HomeMy WebLinkAboutCONTRACT MODIFICATION #7 FOR AIRPORT FRONT DOOR PARKING IMP WITH REEVES CONSTRUCTION CO PROJECT 0733-18 (AUGUSTA REGIONAL AIRPORT)Item # Description Unit Quantity Unit Price Total Price 1 Adjust Existing Structures to Grade - Phase 1 LS 1 $1,200.00 $1,200.00 2 Curb Inlet Material Substitution (Credit) LS 1 - $1,875.00 - $1,875.00 3 PS # 4 Panel Modification LS 1 $974.00 $974.00 4 Miscellaneous Electrical Proposal - Concrete Pads for Floodlights EA 7 $143.00 $1,001.00 - Additional Electric / Comm. Boxes EA 6 $474.00 $2,844.00 - Additional Receptacles, Transformer, Etc. LS 1 $1,571.00 $1,571.00 5 Sanitary Sewer for Toll Booth (Credit) LS 1 - $2,497.00 - $2,497.00 6 Site Lighting and Electrical Change (Credit) LS 1 - $39,581.00 - $39,581.00 7 3/4" PVC Water Connection for Toll Booth LS 1 $1,660.00 $1,660.00 8 Irrigation Sleeves Under Pavement LS 1 $23,589.10 $23,589.10 9 Irrigation Sleeves Phase 2 (Not Under Pavement) - 2" PVC Sleeve LF 790 $4.90 $3,871.00 - 4" PVC Sleeve LF 180 $6.40 $1,152.00 - 6" PVC Sleeve LF 100 $9.75 $975.00 10 Landscaping - Landscaping (Original Bid) LS 1 - $36,700.00 - $36,700.00 - Landscaping (Revision 4/20/2012) LS 1 $45,195.00 $45,195.00 - Sod SY 12400 $5.25 $65,100.00 - Mulch SY 1700 $6.38 $10,846.00 - Mulch Around Relocated Trees LS 1 $1,100.00 $1,100.00 11 Irrigation System Installation LS 1 $97,000.00 $97,000.00 12 Modification to Rental Return Lot - Unclassified Excavation CY 140 $5.25 $735.00 - Subgrade Preparation SY 120 $0.55 $66.00 - Demolition LS 1 $18,400.00 $18,400.00 - Full Depth Pavement Demolition SY 355 $1.25 $443.75 - GABC (10" Depth) SY 140 $11.90 $1,666.00 - PCC Sidewalk (4" Depth) SY 64 $38.50 $2,464.00 - 8" Thermoplastic Marking (White) SF 240 $3.50 $840.00 - 24" Thermoplastic Marking (White) SF 28 $8.60 $240.80 - Thermoplastic Arrow (Right) EA 1 $91.00 $91.00 - Thermoplastic Arrow (Straight) EA 1 $80.00 $80.00 Airport: Augusta Regional Airport Owner: City of Augusta Contractor: Reeves Construction Company Contract Modification #7 Date Initiated: October 25, 2012 Project: Front Door Parking Improvements Project Number: 0733 -18 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Page 1 of 5 Total Contract Time Original Phase 1 Contract Time 150 calendar days Changes to Phase 1 Contract Time from Previous Contract Modifications 8 calendar days Changes to Phase 1 Contract Time from This Contract Modification 155 calendar days Revised Phase 1 Contract Time Total 313 calendar days Original Phase 2 Contract Time 100 calendar days Changes to Phase 2 Contract Time from Previous Contract Modifications 0 calendar days Changes to Phase 2 Contract Time from This Contract Modification 32 calendar days Revised Phase 2 Contract Time Total 132 calendar days Revised Total Contract Time 445 Calendar Days Total Contract Amount Original Contract Amount $4,310,823.10 Changes to Contract Amount from Previous Contract Modifications + $198,494.25 Changes to Contract Amount from This Contract Modification (CM #7) + $268,563.61 Revised Contract Total $4,777,880.96 Augusta Regional Airport Front Door Parking Improvements Contract.Modification # 7 This document shall become an amendment to the contract and all provisions of the contract will apply. Description and Justification for Change Brief description and justification of the proposed contract changes and locations: 1. Adjust Existing Structures to Grade — Phase 1. During the final grading associated with Phase 1, it was determined the existing water vault and valve box was below the proposed Page 2 of 5 - Pavement Word Marking (STOP) EA -1 $130.00 - $130.00 - Pavement Word Marking (ONLY) EA 1 $130.00 $130.00 - Reflective Markers EA 20 $6.40 $128.00 - Galvanized Steel Posts EA 1 $240.00 $240.00 - Traffic Signs SF 6 $30.65 $183.90 - 6 inch Diameter Steel Bollard EA 11 $560.00 $6,160.00 - PCC Curb and Gutter, Type 2 LF 147 $13.40 $1,969.80 - PCC Header Curb, Type 2 LF 119 $12.95 $1,541.05 - 2" Schedule 80 Conduit LF 75 $10.00 $750.00 - #10 XHHW LF 300 $0.60 $180.00 - Change Inscription on Existing Graphic Sign EA 5 $250.00 $1,250.00 13 Project Delay Costs - Job Overhead LS 1 $42,912.00 $42,912.00 - Home Office Overhead LS 1 $30,000.00 $30,000.00 - Asphalt Appreciation Index LS 1 $10,297.21 $10,297.21 14 12.5mm Superpave TON -500 $59.00 - $29,500.00 Total: $268,563.61 Augusta Regional Airport Front Door