PN31 /02C
REMOVE NONE PN31 /02C
REMOVE TRANSFER PN31 /02C
1 N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
1 N PRI -NEUT DOUBLE DEADEND VERTICAL 3 PH
3 N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 Y TRANSF ASSY 1 PH 1 -37.5 KVA 120/240V NO TAPS CPT W /CO & LA BKT
& FUSE.
164 Y 3PH PRI- NEUTRAL (3- 1 /OACSR &1- 2ACSR)
InstOp Volt Num : 12
Inaccessible : N
3 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 30 FT CLASS 5
46 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N SEC DBL DEADEND 1 WIRE
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rn1v Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 13.03
Rmv Dsgn Volt Num 25 Rmv Op Volt Num • 12
Rock /Swamp : N Est Co ManHour : 6.74
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
4 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
1 N SEC DEADEND ONE WIRE
4 N SVC WIRE SPLICE TRIPLEX 1/0* *INVENTORY BY FT ** *INVENTORY
SPLICE SEPARATE
105 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
1
N SEC DEADEND ONE WIRE
59 Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
Inst Op Volt Num : 12
Inaccessible : N
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 36.65
354 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 2ACSR)
3 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 2ACSR)
354 Y 3PH PRI - NEUTRAL (3- 1 /OACSR &1- 2ACSR)
Page : 115
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
EXHIBIT B
Total Relocation Cost of
Reimbursable Facilities
$ 240,153.00
Job Estimating & Tracking System - JETS
FACE SHEET REPORT
Job Description
Driving Directions
Permits /Notification(s) .
MANHOURS:
Company
Contractor
Company Labor
Contract Labor
Company Material
Contractor Material
Company Equipment
Contractor Equipment
Engr Supv OH
Subtotal
Blanket
Salvage
Total
Total WO Bill :
Total Net Cost :
Rate :
TVM Amount : $0
Total Bill Amount :
Approvals
Auth :
Close :
relocations for road widening project
$19,289 $9,179
$0 $0
$25,195
$0
$65,530
$189,171
$2,169
$187,002
Revenue: $0
Loc Cost: $0
CPS Amount : $0
Georgia Power Company
Distribution Work Order
Type Construction: OVERHEAD
Headquarters :CENTRALIZED DISTR. SVCS W.O. Number : GP892H02011
Customer : GDOT RICHMOND COUNTY P.E. : 7030 01 WR# : 0
Address : PI #250510- WRIGHTSBORO ROAD FM BOBBY JONES TO J Job Reference : 2947608
Town :AUGUSTA Job Type : H- HIGHWAY RELOCATIONS OH / UD
Rep Allow : No Blanket : No
Home Phone Substation
Map Number Circuit
Type Customer : DOT PROJECTS OH /UD REIMBURSIBLE & NONREIMB Charge Account :
Estimate Name : REIMBURSABLE Credit Account
Engineer : GRIFFIN,KRISTI B. Date Last Est : 31 -OCT -2012
Committed Service Date : CSS Bill Acct#
Total Estimated External Charges Included Below: $0
Billing: Fixed Joint Use
$0 $0 $0
Onsite Travel Headquarters
1,240.94 186.07 62.00 1,489.01
63.50 0.00 0.00 63.50
Labor Multiplier : 1.25 Comment : DOT PROJECT
Travel : 0.00 HQ : 0.00 EOH Labor : 0.00 EOH Matl : 0.00
Cost Summary Plant Transformers Meters Maint Removal
$46,657 $356 $0
$32,500 $0 $0
$192
$0
$0
$9,727
$5,773
$3,954
Date
Sales Tax :
$0
$0
$0
$0
$0
$0
$0
$0
Total Ratio : 0.00
Local Ratio : 0.00
Completed By
$0
Total Estimated: 1,552.51
$6,121
$0
$0
$0
$3,305
$0
$9,426
$0
$9,426
Date: 01- Nov -2012 10:00:15 AM
Out Of Ratio Customer Contribution
Profit :
$16,879
$0
$0
$0
$13,777
$39,771
$0
$39,771
ROE : 0.00
Net Present Val : 0
Date
$0
Total
Total
$70,013
$32,500
$28,468
$
$9,115 $37,807
$0 $0
$79,307
$248,095
$0
$7,942
$240,153
$0
$240,153
Date : 01- Nov -2012 10:00 AM
Job Ref #
Applicant Name
Estimate Name
Estimate Description : REIMBURSABLE LOCATIONS AFTER FRANCHISE AGREEMENT IS APPLIED
Work Special
Function Processing
Work Location : 2.00
INSTALL EXCLUDE STAT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
TRANSFER NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
