HomeMy WebLinkAboutAGREEMENT BETWEEN CITY OF AUGUSTA ANND S.D. CLIFTON CONSTRUCTION INC FOR THE MARSHAL'S OFFICE 30509 DEANS BRIDGE ROAD AIA Document A101 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a ST/PULATED SUM 1987 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO lTS COMPLETION OR MODIFICATION. The 1987 Edition of A/A Document A201, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. AGREEMENT made as of the , 15th ' day of ' March ' in the year of Two Thousand Twelve ' BETWEEN the Owner: GITY QF,�UGUSTA (Name and address) 530 GREENE STREET ' AUGUSTA, GA 309(�� and the Contractor. S.t?. Clifton Consfructian, Inc. ' (Name and address) 4324 Wheeler Road Martinez, GA 30907 The Project is: Design Builcl Cflnstructior� Service for A (Name and location) su�port strucfure far The M�rst#al's Office 305Q Deans Bridge Ra�d Augusta, G,A The Architect is: definitiue [7�sign Grc�up ; (/Vame and address) 427fJ �elair Frantage Road �ugusta, GA 30909 The Owner and Contractor agree as set forth below. Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, O 1987 by the American Institute of Architects, 1735 New York Avenue, N.W., Washington, D.C. 20006. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution. AIA DOCUMENT A101 * OWNER-CONTRACTOR AGREEMENT * TWELFTH EDITION' AIA O* OO 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 1 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of the Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) Qate of commencement to b� within 10 days of reeeipt of Building Permit: Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractar shall notify the Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanids liens and other security interests. 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than ' 90 days (Insert the calendar date or number of calendar days after the date of commencement. Also insert any requirements for earlier Substantial Completion of certain portions of the work, if not stated elsewhere in the Contract Documents.) 90 days from no#ice �f commencement. , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for Ziquidated damages relating to failure to complete on time.) AIA DOCUMENT A101 * OWNER-CONTRACTOR AGREEMENT * TWELFTH EDITION ' AIA O" OO 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 2 _ _ ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Ninety Thousarrd and npf100 Qollars Dollars $9Q,U00.00 ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) 4.3 Unit prices, if any, are as follows: AIA DOCUMENT A101 * OWNER-CONTRACTOR AGREEMENT * TWELFTH EDITION * AIA O" �O 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 3 ARTICLE 5 PROGRESS PAYMENTS 51 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. 5.2 The period covered by each Application far Payment shall be one calendar month ending on the last day of the month, or as follows: �ne' Calendar month ending on the twenty-fifth of:#he monih. 5.3 Provided an Application for Payment is received by the Architect not later than the tw0nty-fifth (2�#h), day of a month, the Owner shall make payment to the Contractor not later than the Tenth (10th) day of the ' n2�ct ' month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than telt (10� ' days after the Architect receives the Application for Payment. 5.4 Each Application far Payment shall be based upon the Schedule of Values submitted by the Contractor in accordance with the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This Schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 5.6.1 Take that portion of the Contract Sum properly allocable to completed work as deternuned by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the Schedule of Values, less retainage of < Ten percent ( '[� %). Pending final deternunation of cost to the Owner of changes in the Work, amounts not in dispute may be included as provided in Subparagraph 73.7 of the General Conditions even though the Contract Sum has not yet been adjusted by Change Order; 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of tBn ', percent ( ' 1 � ', %); 5.6.3 Subtract the aggregate of previous payments made by the Owner; and 5.6.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Para- graph 9.5 of the General Conditions. 5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following circumstances: 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to E7ne Hundr2d percent ( 1 Qa <%) of the Contract Sum, less such amounts as the Architect shall deternune for incomplete Work and unsettled claims; and 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions. 5.