Parking Improvements Contract.Modification # 7 This document shall become an amendment to the contract and all provisions of the contract will apply. Description and Justification for Change Brief description and justification of the proposed contract changes and locations: 1. Adjust Existing Structures to Grade — Phase 1. During the final grading associated with Phase 1, it was determined the existing water vault and valve box was below the proposed Page 2 of 5 Augusta Regional Airport Front Door Parking Improvements Contract.Modification # 7 curb grade, which would not allow for positive drainage. Therefore, these structures had to be adjusted accordingly. This modification is an increase to the contract amount by $1,200.00. Refer to attached Reeves proposal dated 24 April 2012. 2. Curb Inlet Material Substitution. Due to supplier delivery conflicts, the contractor requested permission to provide gray iron curb inlets as opposed to the required ductile iron curb inlets. This material change was approved. This change is a credit to the contract amount by $1,875.00. Refer to attached Reeves proposal dated 28 February 2012. 3. PS #4 Panel Modification. This change is associated with relocating an existing power panel near the grinder pump station to Power Station #4. This relocation allowed the two (2) panels to be placed in one location to be easily maintained. This change is an increase to the contract amount by $974.00. Refer to attached Reeves proposal dated 22 March 2012. 4. Miscellaneous Electrical Additions. This modification is associated with providing: a.) Concrete maintenance pads around the floodlights, the flagpole, and the entrance signs. b.) Additional electrical /communications junction boxes and two (2) receptacles at the entrance sign. c.) Additional ballast and labor to convert 2 existing light fixtures on Hangar Road to 277V. This change is an increase to the contract amount by $5,416.00. Refer to attached Reeves proposal dated 4 May 2012. 5. Sanitary Sewer for Toll Booth. This change is associated with field modifications to the relocation of the existing grinder pump station. The existing grinder pump station could not be rotated as originally anticipated. In order to accomplish the final goal, additional pipe was used to operate correctly. This change is a credit to the contract amount by $2,497.00. Refer to attached Reeves proposal dated 24 April 2012. 6. Site Lighting and Electrical Changes. This change is associated with the adjustment of the parking lot poles to ensure a light pole was not placed within an island. This modification is a credit to the contract amount by $39,581.00. Refer to attached Reeves proposal dated 28 February 2012 and letter dated 19 July 2012. 7. 3 /4" PVC Water Connection to Toll Booth. As noted on the plans, the contractor was to connect the water service from the Toll Booth to an existing 3" water line. However, this 3" water line did not exist as shown. Therefore, additional 3 /4" water line pipe and a ball valve were required. As a result, this change is an increase to the contract amount of $1,660.00. Refer to attached Reeves proposal dated 24 April 2012. 8. Irrigation Sleeves Under Pavement. This modification is associated with installing irrigation sleeves under the paved areas (long term parking lots) in order to install the proposed water line to service each island. This was performed as a result of having the graded aggregate base course in place. This change is an increase to the contract amount by $23,589.10. Refer to attached Reeves proposal dated 13 April 2012. 9. Phase 2 Irrigation Sleeves (Not Under Pavement). This modification is associated with installing irrigation sleeves under non -paved areas (short term parking lots) in order to install Page 3 of 5 Augusta Regional Airport Front Door Parking Improvements Contract.Modification # 7 the proposed water line to service each island. This change was made prior to the installation of any base or surface course. 10. Landscaping - Revised. This change pertains to the costs associated with the revised landscaping plan to include sod, trees, mulch, and seeding. This modification is an increase to the contract amount by $85,541.00. For the unit rate items, only the amount installed will be invoiced. Refer to attached Reeves proposal dated 2 July 2012. 11. Irrigation System Installation. This change is associated with the installation of the irrigation system as shown in the revised plans. This additional work will increase project cost by $97,000.00. Refer to attached Reeves proposal dated 31 April 2012. 12. Rental Return Entrance / Exit Modifications. This change covers additional work required to separate the rental return lot from the remainder of the parking lots and to provide a separate entrance and exit to the rental return lot. This will separate rental traffic from short and long term revenue - producing traffic. See attached Reeves proposal dated 3 October 2012. 13. Project Delay Costs. This item represents costs incurred by the contractor due to project delays outside the contractor's control. The asphalt appreciation costs were determined using published GDOT liquid asphalt prices. 14. Reduction in 12.5mm Superpave Asphalt Concrete. This item is reduced because the total contract amount was not necessary for the project. Time Adjustment (Phase 1). The contractor supplied schedule impact analyses justifying the inclusion of 155 additional contract days for phase 1. All costs associated with these delays are included in item 12 "project delay costs." Time Adjustment (Phase 2). Over 12 inches of rain fell on the project site during the month of August 2012. This justified the addition of contract time in accordance with specification section 01320 -3.8 -C "Time Extensions for Unusually Severe Weather." 17 additional calendar days are added to phase 2 for this reason. In accordance with the specifications, these delays resulted in no additional monetary compensation to the contractor. Additionally, 15 additional calendar days are added to the contract duration for the work associated with item 11 "rental return entrance / exit modifications." These calendar days are solely associated with the work on the rental return entrance and exit. All other work on phase 2 is to be completed within the modified contract time of 117 days. It is anticipated that there will be a work stoppage between beneficial occupancy of the revenue generating portions of the project and the construction of the rental return entrance and exit. "Revenue generating portions" refers to the northwest and southwest long -term parking lots and the southeast short-term parking lot. No contract time will be charged during this period, and contract time will only resume once the contractor is remobilized to complete the rental return entrance / exit work. All costs associated with the additional rental return entrance and exit are covered under item 11 "rental return entrance / exit modifications." No additional costs of any type, including overhead, will be claimed for this item of work, for the additional time required to complete the Page 4 of 5 Augusta Regional Airport work, or for the work stoppage period between beneficial occupancy of the revenue generating parking lots and remobilization to complete the rental return entrance / exit. Recommended by: Accepted by: Approved by: Approved by: atta Augus a Front Door Parking Improvements Contract Modification # 7 Campbell & Paris Engineers Reeves Construction Company eg Page 5 of 5 11/ .2/201. Date 1� - - / z1 Date oval Airport Date K(` I /4(6 2-- City of Augusta Date ittif I 2 fig/ 7- Submit 4 original copies to the City ofsta. I .APAC Industrial i iy Augusta. Cenrwia 309117 Phone: ( April 24, 2012 Jack Mayfield Campbell and Paris Engineers 313 Wingo Way Mount Pleasant, S.C. 29464 RE: Augusta Regional Airport- Front Door Parking Improvements Adjust Existing Structures to Grade Phase 1 Proposal lvlr. Mayfield, Reeves Construction Company respectfully submits the following proposal to adjust the existing structures to grade on the above referenced project. As previously discussed. the existing water vault mid valve box was below the proposed curb grade which will not allow for positive drainage. This water vault and valve box hud to be raised 6„ to ensure that the water would shed from the area. Description Adjust Existing Structures to Grade -- Phase 1 File: 508114 Reeves Cling Cnrapall I as1 Hej inn Office Please add this line item at your earliest convenience, If you have any questions, please don't hesitate to contact rne. 5 inpeitcly. Da11a$' sub Project Manager Reeves Construction Company Qty Unit Unit Price Total Proposal (:rovetawo Phial 504: 1706) 210 -14)82 • Augusta Plain 6112: (706) 731.81616 SIaiesboro Mani 1191: (112)681 -2992 • Millen Plans 801: (478) 982 -1977 Stn irxborn Office Phone: (912) 681 -1491 1•acsimile; (912) 681 -1887 l'nrl Ofire 11ns 1129 Augusta, (. rorg in 30903 f acsimile: (706) 731-8620 LS $1,200.00 $ 1,200.00 Line item Description Qty Unit 25 EA Unit Price $1,000.00 Total Price $25,000.00 668 - 1000 668 -1000 Curb Inlets Curb Inlets (Gray Iron) 25 s EA $925.00 $23,125.00 Total Credit Piop sal ("175.00) (51.875.00) 1 AI'AC Iadu t,ial Way Auguste. C:eurgia 30907 Prone: (706) 731.5230 February 28, 2012 Kerr Chase Resident Engineer Campbell and Paris Engineers 707 East Franklin Street. Suite C Richmond, Va. 23219 Dear Mr. Chase, 4+444 Reeves Construction Company East RcKinn Office RE: Augusta Regional Airport Front Door Parking Improvements (508114. Curb Inlet Material Substitution Credit Proposal Post ()rice Box 1129 Augusta. Georgia 311903 I.Nesbite: (7116) 731 -8620 As discussed earlier, Reeves Construction Company requested the use of gray iron in lieu of ductile iron curb inlets on the above referenced project. This request was made by the material supplier due to supply conflicts with the current construction schedule. Reeves Construction Company proposed the following credit for allowing this material substitution. Please provide a change order to reflect this deduction in the contract amount. Feel free to give me a call if you have any questions. Syfic erely, as t ti, Project Manager Rccves Construction Company CC: Rob roar File: 508114 C: ro'elown Plant 504: (706) 210 -1082 • Angusta Plant 602: (7116) 731 -8616 Sim leaboro Plant 801; (912)681 -2992 • N1111en Plant 804; (478) 982 -4977 Statesboro Office I'Imoe: (9121681 -1491 EacsiniiIv: (912) 681.1887 Description Quantity Unit Unit Price Total Proposal Request PS #4 Panel'' Existing Panel Modification 1 1,S $974.00 $974.00 I IPA(' lntlnsidaI Way .tnl;asia. Georgia 309I17 Phone: {1O() 731.1230 March 22. 2012 Kerr Chase, Resident Engineer Campbell and Paris Engineers 707 East Franklin Street. Suite C Richmond, Va. 23219 RE: Augusta Regional Airport - Front Door Parking improvements Power Station M4 Panel Modification Proposal Mr. Chase. Reeves Construction Company respectfully submits the following price to relocate the existing power panel located near the grinder pump station to Power Station #l4 on the above referenced project. Campbell and Paris Engineers have requested this proposal due to the proposed power station #4 being in close proximity to the existing panel. Combining these two panels into one location will be more aesthetieally pleasing and more maintenance friendly. Reeves' proposes to mount the existing panel directly to the backside of the new power station.. Reeves Construction Company does not request any additional calendar days be added to the contract: time for this work. If you have any questions. please don't hesitate to contact me, S' rely, all (is Sug Project Manager Reeves Construction Company CC: Rob Loar Jack Trude File: 508 114 444404' Reeves (.'tsnxlruction Cowan), East Region Office Grovetmi n Plant 504: (71161 210-146'2 + Animas Plant 602: (706) 73144616 StalcsIarn Moat 11III: 1912) 681 -2992 • tliliru Plant 804: (476) 982.4977 Statesboro Office Mane: (912) 681 -1491 Facsimile: (912) 001 -181x7 Post Office !lox 1129 Aa} 1rs1a. Georgia 311903 Faehimiic: 1700) 731 -8620 Description Quantity 7 Unit L " -A Unit Price $143.00 Total Price 51,001.00 Concrete Pads for Floodlights Additional Electric/ Comnl. Boxes 6 1 A 5474.00 52,844.00 Additional Receptacles. 'Transformer, etc, 1 LS $1,571.00 S1,571.00 $5,416. Total Proposal Request 1 AI'AC IuQuslrinl 11'a� AukISua. Georgia 30907 Pliuus: (706)731 -5I30 May 4, 2012 Jack Mayfield Campbell and Paris Engineers 313 Wingo Way Mount Pleasant. S.C. 29464 Mr. Mayfield, File: 508114 Reeves Coustrnelion Compa■ fns/ Iteginn OlTire R1.: Augusta Regional Airport - Front Door Parking Improvements Miscellaneous Electrical Additions Proposal I'ns1 Office lies 1129 Avowln. Georgia 30903 Facsimile: (704) 731 -8620 Reeves Construction Company respectfully submits the fallowin price for the additional electrical work on the above referenced project. Campbell and Paris Engineers requested the installation of concrete maintenance pads for the floodlights around the flagpole and signs. Other items requested by the Engineer include additional electrical/ communication boxes. and the addition of two receptacles at the entrance sign. Also included in this proposal are the additional ballast and labor associated with converting 2 existing light fixtures to 277 \'. If you have any questions, please don't hesitate to ask. S itt4erel }� 1 ' t t! L? I ! Dias B, gs Protect Manager Reeves Construction Company CC: Rob Loar Jack 'Prude C:rovetm%n Plant 514: (706) 210 -1082 • Augitsla Maul 602: (706) 731.8616 Stntehhnro Phial 801: (912) 681 -2992 • Millen Haul 8114: (478) 982.4977 Si:alcsburo Office Plume: (9121 681-1491 Facsimile: (912) 481 -18887 Line Item Description Qty Unit Unit Price Total Price 4" PVC Sanitary Sew. Connection — Toll Booth 1 LS $2,760.00 $2,760.00 670 -900(1 R ltu.;ltion 1 Ni \I (1'111111'.1 P11 1) 5111114111 -1 10 I S I 1 51.775.00 549,40 (S3.775_00) (501.482.0 1,(,0 -1(11) 5 . Mit ,l )J Y (Irovily tit\\er Pi le Total Proposal Request (S ' 4s)`r`.0t 1 AI'.4( Intl oslrial VFap Augusta, Georgia 30907 Phone: (706) 731 -52311 April 24, 2012 Jack Mayfield Campbell and Paris Engineers 313 Wingo Way Mount Pleasant, S.C. 29464 RE: Augusta Regional Airport- Front Door Parking Improvements Sanitary Sewer Connection Proposal for Tall Booth Service Mr. Mayfield, Reeves Construction Company respectfully submits the hollowing proposal to connect sanitary sewer from the existing pump station to the large toll booth on the above referenced project. As previously discussed, the existing pump station is encased in concrete and will not allow for it to be relocated or rotated. Reeves Construction cored the pump station and installed a boot that allowed for the connection of a 4" PVC sewer service line from the large toll booth. Reeves utilized 4" PVC in lieu of 8" PVC due to having to connect to toilet inside the building. Reeves also installed two cleanouts that will allow the Airport to service this line if needed. Please add this line item at your earliest convenience. I f you have any questions, please don't hesitate to contact me. Sh*crelyl. u t 1)a las SugF t Project Manager Reeves Construction Company File: 508114 Reeves Constraclion Company East Regime Office Grim:W n 1'18015114: (706) 210 -1082 + Attgo to Phtnl 602: (706) 731 - 13616 Slntesborn Plant 801: (912) 681 -2992 • Millen Muni 804: (4713) 982-4977 Stnteshntu Office Phone: (912) 681 -1491 Facsimile: 1912) 681 -1887 Post °Ince I1a. 1129 Augusta. Georgia 309113 Foe simile: (706) 731 -86211 Line Item Description Qty Unit Unit Price Total Price 00S - 0100 4 1.1s1) 1 1; tore, - 3(J' Pole w Found. - 20 1:.A $9,000.00 ($180.000.00) 4 LED Fixture, 30' Pole w/ Found. 24 EA 59,555,00 $229,320.00 005 - 02(10 1 . 1;1) Fixture. 30 Pole 44I 1;oundl. - 16 NA S7,000.00 {$252.1100.00) 3 LEl7 Fixture, 30' Pole w/ Found. 20 EA $7,688.00 $153,762.00 005 - 0500 1 1.1:1) Fixture. 70' Pole 44/ 1 c)mm(l. -2 {) 1 .A S4. ‘7(J.00 012(,730,0(1) 1 LED Future. 30' Pole w/ Found. 25 EA $4,694.00 5117,350.00 ()(15 - 0400 1 1)etorrttive 1 i':t, 20' Pole: wil ound. _10 F.A 54,700.00 ($47,000.00) 1 Decorative Fixt, 20' Pole w /Found. 10 EA $5,265.00 ' $52,650.00 (1(} )c )0 1'loudli'ht - 1 1?A `(1.30().00 ($1.300.00) Floodlight 5 ! X1111W .100 EA 1.1 $1,545.20 $7,726.00 S2.20 ($1,760.00) (. 2 - 1107 #2/0 X1-1111 ' 800 LF 56.17 $4,936.00 Service L Changes to Toll Booth 1 LS $3,465.00 $3,465.00 Total Proposal Request (`, 39,581.00) 1 AI'AM. Indu %llinl Way Augusta. Georgia 30907 Phone: (706)731 -5230 February 28, 2012 Kerr Chase, Resident Engineer Campbell and Paris Engineers 707 East Franklin Street, Suite C Richmond, Va. 23219 Dear Mr. Chase. 1 #ewes ('enstrnetiou Company FAA Region °Mee RE: Augusta Regional Airport Front Door Parking Improvements (508114) Site Lighting and Electrical Change Proposal Past Office Box 1129 Augusta, Georgia 30903 Fuesintile: (706) 731 -8620 Page 1 of 2 We are respectfully submitting the following proposal for the various changes for electrical materials on the above referenced project. Please see the proposal breakdown below. Reeves Construction Company submitted the Exterior Lighting information on July 5, 2011 and did not receive an approved as noted until January 20, 2012. During this period, the material supplier experienced price escalations on all of the lighting, materials. We were also provided with revisions to the site layout and photometric