: 2947608
: GDOT RICHMOND COUNTY
: REIMBURSABLE
Local
Cost Unit Identification
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num
Energized : Y Inaccessible : N
S1 /OTPAC 2
G11HIG
PN33974/0C
PNDV3L
SETUP
SS1 /0
G11HIG
PN33971/0C
PNC3L
S1 /OTPAC
cription
Inst Dsgn Volt Num : 25
Energized : Y
PLCUT
SETUP
SPREADPHASES3NONTAN
G
G11HG
G11HIG
PL503SG
PN33971/0C
PNC3L
SCONNOH
SD1
SPREADPHASES3
SVCONNOH
SVTP2S
Work Location Summary Report
ALL LOCATIONS
Qty Ret Ind Description
8
Work Order # : GP892H02011
Job Address : PI #250510- WRIGHTSBORO ROAD FM
BOBBY JONES TO JIMMY DYESS
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 77.42
• SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
154 Y 3PH PRI- NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
2 N PRI AND NEUTRAL DEAD -END VERTICAL 3PH 350 -750AL
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
3 N OVERHEAD SEC CONDUCTOR SPLICE FOR #1 /0 ACSR
4 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
152 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
152 Y SEC WIRE TRIPLEX #1/0 ALUMINUM ALLOY
nst Op Volt Num : 12
Inaccessible : N
Page : 1
Contractor Name
Cont ManHours : 0.00
* * * Work Location : 3.00
Rmv Dsgn Volt Num
Rock/Swamp • N
Rmv Op Volt Num : 12
Est Co ManHour 58.48 Est Cont ManHours : 0.00
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING - 3
PH VERT & DEADEND
1 N GUY ANCH HELIX 11M W' GUARD
3 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 50 FT CL 3 W' SECT GND
215 Y 3PH PRI - NEUTRAL (3- 397ACSR &1- 1 /OACSR)
1 N PRI & NEUTRAL "C" SUSPENSION 3 PH, 4/0 & LARGER CONDUCTOR
1 N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
1 N SEC DEADEND ONE WIRE
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 3 PH - - TANGENT
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
50 N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
REMOVE TRANSFER TA25
* ** Work Location : 11.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PN122C
PND1
SETUP
SR11 /0
SVCONNOH
1
Inst Op Volt Num : 12
Inaccessible : N
1 Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
114 Y 2PH PRI - NEUTRAL (2- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 2 PH W' 6FT STL ARM
1 N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
TB03710 1 Y TRANSF BANK OPEN DELTA 120/240V 37 & 10 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT -N
TA25
PN222C
PND2STL6
SR21 /0
SVCONNOH
* ** Work Location : 18.00
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HG
SD1
SETUP
G11HG
SD1
* ** Work Location 19.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
* ** Work Location : 20.00
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
Gi1HIG
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
INSTALL NONE EASEMENT
Inst Op Volt Num : 12
Inaccessible : N
1
1
2
1
Inst Op Volt Num : 12
Inaccessible : N
Inst Op Volt Num : 12
Inaccessible : N
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 36.11
199 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1/0 7STR
2 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Rmv Dsgn Volt Num : 25
Rock/Swamp : N
N GUY ANCH HELIX 11M W GUARD
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD
N SEC DEADEND ONE WIRE
Rmv Op Volt Num : 12
Est Co ManHour : 5.33
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp : N Est Co ManHour : 3.31
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
OR CONTRACTOR BID
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 32.74
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR
(IR r rThJTRArTr1R RTr1
Page : 2
Est Cont ManHours : 0.00
Est Cont ManHours : 0.00
Est Cont ManHours : 1.44
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 1.44
DOT SUPPORT
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE EXCLUDE STAT
REMOVE NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
