Loading...
HomeMy WebLinkAboutCONTRACT MODIFICATION #7 WITH CHOATE CONSTRUCTION COMPANY PROJECT (NEW FBO TERMINAL PROJECT NO 0733-17Item # Choate Contract Mod # Description Unit Quantity Line Item Price 1 27 Irrigation Sleeves LS 1 $0.00 2 29 Acoustical Ceiling Change LS 1 $7,321.23 3 32 Exterior Soffit Revisions LS 1 $3,746.82 4 33 Roof Expansion Joint LS 1 $847.18 5 34 Light Fixture Allowance Reconciliation LS 1 $2,626.25 6 35 Light Fixture Revisions LS 1 $1,775.22 7 36 Delete Temp /Permanent Power Budget LS 1 ($9,630.00) $5,737.55 8 37 Additional Concrete Apron LS 1 9 38 Pole Base Revisions LS 1 $7,079.08 10 39 Floor Leveling at Rooms #119 and #120 LS 1 $0.00 11 42 IT Room HVAC LS 1 $0.00 12 43 Relocate Access Control Panel LS 1 $5,053.58 13 44 IT Room Electrical Addition LS 1 $3,189.21 14 47 Conduit from HH7 to HH -C2 LS 1 $9,823.61 15 50 Gate "N" Revision LS 1 $4,783.84 16 51 Canopy Drop Off Island LS 1 $3,222.73 17 52 IT Room Cabinets and Accessories LS 1 $3,893.04 18 53 Landscaping and Irrigation LS 1 $26,119.00 19 55 Granite at Fireplace Hearth LS 1 $1,429.46 20 57 Yard Drain at SW Corner of Building LS 1 $1,474.81 $78,492.61 Total Contract Amount Original Contract Total $5,045,461.00 Previous Contract Modification Total (CM #1 - 6) $131,211.56 This Contract Modification Total (CM #7) $78,492.61 Revised Contract Total $5,255,165.17 Airport: Augusta Regional Airport Owner: City of Augusta Contractor: Choate Construction Company Contract Modification #7 Date Initiated: 17 May 12 Project: New FBO Terminal Project Number: 0733 -17 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Total Contract Time Original Contract Time 250 calendar days Changes to Contract Time from Previous Contract Modifications 2 calendar days Changes to Contract Time from This Contract Modification 0 calendar days Revised Contract Time Total 252 calendar days This document shall become an amendment to the contract and all provisions of the contract will apply. Justification for Change Brief description of the proposed contract changes and locations: Brief description of the proposed contract changes and locations: 1. Irrigation Sleeves. This COP is to provide sleeves required for irrigation lines to be installed under pavement. The cost to install the sleeves is associated with the irrigation and landscape budget. Therefore, there are no separate costs associated with this item. Refer to Choate Change Order Proposal #27. 2. Acoustical Ceiling Change. As a result to the submittal associated with the acoustical ceiling tile (ACT), it was determined the quantities of the three (3) types of ACT did not match the intent of the ACT layout. The type of the ACT listed in the plans was not correct. This COP ensures the quantity of the ACT is correct, and increases the contract amount by $7,321.23. Refer to Choate Change Order Proposal #29. 3. Exterior Soffit Revisions. As a result to the revised architectural drawings A5.0, A5.1 and A6.6R, additional framing at the soffits of the line room and cupola is required. This COP also accounts for the incorporation of vented soffit materials per the architect. This COP is an increase to the contract amount by $3,746.82. Refer to Choate Change Order Proposal # 32. 4. Roof Expansion Joint. This COP is associated with RFI #41 and includes the addition of roof expansion joints. This COP is an increase to the contract amount by $847.18. Refer to Choate Change Order Proposal # 33. 5. Light Fixture Allowance Reconciliation. This COP reconciles the actual costs of the light fixtures against the light fixture allowance. In addition, this COP includes the cost to install four (4) additional Type M fixtures which requires additional power circuits. This COP is an increase to the contract amount by $2,626.25. Refer to Choate Change Order Proposal # 34. 6. Light Fixture Revisions. This COP includes additional light fixtures that were not previously included in the office or fireplace additions. This COP is an increase to the contract amount by $1,775.22. Refer to Choate Change Order Proposal # 35. 7. Delete Temp /Permanent Power Budget. Choate offered to credit the budget amount associated with the temporary and permanent power associated with the FBO. This COP is a credit to the contract amount by $9,630.00. Refer to Choate Change Order Proposal # 36. 8. Additional Concrete Apron. Originally, the plans called for a landscaped area on the apron side of the FBO. It was felt the vegetation could have created a FOD issue. Therefore, the landscape area was removed and concrete was placed instead of the vegetation. This COP is an addition to the contract amount by $5,737.55. Refer to Choate Change Order Proposal # 37. 9. Pole Base Revisions. This COP is associated with the base /foundation associated with the 53' light poles that illuminate the apron area. The architectural plans did not include a pole base /foundation for this specific pole. However, the contractor utilized the pole base /foundation for the parking lot lights, which was determined to be undersized for the 53' pole. A design was performed for the 53' pole base /foundation, which increased the diameter of the base /foundation. This COP is an addition to the contract amount by $7,079.08. Refer to Choate Change Order Proposal # 38. 10. Floor Leveling at Rooms at Rooms #119 and #120. A COP request to level these rooms was made. However, an alternative was determined to accomplish the concerns at no cost to the client. This COP does not increase the contract amount. Refer to Choate Change Order Proposal # 39. 11.IT Room HVAC. This COP does not increase the contract amount. Refer to Choate Change Order Proposal # 42. 12. Relocate Access Control Panel. A revision to the plans was made to relocate the access control panel in the IT Room. However, the panel and wiring was installed as originally shown in the plans. This COP reflects relocating the panel and wiring to the IT Room as requested by IT Department. This COP is an addition to the contract amount by $5,053.58. Refer to Choate Change Order Proposal # 43. 13. IT Room Electrical Addition. This COP is associated with the revisions made to the IT Room. This includes additional power and date circuits as requested by IT Department. This COP is an addition to the contract amount by $3,189.21. Refer to Choate Change Order Proposal # 44. 14. Conduit from HH7 to HH -C2. This work is associated with the rerouting of the COMCAST service which feeds the terminal building, new FBI and the buildings south the new FBO. This COP is an addition to the contract amount by $9,823.61. Referto Choate Change Order Proposal # 47. 15. Gate "N" Revision. The original plans required a chain link gate be used at Gate "N ". However, it was noted the gate needed to be similar to the ornamental fence type on the observation brick wall. This COP is an addition to the contract amount by $4,783.84. Refer to Choate Change Order Proposal # 50. 16. Canopy Drop Off island. This COP includes a sidewalk area around the canopy columns as a precautionary measure to protect the columns from damage from vehicles. This COP is an addition to the contract amount by $3,222.73. Refer to Choate Change Order Proposal # 51. 17.IT Room Cabinets and Accessories. This COP is associated with a change required by IT Department to meet their requirements for cabinets used in the IT Room. The originally proposed cabinet was not of sufficient dimensions. This COP is an addition to the contract amount by $3,893.04. Refer to Choate Change Order Proposal # 52. 18. Landscaping and Irrigation. This COP is associated with the required landscaping in the parking lot, as well as the irrigation required to assure the growth of the vegetation. This COP is an addition to the contract amount by $28,533.67. Refer to Choate Change Order Proposal # 53. 19.Granite at Fireplace Hearth. This COP is associated with a change in the material of the fireplace hearth. It was highly recommended to use a granite material as opposed to corian due to the heat from the fireplace. This COP is an addition to the contract amount by $1,428.46. Refer to Choate Change Order Proposal # 55. 