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Campletion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subparagraphs 5.6.1 and 5.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) Retainage will be reduced ta 5% when #he work cn�mplsted anci stored reaches 5Q°1a of the contraet �mount. AIA DOCUMENT A101 * OWNER-CONTRACTOR AGREEMENT * TWELFTH EDITION * AIA O* O 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 4 ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconfornung Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment; and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by Owner not more than 30 days after the issuance of the Architect's final Certificate far Payment, or as follows: ARTICLE 7 ` MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of'business, the location of the Project and elsewhere may af�ect the validity of'this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding require- ments such as written disclosures or waivers.) 7.3 Other provisions: 7.3.f Owner may terrninate tfiis contr�ct i� gai't or iin whale upvn writte�i na4iee �� the Conlractor; 'IY�e Contractor shall be'paid far'any validates services under the Conttact up to the time of terminafion. 7.3.2 'Fhe terms of this agreement supersede any and ali pro�isions of the Georgia Prvmpt Pay Aet. 7.3.3 The CQntractor' warrants that no person or seliing ag�nay has been' emptay�ci ar retain�d to svlicit or'seeur� this Agreernent upon an ' agreement or����understanding for a commission, p�reentage, brc���rage, or��9n�ingent fee, except�ng bona fide emptaye�� or 1�on� fide, estahlished cpmmerciai or selling agenci�s maintained by Cc�ntractt�r for the purpos� of securing business and that the Cc�ntcactor. has not xec�iued any non-Owner fee re�ated to ��-this Agreemenz vuitt�out #he �'iQr �vritten.c�nseat o�` the t7wner. For �r�ach br violaYioxi of fhis warranty '�� the Qwn�r shall have the right to annul this Agreement withouk Iiability Qr at its di�crerion to deduct fr€�m tlie Agreernent Frice of consideration' the full amount of such cornmission, perc�ntage, br�kerage vr contingeni fee. 7.3.4 Contraetar aclenowledges that this cantract and any chang�s tQ it by amendment, madi�eation„ change order or ather similar document' may haue required ar may require the legisiative autharizatian af th� Board of �omrnissioners and approv�l.�rf the Nlayor. Und�r �eorgia law '' Contractor is'�de�medt4 possess laiawl�dge co��erning?Augusta; Geargia's ability tQ assuirie contractual abligations and #he eonsequences o;f Contractor's provision of goods or seruices to Augusta,;Georgia under an unauthorized canh amendment, rnodificatian, change order or '' other similar document, including the pvssibility that the.Contractor may be preclude�:frcrm recovering paymenk far such unauthorized goods ' ar services. Accordingly, Contractar agrees that if it provides goflds or seruices to August�, �eorgia under a cQntract that l�as not received proper legislative au�horization or if the Cvntractor prQVides �oods ar s�ivices to,Aiagusta, Gec�rgia in ex��ss of the any �antraetually autharized �aods ar seruices, as required by t�ugusta, Georgia's Charter and Gode, Augusta, C�ecargia may withh�ld' paym�nt for any unauthorized'�� gaods o� services pravided by Contractar'� Cv�tra�tor �ssutnes ail risk of no�-pa�nent #'Qr the grovisiau vf`�nj� unauthorized �'� goods �r services to A�agusta, Georgia; and i� waives alt claims to payment or ta other remedies:for the �ravisiAn o�any una�thorized goods or '�� servic�s ta Augusta, Georgia, however; characterized, in�luding a11 r�rnedies at law �r �quity. ' ?.3.5 In event of any'conflict b�t�een'A1A Dc�cument AI01, AlA DocumentA241, an�'the "Co�Cract D,�cuments" as defined in the Agreement (Section A) eontained in RFP 11-131, the "Contracf Documents" wilt prevail.' ARTICLE 8 TERMINATION OR SUSPENSION 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. AIA DOCUMENT A101 * OWNER-CONTRACT R AGREEMENT * TWELFTH EDITION' AIA 0* OO 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 5 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 91 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 91.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated > and are as follows: Document Title Pages 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages AIA DOCUMENT A101 * OWNER-CONTRACTOR AGREEMENT * TWELFTH EDITION' AIA �' �O 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 6 9.1.5 The Drawings are as follows, and are dated ' unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date A-0:1 �aver Sheefi ' dec�rrib�r:5,; 2411 ; 5-1.1 F�undatir��r Plan ' Decer�rber 5,', 2�1�11 ' A-1 !.1 Flocar Rlan & Etevati�ns ' Q�cember �,' 24� 1' A�1'.2 Walls Sections'' ' De�ember 5, 2011 A-1',3 Schedufes ' Qecerriber 5; 2011 PM'-1 Plumbing & H�I;4C Plan November 2, 2p11 PM'=2 Nate� &'Qe#ails November 2,:20�'I ' E1.1 Electrical Pl�ns ��� Nov�be� �:����; 20'!'1 '�� E'I .2 Electrical Det"ails ' Nov�mber.2,; 2011 , 9.1.6 The Addenda, if any, are as follows: Number Date Pages Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. AIA DOCUMENT A101 * WNER-C NTRACTOR AGREEMENT * TWELFTH EDITION * AIA O" OO 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 7 9.