G11HIG
OHFLAGTRAFF
PN122C
PND1
SETUP
S4DPXC
G11HIG
PN122C
PND1
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
148 Y 1PH PRI- NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
4 N SETUP TIME PER POLE - FOR LARGE JOBS ONLY
67 Y SEC WIRE -ACSR DUPLEX #4
1 N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
67 Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
1 N PRI & NEUTRAL DEADEND 1 PH
* Work Location : 22.00
Work Location 28.00
* Work Location : 30.00
Description :
Inst Dsgn Volt Num : 25
Energized : Y
G11HIG
PND1
SETUP
G11HIG
PND1
Description :
Inst Dsgn Volt Num : 25
Energized Y
SETUP
SVCONNOH
SVCONNOH
EASEMENT
PL453G
PN322C
PNT3F
SD1
SETUP
SVCONNOH
Inst Op Volt Num 12
Inaccessible : N
1
1
2
1
Est Cont ManHours : 0.00
Inst Op Volt Num 12
Inaccessible : N
2
1
Description
Inst Dsgn Volt Num : 25 Inst Op Volt Nur
Energized : Y Inaccessible - N
1,000
4
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour :11.24
N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
N SET UP TIME PER POLE FOR LARGE JOBS ONLY
N GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
N PRI & NEUTRAL DEADEND 1 PH
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 2.99
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op. Volt Num : 12
Rock /Swamp : N Est Co ManHour 27 84 Est Cont ManHours : 1.44
Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT DOT SUPPORT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
Y POLE WOOD CCA 45 FT CLASS 3 W' GROUND
Y 3PH PRI - NEUTRAL (3- 2ACSR &1 - 2ACSR)
N PRI &NEU TANG 3 PH W/ PTP 2 PH F'GLASS BKT -SO. ELE. STANDARD (B
-9445)
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Page : 3
INSTALL TRANSFER LTAHPS272
REMOVE NONE PL355
REMOVE NONE SD1
REMOVE NONE SVCONNOH
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE TRANSFER
TRANSFER NONE
Work Location : 31.00
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
Work Location 33.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
LTAHPS272
S4DPXC
Description :
Inst Dsgn Volt Num : 25 Inst Op Volt Num 12
Energized : Y Inaccessible : N
G11HIG 1
PL453SG
PND3STL6
SETUP
SR21 /0
SVCONNOH
TB02515
LTA72
SVQP1 /0S
G11HIG
PL453SG
PND3DW8
SR21 /0
SVCONNOH
TB02515
LTA72
SVQP1 /OS
Description
Inst Dsgn Volt Num
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
Inst Op Volt Num • 12
Inaccessible : N
Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP & 2 FT BRKT
Y POLE WOOD CCA 35 FT CLASS 5
N SEC DEADEND ONE WIRE
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y STREET LIGHT LUM -HPS 27000L 250W 120V, COBRA DROP, W /PE,
LAMP & 2 FT BRKT
91 Y SEC WIRE -ACSR DUPLEX #4
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour 59.55
• GUY ANCH HELIX 11M W GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
1 N PRI & NEUTRAL DEADEND 3 PH W 6FT STL ARM
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y TRANSF BANK OPEN DELTA 120/240V 25 & 15 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
1 Y STREET LIGHT LUM -MV 7000L 175W 120V W /PE, LAMP & 2 FT BRKT
50 N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
1 N GUY ANCH HELIX 11M W' GUARD & 1 F'GLASS STRAIN INSUL
1 Y POLE WOOD CCA 45 FT CL 3 W' SECT GND
1 N PRI & NEUTRAL DEADEND 3 PH W DOUBLE8 FOOT WOOD ARM
1 N SEC RISER (2) XFMR BANK 37.5KVA AND SMALLER -WP CU #1/0 7STR
1 N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
1 Y TRANSF BANK OPEN DELTA 120/240V 25 & 15 KVA NO TAPS CPT W/2
CO 2 LA 2 BKT-N
1 Y STREET LIGHT LUM -MV 7000L 175W 120V W /PE, LAMP & 2 FT BRKT
50 N SERVICE -4 WIRE QUADRUPLEX 1 /0AL
Rmv Dsgn Volt Num • 25 Rmv Op Volt Num 12
Rock/Swamp : N Est Co ManHour 4.71
N GUY ANCH HELIX 11M W' GUARD
Page : 4
Est Cont ManHours : 0.00
Est Cont ManHours : 5.38
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
DOT SUPPORT
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
