Loading...
HomeMy WebLinkAboutCHANGE ORDER #2 THE POTTS CO (RICHMOND COUNTY NEW SHERIFF'S OFFICE BUILDINGRichmond County Sheriffs Office New Sheriffs Office Building Change Order to Contract Change Order # 2 Project No.: 10 -121 Date of Change Order: March 26, 2012 Contractor. The Potts Company Reference: 981 East Freeway Drive COP # 9 Conyers, Georgia 30094 Project Description; Construction of a New approx. 39.975 s.f. Sheirfrs Office Building Description of Change Provide and install the Tele /Data, Security Access Control, MATV and CCTV Systems to the Scope of Work: Project Duration: Number of Days added to the Substantial Completion Date as a result of this Change to the Scope of Work: Days Contract Amount Original Previous Previous Amount Current Contract Amount $ 7,845,847.00 Change Orders $ 2,655.74 Contract Amount $ 7,848,50234 of this Change Order $ 705,125.16 Contract Amount $ 8,553,627.30 All a s . nd conditions of the Contract Agreement between the Owner : the • ontractor .:: y to this Change Order. Signatures: .reed . by Co .r. 'avid . Buser D President Recommended for Acceptance by the Architect skIii Clark K. Recommended tte n Lee Date Scott Gordon, AIA, NCARB, LEED®AP for Acceptance by Program Manager: -- z is i 0 5) ,-L FI Forrest Program Accepted ery International, Inc. Date W. White CCM, LEED ®AP BD +C Manager The 9wner. /7.--d 7, . , u Deke Copenhaver Date /J �j Mayor 5716 /2 Irk Page 1 of 1 Architect: Virgo Gambill Architects Change Order Request #9 Low Voltage Cabling & Security Infrastructure To: Forrest White From Steve Virgo Date: March 21, 2012 Project Name: Richmond County Sheriff's Administration Office Project #: RE Change Order Proposal #9 CC: File: Attached please find the change order proposal from the Contractor requesting additional compensation for installing low voltage wiring and providing security infrastructure as part of construction package. Description of Change: To have POTTS Construction Company be a single source provider for all low voltage cabling, installation and testing, including the security systems. Why is this change necessary? This work would normally fall outside of the scope of the construction service of the C.M. at Risk and go to a third party. By including it as part of the original construction package, it will be coordinated and installed under the supervision of Potts Construction Company. Who requested this change? The change was originated and requested by the owner. Is there an alternative to doing this work and what impact does it have? Send to bid and have outside companies do the work after the fact. This would cause delays in full owner use of space when building is turned over What will happen if this change is not made? Possible delays in delivery and quality control may suffer. Impact of Project Schedule: None Reason for Change: ❑ Unforeseen Conditions El Owner Request ❑ Life Safety ❑ Errors and /or Omissions ❑ Code Requirement ❑ Other(specify) Memorandum Request for Change Order Signature: Date: 6 i • 2012 -- Comments: We hereby certify that we have reviewed the Contractor's proposal and we have determined that the cost that we have recommended is fair and reasonable compensation for the scope of work described. Jay, Dean Electric Company, Inc. December 20, 2011 (Revised 2/23/2012) Jay McClellan The Potts Company 981 East Freeway Drive Conyers, Georgia 30094 RE: Augusta Sheriffs Office - Change Request No.5 Tele / Data System Proposal We appreciate the opportunity to provide you with pricing for the project referenced above. Our proposal based on drawings E000, and E402 dated 07/29/2011 and Revision #2 drawing E401 dated 12/07/2011 as prepared by Clark Patterson Lee Design Professionals, as well as specification section 27 "Communications" dated 8/17/2011. Add alternates listed at the end of this proposal include all add requests from our previous two (2) on site meetings with the Architect, Engineer, Owner's Representatives and Program Manager. Please see below for pricing and scope clarification: Base Price $129,041.00 Specific Inclusions; • Sales tax Bond at 1% Permits and fees. Mid Grade Cat6 plenum cable for all V & D; TV and WAP locations. Proposal provides for (1) data cable and (1) voice cable at each symbol UON. Proposal provides for (1) data cable for every WAP location UON. Proposal provides for (1) RG6 quad shield cable for every TV location UON (3) Locations with (4) drops each per Note 8 on E402. • Ladder Rack in closet per drawings • Patch Panels, Jacks and Plates for termination of Cat6 cable. POE Mid -Span in MDF. Fire caulking as required.. Twelve Strand Fiber, 25 Pair Copper, fiber housings, coupler panels, connectors and labor to connect MDF and IDF. (4) lockable 7' equipment cabinets; (2) per floor. Horizontal Wire Management $5,000.00 allowance per floor for future data drops per note G on page E401 and H on E402. • Plates, Wire and F inserts for all TV locations. • Grounding. • 25 year performance warranty on mid /high grade Cat6 cabling solution. • Plenum Tie Wraps and Velcro as needed. • Closet and Station side generic Cat6 patch cords. Testing and labeling. 