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List here any additional documents which are intended to f'orm part of'the Contract Documents. The General Conditions provide that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of'the Contract Documents unless enumerated in this Agreement. They should be Zisted here only if'intended to be part of'the Contract Documents.) Design/Buii�l seruicss far'A Suppart Str,�acture for �h� �ity of �4ugus�a =.M�r,shal`s €�fFic�. ' Dated 1/9/12, 5 pages, E�I'tibit "A�" All "Contracf Do�uments" as that terrn is defined in the Rgreement (�ection A) eontairted in R�P 'I'I-'131, in�luding, but not fimi#ed to, F2equ€�st for Pre�posal 11-131, General Gonditions, Supplernenfal Gener�l Gpnditions, and >Contractor's Praposal This Agreement is entered into as of the day and year first written above and is executed in at least three original copies of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner. OWNER CONTRACTOR ��f� ! .�.. �-.-�- � �`, . ��_ t� ��" �2 �;, (Signature) (Signature) 1 � � ��� ��"�' � N L ��*,t�j��� �/(���� a�� , Steve D. Clifton - President ,(Printed �r�e a title �. � � � (Printed name and title) ' • ('1 � � ��� � s t ,i AI D, U�;IIA A1 - CTOft GREEMENT * TWELFTH EDITION * AIA O* O 1987 THE AM�RdC�N WS, � CTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 ' •° "� A101-1987 8 ' �-, �;. � � � a .��� �� � �;�a�.:-L:�' � ' �� �C�(ti15T�U'�TI€�[�, IRIC. �t���r°��r�i�[ January 9, 2012 Mr. Jeff Barrett Richmond County Marshal's Office Administration 530 Greene St. Rm 701 Augusta, GA 30901 Via Email: JBarrett@augustaga.gov Re: Design / Build Services for a Support Structure for The City of Augusta — Marshal's Office Dear Jeff: We are pleased to provide this final proposal for the design and construction of the Marshal's Office Support Building based on the RFP Item #11-131 Design / Build Services for a Support Structure for The City of Augusta — Marshal's Office, the following scope of work and the attached drawings (A1.0, A1.1, A1.2, A1.3, 51.0, PM-1, PM-2, E-l.l and E-1.2, dated 11/2/11) prepared by Definitive Designs Group Inc. I. SCOPE OF WORK: DESIGN FEES — We will employ Definitive Designs Group to provide the architectural and structural design, S& G Engineering for the plumbing and HVAC design and Alektrocon Engineering for the electrical design. Since the building is less that 5000 SF in area, the building code does not require them to be stamped by the architect and engineers. GENERAL CONDITIONS - Full time supervision, progressive clean up, final clean up, insurance, performance and payment bond and building permit fees. We anticipate being allowed to use water and electricity from the Marshal's office during construction. SITE WORK — The site work for this building was performed when the Marshal's Office was constructed. The only site work that will be required is stripping new grass off of the building pad. TERMITE TREATMENT - Provide soil poison below slab of building addition. P.O. Box 949 — Evans, GA 30809 — 706-731-0978 — Fax: 706-733-4030- E-mail: sdclifton@knology.net Page 2 CONCRETE FOUNDATION — The concrete foundation for the building will be a continuous spread footing 2'-0" wide and 1'-0" thick reinforced with two number 5 reinforcing bars. CONCRETE SLAB - Slab is to be 4" thick 3000-PSI concrete over at least 2" of sand fill and 6-mil vapor barrier. The slab will be reinforced with fiber mesh reinforcing. Slab is to be cured with curing compound. The concrete slab at the covered pad will be 4" thick 3000-PSI concrete over 2" sand fill with a 12" deep turned down slab edge. MASONRY — The exterior walls will be reinforced, load bearing, 8" concrete block walls. The concrete block walls will be reinforced with horizontal joint reinforcing at 16" on center horizontally and one #5 rebar at 32" on center vertically. The building will be designed so that we can utilize the existing 8" split face, smooth, colored, concrete block stockpiled on site. WOOD FRAMING — The roof structure will be framed using pre-engineered wood trusses with a 4:12 roof pitch with gables at each end of the building. The