HomeMy WebLinkAboutAMDNEMENT TO THE STANDARD FORM OF CONTRACT FOR PROFESSIONAL ARCHITECTURAL SERVICES WITH CONSTRCTION MANAGER @RISK BETWEEN VIRGO GAMBILL ARCHITECTS VIRGO GAMBILL ARCHITECTS )FOR MUNICIPAL BUILDING AND MODERNIZATIONJanuary 22, 2013
AMENDMENT TO THE STANDARD FORM OF CONTRACT FOR PROFESSIONAL
ARCHITECTURAL SERVICES WITH CONSTRUCTION MANAGER @ RISK
BETWEEN
Augusta, Georgia (The Owner) and Virgo Gambill Architects (the Architect) for
Municipal Building Renovations and Modernization
530 Greene Street, Augusta, Georgia 30901
Owner's Project ID # 10 -173
Originally Signed and Dated by Architect on 2/29/2012
Originally Signed and Dated by Owner on 3/7/2012
This Amendment modifies the original Contract and shall become part of the
Contract. These changes shall be made valid as if they are included in the original
stated contract. No other terms or conditions of the stated contract shall be negated
or changed as a result of this here stated amendment.
Modifications to the Contract are as follows:
Page 1 - General Project Description: Add the following sentence: The project
also includes the addition of a new approximately 8,080 sf main building entrance
lobby with combined training room / Board of Elections voting station, and also a
new 9 -story elevator tower. Site work is limited to those areas immediately
adjacent to the new building addition.
Page 8 - Paragraph 7.1, Owner's Budget: Revise the paragraph to read: The
Architect understands and acknowledges that the Owner has established a budget
for the Project. The Construction Contract Award Price (CCAP) for the entire project
has been estimated at Twenty Three Million, Four Hundred Fifteen Thousand, Eight
Hundred Eighty Five and 00 /100's Dollars ($23,415,885.00).
The project is to be broken into a Phase One construction package, which generally
consists of the construction of the new approximately 8,080 sf main building
entrance with combined training room / Board of Elections voting station, the new
9 -story elevator tower, interior renovations to existing floors 1 and 2, and interior
renovations to the existing building core spaces on floor 3 thru 9. The Construction
Contract Award Price (CCAP) for the Phase One construction package shall not
exceed Seventeen Million Two Hundred Sixteen Thousand, Three Hundred Eighty
Five and 00 /100's Dollars ($17,216,385.00).
1
Page 9 - Paragraph 8.1.1, under Compensation: Revise the paragraph(s) to read:
For the Basic Services of the Architect, Basic Services Compensation shall be in the
amount of One Million, Four Hundred Fifty Eight Thousand, Three Hundred Twenty
Nine and 00 /100's Dollars ($1,458,329.00). The Contract Amount will be broken
out as follows:
Basic Services Compensation shall be in the amount of One Million, Three Hundred
Twenty Five Thousand, Seven Hundred Fifty Four and 00 /100's Dollars
($1,325,754.00) being 6.24% of the CCAP as detailed below.
The A/E fee will be based on the cost of the total building, with an adjustment for
performing the Construction Administration phase portion on a smaller Phase One
CCAP. As stated on Page 10, paragraph 8.2.1, the Design Narrative thru the
Construction Documents phases comprise 65% of total fee, and the Permitting thru
the Final Completion phases comprise 35% of total fee.
Total project cost of $23,415,885 x 6.24% fee
x 65% (Design Narrative thru CD phases) =
Phase One CCAP of $17,216,385 x 6.24% fee
x 35% (Permitting thru Final Completion phases) =
Total
$949,748
$376,006
$1,325,754
Compensation for reimbursable expenses will be a not to exceed amount of One
Hundred Thirty Two Thousand, Five Hundred Seventy Five and 00 /100's Dollars
($132,575.00).
Page 10 - Paragraph 8.2.1, Revise the chart to read:
Phase Phase Value
Design Narrative 5%
Schematic Design 10%
Design Development 10%
Construction Documents 40%
Permitting and Bidding / Negotiation 5%
Construction 25%
Final Completion 5%
Page 22, Exhibit A - After the first paragraph add: This Space Program has been
updated and the current Owners requirements can best be shown in the 60%
Construction Review Documents, submitted by the Architect and dated November
29, 2012.
2
Page 45, paragraph 14 - Delete in its entirety. (Leadership in Energy and
Environmental Design (LEED) ).
Page 47 - Exhibit C - Schedule: Add the following Paragraph. The 100% CD
deliverables are due on March 8, 2012.
In witness whereof, each individual executing this agreement acknowledges that
he /she /it is authorized to execute this agreement and further acknowledges the
execution of this agreement on the date signed below.