layout on January 18 and 25 respectfully, which changed the layout and number of proposed poles. The additional floodlights were also requested during the Progress Schedule Meeting on February 13 The 2/0 Xi-11 - 1N and Load Changes to the toll booth were required by Campbell Circitit town Plant 504: (706) 210.1082 + Augusta Plant 602: (706) 731.8616 Sialesbnro Mal 801: (912) 681 -2942 • Millen Plait 804: (4714) 482 -4977 Siateahoro Oilier Phone: (412) 681 -1491 Facsimile: (9121681-t887 1 A PA( ' Industrial Way Augusta, Georgia 30907 Phone: (7061731.52311 and Paris due to the size increase requested by Republic Parking. This proposal also includes a S4000 deduction for the foundation change from 30" to a 24" diameter base. We are requesting that a change order be provided to cover this change in scope, so that work on these items may proceed. As discussed earlier, the material procurement has the ability to significantly delay the duration of Phase I. Reeves Construction Company will request additional time once the impact of the delay is known, If you have any questions, feel free to call me at 706- 799 - 9006. S r`cerely. 1' Da las i . 5Cigg. Project Manager Reeves Constriction Company CC: Rob hoar Phillip \Waters File: 5081 14 Woes C'nnSirucliutt Company 1.ast Region Office (:ivvctutrn Plant 504: (700) 210-1082 *Augusta Plant 692: (706) 73148616 Sialesboru Plant 801: (912)081 -2992 • Millen Plant 804: (478) 9824977 StultsI'uru Office Phone: (912) 681 -1491 Facsimile: (912) 681 - 1887 Past Office Box 1129 ,Augusta. (;curgia 30903 Facsimile: (7116) 731 -8620 Page 2 of 2 Line Item Description Qty Unit Ink Price r'Total Price 3;4 "' PVC: Water er Service for 'f�ol1 Booth 1 1 _, $2,990.00 $2,990.00 // // / j `) 7(1' 4 1.. [. fate \{411 4e and lin 1 ' { 1 -. t!a�l�'� ($1:130 00) fatal Proposal Request $1,660.00 1 4P.+t(` lod Way Atigtot C:tOrrgin 309117 Phone: (7061731 -52311 April 24, 2012 l.lalla Sug Project Manager Reeves Construction Company File: 50€1 l 14 Reeves Construction Company East Region Office Jack Mayfield Campbell and Paris Engineers 313 Wing° Way Mount Pleasant. S.C. 29464 RI;: Augusta Regional Airport- Front Door Parking improvements 314" PVC Water Connection Proposal for `boll Booth Service Mr, Mayfield, Reeves Construction Company respectfully submits the following proposal to connect the water service to the new toll booth an the above referenced project. When Reeves ended the installation of Waterline 13, the existing 3" PVC waterline could not be located. This existing 3" PVC waterline was to be rerouted to the new toll booth for service. From the end of Waterline 13, Reeves installed a 311" PVC service line to the new toll booth location. This 1" PVC service line also contains a ball valve, backflow preventer, pressure reducer valve, and valve box. Please add this line item at your earliest convenience. If you have any questions. please don't hesitate to contact nie. Sine (irovelown Plant 594: {706) 210.1082. Augusta Plant 602: (706) 7314616 Statesboro Plant 801: (912) 681 -2992 s Millen Plant 804: (4711) 982 -4977 Statesboro Office Phone: (912) 681 -1491 1'aesimile: (912) 681 -1887 Pnsl Office 112 Augusta, Georgia 30903 Farbinailc: (706) 731 -8620 1 , %PA( It'd initial Way Angustn, Georgia 30997 Phone: (706 731 -5230 April 13, 2012 Kerr Chase Resident Engineer Campbell and Paris Engineers 707 Fast hranklin Street, Suite C Richmond, Va, 23219 RE: Augusta Regional Airport Front Door Parking Improvements Irrigation Sleeve Proposal for Phase I Mr. Chase, Reeves Construction Company respectfully submits the foliowing price for the irrigation sleeve placement on the above referenced project. This proposal is being requested due to the additional work that had to be performed to ensure irrigation access throughout the project. Description 2" PVC Irrigation Sleeves 4" PVC Irrigation Sleeves 6" PVC Irrigation Sleeves Total Proposal Req u es t CC: Rob Lour Jack "Prude Pile: 508114 Reeves ('onstruetion ('nmpam I :nst 0flue Quantity Unit Unit Price $ 1.5.85 $16.34 $20.09 950 1,F 350 140 I,F 10%1 Mire Pins 112') Augusta, Georgia 30903 Facsimile: (70(,) 731 -8029 Total Price $15,057.50 $5,719.00 $2,812.60 $23,589.10 Reeves Construction Company requests that four days added to the contract time of Phase] fbr the duration of this work. Please understand that this quote does not include testing