20. Yard Drain at SW Corner of Building. This COP proposes to install a yard drain in area that potential could hold water near the southwest corner of the new FB 0 building. This COP is an addition to the contract amount by $1,474.81. Referto Choate Change Order Proposal # 57. C & P E Project #: 073 Recommended by: Y May 17, 2012 D ate Accepted by: Camp. •11 & Paris E `ii eers Contract Modification # 7 Approved by: Approved by: Choate Construction Company Date Augusta Regional Airport Date City of Augusta fet 661 Submit 4 original copies to the City of Augusta. Date AUGUSTA RICHMOND COUNTY ,4h1 Deke S. Copenhaver, Mayor (4/12 Approved as to Form: Andrew Mackenzie, E 1 Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 -790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -I1 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers CHOATE — CONSTRUCT ION — Change Order Proposal The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Irrigation Sleeves Phase Description Cost Type Quant UM Unit Cost 2100- 20- SITE PREPARATION 4 SUB 0.00 LS 0.00 Furnish and install 806 LFof 4" Sch 40 PVC sleeves as needed for irrigation system x $6.50 = $5,239.00 2900 - LANDSCAPING ALLOWANCE 4 SUB 0.00 LS 0.00 Reduce Landscaping Allowance already included in Contract Amount. Original Total Landscape & Irrigation Allowance = $28,000 Deduct for Irrigation Sleeves - ($5,239) Current Landscaping and Irrigation Allowance = $22, 761 Approved By: (Architect) Submitted By: Campbell & Paris Engineers CHOATE CON T�RU Signed: Signed: w't Date: D 1 1 rii Z Subtotal $0.00 Safety S0.00 P &P Bond $0.00 Overhead $0.00 General Liability Insurance $0.00 Business License $0.00 Builder's Risk Insurance $0.00 Field OH & Supervision $0.00 Plans/Postage/Courier S0.00 Fee 0.00% $0.00 Subauard $0,00 Total For Change Order Proposal $0.00 Change Order Proposal # : Owner a27 Date: 1/9/2012 Amount $5,239.00 $- 5,239.00 Subcontractors Total 0.00 Requested Total For Item 1 $0.00 Approved By: (Owner) COMPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Date: Page 1 of 1 1/11/2012 9:01:03 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : Project: Architect: The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Acoustical Ceiling Change Phase 9250 - AUGUSTA - RICHMOND COUNTY, GA 2103 -11 AUGUSTA FBO TERMINAL Campbell & Paris Engineers Description TRUSSES/MIL. STUD / DRYWALL/1M SCD, Inc. Original ACT and Grid per specifications were as follows.: ACT 1 - 3,281 SFx $3.04/SF = $ 9,974.24 ACT 2 - 4,640 SFx $2.21/SF = $10,254.40 AC7' 3- 814SFx$5.28 /SF =$4,297.92 Subtotal = $24,526.56 Current request for ACT and Grid are as follows: ACT 1 - 3,281 SFx $5.28/SF = $17,323.68 ACT 2 - 4,640 SFx $3.04 /SF = $14,105.60 ACT 3- 814 SFx $2.11/SF= $1,798.94 Subtotal = $33,228.22 Difference in Cost = ADD $8, 701.66 Voluntary Deducts: SCD, Inc - Deduct ($500.00) Choate- Deduct ($1,500.00) Net ADD- $6,701.66 CHOATE CONSTRUCTION — Change Order Proposal Change Order Proposal # : Owner #29 Date: 1/26/2012 Cost Type Qnant UM Unit Cast 4 SUB 0.00 LS 0.00 Amount 56,701.66 Subcontractors Total 6,701.66 Subtotal $6,701.66 Field 011 & Supervision 80.00 Plans/Postage/Courier $33.51 Fee 5.41% 8366.52 Subguard $92.84 Builder's Risk Insurance 814.47 Overhead $0.00 General Liability Insurance 839.74 Business License 80.00 Safety 80.00 P &P Bond $72.49 Requested Total For Item 1 87,321.23 Page 1 of 2 2/4/2012 8:16:06 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : Project: Architect: AUGUSTA - RICHMOND COUNTY, GA 2103 -11 AUGUSTA FRO TERMINAL Campbell & Paris Engineers CHOATE CONSTRUC'!R)\ — Change Order Proposal Change Order Proposal if : Owner #29 Date: 1/26/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Total For Change Order Proposal $7,321.23 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS UCTI PANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: 61 . Signed: Date: Date: Z `i / t Z Date: Page 2 of 2 2/4/2012 8:16:06 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers In addition, incorporation o included in this COP. Phase 6400- - Description INTERIOR WOOD TRIM Upon The Rock: Labor - $700.00 Materials - $563.75 Subtotal - $1,263.75 9250 - TRUSSES/MTL. STUD/ DRYWALL/IN: SCD, Inc. CHOATE — CONSTRUCTION — Change Order Proposal Change Order Proposal # : Owner #32 Date: 2/13/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Description of Work: Exterior Soffit Revisions This COP is issued in response to receipt of revised drawings A5.0, A5.1, dated 12/20/11 and A6.6R dated 12/27/11 that reflect additional framing at soffits of line room and cupola. Tobon vented soffit material in accordance with 2/3/12 e-mail confirmation of field conversa from L Item : 1 Exterior Soffit Revisions Cost Type Quart UM 4 SUB 0.00 LS Blocking as required for antenna mounting is excluded from this proposal. Unit Cost 0.00 Furnish and install 24' wide vented smooth sots at covered porches #103, 104, 105, 106, 107, 101, 102. Vented soffit will run parallel with grid line 11.6 only at covered porches 11103, 104, 105. Wood blocking to support additional panel joints for proper attachment is included. Furnish labor, materials, equipment to install additional metal framing at soffits at line room and cupola - 114 LFx $19 /LF = $2,166 Amount $1,263.75 4 SUB 0.00 LS 0.00 $2,166.00 Subcontractors Total 3,429.75 Subtotal S3,429.75 Safety $0.00 P &P Bond $3437 Overhead $0.00 General Liability Insurance $20.58 Business License $0.00 Builder's Risk Insurance $6.86 Field OH & Supervision $0.00 Plans/Postage/Courier $ 17.35 Fee 5.41% $189.83 Subguard $48.08 Requested Total For Item 1 $3,746.82 Total For Change Order Proposal $3,746.82 Page 1 of 2 2/13/2012 4:17:58 PM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA CHOATE — COti TRUC ION — Change Order Proposal Change Order Proposal # : Owner #32 Project: 2103 -11 AUGUSTA FBO TERMINAL. Date: 2/13/2012 Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONSTRU C MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: /' 1 / �l Signed: Date: Date: 21/to/ti Date: Page 2 of 2 2/13/2012 4:17:58 PM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA- RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Description of Work: Roof Expansion Joint This COP is issued related to RFI #41 and metal roof expansion joint detail provided by Eastern Corporation. It includes the of roof expans joint in accordance with referenced detail (attached) as previously approved. CHOATE — CONSTRU(" 11ON — Change Order Proposal Change Order Proposal # : Owner #33 Date: Other costs as related to building expansion joint where structure abuts canopy are not included in this proposal as details are to be determined. Item : 1 Roof Expansion Joint Phase 7500- - Description ROOFING SYSTEM Eastern Corp: Labor - $380.00 Material - $325.00 Ovhd & Fee - $70.50 Subtotal - $775.50 Cost Type Quant UM Unit Cost 4 SUB 0.00 LS 0.00 Furnish and install roof expansion joint in accordance with attached detail where canopy abuts main building structure. Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONSTRUCTI OMPANY AUGUSTA- RICHMOND COUNTY, GA Signed: Signed: f Signed: Date: Date: � �`( L Date: 2/13/2012 Amount 1775.50 Subcontractors Total 775.50 Subtotal $775.50 Builder's Risk Insurance $1.55 Field OH & Supervision 10.00 Plans/Postage/Courier 13.92 Fee 5.41% 142.92 Subguard 110.87 Safety $0.00 P &P Bond $7.77 Overhead $0.00 General Liability Insurance $4.65 Business License $0.00 Requested Total For Item 1 $847.18 Total For Change Order Proposal 1847.18 Page I of 1 2/13/2012 4:32:46 PM EXPANSION JT. FLASH SD11 FASTENER 12' O.C. 3/16 "x7/8" BUM TAPE PANEL RECEIVER 1" NON- SKINNING BU1YL SEALANT AA,STA EXPANSION JO \ T Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 Light Fixture Allowance Reconciliation Description 16000- ELECTRICAL The SACK Co: Phase CHOATE — CONSTRUCTION — Change Order Proposal Change Order Proposal # : Owner #34 Date: 2/18(2012 Fixture Material Cost vs Allowance Values - $1,430.00 Labor - (This is due to addition of (4) EA Type M Fixtures, requiring additional power circuits.) - $604.00 Misc Materials and Equipment - $370.00 Subtotal - $2,404.00 Cost Type Quant UM Unit Cost 4 SUB 0.00 LS 0.00 Builder's Risk Insurance Field OH & Supervision Plans/Posta2e/Courier Fee Subguard Safety P &P Bond Overhead General Liability Insurance Business License Subcontractors Total Subtotal Total For Change Order Proposal 5.41% Requested Total For Item 1 Amount $2,404.00 2,404.00 $2,404.00 $4.81 $0.00 $12.16 $133.06 $33.70 $0.00 $24.09 $0.00 514.43 $0.00 $2,626.25 52,626.25 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONSTRUCTI MPANY AUGUSTA RICHMOND COUNTY, GA Signed: Signed: 4 ..A Signed: Date: Date: 4/2.Q/1Z- Date: Page 1 of 1 2/20/2012 7:10:34 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the wort: that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Light Fixture Revisions Phase Description 16000- ELECTRICAL The SACK Co. Furnish and install the following fixtures: 1. (2) EA Type "A " - Fixture cost only (no labor change) 2. (2) EA Type "F2" - Labor and materials (A total of 4 were addea4 however, 2 were previously included in fireplace addition budget) 3. (2) EA Type "P" at cabinets - Labor and materials 4. (1) ea Type "F" - Labor and materials Cost Breakdown is as follows: Labor - $303.00 Materials - $1,21200 Misc Materials and Equip - $110 Subtotal - $1,625 CHOATE — COSSTRUc rioN — Change Order Proposal Change Order Proposal # : Owner 1135 Date: Cost Type Quant UM Unit Cost 4 SUB 0.00 LS 0.00 2/18/2012 Amount S1,625.00 Subcontractors Total 1,625.00 Subtotal $1,625.00 Builder's Risk Insurance $3.25 Field 011 & Supervision $0.00 Plans/Postage/Courier $8.22 Fee 5.41% $89.94 Subguard $22.78 Safety $0.00 P &P Bond $16.28 Overhead $0.00 General Liability Insurance $9.75 Business License $0.00 Requested Total For Item 1 $1,775.22 Total For Change Order Proposal $1,775.22 Page 1 of 2 2/20/2012 7:20:13 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers CHOATE - COS TRUCION - Change Order Proposal Change Order Proposal # : Owner #35 Date: 2/18/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS UC MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: ( 4 P Signed: Date: Date: Z (Z. /a % Date: Page 2 of 2 2/20/2012 7:20:13 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 Delete Temn/Permanent Power Budget Phase Description 1310- - FINAL POWER Choate: CHOATE — CONSTRUCTION — Change Order Proposal Cost Type Quant UM Unit Cost 3 MATL 0.00 LS All power consumption costs from permanent transformer to be paid by Owner. Change Order Proposal # : Owner #36 Date: 2120/2012 Safety P &P Bond Overhead General Liability Insurance Business License Builder's Risk Insurance Field OH & Supervision Plans /Postage/Courier Fee Subguard 0.00 Amount S- 9,630.00 Material Total - 9,630.00 Subtotal S- 9,630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Requested Total For Item 1 S- 9,630.00 Total For Change Order Proposal S- 9,630.00 0.00% Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONSTRUCTIO OMPANY AUGUSTA - RICHMOND COUNTY, GA 4 Signed: Signed: / ltv /( / Signed: Date: Date: a 0,4 112_ Date: Page 1 of 1 2/20/2012 7:26:50 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA- RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers CHOATE — CONSTRUCTION — Change Order Proposal The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 Added Anron Concrete 1 Phase Description 3000- - TURNKEY CONCRETE Forrest Concrete: 624 SFx $8 /SF = $4,992 52 LF dowels x $5 /LF = 260 Subtotal = $5,252 Cost Type Quant UM Unit Cost 4 SUB 0.00 LS Furnish and install labor, materials, and equipment to install 624 SF of PCC paving, including dowels and required stone base. Change Order Proposal # : Owner #37 Date: 2/22/2012 0.00 Amount $5,252.00 Subcontractors Total 5,252.00 Subtotal $5,252.00 Field OH & Supervision s0.00 Plans/Postaee/Courier $26.26 Fee 5.41% $287.24 Subeuard $72.76 Builder's Risk Insurance $11.34 Overhead $0.00 General Liability Insurance $31.14 Business License $0.00 Safety $0.00 P &P Bond $56.81 Requested Total For Item 1 $5,737.55 Total For Change Order Proposal $5,737.55 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS,,RUCTl9)i 9OMPANY AUGUSTA - RICHMOND COUNTY, GA y e Signed: Signed: l 4, ( . � ` Signed: Date: Date: Z/ Z2// Z Date: Page 1 of 1 2/22/2012 11:08:13 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790-0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 Pole Base Revision Phase Description 16000- ELECTRICAL The SACK Co: CHOATE — CONSTRUCTION— Change Order Proposal Cost Type Quant UM 4 SUB 0.00 LS See cost breakdown and comparison to original pole base design attached. Subtotal - $6,480.00 Change Order Proposal # : Owner 038 Unit Cost Date: 0.00 Furnish labor, materials, and equipment to install (4) EA light pole bases for Fixture Type "AA" in accordance with structural design dated 2/25/12. 3/8/2012 Amount $6,480.00 Subcontractors Total 6,480.00 Subtotal $6,480.00 Builder's Risk Insurance $12.96 Field 011 & Supervision $0.00 Plans/Postage/Courier $32.79 Fee 5.41% $358.66 Subguard $90.85 Safety 50.00 P &P Bond $64.93 Overhead $0.00 General Liability Insurance $38.89 Business License 50.00 Requested Total For Item 1 $7,079.08 Total For Change Order Proposal $7,079.08 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS CT t PANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: ' o• Signed: Date: Date: 31 el 1/ Date: Page 1 of 1 3/8/2012 3:21:06 PM Project : ARA FBO Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 THE SACK COMPANY _ March 7;- - - -.. 2012 - - • Attn: Rick Parrish Subject : Change Proposal - 50 ft Pole Base Detail Revised Mr. Parrish, The following is our cost of the material and labor for the new pole base detail. Install Labor (32 Hrs x $20.00) $640.00 Labor Burden (40 %) $256.00 Mark-up (15 %) $134.40 • Total $1,030.40 Material $4,637.72 Tax (7 %) $324.64 Mark-up (15 %) $744.36 Total $5,706.72 SUB: Seamon Outdoor $2,720.00 Tax (7 %) $0.00 Mark -up (15 %) $408.00 Total $3,128.00 Deduct $2.521.17 Bond $73.44 Grand Total $7,417.39 *Breakdown for material and install labor is attached Please issue a change order for this work if we are to proceed. If you have any questions or concerns dealing with the above please give us a call. Sincerely, Chuck Jackson Project Manager cc: Seth Yawn Corey Hinson Install Labor (32 Hrs x $20.00) $1,030.40 Supervision $0.00 Material $5,706.72 SUB: Seamon Outdoor $3,128.00 Bond $73.44 $9,938.56 Deduct $2,521.17 Grand Total $7,417.39 , Page 2 of 2 March 7, 2012 Project: ARA Terminal Attn: Rick Parrish Subject: Comparison of the 30' pole base to a 50' pole base. Pricing Totals: • 30' pole base material: $585.89 ea • 50' pole base material: $2,2844 ea. 2 1 50 • 30' pole base labor . 