By:
Owner:
Au • usta Geor
46111 (Signature)
k I y Deke Copenha
(Name)
Mayor
(Title)
530 Greene Street; Suite 806
(Street Address - No PO Box)
Augusta, Georgia 30901
(City, State, Zip)
/ - 31 -13
(Witnes
C. s )e �c�
•�'a�aw c �'�
•
OW, tl •
•
tad O
e TST,
eh 443E p y
e •• • +rw oecA . ,r9
+ 411 E'.1c` =! .: President
(Title)
(Date of Signature)
` t)a , J ttP/nOatv046
Architect:
Virgo Gambill Architects
Eiat>tr (Seal)
Jas ph W. Gambill, Jr., AIA
e'
2531 Center West Pkwy, Suite 200
(Street Address - No PO Box)
Augusta, Georgia 30909
(City, State, Zip)
(Date of Signature)
3
January 22, 2013
AMENDMENT TO THE STANDARD FORM OF CONTRACT FOR PROFESSIONAL
ARCHITECTURAL SERVICES WITH CONSTRUCTION MANAGER @ RISK
BETWEEN
Augusta, Georgia (The Owner) and Virgo Gambill Architects (the Architect) for
Municipal Building Renovations and Modernization
530 Greene Street, Augusta, Georgia 30901
Owner's Project ID # 10 -173
Originally Signed and Dated by Architect on 2/29/2012
Originally Signed and Dated by Owner on 3/7/2012
This Amendment modifies the original Contract and shall become part of the
Contract. These changes shall be made valid as if they are included in the original
stated contract. No other terms or conditions of the stated contract shall be negated
or changed as a result of this here stated amendment.
Modifications to the Contract are as follows:
Page 1 - General Project Description: Add the following sentence: The project
also includes the addition of a new approximately 8,080 sf main building entrance
lobby with combined training room / Board of Elections voting station, and also a
new 9 -story elevator tower. Site work is limited to those areas immediately
adjacent to the new building addition.
Page 8 - Paragraph 7.1, Owner's Budget: Revise the paragraph to read: The
Architect understands and acknowledges that the Owner has established a budget
for the Project. The Construction Contract Award Price (CCAP) for the entire project
has been estimated at Twenty Three Million, Four Hundred Fifteen Thousand, Eight
Hundred Eighty Five and 00 /100's Dollars ($23,415,885.00).
The project is to be broken into a Phase One construction package, which generally
consists of the construction of the new approximately 8,080 sf main building
entrance with combined training room / Board of Elections voting station, the new
9 -story elevator tower, interior renovations to existing floors 1 and 2, and interior
renovations to the existing building core spaces on floor 3 thru 9. The Construction
Contract Award Price (CCAP) for the Phase One construction package shall not
exceed Seventeen Million Two Hundred Sixteen Thousand, Three Hundred Eighty
Five and 00 /100's Dollars ($17,216,385.00).
1
Page 9 - Paragraph 8.1.1, under Compensation: Revise the paragraph(s) to read:
For the Basic Services of the Architect, Basic Services Compensation shall be in the
amount of One Million, Four Hundred Fifty Eight Thousand, Three Hundred Twenty
Nine and 00 /100's Dollars ($1,458,329.00). The Contract Amount will be broken
out as follows:
Basic Services Compensation shall be in the amount of One Million, Three Hundred
Twenty Five Thousand, Seven Hundred Fifty Four and 00 /100's Dollars
($1,325,754.00) being 6.24% of the CCAP as detailed below.
The A/E fee will be based on the cost of the total building, with an adjustment for
performing the Construction Administration phase portion on a smaller Phase One
CCAP. As stated on Page 10, paragraph 8.2.1, the Design Narrative thru the
Construction Documents phases comprise 65% of total fee, and the Permitting thru
the Final Completion phases comprise 35% of total fee.
Total project cost of $23,415,885 x 6.24% fee
x 65% (Design Narrative thru CD phases) =
Phase One CCAP of $17,216,385 x 6.24% fee
x 35% (Permitting thru Final Completion phases) =
Total
Compensation for reimbursable expenses will be a not to exceed amount of One
Hundred Thirty Two Thousand, Five Hundred Seventy Five and 00 /100's Dollars
($132,575.00).
Page 10 - Paragraph 8.2.1, Revise the chart to read:
Phase Phase Value
Design Narrative 5%
Schematic Design 10%
Design Development 10%
Construction Documents 40%
Permitting and Bidding / Negotiation 5%
Construction 25%
Final Completion 5%
$949,748
$376,006
$1,325,754
Page 22, Exhibit A - After the first paragraph add: This Space Program has been
updated and the current Owners requirements can best be shown in the 60%
Construction Review Documents, submitted by the Architect and dated November
29, 2012.
2
Page 45, paragraph 14 - Delete in its entirety. (Leadership in Energy and
Environmental Design (LEED) ).
Page 47 - Exhibit C - Schedule: Add the following Paragraph. The 100% CD
deliverables are due on March 8, 2012.
In witness whereof, each individual executing this agreement acknowledges that
he /she /it is authorized to execute this agreement and further acknowledges the
execution of this agreement on the date signed below.
By:
Owner: , -Ar chitect:
Augusta. Georgi Virgo Gambill Architects
Mayor
(Title)
Augusta, Georgia 30901
(City, State, Zip)
1 -31 -/3
4 611 (Signature
ki3011, Deke Co.enha
(Name) fo1 '• s •
f °oe s *r'
530 Greene Street, Suite 806
(Street Address - No PO Box)
C. 19 . 44 l
„.,,..to jcz
\1atr r
® Jos ph W. Gambill, Jr., AIA
me)
peuJ!9PQ lr F
�'... °"Presidtht
(Date of Signature)
`tk. e?ev
(Witnes
(Title)
(Seal)
2531 Center West Pkwy, Suite 200
(Street Address - No PO Box)
Augusta, Georgia 30909
(City, State, Zip)
it e 2P1 I(
(Date of Signature)
3