HomeMy WebLinkAboutCHANGE ORER #4 THE POTTS COMPANY PTOJECT NO 10-121 NEW SHERIFF'S OFFICE BUILDINGmcld s County Sheriff's O d z w New Sheriffs Offic: UBtding Change Order to ontract Change Order # 4 Project No.: 10 -121 Date of Change Order: The date of this Change Order #5 will be the date of the last signature. Contractor: The Potts Company Reference: 981 East Freeway Drive COP # 21 Conyers, Georgia 30094 Project Description: Construction of a New approx. 39,975 s.f. Sheirffs Office Building Description of Change Pressure 'Blast" the exteriors of the Sheriffs Garage and the Sheriffs Evidence buildings; remove all exterior to the Scope of Work: paint, scale, mold, mildew, undesirable materials; point patch all holes cracks etc.; coat the exterior walls of the two (2) buildings with BASF Thorocoat (colors to be picked by the Owner and Architect); demo and haul off existing metal coping and downspouts and replace with new standard color coping, conductor heads and downspouts. If the work is done prior to the completion of the Sheriffs building then no General Conditions will be added. The Thorocoat system carries a (5) year warranty from BASF and there is a (1) year warranty from Southern Wall systems. Project Duration: Number of Days added to the Substantial Completion Date as a result of this Change to the Scope of Work: Days Contract Amount Original Contract Amount $ 7,845,847.00 Previous Change Orders $ 711,298.99 Previous Contract Amount $ 8,557,145.99 Amount of this Change Order $ 50,618.49 Current Contract Amount $ 8,607,764.48 All terms and conditions of the Contract Agreement between the Owner and the Contractor apply to this Change Order. Signatures: Ag - -. o by . - . c i / /D 9 z David C. Buser Date President Recommended for Acceptance by the Architect: Clar Pat on Lee Date K. S tt Gordon, AIA, NCARB, LEED®AP Recommended for Acceptance by Program Manager: 6. --' -- �-- 14 I 03 ) l 2 Heery International, Inc. Date Forrest W. White CCM, LEED®AP BD +C Program Manager Recommended for Acceptance by The Owner: / ! r 1 ► Z y� C��. (� , 'f Deke Copenhaver Date 12 H ),Mayor Page 1 of 1 To: Forrest White Memorandum Request for Change Order Architect: Virgo Gambill Architects Change Order Request #4 Coating of Adjacent Buildings From: Steve Virgo Date: September 11, 2012 Project Name: Richmond County Sheriffs Administration Office Project #: RE: Change Order Proposal #4 (RCO 21 by Potts) CC: File: Attached please find the change order proposal from the Contractor requesting additional compensation for: Description of Change: To have POTTS Construction Company be a single source provider for sealing and replacing the metal coping, downspouts and leader heads on the old maintenance and evidence storage building. Why is this change necessary? The buildings in question are long overdue for maintenance and painting. Someone has stripped the rain water leaders from the building and left them on the ground. The repairs are needed to make the building water tight and improve the overall function of the facilities. By including it as part of the original construction package, it will be coordinated and installed under the supervision of Potts Construction Company. Who requested this change? The change was originated and requested by the owner. Is there an altemative to doing this work and what impact does it have? What will happen if this change is not made? Impact of Project Schedule: None Reason for Change: ❑ Unforeseen Conditions ❑ Owner Request ❑ Life Safety ❑ Errors and/or Omissions ❑ Code Requirement Signature: ❑ Other(specify) Date: 1/ Comments: We We hereby certify that we have reviewed the ontractor's proposal and we have determined that the cost that we have recommended is fair and reasonable compensation for the scope of work described. Request For Change Order Date 7/24/2012 Cost Event No. Description Paint/ Seal adjacent buildings From Scope of Work Jay McClellan The Potts Company 