3 hou4 e • 50' pole base labor 8flourste • Please see attached' spread shee feel;free call. Sincerely, Chhck:Iackson- Project Manager Cc: Seth Yawn Corey Hinson �.. _THE SACK COMPANY electrical • refrigeration • hvac • process piping • plumbing • millwrights • energy management • contractors • riggers 3302 Zell Miller Parkway (912) 871 -8771 Estimating- Wing Fax: (912) 681 -4517 Post Office Box 528 Statesboro, GA 30458 Front Ofc. Fax: (912) 681 -6001 Construction Wing Fax: (912) 681 -6317 Statesboro, GA 30459 ___._...._ POLE BASE- 3pOLE--- _ _ MATERIAL W/ TAX W/ 15% SONOTUBE 57.54 66.17 REBAR 126.18 145.11 CONCRETE 200.00 230.00 AUGER 100.00 115.00 LUMBER 25.75 29.61 . TOTAL TOTAL 585.89 LABOR HOURS HOURS RATE 8.00 3.00 20.00 60.00 BURDEN 40% BURDEN 40% 24.00 MARK -UP 15% MARK -UP 15% 9.00 TOTAL TOTAL 93.00 --- __•50 =1• POLE - --- MATERIAL W/ TAX W/ 15% SONOTUBE 89.18 102.56 REBAR 504z 7,e9 8996 529.00 CONCRETE 460.00 AUGER 680.00 782.00 LUMBER 53.50 61.53 . TOTAL 2,284.44 LABOR HOURS RATE 8.00 20.00 160.00 BURDEN 40% 64.00 MARK -UP 15% 24.00 TOTAL 248.00 MATERIAL DIFFERENCE = 1,698.55 X 4.00 TOTAL 7,414.20 ly s 6,794.20 5 o LABOR DIFFERENCE = X 155.00 4.00 620.00 0 0 CHAMFER OR ROUND EDGE N lie., U 3" CLR. • 3'-6"0 NEW FBO AT KAGS v v 50' LIGHT POLE FOUNDATION SCALE: 1/2" = 1' -0" 12.1007 1 z" fa ANCHOR BOLTS IN 22"0 BOLT CIRCLE - SEE LIGHT POLE BASE DWGS. PROVIDE SMOOTH OR RUBBED CONC. FINISH AT ALL EXPOSED CONC. #5 CIRCULAR TIE REINF. PROVIDE (2) AT TOP, 8 AT 6" O.C., BAL. AT 12" O.C. (14) #9's OR (18) #8's VERT. AT EQ. SPACING AROUND AUGUR FOUNDATION - PROVIDE 12" HOOK AT TOP SK -1 2/25/12 NEW FBO AT KAGS SCALE: 1/2" = 1' -0" HOOKED A.B's. - SEE LIGHT POLE BASE DWGS. #5 CIRCULAR TIES (14) #9's OR (18) #8's VERT. 50' LIGHT POLE FOUNDATION 12.1007 SK -2 2/25/12 nstruction Company est Mulberry Boulevard, Suite 20 cr, GA 31322 one: 912 - 790 -0011 Owner : Project: Architect: Phase 9680- - AUGUSTA - RICHMOND COU 2103 -11 Campbell & Paris Engineers Description CT/CARPET / VCT / BASE Augusta Tile Crafters, Inc AUGUSTA FBO TERMINAL See attached proposal front ATC attached. Subtotal - $2,890.92 hange Order Proposal 4 SUB 0.00 LS Change Order Proposal # : Date: Cost Type Quant UM Unit Cost In accordance with conversation held on 3/13/12 at OAC !dig, Choate will provide a Voluntary Credit associated with this change and lookfor ways to offset cost in the fitture. Voluntary Credit - ($2,890.92) Net Amount = $0.00 Builder's Risk Insurance Business License Fee Field OH & Supervision General Liability Insurance Overhead P &P Bond Plans/PostagelCourier Safety Subguard Requested Total For item 1 0.00 Owner 1139 3/S/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. 1 Item : 1 Floor Leveling at Rooms #119 and #120 5.41% Amount $0.00 Subcontractors Total 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ 0.0 0 Total For Change Order Proposal $0.00 Page 1 of 2 3/26/2012 3:59:50 PM jte Construction Company West Mulberry Boulevard, Suite 200 Toler, GA 31322 Mahone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA F13O TERMINAL Architect: Campbell & Paris Engineers Approved By: (Architect) Campbell & Paris Engineers Signed: Date: Change Order Proposal The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Submitted By: CHOATE CONS U T Signed: /(1 Date: Change Order Proposal # : Owner #39 Date: 3/8/2012 Approved By: (Owner) MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Date: Page 2 of 2 3/26/2012 3:59:50 PM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers 15400- PLUMBING SYSTEMS Coleman Construction: CHOATE — CONSTRUCTION — Change Order Proposal Change Order Proposal # : Owner #42 Date: 3/1212012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. l Item : 1 IT Room HVAC Phase Description Cost Type Quant UM Unit Cost 1020- - PROJECT MANAGER 1 LAB 0.00 LS 0.00 Voluntary Credit offered by Choate to arrive at a "zero" cost change order for this Proposal. Labor Total 4 SUB 0.00 LS 0.00 Amount $- 113.81 - 113.81 $1,289.00 Provide hub drain for AHU in 17' room Reference proposal attached. 15500 HVAC SYSTEM 4 SUB 0.00 LS 0.00 8 2,868.00 Bardi: Furnish and install specified Mitsubishi mini -split system including DHP -1 and DFC -1, including refrigerant piping, condensate piping, pump, and insulation Coring as required through exterior wall is included in this amount. Reference proposal attached for a detailed breakdown of costs HVAC Allowance Included in Contract = 810,000 Actual HVAC Cost = $7,132 Net DEDUCT Amount = ($2,868) 16000 ELECTRICAL SACK Co: Furnish labor and materials to provide power connections to additional HVAC equipment. Reference attached cost proposal from SACK Ca for additional cost breakdown 4 SUB 0.00 LS 0.00 51,692.81 Subcontractors Total 113.81 Subtotal $0.00 Page 1 of 2 3/14/20123:36:13 PM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers CHOATE -- CONSTRUCTION - Change Order Proposal Change Order Proposal # : Owner #42 Date: 3/12/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Overhead General Liability Insurance Business License Safety P &P Bond Field OH & Supervision Plans/Postage/Courier Fee 5.41% Subguard Builder's Risk Insurance $0.00 $0.00 50.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 Requested Total For Item 1 50.00 Total For Change Order Proposal 50.00 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CON CCJ6) MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: O // Signed: Date: Date: 3J 4/12- Date: Page 2 of 2 3/14/2012 3:36:13 PM 4t COLEMAN CONSTRUCTION, INC. Plumbing• PipingsFabrication Choate Construction Co. 101 West Mulberry Blvd. Poo ler, GA 31322 Attn: Rick Parrish Project: Augusta Regional Airport — FBO Terminal Augusta, GA Rick, Thank you for your interest in our company and allowing us this opportunity to work with you on this valuable project. Our price is based on the sketch emailed by Rick Graham on Friday 03/02/2012. We include labor and material to install a hub drain for the AHU in the IT Room. Please find our pricing breakdown below. If you have any questions or comments, or if you need any additional information, please do not hesitate to contact us. Thanl f ,, I T' o eman - Project Manager Approved By: Date: Printed Name: Request for Change Order 30' - 2" Cl No-Hub Pipe: $ 136.20 8 - 2" HD No -Hub Couplings: $ 56.32 6 - 2" CI 'A Bends: $ 40.02 1 - 3 "x2" Bell Reducer: $ 4.74 1 - 2" P -trap: $ 9.95 1 - 2" Proset Trapgaurd: $ 41.00 6 - 2" Clevis Hangers: $ 14.88 Insulation: $ 30.00 Tax 7% $ 23.32 MJU 10% $ 33.31 Labor $ 900.00 Total RCO $1,289.00 We exclude the following from our scope of work - Electrical wiring, starters, controls, or disconnects. Storm water, irrigation, or fire protection piping. Patching of any floors, walls, or ceilings - painting of any kind. Engineering or bonding fees. Note: This proposal may be withdrawn if not accepted with 30 days. Date: 03/09/2012 RCO #5 P.O. Box1470 Harlem, GA 30814 Phone (706)556 -3400 Fax (706) 556 -6116 Bardi �www.bardi.com Heating & Air Conditioning Ready to Deliver 24/7 To: Choate Construction Company Attn: Rick Parrish From: Rick Jenkins Date: March 5, 2012 Project: Augusta FBO — IT Room HVAC HVAC PROPOSAL *******.L ***I * *** *********** ****$7132 ,x* **************** *********A* Our quotation is based on current steel/copper pricing and is subject to change at time of contract award pending future escalation Scope of Work Fumish and install HVAC system based on information provided on IT Room HVAC Plan drawing from INC Consulting received on 3 -2 -12. Specifications and notes drawing reviewed. No addenda acknowledged and reviewed. • Equipment: $4,190.00 o Mitsubishi mini -split 3,550 o Wired remote controller 105 o Insulated line set 400 o Condensate pump 135 • Labor: 34 hours © $45/hr $1,530.00 • Subcontract: Core wall $ 482.00 • OH &P: 15% $ 930.00 Includes: Permits, taxes, labor based on regular working hours, one -year warranty and other miscellaneous materials that may be required for a complete HVAC installation. THANK YOU FOR THIS OPPORTUNITY! THIS PROPOSAL IS VALID FOR 7 DAYS. 2175 Royal Palm Court PHONE - 770- 263.9300 / Commercial FAX • 770-263-9400 Norcross, GA 30071 -4616 770-263-5355 / Residential THE SACK COMPANY March 9, 2012 Page 1 of 2 Protect: ARA -FBO Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, G A 31322 Attn: Rick Parrish Subject : Change Proposal - IT Room H V A C Mr. Parrish, The following is our cost of the material and labor for the new - pike- base-tie i17 r"r Install Labor (25 Hrs x $20.00) $500.00 Labor Burden (40 %) $200.00 Mark -up (15 %) $105.00 Total $805.00 Material Tax (7 %) Mark -up (15 %) Total Bond Grand Total $721.50 $50.51 $115.80 $887.81 $ $1, 709,04 _ Rook WYPre, Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : Project: Phase AUGUSTA - RICHMOND COUNTY, GA 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers Description 16000- - ELECTRICAL SACK Co. CHOATE - CONSTRUCTION- Change Order Proposal Change Order Proposal # : Owner #43 Cost Type Quant UM Unit Cost 4 SUB 0.00 LS 0.00 Reference attached proposal dated 3/12/12 for a description of work and associated cost breakdown Date: 3/14/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 Relocate Access Control Panel Amount $4,625.91 Subcontractors Total 4,625.91 Subtotal $4,625.91 Overhead $0.00 General Liability Insurance $27.43 Business License $0.00 Safety $0.00 P &P Bond $50.04 Field OH & Supervision $0.00 Plans/Postage/Courier $23.13 Fee 5.41% $253.00 Subguard $64.08 Builder's Risk Insurance $9.99 Requested Total For Item 1 $5,053.58 Total For Change Order Proposal $5,053.58 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONSTR JCTI PANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: / � `v" Signed: Date: Date: 3// L i/1Z Date: Page 1 of 1 3/14/2012 4:02:34 PM March 12, 2012 Project : ARA -FBO Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, G A 31322 Attn: Rick Parrish THE SACK COMPANY Subject : Change Proposal - Relocate Access Control Panel Relocate access panel from electrical gear room to IT room. Re -work all conduits in gear room, then run additional 3/4" conduits to IT room. Simplex to provide copper ACS cable and extend already pulled A CS cable trom current head end location in electric room to new head end location in IT roomn. Splice already pulled cable at trough at existing location. Provide additional fiber for gate to extend to new A CS head end location. Mr. Parrish, The following is our cost of the material and labor and Simplex. Install labor (34.5 Hrs x $20.00) $691.20 Labor Burden (40 %) $276.48 Mark -up (15 %) $145.15 Total $1,112.83 Sincerely, Chuck Jackson Project Manager cc: Seth Yawn Corey Hinson Material $740.05 Tax (7 %) $51.80 Mark -up (15 %) $118.78 Total $910.63 Simplex $2,263.00 Mark- up(15 %) $339.45 Total $2,602.45 Bond $46.26 Grand Total $4,672.17 install Labor (50.61 Hrs x $20.00) $1,112.83 Simplex $2,602.45 Material $910.63 Bond Grand Total $4,672.17 Please issue a change order for this work if we are to proceed. f G25,`�l If you have any questions or concerns dealing with the above please give us a call. Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Item : 1 IT Room Electrical Additions Description 16000- ELECTRICAL The Sack Co. Phase CHOATE L O:N ir I1 ON— Change Order Proposal Approved By: (Architect) Submitted By: Campbell & Paris Engineers CHOATE CONS." UCT Signed: Signed: /( 'X Date: Date: 3//k///2. Change Order Proposal # : Owner 044 Date: 3/14/2012 Cost Type Quant UM Unit Cost 4 SUB 0.00 LS 0.00 Reference Sack proposal dated 3/12/12 for a detailed description of work and associated cost breakdown. Amount $2,919.32 Subcontractors Total 2,919.32 Subtotal $2,919.32 Safety $0.00 P &P Bond $29.25 Overhead $0.00 General Liability Insurance $17.52 Business License $0.00 Builder's Risk Insurance $5.84 Field 011 & Supervision $0.00 Plans /Postage/Courier $14.77 Fee 5.41% $161.58 Subguard $40.93 Requested Total For Item 1 $3,189.21 Total For Change Order Proposal $3,189.21 Approved By: (Owner) PANY AUGUSTA - RICHMOND COUNTY, GA Signed: Date: Page 1 of 1 3/14/2012 4 :32:08 PM March 12, 2012 Protect: ARA - FB0 Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, G A 31322 Attn: Rick Parrish Chuck Jackson Project Manager cc: Seth Yawn Corey Hinson THE SACK COMPANY Subject : Change Proposal - IT Room Changes: Additional circuits for antenna/radio, circuits are: :L E Q 29,31,49,51,53. Relocate outlet circuits from wall to data rack in center of data room, circuits are: L E Q 56,58,60,62. Add 3 additional circuits to data rack in IT room, circuits are:LEQ 34,36,38. All circuits are 120V. Breakers are already provided in L E Q panel. Mr. Parrish, The following is our cost of the material and labor. Install Labor (56.61 Hrs x $20.00) $1,012.20 Labor Burden (40%) $404.88 Mark -up (15%) $212.56 Total $1,629.64 Material $1,048.09 Tax (7 %) $73.37 Mark -up (15 %) $168.22 Total $1,289.68 Bond $29.19 Grand Total $2,948.51 Install Labor (50.61 Hrs x $20.00) $1.629.64 Supervision $0.00 Material $1,289.68 Bond Grand Total $2,948.51 2 i9 3 Z- Please issue a change order for this work if we are to proceed. If you have any questions or concerns dealing with the above please give us a call. Sincerely, Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA- RICHMOND COUNTY, GA project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers CHOATE — CONSTRUCTION — Change Order Proposal Change Order Proposal # : Date: Owner I/47 3/20/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner' auth orizati on in the apace provided below. hat nduits from HH7 response io receipt of SEi I rev thro 3/2: 12, if iteti4pprovc"d.by #this ti tt revise ,based upon tnpact.to`Pro1ect I Item : 1 Conduits from HH7 to HH -C2 Phase 16000- - Approved By: Web' Campbej14 Paris Signed: Date: Description ELECTRICAL The Sack Co: See attached proposal for a cost breakdown. Cost Type Quant UM Unit Cat 4 SUB 0.00 LS Furnish labor, materials, and equipment to install (2) E4 - Schedule 80 PVC Conduits from 1-111-7 to 11H -C2. (320 LF basd upon ffield measurement) Builder's Risk Insurance Business License Fee Field 011 & Supervision General Liability Insurance Overhead P &P Bond Plans/Postage/Courier Safety Subguard Page 1 of 1 Subcontractors Total Subtotal Requested Total For Item 1 0.00 Total For Change Order Proposal Amount 58,99219 8,992.29 S8,992.29 S19.41 50.00 5.41% 5491.80 50.00 553.32 50.00 597.26 544.96 50.00 5124.57 59,823.61 59,823.61 Submitted By: Approved By: (Owner) CHOATE CONST CTI ANY AUGUSTA - RICHMOND COUNTY, GA Signed: / � 'rrt Signed: Data 3 J zo /j Z Date: 3/20/2012 3:37:35 PM March 02, 2012 Page 1 of 2 Prefect: ARA -FB0 Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, G A 31322 Attn: Rick Parrish THE SACK COMPANY Subject : Change Proposal - 2 -4" pvc conduits from weather building to H H -7. On drawing SE1.1 dated 02 -24 -2012. Mr. Parrish, The following is our cost of material and labor . Install Labor (110.12 Hrs x $20.00) $2,202.40 Labor Burden (40%) $880.96 Mark -up (15 %) $616.67 Total $3,700.03 Supervision (16.52 Hrs x 28.00) $462.50 Labor Burden (40 %) $185.00 Mark -up (15 %) $129.50 Total $777.00 Material $2,482.01 Tax (7 %) $157.19 Mark -up (15 %) $527.84 Total $3,167.04 Equipment $1,050.00 Tax (7 %) $73.50 Mark -up (15 %) $224.70 Total $1,348.20 Bond Grand Total $ $9 it .21 V" 912 D1 electrical • refrigeration • hvac • process piping • plumbing • millwrights • energy management • contractors • riggers 3302 Zell Miller Parkway (912) 871 -8771 Estimating Wing Fax: (912) 681 -4517 Post Office Box 528 Statesboro, G A 30458 Front Ofc. Fax: (912) 681 -6001 Construction Wing Fax: (912) 681 -6317 Statesboro, G A 30459 Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 -790 -0011 Owner : Project: Architect: Phase AUGUSTA - RICHMOND COUNTY, GA 2103 -11 AUGUSTA FBO TERMINAL Campbell & Paris Engineers CHOATE — CONSTRUCTION — Change Order Proposal Description Cost Type Quant 2830- - FENCING 4 SUB 0.00 Value of Chain Link Sliding Gate "N" included in Contract = $3,981.00 Cost for "V" Groove Ornamental Aluminum Sliding Gate = $7,700.00 Additional Cost - $3, 719.00 Change Order Proposal # : Owner #50 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. Description of to "NY Re &i n �' Item : 1 Gate "N" Revision UM Unit Cost LS 0.00 The "V" groove sliding gate will be manufactured by Martin- Robbins Fence Ca, color to match existing observation fence. Martin - Robbins will fabricate aluminum to match details by Ty Metal. Subcontractors Total 3,719.00 Subtotal $3,719.00 Builder's Risk Insurance $7 Business License $0.00 Fee 5.41% 1205.84 Field OH & Supervision $0.00 General Liability Insurance $22 Overhead $0.00 P &P Bond $37.26 Plans/Postage/Courier $18.82 Safety $0.00 Subguard $52.14 $4,062.82 Total For Change Order Proposal 14,062.82 Requested Total For Item 1 Date: 4/16/2012 $3,719.00 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONTU MPANY AUGUSTA - RICHMOND COUNTY, GA C Signed: Signed: /a Signed: ned: Date: Date: 4/ 1 t. i 1 Z. Date: Amount Page 1 of 1 4/16/2012 3 :12:38 PM Rick Parrish From: Jack Mayfield [JMayfield@campbell- paris.com) Sent: Thursday, April 05, 2012 7:32 AM To: Rick Parrish Cc: Rick Graham; Jimmy Hendrix Subject: RE: AUGUSTA FBO TERMINAL PROJ.