Work Location : 37.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
Work Loca
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
POLESTAKE
SD1
SETUP
SD1
Description :
Inst Dsgn Volt Nu
Energized : Y
PL553SG
PLCUT
PNTV2PS
SETUP
SPREADPHASES2
SR11 /0
SVCONNOH
TA25
PN21 /01 /0C
SVTP1 /0S
PL405SG
PNTV2PS
SPREADPHASES2
SR11 /0
SVCONNOH
TA25
PN21 /01 /0C
SVTP1 /0S
Description':
Inst Dsgn Volt Num : 2
Energized : Y
G11HIG
OHFLAGTRAFF
PDDJUMPER1
PDDJUMPER3
PL553G
PN11 /01 /OC
3
1
2
nst Op Volt Num : 12
naccessible : N
1
1
1
4
1
1
140
30
1
1
1
140
30
Op Volt Num 1"
; naccessible • N
3
10
1
1
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR
N SEC DEADEND ONE WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num : 25
Rock/Swamp : N
Rmv Op Volt Num : 12
Est Co ManHour : 51.25
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
N TOP ANY SIZE POLE TO MAKE SHORTER POLE
N P &N TAN VERT 2 PH W /PTP & 1 POST BKT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y 2PH PRI- NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
N P &N TAN VERT 2 PH W /PTP & 1 POST BKT
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
N SEC RISER 1 XFMR 37.5KVA AND SMALLER -WP CU #1 /0 7STR
N CONNECTORS & MHR FOR OH SVC ANY SIZE * * * *1 PER
SERVICE * * * **
Y TRANSF ASSY 1 PH 1- 25 KVA 120/240V CPT W /CO & LA BKT & FUSE
Y 2PH PRI- NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
N SERVICE -3 WIRE TRIPLEX 1 /0AL * *ADDITIONALLY USE SVOH3W FOR
EA SVC **
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 97.62
N GUY ANCH HELIX 11M W GUARD & 1 F`GLASS STRAIN INSUL
N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI DOUBLE DEADEND 3 PH LABOR - VARIOUS CONDUCTOR
Y POLE WOOD CCA 55 FT CLASS 3 W GROUND
242 Y 1PH PRI - NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
Page : 5
DOT SUPPORT
Est Con
anHours • 0.00
Est Cont ManHours : 3.94
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
PN21 /01 /OC
PN33974/0C
PND1
PNDDV3B1L
PNDV2
POLESTAKE
SETUP
SPREADPHASES2
Work Location:: 42.00
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE NONE
REMOVE TRANSFER
REMOVE TRANSFER
SPREADPHASES2 1
Description :
Inst Dsgn Volt Num : 2
Energized : Y
PLCUT
SETUP
CO 1
G11HG 1
PDDJUMPER1 1
Work Location 42.01
PL405SG
PNDD1
PN11 /01 /0C
SVTP2S
Description
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
DSALB
EASEMENT
PDDJUMPER1
PL553SG
PN122C
PN33974/0C
PND1
PNTV3F
31
224
1
Y 2PH PRI- NEUTRAL (2- 1 /OACSR &1- 1 /OACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
N PRI DOUBLE DEAD -END VERTICAL 3PH W /3POST INSULS 350 -750AL
PRI
N PRI -NEUT DEADEND VERTICAL 2 PH
N POLE STAKING BY SURVEYOR - USE DOT SUPPORT CONTRACTOR DOT SUPPORT
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
N INSTALL TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING
- 2 PH - TANGENT
1
3
4
1
Inst Op Volt Num'
Inaccessible : N
Inst Op Volt Num 12 Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Inaccessible : N Rock/Swamp : N Est Co ManHour : 17.24 Est Cont ManHours : 0.00
1
1
50
100
1
40
126
2
1 N TOP ANY SIZE POLE TO MAKE SHORTER POLE
4 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
Y DISC SW CUTOUT FOR DSRD PRI VOLT
N GUY ANCH HELIX 11M W GUARD
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 40 FT CL 5 W SECT GND
N PRI & NEUTRAL DBL DEADEND 1 PH
Y 1PH PRI - NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
1 Y
1
2
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num
Rock/Swamp : N Est Co ManHour 65.51
DISC SW ASSY 1 -100A LB 15/26KV CUTOUT & BKT
Y AGENTS COST OF OBTAINING EASEMENT- ($850) - USE DOT CONTR DOT SUPPORT
OR CONTRACTOR BID
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
Y POLE WOOD CCA 55 FT CL 3 W SECT GND
Y 1PH PRI - NEUTRAL (1- 2ACSR &1- 2ACSR)
Y 3PH PRI - NEUTRAL (3 -397 ACSR &1- 4 /OACSR)
N PRI & NEUTRAL DEADEND 1 PH
Est Cant ManHours : 5.38
DOT SUPPORT
1 N PRI &NEU TANG VERT 3 PH W/ 3 -1 PH FIBER- GLASS BKT -SO. ELE.
STANDARD (B -9438
POLESTAKE 3 N POLE STAKING BY SURVEYOR USE DOT SUPPORT CONTRACTOR DOT SUPPORT
Page : 6
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
INSTALL TRANSFER
REMOVE NONE
* ** Work Location : 43.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
* ** Work Location : 48.00
INSTALL NONE
INSTALL NONE
INSTALL NONE
REMOVE NONE
REMOVE NONE
* ** Work Location : 50.00
INSTALL NONE
PS2
Sl/OTPAC
SCONNOH
SDD1
SETUP
SPREADPHASES1NONTAN
G
SS2
LTAHPS82
PN11 /01 /0C
PN122C
SVTP2S
SPREADPHASES1NONTAN
G
Description :
Inst Dsgn Volt Num : 25
Energized : Y
DISTEASEMENT
EASEMENT
G11HG
OHFLAGTRAFF
SD1
SETUP
SD1
Description :
Inst Dsgn Volt Num : 25
Energized Y
PDDJUMPER1
PNDS1
SETUP
PDDJUMPER1
PND1
Description :
Inst Dsgn Volt Num : 25
Energized : Y
PND1
1
140
1
1
4
1
1
50
200
100
Inst Op Volt Num 12
Inaccessible : N
1
Inst Op Volt Num : 12
Inaccessible • N
1
1
4
1
Inst Op Volt Num : 12
Inaccessible : N
1
N OVERHEAD PRI SPLICE FOR #2 ACSR
Y SEC WIRE TRIPLEX #1 /0 ALUMINUM ALLOY
N CONNECTORS & MHR FOR SECONDARY CONNECTIONS -ANY SIZE
N SEC DBL DEADEND 1 WIRE
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
N OVERHEAD SEC CONDUCTOR SPLICE FOR #2 ACSR
Y STREET LIGHT LUM -HPS 8550L 100W 120V, COBRA DROP, W /PE, LAMP
& 2 FT BRKT
Y 1PH PRI - NEUTRAL (1- 1 /OACSR &1- 1 /OACSR)
Y 1PH PRI - NEUTRAL (1- 2ACSR &1 - 2ACSR)
N SERVICE -3 WIRE TRIPLEX 2AL * *ADDITIONALLY USE SVOH3W FOR
EACH 3 W SERVICE * **
N INST TEMP ARM TO SPREAD CONDUCTOR FOR RECONDUCTORING -
1PH VERT & DEADEND
Page : 7
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 19.72
1,000 Y DISTRIBUTION EASEMENT- AMT PAID TO CUSTOMER - USE DOT
SUPPORT CONTRACTOR- * *INVENTORY DOLLARS PAID * **
Y AGENTS COST OF OBTAINING EASEMENT - ($850) - USE DOT CONTR
OR CONTRACTOR BID
1 N GUY ANCH HELIX 11M W' GUARD
10 N OVERHEAD TRAFFIC FLAGGING ID - WHEN THERE WILL BE AN EXTRA
MAN TO FLAG
1 N SEC DEADEND ONE WIRE
2 N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
1 N SEC DEADEND ONE WIRE
Rmv Dsgn Volt Num 25 Rmv Op Volt Num : 12
Rock/Swamp : N Est Co ManHour : 9.41
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI -NEUT DEADEND SLACKSPAN 1 PH
N SET UP TIME PER POLE - FOR LARGE JOBS ONLY
N PRIMARY DOUBLE DEADEND JUMPER LABOR 1 PH - VAR CONDUCTOR
N PRI & NEUTRAL DEADEND 1 PH
Est Cont ManHours : 1.44
DOT SUPPORT
DOT SUPPORT
Est Cont ManHours : 0.00
Rmv Dsgn Volt Num : 25 Rmv Op Volt Num : 12
Rock /Swamp N
N PRI & NEUTRAL DEADEND 1 PH
Est Co ManHour . 6.56
Est Cont ManHours : 0.00