and Reeves Construction Company will not be held liable for any depression that may arise due to this work. If you have any questions, please don"t hesitate to ask. *der l alia Su Project Manager Reeves Construction Company (;u i d. tru Plant 504: (706) 210 -1082 a AugiNa Mani 602: (706) 731 -8616 Suttcsl►aro Plant 801: (912) 681 -2992 o 81111cn Plant 8114: (478) 982.4977 Sim ies Coro 4)Iliec !'hone: (912) 681 -1491 Facsimile: (912) 68I -1887 Item Deseri tion uant Unit Unit Price Total Mee 710 -1000 1 1 andsca (Uri anal Hid) -1 LS t _ fr,70 0) ($36.7 0,00 Landscapit (Revision 4/20/12) 1 1,S $ 45,195.00 S45,I95.00 Sod 12,400 SY $5.25 565,100,00 Mulch 1,700 t 1 SY IS S6.38 510,846.00 $ 1,100.00 $1,100.00 Mulch Around Relocated 'Frees Total Proposal Request 585,541.00 1.11:\( IndusUinlll'n� AxKustn, Georgia 30907 Plume; (7061731-5230 July 2, 2012 Jack Mayfield Campbell and Paris Engineers 313 Wingo Way Mount Pleasant, S.C. 294M Mr. Mayfield, Sincerely, Danas I3, Suggs Project Manager Reeves Construction Company (IC: Rob Loar Jack Trude File: 508114 'treks Construction Cowan). in) 1 ?nsi Region Office RE: Augusta Regional Airport - Front boor Parking Improvements Rev =ised Landscaping 4 -30 -12 Proposal Please give notice at your earliest convenience so that eve can schedule this work to be accomplished. C.rnsc0ow•n Planl 504: 4706) 210 -1082 • Angttsla Plant 602: (706 731 -5616 St Plain 801: (912) 681.2992 • Millen Plant 8O4: (478) 982 -4977 Sifnesburx Office Phone: (912) 681 -1191 Fxcsin;ile: (912)681-11017 Past Office BOA 1129 Ammo. Georgia 30903 F Aisimilc: (706) 711 -86211 Reeves Construction Company respectfully submits the following, price based on the landscaping revisions dated 4 -30 -2012 on the above referenced project, This prig: has been generated off of the latest revisions and conversations that have taken place regarding the landscaping. 1 APA(' ludoxerlal Way rl te(;usla, (;erir is 30907 Phone: (706) 131.5230 April 30, 2012 Jack Mayfield Campbell and Paris Engineers 313 Wingo Way Mount Pleasant. S.C. 29464 RE: Augusta Regional Airport - Front i)oor Parking Improvements Irrigation Proposal Mr, Chase, Reeves Consinie lion Compri))) EMI Region OI ire Reeves Construction C'ompany 1espectl'ully submits the following price for the Irrigation System Installation on the above referenced project. Campbell and Paris Engineers have requested this proposal to provide an adequate amount of water to the landscaping to be installed. Reeves was asked to review the plan provided by Campbell and Paris Engineers and submit a price based on potential cost savings options. Description Quantity Unit Irrigation System Installation 1 LS Total Proposal Repuest Reeves Construction Company removed 334 Rain Bird 1804 SAM Popup Sprayhcads from the original plan. Most ofthe heads were removed from the islands located inside the parking Tots to eliminate wasteful overspray. We have attached a marked up plan that indicates where the changes were made. Reeves Construction Company would also like to offer a credit of $1,600 for the elimination ofthe SAM series sprayheads and replace with a normal 1504. The Pressure Regulator Valve is also excluded from this proposal because there is an existing one located near the proposed tap. The PVC sleeves are also excluded from this proposal per your request. If you have any questions. please don't hesitate to ask. Sin 'erely, IL! tin Project Manager Reeves Construction Company CC: Rob hoar .lack Trude File: 508114 (:rwwelnt Mal 504: (706) 210 -1082 • Augusta Plant M12: (796) 731-0610 Statesboro Plana[ 801: (912) 681.2992 • Millen Plant 804: (478) 982 -4977 Stnlesb•ro Office Phone: 1912) 661 -1491 Facsimile: (912) 681 -1887 I'ost Office Ras 1129 Augusta. Georgia 309113 Facsimile: (706) 731 -8621) Unit Price Total Price 597,000.00 197,000.00 $97 000.00 41' lad asi I ial a) Augusta, Georgia 309117 l'hnne: (706)731-52311 Reeves f 'ofiqructinii Coffipany 1:as1 Region Office rust 011ire Rim 1129 Atirmia. Craryin J4)9I 1:aesimilc: (70(i)731-X620 October 3, 2012 KCIT Chase, P.E. Campbell and Paris Engineers 707 Rost Franklin St. Suite C Richmond VA., 23219 Augusta Regional Airport - Front Door Parking Improvements Rental Return Lot Entrance Additional Work Proposal Dear Mr. Chase: Reeves Construction Company respectfully submits the following proposal Ibr the additional work associated with the modifications to the rental return lot on thc above referenced project. Campbell and Paris Engineers have requested Reeves Construction Company to provide pricing based on recent revisions to the project plans. Reeves Construction Company proposes a contract increase in the amount of $39,185.30 to complete this work. Attached is a unit price breakdown or this proposal. Reeves Construction Company provided budget numbers a few weeks ago based an the inhumation available at the time. Since then. Reeves has proceeded with the work available and will not he able to perform this work before asphalt is placed. Because of this, there is an increase in the amount of Misc. Demolition and Removal to cover the additional mobilization cost that will be incurred. If it is determined that no additional mobilization cost were incurred from this additional work, Reeves will consider a credit to the Mise. Demolition and Removal item. R.ceves Construction Company requests that 15 Calendar Days be added to the Contract Time of Phase II for this additional work. Because this additional work may require Reeves or its subcontractor(,; to remobilize, Reeves Construction Company reserves the right to request additional days based on this duration. Reeves cannot predict when this additional work will be approved, therefore we cannot be certain of thc amount of time it will require for Reeves or its subcontractors to remobilize. If you have any questions, please feel free to contact me at (706)799-9006. s B. Suggs Project Manager Reeves Construction Company CC: Rob Loar -- Reeves Construction Company Jack Mayfield, P.E. — Campbell and Paris Engineers Groveitinn Iluni 5114: (706) 216-1082 • Augu1/41n Plant 602: (706) 73144616 SlaIeshnen Plant 801: (912)681-2992 • Millen Mom 804: (478) 982 -4977 tilideslawo Office (912) 681 -1491 Facsimile: (912) 681-18117 0733 -12 Panting Lot Improvements Project Ready/Return Lot Modification • Concept 4 Proposal Breakdown ITEM SPEC. SECTION ITEM DESCRIPTION UNIT BID ` QUANTITY UNIT BID PRICE TOTAL BID PRICE REV QUAH1itY UNIT BID PRICE TOTAL REVISED PRICE 8 02300.3.21.A UnclassiSad Excavation CY 34,024 55.25 5176.626.00 34,164 $ 5.25 $ 179,361.00 10 02300.321.0 Subgrade Preparation SY 45,153 30.55 524,834 15 45,273 $ 0.55 $ 24,900.15 16 .02221.4.2.1 Miso. Demolition and Removal LS 1 $123,700.00 3123.700.00 1 3142,100,00 3 142.100.00 17 02221.4.2.2 Full Depth Pavement Demo and Removal SY 14,656 31.25 318,320.0D 15,011 3 1.25 3 18.763.75 19 02310.5.A,1 Graded Ague Bess (111• Depth) SY 42 311.90 3503..108.20 42.418 $ 11.90 3 504,774.28 21 02400.5 12.5rmm Superpave Bit. Surface Course TON 9.662 $59.00 3570,058 00 9,696 3 59.00 3 572,064.00 23 03300.42.8 PCC Sidewalk (4" Depth) SY 2,404 338.50 392,554.00 2,468 3 3850 S 95,918.00 48 02580- 3..3.A.2 8" Them optastic Marking (white) SF 2,776 53.50 59,716.0D 3,016 3 3.50 $ 10 ,556.00 49 02580 -3.3,A 3 24" Tbem oplas8c Marking (white) SF 978 38.69 58,410 1,006 $ 8.60 $ 8,551.60 51 025803.3.8, 2 Thermaplaet o Arrow - Right EA 1 591.00 591.00 2 $ 91.00 3 182.00 52 02580- 3.3.8.3 Thermoplastic Arrow- Straight EA 11 580.00 3880.00 12 S 80.00 3 960.00 53 [02580.3.3.8.4 Pavement Ward arking -STOP EA 10 $130.00 51,300.00 9 $ 130.00 $ 1,170.00 54 02580.3.38.5 Pavement Wad Marking - ONLY EA 3 5130.00 $390.00 4 3 130.00 $ 520.00 56 02580-3.3.8.7 Reflective Markers EA 229 $6.40 $1.465.60 249 3 6.40 3 1,593.60 57 02701.42A_1 Galvanized Steel Posts EA 5 3240,00 51,200.00 6 $ 240.00 $ 1,440.00 58 02701.4.2.8 Traffic Signs SF 22 $30.65 3674.30 28 5 30.65 $ 858.20 59 02101.4.2A2 6 in. Dia. Steel Sotard EA 30 $560.00 516,800,00 41 5 580.00 $ 22,960.00 94 03300.4.2A1 PCC Curb & Gutter, Type 2 LF 8,654 $13.40. $115,963.60 8,801 $ 13.40 5 117,933.40 95 03300.42A2 PCC Header Curb. Type ll IF 4,898 $12.95 $83,429.10 5,017 5 12.95 $ 64,970,15 98 16123.42A1 2" SCH 80 Conduit LF 14,000 510.00 5140,000.00 14.075 $ 10.00 3 140,750.00 104 18123.42A7 OXHHW IF 25,500 $0.60 315,300.00 25,800 $ 0.60 3 15,480.00 i AS-1382 TOTAL: 51.886,82075 REVISED TOTAL: 5 1,925,006.06 NEW LBIE ITEMS 63A 02701.4.2A7 Change Inscrtpkon on Existing Graphic Si12 �' 4 $ 250.00 3 1,000.00 ADDITIONAL ITEM TOTAL 3 1,000.00 REVISED TOTAL: $ 1,92 ADDITIONAL ITEM TOTAL: $ 1,000.00 REVISED GRAND TOTAL: $ 1,926,006.06 REVISED GRAND TOTAL: 5 1,926,006.06 AS-BID TOTAL: 51,866,820.75 DIFFERENCE: 539,186.30