(SWING & V- GROOVE GATE).xls Rick, Please go forward with the ornamental slide gate. Please make sure the gate provided by Martin Robbins meets the spacing shown on the plans. Jack L. Mayfield, PE Campbell & Paris Engineers 313 Wingo Way Mt. Pleasant, SC 29464 843.856.9989 office 843.856.0107 fax www.campbell-Daris.com From: Rick Parrish (mailto:RParrish@choateco.com] Sent: Wednesday, April 04, 2012 11:05 AM To: Jack Mayfield Cc: Rick Graham Subject: FW: AUGUSTA FBO TERMINAL PROJ.(SWING & V- GROOVE GATE).xls See attached and below from Chad related to ornamental swing gate pricing for comparison purposes. I'm on my way out...this baby is coming this afternoon. So hopefully, this gives you the information needed for the Airport to make a final decision. I know Rick G is checking emaiis this week, so please copy him on any direction you give so he can keep things moving. Later on. Rick Parrish, LEED AP BD +C Sr. Project Manager Choate Construction Company 101 W. Mulberry Blvd, Suite 200 • Pooler, Georgia 31322 Direct: 912 - 330 -7417 • Main: 912 - 790 -0011 Cell: 912 -429 -0691 • Fax: 912- 790 -0010 rparrishOchoateco.com • http: / /www.choateco.com From: Chad White f mailto:chadwOmartinrobbins.com1 Sent: Wednesday, April 04, 2012 10:53 AM 1 3 `7 1- 7 l" 3 '11 i QUOTATION AJ- ROBBINS FENCE CO., INC 3TSIDE COURT VILLE, GA 30078 770 - 972 -8141 770 - 985 -6838 CHOATE CONSTRUCTION ATTENTION: RICK PARRISH E -MAIL: rparrish @choateco.com Ph: 912 - 330 -7422 FAX 912 -790 -0010 Date: April 3, 2012 RE: AUGUSTA FBO TERMINAL PROJECT AUGUSTA REGIONAL AIRPORT AUGUSTA, GA "" REVISED QUOTE 4/3/12 "" Description FURNISH AND INSTALL SINGLE SWING GATE 15' W X 7'+ B.W. SINGLE SWING GATE HUNG ON 6 5/8" OD POSTS V- GROOVE CHAIN LINK GATE 15' W X 7'11 + B.W. SINGLE V- GROOVE SLIDE GATE HUNG ON 4" OD POST. "" V- GROOVE GATE WILL HAVE TO SLIDE ON A TRACK. HAS A SMALL COUNTER BALANCE AND COULD WORK IN THIS APPLICATION. "" V - GROOVE ORNAMENTAL GATE BY MARTIN - ROBBINS 15' W X 8' H "SINGLE' SLIDE V- GROOVE GATE ON 4" OD POSTS WITH GREEN FINISH. V- GROOVE ORNAMENTAL GATE BY TYMETAL 15' W X 8' H "SINGLE" SLIDE V- GROOVE GATE WITH ALUMINUM SPEAR STYLE PICKETS HUNG ON 4" OD POSTS WITH GREEN FINISH. Unit qu Unit Price Total LUMP SUM LUMP SUM WITH ALUMINUM SPEAR STYLE PICKETS HUNG LUMP SUM LUMP SUM S: PRICE GOOD FOR 30 DAYSI V- GROOVE GATE NEEDS TO BE INSTALLED VEL GRADE AND WILL NEED CONCRETE PAD TO ANCHOR TRACK TO. E YEAR WARRANTY ON V- GROOVE ORNAMENTAL GATES*" TAX Shipping TOTAL $ 2,600.00 $ 4,200.00 M.R. V- GROOVE $ 7,700.00 TYMETAL V -GR $ 10,050.00 ITEM *IOTE )N LE " ON :stimate authorized by Jame: CHAD WHITE itte: ESTIMATOR :ustomer Signature Date: Signature April 3. 2012 a blealoi,4„ Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 -790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. w , Item : 1 Canonv Dron Off Island Phase 2100 - 20- Description SITE PREPARATION Precision Siteworks: Install +/ -140 LF of curbing at entry canopy - $1,950.00 3000 - TURNKEY CONCRETE Forrest Concrete: CHOATE — CONSTRUCTION — Change Order Proposal Cost Type Quant 4 SUB Change Order Proposal # : Owner #51 UM 0.00 LS Add (4) EA 5' x 2' tactile paver strips at cut through raised island per detail on C3.3. - $250/EA = $1,000.00 Unit Cost Date: 4/16/2012 0.00 4 SUB 0.00 LS 0.00 $1,0 Subcontractors Total 2,950.00 Subtotal $2,950.00 Builder's Risk Insurance $5.90 Business License $0.00 Fee 5.41% $163.28 Field OH & Supervision $0.00 General Liability Insurance $17.70 Overhead $0.00 P &P Bond $29.56 Plans/Postage /Courier $14.93 Safety $0.00 Subguard $41.36 Requested Total For Item 1 $3,222.73 Total For Change Order Proposal $3,222.73 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS " UC a MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: , / �+/�( , Signed: I Date: Date: ' /(t: // a Date: Amount 11,950.00 Page 1 of 1 4/16/2012 3:31:48 PM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers CHOATE — C ONSTR U CTIO N — Change Order Proposal The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. eset'n ! tion Item : 1 IT Room Cabinets and Accessories Phase Description 16000- ELECTRICAL 4 SUB 0.00 LS Reference Sack proposal dated 4/18/12 for a description of items included and associated cost breakdown I have also attached the cabinet configuration/components list to reference what was priced. Approved By: (Architect) Campbell & Paris Engineers CHOATE CONS UCTI Signed: Signed: /(e1//( Date: Date: Submitted By: Cost Type Quant UM Subtotal $3,563.59 Builder's Risk Insurance $7.13 Business License $0.00 Fee 5.41% $197.24 Field OH & Supervision $0.00 General Liability Insurance $21.38 Overhead $0.00 P &P Bond $35.71 Plans/Postage/Courier $18.03 Safety $0.00 Subguard $49.96 Requested Total For Item 1 33,893.04 Total For Change Order Proposal $3,893.04 Change Order Proposal # : Owner #52 Unit Cost 0.00 Date: 4/18/2012 Amount 33,563.59 Subcontractors Total 3,563.59 Approved By: (Owner) MPANY AUGUSTA - RICHMOND COUNTY, GA Signed: Date: Page 1 of 1 4/18/2012 4:46:28 PM April 18, 2012 Project : ARA -FBO Terminal Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Attn: Rick Parrish Chuck Jackson Project Manager cc: Seth Yawn Chris Elliott THE SACK COMPANY Subject : Change Proposal - Chatsworth cabinets and accessories 1: Provide and install (2) Chatsworth cabinets as requested by IT Dept. for Augusta Regional Airport. Airport. 2: Provide and install (2) Startech or Egual adjustable 4 post shelf. 3: Provide and install (2) APC PDU,s AME- AP7830. The following is our cost of the equipment. Net Planner Total $8,632.30 Credit $5.533.53 $3,098.77 Net Planner Equipment $3,098.77 Mark -up (15 %) $464.82 Total $3,563.59 Bond $0.00 Grand Total $3.563.59 Please issue a change order for this work if we are to proceed. If you have any questions or concerns dealing with the above please give us a call. Sincerely, Rick Parrish From: Chuck Jackson [ChuckJ @hasack.com] Sent: Wednesday, April 18, 2012 2:16 PM To: Rick Parrish Subject: FW: FBO building - IT Cabinet Attachments: ARA FBO Netplanner Equipment.xlsx Rick, see below from NetPlanner and that was a type -o on the part U. I attached a another sheet. 61tuck c'acksott Electrical Project Manager The Sack Company /SCM, Inc. 1601 Hartrich Rd. Augusta GA 30906 Cell: 912 -531 -3814 Ofc: 706 - 434 -2890 chucki(hasack.com From: Mike Dycus [ mailto :mike.dycusftnetplanner.coml Sent: Wednesday, April 18, 2012 2:08 PM To: Chuck Jackson Cc: Todd Osgood Subject: RE: FBO building - IT Cabinet Global Frame is Chatsworth's cabinet line "Phrase Name" All the same! Thank you, Mike Michael Dycus, RCDD Vice President - Business Development NetPlanner SYSTEMS,INC. Your Pathway to Connectivity SYSTEMS,INC. Your Pathway to Connectivity 3100 Narthwoode Place • Suite 8 • *moss, GA 30071 Once: 7768628482 • Fez 7704413773 Direct: 678- 205 -2576 Cell: 770- 833 -3130 mike.dycus @netplanner.com www.netpianner.coru Atlanta • Augusta • Columbus • Savannah From: Chuck Jackson fmailto:ChuckJOhasack.com1 Sent: Wednesday, April 18, 2012 1:33 PM To: Mike Dycus Cc: Todd Osgood Subject: FBO building - 1T Cabinet CP3132829 GF- Series GlobalFrame Cabinet System with accessories installed Configuration includes the following components: Part Number Description Qty GF-1C320 25088 -710 25130 -710 25190 -001 35021 -000 25404 -706 25221 -702 GlobalFrame Cabinet, 42U, Perforated Metal Front Door, Double Perforated Metal Rear Doors, Two (2) Side Panels, Universal Top Panel, Black, 31.5" (800 mm) W x 42.3" (1074 mm) D x 79.3" (2013 mm) H Fan Top Panel Kit, 115V, GlobalFrame Cabinet, 800W X 1050D, Black, 31.1" (789 1 mm) W x 38.1" (967 mm) D x 2.4" (62 mm) H Bottom Panel, GlobalFrame Cabinet, 800W X 1050 D, Black, 31.1" (789 mm) W x 1 32.9" (835 mm) D x 1.8" (45 mm) H Cable Port Brush Kit, Top Panel, 2 Ports, GlobalFrame Cabinet, Black, 5.8" (148 1 mm) W x 10.6" (268 mm) D x 0.8" (20 mm) H Grommet Cable Opening, 3.5" Round, Pack of 2, Black Vertical Cable Manager, Short