7000 Creekwood Rd. • Fairburn, GA 3021.3 • Phone (404 Dean Electric Company, Inc. December 21, 2011(Revised 2 /15/2012) Mr. Jay McClellan The Potts Company 981 East Freeway Drive Conyers, GA. 30094 RE: Augusta Sherrifts Office Building Security Access Control, MATV and CCTV Systems Jay We appreciate the opportunity to provide you with pricing for the scope of work referenced above. Our proposal is based on drawings and specification dated 8/23/2011. Please note the specifications do not clearly define all aspects or scope of this work, as it was originally noted to be provided by the owner. We have included specific part/model numbers and manufacturer on the significant equipment and materials associated with these systems. Please see below for our pricing and scope clarifications. Specific Inclusions: • Bond Premium (1 %) • Access Control System (see below) • Secure Network (see below) • MATV System (see below) • CCTV System (see below) • All Required Electrical Infrastructure (see below) Access Control System $74,048.00 Includes: Access Equipment • ° _C -Cure 9000 Series M Security and Event Management System • C -Cure 9000 Kit • C -Cure 9000 License (2) additional • (3) Duress Devices • (1) C -Cure Series AS0073 -000 (8) Input Reader Bus Module • (1) RM -DCM -CAN - Enclosure for (2) RM4 -E Reader Interface and (2)18/08 i -Star Relay • (3) Additional Card Readers ProxPro II • (1) AL 175UL Large Cabinet with Cam Lock (4) Automatic Security Gates Badging Equipment • C -Cure ID Bagging Software (1) CC800 -VA3 Camera USB Badging 7000 Creekwood Rd. • Falrburn. GA 30213 • Phone (404) 799 -1234 • Fax (404) 794 -5329 CCTV Includes: Project & Construction Management Training $278,220.00 Total cost of the Security /Access Control System (Turnkey Price) is $505,976.00. Page 3 • Server (Not in Specifications) • Viewing Station • • (16) Interior IP Cameras - Illustra 400 Fixed Dome • (13) Exterior IP Cameras - Illustra 600 HD720P Mdome o (8) Wall Mount with Pendant Cap o (5) Discover Pole Mount Adapter • (1) Indoor PTZ IP Camera — Video Edge Speeddome • (1)VE NVR 16 Camera 3 TB Storage • (2) Victor Ste Mgr /Client Base 5 SW • (14) VE NVR Camera Lic. 1 additional • (1) 8 port KVM Console • (1) Lot 10' Cable Tripp Lite KVM • (1) NB Laptop USB to PS2- Adapter • (1) Rack and Cable management materials with 16 PTC Power supply • (6) Interview Rooms and (3) Holding Roos Utilizing "Case Cracker Interview System" ($126,604.00 included in pricing above) • Design Labor • Cad Labor • Installation • Programming & Testing • Project & Construction Management Training Electrical Infrastructure $9,573.00 Includes: • Conduit and box rough in for all additional data drops required for security, cctv, matv and secure network (14). • (2) Additional quad receptacles in locations where head -end equipment is to be installed; location to be determined. (3) Additional Card reader locations Box and conduit stub • (3) additional exterior camera locations Box and conduit stub • (1) 208V circuit for Network UPS • Sleeves as required • (3) 3 ", sleeves from 1st floor to 2nd floor control rooms Alternate: Upgrade to High Grade Cat6 (Add) $13,626.00 Add (20) network drops for security system access (Add) $ 4,181.00 Electrical Rough for added Network Drops (Add) $ 3,793.00 Add (2) additional drops at 262 drop locations, total cable add (524) (Add) -4-97-,36.7700--- • Includes all cabling, jacks, patch panels, plates, termination, testing etc. • AS- Built Drawings. • Wiring for elevator car telephone line: • Submittals as specified. We suggest the use of an electronic submittal process to expedite review and turnaround times Specific Exclusions: • Electrical Design Fees. • Davis -Bacon Wages. • Fiber patch cords, as we will need to know what length and what type. • Security camera wiring by others • Plywood backboards (already in the base electrical bid). • Cable tray (already included in Electrical Base Bid). • Head End equipment for the CATV system. • OSP fiber going to another building • Coax Backbone • Battery Backups/ UPS Total Cost of Tele /Data System (Turnkey Price) is $248,008.00 Please call me or e-mail me if you have any questions, or if you require any additional information. Thank you for your consideration. Cordially, Andy Garner Vice president agarnerOdeanelectricco. com 150,641.00 Page 2