roof sheathing will be 5/8" thick OSB sheathing. The interior walls will be framed using 2 x 4 wood studs at 16" on center. Wood furring strips will be installed on the concrete block walls in the Restroom to receive the drywall. INSULATION — R-19 fiberglass insulation will be installed above the drywall ceiling in the Office, Restroom and Laundry Room. R-11 fiberglass batt insulation will be installed in the walls around the Office, Restroom and Laundry. ROOFING- Architectural asphalt shingles will be installed over 15# asphalt felt over the roof sheathing. VINYL 50FFIT, FASCIA AND SIDING- We have included furnishing and installing vinyl soffit and fascia at the cornice around the building and vinyl ceiling at the covered pad area. DOORS — The exterior door will be a hollow metal door in a welded hollow metal door frame. The three interior doors will be solid core pre-hung wood doors in wooden frames with wood door casing. HARDWARE - Hardware is to be medium grade commercial hardware. This hardware is to be the lever type hardware to meet the current ADA requirements. P.O. Box 949 — Evans, GA 30809 — 706-731-0978 — Fax: 706-733-4030- E-mail: sdclifton@knology.net Page 3 INTERIOR FINISHES — Then interior finishes will be as follows: • Garage and Storage Area: Floor — Exposed concrete Walls — Exposed CMiJ and Painted drywall Ceiling — Exposed Wood trusses • Office, Restroom and Laundry: Floor — VCT tile with vinyl bas Walls — Painted drywall and Painted CMU Ceiling — Painted drywall PAINTING - Walls to be painted will receive one coat of primer and two coats flat latex wall paint. All doors and frames to receive three coats semi gloss enamel. The exterior concrete block will receive a coat of clear water repellant. TOILET ACCESSORIES & SPECIALTIES — Includes, mirror (1 ea.), handicap grab bars (2 ea.), and toilet paper holder (1 ea). We have included one 10# fire extinguishers. PLUMBING - Plumbing system complete: -One tank type handicapped toilet -One wall mounted lavatory with faucet -One 30 gallon electric water heater -One laundry sink -One washing machine connection box -One Frost Proof Exterior Hose Bibb -Water and Sewer piping stubbed out 5' from building HEATING AND AIR CONDITIONING — We are providing HVAC equipment for the building as flows: • Heating and air conditioning for the office to be provided by a 9000 BTU Ductless Mini Split System. • Heat for the Laundry Room will be provided by an electric wall heater. • One restroom exhaust fan with wall cap ELECTRICAL — Complete electrical system to include: • Single phase electrical service • Fluorescent strip lighting • Includes power to HVAC and water heater. \ • Includes exit lights as required by code • Receptacles per code P.O. Box 949 — Evans, GA 30809 — 706-731-0978 — Fax: 706-733-4030- E-mail: sdclifton@knology.net Page 4 ITEMS NOT INCLUDED: Building Signage Soil Borings and Report Fire Alarm or Security System Telephone or Computer networking system Shelving Site Work Site Lighting Handicap shower Unit. Heating or Cooling in the Garage We propose to design and construct the Support Structure for the Marshal's office as described above for the sum of NINETY THOUSAND AND NO/100 DOLLARS ($90,000.00) PROPOSAL BREAKDOWN: • Design Fee $3,950.00 • General Conditions $13,425.00 • Concrete Foundation and Slab $8,781.00 • Masonry $6,523.00 • Wood Framing $7,923.00 • Vinyl Siding & Vinyl Cornice $3,128.00 • Roofing $3,998.00 • Insulation & Sealants $613.00 • Doors, Frames and Hardware $1,372.00 • Overhead Door $1,130.00 • Drywall $1,972.00 • Painting $2,000.00 • Flooring $1,044.00 • Specialties $608.00 • Plumbing $5,403.00 • Water and Sewer Tie Ins $600.00 • HVAC $3,200.00 • Electrical $6,880.00 • Sales Tax, Insurance, Bond & Permit $3,450.00 • Overhead and Profit $14,000.00 TOTAL $90,000.00 P.O. Box 949 — Evans, GA 30809 — 706-731-0978 — Fax: 706-733-4030- E-mail: sdclifton@knology.net Page 5 ALTERNATE PRICES: 1) Add a handicap fiberglass shower unit complete with shower seat, handicap grab bars, hand held shower head. ADD $3,800.00 2) Add a 10 KW electric unit heater for the Garage Area. ADD $1,200.00 3) Add a 2 KW electric wall heater for the Restroom ADD $750.00 4) Delete the requirement for a Performance & Payment Bond. DEDUCT $1,089.00 5) If the City provides the Builders Risk Insurance. DEDUCT $500.00 6) If the City waives the Building Permit Fee. DEDUCT $500.00 Thank you for the opportunity to present this proposal. We look forward to moving on the next step. Sincerely, Max Knight Proj ect Manager S.D. Clifton Construction, Inc. P.O. Box 949 — Evans, GA 30809 — 706-731-0978 — Fax: 706-733-4030- E-mail: sdclifton@knology.net