Fingers, GlobalFrame Cabinet, 800 mm Wide X 42U High, Black Cable Lashing Bracket Kit, GlobalFrame Cabinet, 1 1 2 2 250MM X 42U, Black, 9.8" (250 mm) W x 1" (25 mm) D x 33.4" (849 mm) H Cable Ring Kit, Eight (8) Rings, GlobalFrame Cabinet, 800 mm Wide Rails, Black, 1 4.5" (114 mm) W x 10.1" (258 mm) D x 2" (51 mm) H Cable Ring Kit, Eight (8) Rings, Medium Size, GlobalFrame Cabinet, 800 mm Wide Rails, Black Vertical Power Distribution Unit 1 Input Field Value Cabinet Name Project Location Cabinet Application Cabinet Height Cabinet Width Cabinet Depth Cabinet Side Panels Door Style Would you like Vertical Accessories? LEFT RIGHT Middle Left Middle Right Front Left Front Right Would you like Thermal Accessories? Rail Seal Kit Bottom Panel Fan Top Panel Kit Snap -In Grommet and Plug Kit Cable Port Brush Kit Cable Port Grommet Kit Standard (Hot Aisle /Cold Aisle or Enclosed Aisle Environments) 42U Rail Height 31.5" (800 mm) 41.3" (1050 mm) Two Solid Side Panels Single Perf Metal Front w/ Double Perf Metal Rear Yes Large Cable Ring Kit Medium Cable Ring Kit 10" Cable Lashing Bracket Kit 10" Cable Lashing Bracket Kit Vertical Cable Manager - Standard Fingers Vertical Cable Manager - Standard Fingers Yes None One 115 VAC Fans, NEMA 5 -15 Plug None One Kit One Kit Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. i Oil 9 I<an d s caping.P Ian Ll I rrigation Plans" #1,2 ( Reference attac LI As time ts.oft esseti we can begin achieve Substan, m r I Item : 1 Landscanine and Irrination Phase Description CHOATE - CONSTRUCTION - Change Order Proposal 2900- - LANDSCAPING ALLOWANCE Pine Hollow Nursery & Landscaping: 1. Irrigation System per plans - $21,950 2. Modifications to Irrigation system per sheet 1 attached -($2,500) 3. Trees, hardwood mulch- $14,000 4. 419 Bermuda Sod per plan- $22,150 5. Modifications to Sod area per L1.1 attached - ($6,720) Revised Subtotal - $48,880 Current Landscaping and Irrigation Allowance = $22,761 Net Add to Complete Work - $26,119 Qualifications/Exclusions: Cost Type truant UM Unit Cost 4 SUB Change Order Proposal # : Owner #53 0.00 LS 1. 12 Month Maintenance is Excluded for lawns and grasses Maintenance ofplantings to end at Project Substantial Completion is Included. 2. Power for irrigation controller is excluded. 3. Relocation of existing utilities, light poles is Excluded. 4. Alterations to existing water source to provide discharge flow to meet system demand is excluded. 5. Any tap, meter, impact fees are excluded Date: 4/30/2012 0.00 Amount $26,119.00 Subcontractors Total 26,119.00 Subtotal S26,119.00 Page 1 of 2 5/2/2012 9 :42 :53 AM Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect: Campbell & Paris Engineers CHOATE — CONSTRUCTION — Change Order Proposal Change Order Proposal it : Owner #53 Date: 4/30/2012 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. $52.24 Business License $ Fee 5.41% $1,445.65 Field OH & Supervision $0.00 General Liability Insurance $156.73 Overhead $0.00 P &P Bond $261.71 Plans/Postage/Courier $132.16 Safety $0.00 Subguard $366.18 Builder's Risk Insurance Requested Total For Item 1 S28,533.67 Total For Change Order Proposal $28,533.67 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS/3U UC ) AUGUSTA - RICHMOND COUNTY, GA 7 fi Signed: Signed: z �'( Signed: Date: Date: 5 /Z J l Z Date: Page 2 of 2 5/2/2012 9:42:53 AM (r fOP SYMBOL DESCRPTICN (EACH/TOTAL) TRAWL OESCRIP00N *LLCM OW TREE 00 /1620 $4 1 PROPOSED LENT POLES WEEPING CHEERY TREE 5/60 It JAPANESE CRAPE MYRTLE 39/231 TREES Da NEW SOD WITH NTH 7 R:TfF•F ' ELETED. TO FURN SH AND INSTALL ULCH TO I STU D R IN L EU L SOD LL I 10 " A HAS HIS AR ARE DELETED. ALONG WITH ASSOCIATED PIPI ERS AS REOU RED FOR TREES EMAIN I C. IP • IZ S ' ''� A N L. E S 1I11 1111111 MATCMNE 1 - BASELINE 'A' STA 11 N000 SEE INSET 'A' NS SHEET GRAPHIC SCALE 1 (mew) naffs 110 NOTES: r MN SAUCER AMATO TREE 3" SHREDDED HARDWOOD MULCH DO NOT CUT MAN LEADERS SJRVEYOR5 FLAGGING TAPE OR APPROVED EQUAL (TYP.) FINAL GRADE APPROVED BACKFILL SEE PROJECT SPECIFICATIONS FABRIC UNER (SUBMIT S1404 DRAWINGS) TREE QUALM' POWER NEW FBO PROJECT AUGUSTA REGIONAL AIRPORT A - Quality Point Factor for Retention mono mar C+•Pe IAZ160 I 15 Planted Trees WAIOW Oak Tree Quality Panne Quality Retina for Minden Preferred 90 2 Recommended 5 0.8 Profaned 39 1.4 DOS TOP. ICGMDBFI) QPF Quantity Tote Tree Quality Poi Acme Dteterbed 1 Required Number of TQP ALL COST M EANT 1 TO INSTALLING THE PROPOSED 2. THE NSTALUTON ANO MAMRNNCE 500055ATE0 Mm THE TREE PROTECTION ZONE FENCE SHALL PER 02231, TREE P001050KN APO 1RIMMNC 3. THERE WALL BE A PERMWEN) WATER SOURCE 017I414 100' OF EVERY TREE. 4. NO LENT POSE SHALL BE PUEEO N Aw REWIRED 1AN055460 ISLAND NOR WINRN 20' 05 ANY TREE. 5. NO OIIl1IIFS 5!011 BE PUKED DIECR.0 ABOVE NOR BELOW ANY TREE. CUT TOP 1/3 BURLAP AND ROPE FROM TOP OF ROOT BALL FOR TREES WITH MIRE BASKETS REMOVE BASKET ENTIRELY ROOT COLLAR SUM! BE PLACED 3" -A" ABOVE SURROUNDING GRAM `` MINIMUM DEPTH OF PIT TO F MEASURED AT CENTER 0 OF PIT UNOS111R8ED EARTH l/2' REIN RUBBER 105E FORCED 3 EA. - DOUBLE STRANDS OF 12 GA GALVAMZED WIRE TWISTED (WITH RUBBER HOSES OR APPROVED EOUMALENT) 3 EA - 2'02" HARDWOOD STAKES SPACED 120" APART. NOTCH STAKES TO FOLD WIRE N PUCE Tots TOP 1800 So 2538 IBM CAMPBELL & PARIS w � ENGINEERS �rtwl u r VIRGO GAMDI LL 09&: MAO IA Mt 0660: u snow DFSW.a8 R Du KO e C C AMMO or M V. / 1 Nn PAD.ctt na L1.1 AM a) 2 -1T 201010 LANDSCAPING AUGUSTA REGIONAL AIRPORT FBO TERMINAL AUGUSTA, GA IRRIGATION LAYOUT cSinunonsAziiaLion cSu .o.[0:(,e en swan ROAD W.713.1801111 SC MIA PLY Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912 - 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers CHOATE — CONSTRUCTION — Change Order Proposal Phase Description Cost Type Quant UM 16000- ELECTRICAL 4 SUB 0.00 LS Let me know if you have any questions regarding this request. Change Order Proposal # : Owner #54 The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Parking Lot Light Poles Unit Cost 0.00 Reference attached Letter frwn The Sack Co. dated 4/23/12 related to an increased cost incurred to provide poles for parking lot lights that met project specifications for SSA poles and project specific wind load requirements (110 mph). I have attached a cut sheet for the pole originally included in pricing to match the detail as shown on #SE1.4 (square tapered) as referenced in the 4/23/12 letter. Date: 5/212012 Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CON C ANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: { 5 ; 44 Signed: l Date: Date: 5/ Z ill Date: Amount $5,725.19 Subcontractors Total 5,725.19 Subtotal $5,725.19 Builder's Risk Insurance $11.45 Business License $0.00 Fee 0.00% $0.00 Field OH & Supervision $0.00 General Liability Insurance $34.18 Overhead $0.00 P &P Bond $57.37 Plans/Postage/Courier $0.00 Safety $0.00 Subguard $75.77 Requested Total For Item 1 $5,903.96 Total For Change Order Proposal $5,903.96 Page 1 of 1 5/2/2012 10:31:09 AM Fixture Type Qty. Price (EA.) Total F9-2E130' 11 $ 1,960.00 $21,560.00 F5-2c 30' 12 $ 3,071.89 $36,862.67 F10 2c 30' 1 $ 3,960.78 $3,960.78 F2 -la 30' 4 $ 3,888.89 $15,555.56 April 23, 2012 Project: ARA FBO Terminal Mr. Rick Parrish Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Regarding: Fixture Type F Rick, In regards to Fixture Type F, our original pricing was based upon the detail on Sheet #SE1.4. This drawing has a specific detail for these poles, Square Tapered Steel Galvanized, which is what we submitted. The specifications (16524- 2.4 -A.) states a Lithonia Square Straight Aluminum Pole. Which you persisted we provide as well as match the existing fixtures and until that time you would not turn over our submittal package. Our issues were the discrepancy in the drawings versus the specifications, nothing was existing to match and per Lithonia they did not have a pole to match what was called for in the specifications. We then decided to submit a Hapco Square Straight Aluminum in order to satisfy what you requested. By changing what was shown on the detailed drawings to partially match what the specification stated end up costing us the following: Fixture Type F9 -2B 30' F5 -2c 30' F10 2c 30' F2 -la 30' Qty. 11 12 1 4 Price (EA.) $ 1,815.00 $ 2,921.00 $ 3,612.81 $ 3,396.00 Total $19,965.00 $35,052.00 $3,612.81 $13,584.00 FINAL APP. SPECIFIED TOTAL DIFFERENCE We need to be issued a change order for the cost we have incurred by changing Fixture Type F for the above referenced amount. Sincerely, The Sack Company $77,939.00 $72,213.81 $5,725.19 The Sack Company TOTAL $72,213.81 TOTAL electrical • refrigeration • hvac • process piping • plumbing • millwrights • energy management • contractors • riggers 3302 Zell Miller Parkway (912) 871 -8771 Estimating Wing Fax: (912) 681 -4517 Post Office Box 528 Ctatechnrn C;A 104552 Front ()Fr Fay- (9171 (R1- Ciflfll Cnnetrnctinn Wino Fax• (9171 AR1 -Al 17 Ctatechnrn CIA 10459 ■ =4 Protect 1'-1g776.9 FBO Terminal Bldg Submitted 5y DON BLACKBURN & ASSOC INC Catalog Number STS - 30.641= 1 Notes Ty° L] \ ■ =4 { { imF`n I 3fi'`�J`Ir '' a. .wiz }'rl i•'-�. ` ��g{Jt'C pp-Y �`..� "�'. sy1 s .nom - .,! .... ...m5 -y ht its ¢ €` r`N trio7 t!t'l a t 578- 20.525 -11 -A8 20 155 11 5.25 x 3.05 10.75 10,75 1 x 36 x 4 4.515.5 18.0 450 345 10.7 STS-254300-11=A8 ; : 25 205 11 8.00 x 3.25 113 12 1 x 36 x 4 4.515.5 16,8 420 315 9.6 81 90 260 : 11 ' 6.41 x 3,11 11,88 12.5 1 x 36 x 4 4,5/6.5 13,6 340 245 7A _ STS -30. 641.7 -A8 30 375 1 7 8,41 x 3.11 r 11.88 12.5 1x 36 x4 4.5/ 5.5 23,8 590 447 13,7 342 STS•35- 681 -11-A8 35 305 11 6.81 x 2.96 12.25 13 11136 x4 4.6/5.5 JO.? 575- 35- 713.7AB 35 475 7 7.13 x 3.28 12.63 13.5 1 x 36 x 4 4,5 / 5.5 23,4 17.4 495 13 0 925 ' STS-30. 718 -11 -AB 39 345 ` 11 7_18 x 2.92 12.83 13.5 1 x 30 x 4 ' 4.5 / 6.5 8.8 STS -39- 713 -7A8 39 500 7 7.13 x 2.87 12.63 13.5 . 1 x 38 x 4 4,516.5 19.3 14.2 '355 10.4 260 red Li htfn g Po es u • g quare apere• Pole Shaft The pole shall be a one section design fabricated from standard 11 gauge (0.11961 or 7 gauge (0.17931 steel. Each section shall be fabricated from high strength low alloy steel with minimum yieid.atrength of 50,000 psi Each pole will have a full- length longitudinal weld and will be square in cross•section with a unlortn taper of 0.11 Inches per fool of length. Base Plate The base plate is fabricated from a structural quality hot rolled carbon steel plate that meets or exceeds ASTM A -36 with a minimum yield of strength of 36,000 psi. The base plate telescopes the pole shaft and is circumferential welded top and bottom. The base plate has round bolt holes. Hand Hole A reinforced hand hole. having a nominal 3' x 5' opening, will be installed 18 above the base plate on at poles. A hand hole cover and attaching hardware is Included with each hand hole assembly. A ground lug wit be welded either on the hand hole frame or on the Inside of the pole opposite the hand hole depending on the design. Anchor Bolts Anchor bolts are fabricated from a commercial quality hot rolled carbon steel bar that meets or exceeds minimum yield strength of 55,000 psi. Anchor bolts are sized according to each pole design and are furnished with 2 galvanized heavy hex nuts and 2 galva- nized net washers. Anchor bolts starlit:* galvanized a minimum of 4' on the aueaded,end in accordance with ASTM A -153, Anchor bolts will ship with the poles unless otherwise specified. Pole Top Each pole will be side - drilled with a removable pole cap or have a 2.3/8' 0.0. x 4' tenon top (other sizes available). Welding At welds shall be of the highest quality end performed byAmerican Welding Society certified welders conforming to the latest version of the American Welding Society specification AWS D1.1. Finish At poles, mounting bractrels and platforms are furnished with a coating of either red oxide /zinc primer, factory painted, powder coated or hol-dip galvanized to ASTM A -123. Miscellaneous hardware will be galvanized to ASTM A -153. Exterior finish coatings are avail- able by request. Note Anchor bolt patterns are subfect to change. Please consult factory prior to construction_ Dose Plate 15 L American Anchor Bolt - y i 3 Projection Base Detail Phone: (866) 4744200 • Fax: (817) 924 -7049 Amedeml Lila Pole sorves UM Vita) longs any parson of elk mat: on mahout nonce M ceder to (nomad prooud imprownwnl and aroo An amdnal avaidblay Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FRO TERMINAL Architect Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Granite at Fireplace Hearth Phase 6410- - Description Cost Type Quinn UM Unit Cost CABINET WORK 4 SUB 0.00 LS 0.00 Reference attached pricingfrom RWP dated 4/26 and shop drawing for material /color selection and dimensions. Alowance Included in COP 423 - $1,000.00 Actual Cost - $2,308.50 Net Add - $1,308.50 Approved By: (Architect) Campbell & Paris Engineers Signed: Date: CHOATE — CONSTRUCTION — Change Order Proposal Builder's Risk Insurance Business License Fee Field OH & Supervision General Liability Insurance Overhead P &P Bond Plans/Postage/Courier Safety Subguard Change Order Proposal # : Subtotal Requested Total For Item 1 Date: Subcontractors Total Total For Change Order Proposal Owner #55 5/2/2012 5.41% Amount $1,308.50 1,308.50 $1,308.50 $2.82 $0.00 $71.56 $0.00 $7.76 $0.00 $14.15 $6.54 $0.00 $18.13 $1,429.46 $1,429.46 Submitted By: Approved By: (Owner) CHOATE CONS UCTI ANY AUGUSTA - RICHMOND COUNTY, GA Signed: Ai; Signed: Date: 51Z/12. Date: Page 1 of 1 5/2/2012 11:30:27 AM MVP, INC Roy W. Pattie Services 480 S.W. Broad St. Office: 912- 4274499 Thursday, April 26, 2012 Re: We propose to furnish and install only the items listed below as per plans and specifications for the total base bid sum of: FIRE PLACE HEARTH AND SURROUND AS DRAWN ON UA8.6 FOR BOTH SIDES OF THE FIRE PLACE IN THE LOBBY THESE UNITS ARE QUOTED AS: GRANITE 3cm TROPIC BROWN WITH RADIUS EDGE ON THE HEARTH Sincerely Rob L Murphy Jesup, GA 31545 fax: 912-427 -8607 FBO TERMINAL AUGUSTA REGIONAL AIRPORT 1501 AVIATION WAY AUGAUSTA, GEORGIA 30906 $2,308.50 nrs r�ra wt INC RWP, 'In S.W. Broad St. Jesup, GA 31545 ^^ fax: 912 427 8607 PnUTH.NET jz- 15 PROJECT: ARCHITECT: CONTRACTOR: LOCATION: DATE: FILE: Z ( +3 a 11-4 5 36 co cu 60 FBO TERMINAL SHEET: VIRGO GAMBILL MATERIALS: CHOATE CONSTRUCTION FIELD MEASURE: 1501 AVIATION WAY AUGUSTA, GEORGIA 30906 CONTACT: 4/2612012 1:28 PM SCALE: c:luserstrob I murphyldocumentst rwptchoatelaugustalaugustafbo .dwg FIRE PLACE HEARTH & SURROUND GRANITE 3cm TROPIC BROWN ROB L MURPHY Choate Construction Company 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912- 790 -0011 Owner : AUGUSTA - RICHMOND COUNTY, GA Project: 2103 -11 AUGUSTA FBO TERMINAL Architect: Campbell & Paris Engineers The Contract Documents for the above referenced project are hereby changed as set forth below. To avoid any schedule delays in the work that could impact the cost and schedule, the Contractor is directed to proceed with this work immediately upon Owner's authorization in the space provided below. I Item : 1 Yard Drain at SW Corner of Bldg Phase Description 2100- 20- SITE PREPARATION Precision Siteworks: Labor - $450 Material - $950 Subtotal - $1,350 CHOATE — CONSTRUCTION — Change Order Proposal Cost Type Qaant UM Unit Cost 4 SUB 0.00 LS 0.00 Furnish and install (1) yard inlet and make tie in to drainage system apprax 20 fl away This includes all materials, labor, and equipment to complete the work. Builder's Risk Insurance Business License Fee Field OH & Supervision General Liability Insurance Overhead P &P Bond Plans/Postage/Courier Safety Subguard Requested Total For Item 1 Total For Change Order Proposal Approved By: (Architect) Submitted By: Approved By: (Owner) Campbell & Paris Engineers CHOATE CONS PANY AUGUSTA - RICHMOND COUNTY, GA Signed: Signed: / l ('`t / . Signed: Date: Date: S/ r / i Z Date: Change Order Proposal # : Owner 057 Date: 5/8/2012 Subcontractors Total Subtotal 5.41% Amount $1,350.00 1,350.00 $1,350.00 $2.70 $0.00 $74.72 $0.00 $8.10 $0.00 $13.53 $6.83 $0.00 $18.93 $1,474.81 $1,474.81 Page 1 of 1 5/8/2012 1:33:32 PM