981 East Freeway Drive Conyers, GA 30094 Phone: N/A Fax: 770 -483 -9317 Items No. Budget Contact Code 1 04- 04500 -0- Jay McClellan (The Potts Company) 2 07- 07600 -0- Jay McClellan (The Potts Company) Request For Change Order Project [10016] - Augusta Sheriffs Office Building t a N S T R U C 1 1 The Potts Company 981 East Freeway Drive Conyers, GA 30094 Phone: 770-483-9299 Fax: 770 - 483 -9317 To Edward Boyen Virgo Gambill Associates 2531 Center West Pkwy. S -200 Augusta, GA 30909 Phone: 706-736-3661 Fax: 706-736-4552 Description Paint/ Seal adjacent buildings Remove and replace existing coping, conductor heads and downspouts Page 1 of 2 Date 7/24/2012 RCO No. 021 Pressure "Blast "the exteriors of the existing Sheriff's Garage and the Sheriff's Evidence building. Remove all exterior paint, scale, mold, mildew, undesirable materials. Point patch all holes cracks etc. Coat the exterior walls of the (2) buildings with BASF Thorocoat, colors to be picked by Owner / Architect. If the work is done prior to completion of the Sheriff's building no General Conditions would be added. The Thorocoat system carries a (5) year warranty from BASF, and a (1) year warranty from Southern Wall Systems. Demo and haul off existing metal coping, downspouts, replace with new standard color coping, conductor heads and downspouts. Submitted $39,807.00 $7,500.00 Markups No. Budget Description Rate ( %) Submitted Code https: // secure. constructware. com /Commonlview/Document Display .asp ?DocumentType =... 9/18/2012 Document Type Document Open Description Date Size (KB) Doc 10016 -00336 g :- SWS BUILDING PROPOSAL 9/18/2012147 Doc 10016 -00337 g SWS COPING NUMBER 9 /18/2012 155 Request For Change Order 1 Bond & Ins. OH & Profit Supporting Documents 0.85 $402.11 6.15 $2,909.38 Page 2 of 2 Items Markups Total Submitted $47,307.00 $3,311.49 $50,618.49 The Potts Company Signed: By: Date: Heery International, Inc. Virgo Gambill Associates Signed: Signed: Jay McClellan, Project By: Forrest White By: Edward Boyen Manager Date: Date: https: // secure. constructware .com /Common/View/Document Display.asp?DocumentType =... 9/18/2012 SOUTHERN WALL SYSTEMS Proposed Change Order Contractor: The Potts Company 981 E. Freeway Dr. Conyers, (3A 30094 Attn: Project: Augusta Sheriff Office Date: GC Contract Job No. SWS Contract # #2065 Proposed Change Order No #02 Pursuant to the terms of the above referenced subonctract; Southern Wall Systems, Inc. has been directed to price the following changes: 1 Pressure wash, patch holes and coat with BASF Thorocoat at the Sheriff's garage and evidence building Southern Wall Systems, Inc. By: Name: Tom Wilson Title: Division Manager Accepted -If the above prices and specifications of this Change Order are satisfactory and are hereby accepted, subject to the terms and conditions specified in our original subcontract. Date of Acceptance: Signature: For: Y:Ddve, Esdma*k The Potts Company 7/20/2012 TOTAL AMOUNT OF THIS CHANGE ORDER $39,807.00 Proposed Change Order SOUTHERN WALL SYSTEMS Contractor: The Potts Company 981 E. Freeway Dr. Conyers, GA 30094 Attn: Jay McClellan Project: Augusta Sheriff Office Title: Division Manager Signature: For: Accepted -If the above prices and specifications of this Change Order are satisfactory and are hereby accepted, subject to the terms and conditions specified in our original subcontract. Date: GC Contract Job No. SWS Contract # #2065 Proposed Change Order No #04 Y:OrIve, Estimating The Potts company 8/16/2012 Pursuant to the terms of the above referenced subonctract; Southern Wall Systems, Inc. has been directed to price the following changes: 1 Fumish and install 24 guage Kynar Finished Coping, 4 collector heads and downspouts to storage building next door to the new Sheriffs Office Building. This work will be done as part of the coating change order TOTAL AMOUNT OF THIS CHANGE ORDER $7,500.00 Southe all s ms, Inc. By: Name: Tom Is ` n Date of Acceptance: