HomeMy WebLinkAboutCONTRACT MODIFICATION #4 CHOATE CONSTRUCTION PROJECT NEW FBO TERMINAL Contract Modification #4 Airport: Augusta Regional Airport Date Initiated: 20 Oct 2011 Owner: City of Augusta Project: New FBO Terminal Contractor: Choate Construction Company Project Number: 0733-17 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Item Choate # Contract Mod # Description Unit Quantity Line Item Price 1 5 Added Temporary Fence and Gate LS 1 $1,215.93 2 7 Delete Counter in the Temporary FBO LS 1 $850.00 3 8 Permit Cost for Temporary FBO LS 1 $594.71 4 9 Owner Possession of Salvage Items LS 1 $3,750.20 5 10 Utility Backfill Revision LS 1 $5,615.19 6 12 Temporary Parking Lot Lighting LS 1 $1,097.50 $11,423.53 Total Contract Amount Original Contract Total $5,045,461.00 Previous Contract Modification Total $54,811.02 This Contract Modification Total CM #4) $11,423.53 Revised Contract Total $5,111,695.55 Total Contract Time Original Contract Time 250 calendar da s Changes to Contract Time from Previous Contract Modifications 0 calendar days Changes to Contract Time from This Contract Modification 0 calendar days Revised Contract Time Total 250 calendar days This document shall become an amendment to the contract and all provisions of the contract will apply. Justification for Change Brief description of the proposed contract changes and locations: 1. This item requests that one (1) 6' gate, as well as an additional 32' of security fencing, be added to the security fence adjacent to the existing FBO in order to allow FBO patrons access to the apron area. Refer to Choate Change Order Proposal #5. 2. The original plan was for the trailer manufacturer to construct a counter in the temporary facility for FBO service staff. It was determined the airport had pre- built counters that were in storage that could be used in lieu of the manufacturer constructed counter. Therefore, the counter was deleted from the cost of the trailers. Refer to Choate Change Order Proposal #7. 3. Originally, the temporary trailers were to be installed prior to the execution of the contract with Choate Construction and be the responsibility of the airport to install and maintain. It was determined while Choate's contract was in the execution process it would be beneficial for Choate Construction to be responsible for the acquisition and installation of the trailers. Refer to Choate Change Order Proposal #8. 4. While the two (2) buildings were being demolished, it was determined the Airport wished to retain possession of the HVAC systems and a water cooler/fountain. The demolition contractor had claimed salvage rights to these items and was part of his bid price. This item is the cost associated with owner keeping these pieces of equipment. Refer to Choate Change Order Proposal #9. 5. During the value engineering process prior to contract execution, the contractor proposed a change in the type of backfill used over the new/proposed utilities (i.e. storm, water pipe, etc.) located under pavement areas within the AOA. The proposed change was to allow the contractor to use a sand/clay material as a backfill material in lieu of the full depth stone aggregate backfill as shown in the contract documents. As a result to this change, a credit of $20,305 was given for using the sand/clay material as backfill for the utilities within the AOA. However, the actual intent was to allow this sand/clay backfill mixture be used over the storm and water utilities outside the AOA, not within the AOA. It was felt the full depth aggregate backfill was needed over the utilities within the AOA. By using the sand/clay backfill material over the utilities outside the AOA, a credit of $15,164 will be granted. Therefore, a net increase to the contract amount is $5,140 ($20,305 -$15,164). Refer to the attached Choate Change Order Proposal #10. 6. The original construction of the parking lot was to be phased into 2 phases, which allowed use of a portion of the parking lot while the other was under construction. However, as a result to time concerns, it was agreed to allow the contractor to construct all parking lot pavements in a single phase. Due to the delay in occupying the temporary FBO trailers, the existing FBO remained in service. Therefore a portion of the existing parking lot would be required to remain open for access to the existing FBO. During construction within the parking lot the parking lot lighting was disconnected. As a safety requirement, the contractor was requested to supply two (2) light plants in order for those using the parking lot during night hours. This reflects the use of the light plants from August 9 to August 23. Refer to Change Order Proposal #12. C&PE Project#: 0733-18 Contract Motli�ication # 4 Recommended �, y� -------- ---�- °�-�'�--� ------------ Feb 15, 2012 Campbef Paris Engine aate Accepted by: ' _-------�--`-`� --�------------------- Z � � � 1 Z Choate �onstruction Company �pat � Appraved by: - --- � - ----------------- ---� -�� �I � Aug�sta Regi nal Airport Date � �.� ` Approvetl by; �`�� ------------------------- -------------- � 3 -/---- � c''_- ��� City af Augusta pa�� ����� Submit 4 original copies to the City of Augusta. � ATTEST: ��' Clr��k_of ommission r�° .', . r` °� � '� C�erk (Seal) � �� r ; � � �_,� � � a "; ,;v k ' r �, ,., ; � �� �07 t�� �., �� .� � 4 . ���� , ...��-'G'+�` i i�l Chaate Construction Co�npa��y �' . I01 West Mulberry Bou[evard, Suit�206 Pooler, GA 31322 � Fhone: 912-790-U011 �h�n�e �rcler �r�pos�� Owaer : AUGUST.�-RiCAi✓IOND GOL1N"TY, GA Change t)rder Proposal #• Owncr t�5 Project: 21G3-� I �UGUSTA F'B(? TER��iINAL Date: 8/1512011 Acchitecf, ���i� bc11 & P:�ris Eagineers "Che Contraci Dqcuments for the above referenced prnjeci are hereby changed as sei forth belt�w. Tp avaid aay schedule detays in t[�e wurk tl�at cou(d impact the cost and sche�ule, the Contracior is directed to proceed �viEh tliis work immediately upon Owner's authorization in the space provided below. De'scrip#�o� o#" Wor�C� Add+ed T�mp �en�e and Gafe 7"his �EE#P is fsse�ed iar u�sts r�lat�d to the ��t�nsio� of T�t2pt�r�r� ��� f�ncing a��i acic�i�ic�a�] ��C�.at �(?i1, C�n�i�as diseu5s�� i�t �neeEing ��t site'7��2t°i1� . ; � ra � ^ � Thi� ��orkwas c�r�ig�eked � clirecCed ti�acing th��initial in"stallntic�n "of'2am�arar}�A43A ��ncing: ; ��" ° � � _ Item : 1 Added Temn Fence and Gate Phase Description Cost Type Quant UM Ilnit Cost Amount 2830- - FENCING 4 gUg O.OU LS 0.00 $1,1I�,60 ivarlin-Rab6ins Fence Co 1. Furnish and tnstatl (1) E.4 persannel gale- 6' �i' -$341.(10 2. Add 32' of Temporary r20r� fencing to accommodate dimensions needed for asphalt tie-in arzd close gap created by relocation af 7empormy �`BO trailer. -$777.60 SuLtdtat - �1,118. b0 Subcontractors Total 1,118.60 Subtotal $1,11$.60 Field OH & Suuervision �O.Ofl �verhead $U.00 Safety $0.00 Plans/Posta�e/Courier $0.04 Buildec's Risk Insurance $2.24 Generat Liability Insvrance �G.61 Fee 5.41% $61,d0 P&P Sand $11•88 Business License ��.Q� Sub�uard $15.60 Requested Totai For Item 1 $1,215.93 Total For Change Order Progc�sal �1,215.)3 ���� ���� �� , � ���k� �Q��w;� ,� �,o ed �..� e ,� e , 0 Ap�roved By: (Architect} Submitted By: ��v�l'I�y: (Owrte��•,��� �� ` s: r� ; , ; � �� ? Campbell & Paris Engineers CHOATE CON�RUC O� NiYANY � C�i��. GA .r ,E-Y' � � � �,� , � g ; � r P � � 1P I u � . ' . Signed: Signed: C .��` �'" ��n�d: � - '� Bate: Datc: �" i-� t/ / _ h � �'�` � ��€,�Z-- �� �� � � �'�� � � ;�, . . . `. . � � j � �� „ r ::.. �:;. . . Pa�e I of l � ��.���� ,,; 8tt5l2011 10:?4:45 AM Choate Gonstrucpion Comgany . ]dl West Mt�lberry Boulev�rd, Suite 20(1 Pooler, GA 31322 ° ' Phon�: 912-790-ODIt �hange l'�r�i�r Propa���i Owner : A[iG�1STA-RICHMOND CDUIVTY, GA Change �rder Propas�i ## • Owncr #7 Project: 2I03-11 AIiGLISTA FB{3TERNiINAL �fite• 8115/ZQ1] Architect: Campbell & Paris Enginccrs Tiie Contract Documents for the a6ove referenced project aze hereby chunged as se! Farth below. To avoid any schedule delays in the wark that cauld impact the cost and schedule, the Contractor is directed to prnceed with�this tvork immediateEq upan Owner's authorization in the space provided beiow. ��,scriptinn��;r�f Work, � Deyete �ounterin Tem�t �+'�Q „ - ; �I`his �CSP i� issued in respans� to eon'uexsatia�s cvitfi t�s��r Rep�s���ntatikes �vhn it�dicafed���� that i�se Safes C:b�e�fer is noi�n�d�d�e�n t� �"emp � �'�O. °I'Y#is �ptican Y��s included in Vanguard"s propca�il �nd scope = + � �;���� , � ' '�'hi� �tJP �.��iici thcq!�gh,�1T��� 1, - �� � y � � �± � • There is no impact to praf�ct �ch�t�Ute z�Iat�.`d t4 this chang�. _ _,. _.� _ Item : 1 D�iete Counter in Temp FBO Phase Desrription CosL Typc Quant lJM ilnit Cost Amount 137�- i- SET UP FIELD OFFICE 4 SUB 0.00 LS 0.00 �;-850A0 Delete (1) Grf Sales Courrtei� crnd shelves aptio�a fr^om TenTp F&O Modular Traifer 6y ijangaeQrd. DEDUCT -(�850} Subcontractors Total -$SO.QO . Subtotal $ Field OH & Svpervision $p.4p Overhead $p,dp Safeh' �4.fl0 . Ptans/Posta¢e/Courier $p,pp Builder's Risk Insarance $p,pp General Liahilitv lnsurance $4.fl0 Fee o.00% $0.40 P&P Bond $0.00 ' Business Lieense gp,Qp Sub�uard $0.00 Requested Tatal For Item 1 $-85�.40 Total For Change (Drder P'ragosa] $-850.00 ' `� �� ��:��n , ,,, Q � �� � � �.� C� � � Approved By: (Arcbitect) Submiited $y: rl�irQa� � er�� �� �� Camp6ell �i Paris En�ineers CFIQATE CON RUC �_OMPANY �F�IG�� ,�' ND�'�C'�t�ITY,�GA s., � � i � � t ��� . : .�t • � i Signed: Signed: � '-✓� l � rgne�. -� - � � � Date: Uate: �' ! S� �J ����ate "'� �� �� �_ �> . `K � 1 k � _._...__ �io, � , 4 n � a^a.=,:: � .,t�.�, �".: -. , ` ._""°" I'age 1 of l 8/15/2011 ] 1:18:56 AM Choate Construction Company . 101 West i�iulberry Boulevard, Suite 2�0 0 . Pofl1�;r. GA 3132? Phane: 9I2-790-0011 — � �hang� �r�e� �roposa� Owncr : �1UGUSTA-RICIIi�tOND COUNTY, GA Change Order Proposal #: Owncr �8 Project: 21�3-I1 AIIGUSTA FB43 TEKh�11�JAL Date: $�31/2D11 ArchiteCt: C':�m�bcll & Paris Enginccrs Tite Coatract Dacuments for tlte above referenced project arc hereby changed as set forth below. To avoid any schedule dclays in tlie �vork that could imp3ci the cost and schedule, the Contractor is directed to pr�ceed with tlus cvork immediatety upon Ou�ner's autfiorization in ttie sPace provide�i below. Desc�rigtian of Warka per�nii Gost for Temp FBQ '' `� ` This GOP i� in resppnse to the Oyvner�s�requestthat we submit artd pay for the Building 1'ezmit'as requiiecl for Temporary FB,p Trailexs uti CSA� ��� mtg on 812�11. e `'i� �� � � �` � � . � '� ,�'�, .���G�.� � . _ 3tem : 1 Permit Cost for Temn FBO Pl�ase Description Cost 7'ype Quam UhI Unit Cost Amou��f 1450- - BUILDING PERMITS 3 Mt1TL Q.00 LS 0.00 $5�7.12 Btcifclirrg Permit Cvst for• Ten7poraay F130 Trailers. M1laterfal7'otal 547.12 Subtotal $547.1� Pield OH & Supervisioa $OAO Overhead $O.aO Safetv $O.OQ Plans/Posta�e/Courier $0.00 Buitder's Risk Insurance �1,09 Genera) Liabilitv Insuranee $3.23 Fee 5.=t1% $29.83 P&P Bond �5_8� Business License . $0,04 Sub¢uard $7.63 Requested Total For Item 1 $59�,71 Totai For Change Order Proposal �59�#.71 � ;� � �� ,, � �^ , �, �,@�� �� Apprnved By: (Architect) Submitted By: Apjiroved B�r• f�vn� �� ��� ., a��.� 4 � � '��Mi � � �I . CampbeU & Paris E�zgineers CHOATE CONS RUCT �OMP4NX;� � �IUC�i I fJ�T1� ��DN� ��NTY; GA t �,,,,;� o �, � �� c Signed• Signed• r' c�.l{ " 'gneti. �� F � Date: D�tte: � -�' � �� ��ati�: � l "� � � ,, .--,•—�.. � �- ��E�1, � � . �� e�:;.� ` . -�.. Page 1 of 1 � �` "` �, ��:� . ���� 8!3 U2011 3: f 7:17 PM Ricic �'arrish From: Clarence Fennell jGFennell@augustaga.gov] 5ent: Wednesday, August 24, 20'19 11:33 AM To: Rick Parrish; Jack Mayfield Cc: willis.roberson1 @comcastnet; Rick Graham Subject; RE: Temp FBO Rermit I concur. Clarente J. FennelE, P.E. Director of Engineering and Maintenanee , Augusta Regianaf Airport (706) 796-4010 {706) $36-8344 From: Rick Parrish mailCo:RParrishCc�choateco.coml _ Sent: Wednesday, August 24, 2011 1�.:28 AM To: Jack Mayfield Cc: Clarence �ennell; willis.robersonl@comcast.net; Rick Graham Subject: Temp FBO Permit Jack, UVe have submitted the application for permit for the Temp FBO trailers and are making provisions to gef a ch�ck to the Permit Dept #oday in the amount of $547.12. As we excluded Permitting and associated costs in aur previausly appraved Change Order, please acknowledge your approvai of this amaunt p(us associated add-onslfiee as a cost that will be reimbursed. I wi11 issue a COP as is typica! for this in the near future. ' T�anks. ' Rick Parrish, LEED AP BD+C Sr. Project Manager i � Choate Construction Company . iO1 West Mulberry Boulevard, Suste 2Q0 e e Pooler GA 31322 Phone: 912-790-041( �h�n�� C�rd�r ���p�sal Owner : ALIGUSTA-RICHMOND G�UIVTY, �A Change Order Proposal #: Owncr �9 Project: '-103-11 ALfGUSTA PBQ TERMiNAL Date: S13112011 Architect: �d�P bcll 3c Paris Enginccrs The Co��tract Documents far tlie above reFerenced praject are hereby changed as set forth 6elow. To �void any scl�edtde delays in tlre �vork t1iaF co�ld impact tE�e cost and schedule, the Contractor is direcied to ptoceed wiih ihis work immediately upaii Ow�ier's authorization in tl�c space provided belo���. l3escription afWork: Qwner Fasession�ofSalvage I#ems �� ° - This CQP is in respons� to C>wn�r's �equest for sel�ctiTems during:the �'re-Demolitian Cenfereaca held �114/I l_ - � � - �As�Demolition 5ubcontractor had cfaimed salvage righ#s tci demoli6on items, O�vner has`�leetedtt� pay tar �#ems listed be1o� ' � ,, '1� � . .. �. , ,c � �-3 � �s��, � � �here' �s na�affect tc� th� Ct�nt�ack schedule provided Ownei�takes possession o£iteinsprit�r to ��hed'uled demoIihan st�zrx: h _ _ „= Item : 1 O�vn�r Posession of Salvage Item Phase description Cosf'I'}�pe Quant Ub7 Ur�itCost Amount 206�- - BLDG. DEMOL3TION �. g�13 4.q0 LS 0.00 $3,450.Od !. HY't1C eqztipmertF (concferrsir�g:er�its and %tNU's if desired) -$3,3D0 2. YYater Coolel/Fozsntain - $IS{7 Subtota! - �3, d50. f10 �tiwne,• is ro remove eg:up�neju rrsing it's own farces prior to scl¢edettecl stnrr �f demoliliore. Subcantractors TotaI 3,4�U.Q0 Subtptal �3,45d.Q0 Fietd OH & Supervision $Q,pO (lverhead � ��.OQ Safetv . �O.OQ PEans/Posta�elCouricr �0.00 Builder's Risk I►ssurance �(.9p Ge�era[ Liabilitv Insarance $2Q.40 Fee 5.�i1°ta $I88.I2 ' P&P Bond $36.b5 Business Liceose $0.04 ' Sub�uard $48.13 Requested Total For Item 1 $3,750.20 ' Total For Change Order Proposa! $3,750Z0 ' �AAProved By: {Architect) � SubmitEed By: ApPr�tved �}�'(�v��r� � ��� � � �� � � � Campbel! & Paris Engineers CEtOATE CONSTRUCT� OMPANY AU�S,T�• 3�`I-� m D �} J1��'I', GA �� { �; Y f { � �� a:� � � � ,�, Signed: Ssg�ed: r � < �.' `fC- ```- �� '° ��g�jed; m � '� �f A� ���, � , �„ : � � � Date: Datc: . 3 1_ � � � � ���xte�. � � � -�i �— °� • K � � v: ,, v Page 1 of 1 �`�� ���> � � �- `"�_ � �- �� $�� t%2011 3:26;09� PM 3+ ��� �- � �; -� . � ..r� > ., . ,.f � �. :. .� �us�� e�i���.l A�r��r� Pre-Demalitian Conference FBfl Terminal August 10, 2011 The pre-demolition conference was held at the FB4 building with the � �wners, Choate Construction, and Campbeil-Paris Engineers to discuss the material of ownership. Below is the list of items the 4wner has requested to remove before demolitian is ta proceed. l. The treesJiandscaping in front o�the FB4 building in the island. 2. The trees/landscaping at the upper parking lot by the terminaL 3, Sprinl�ler controls, control baxes, and sprinkier heads in ali flower beds or parking lot islands, 4. Choate wiil reinove and turn over (3) EA Aluminum light poles that are 29'�-0" tall. All otY�ier light poles are property of Choate Canstruction. 5. Gate closure at Gate M. — We will forward this request to the sitework subcontractor to determine if #here is any issue with Owner removing. (F�I� �� � 7 — "I'����°� is ��� � �I'��ct tc��� (��pr���- �°�� c�f° C�a�e C''Ic�s�.��•�.�_ t�; HVAC Units. (4 total) — We wiil forward this request to the Bldg Demolition Subcontractor to determine i� salvage value is affected by Owner removing,{II2..� �!1 � — L��rnc�litic�t� �ul t°���c�i�•�� ���y����nt ��`$3,�t�(� fc��• t1?ese �I�'��` ��t���s.} 7, Water cc�oler/fountain. — Same note as #6. �,�.�' �/� 7— C�����1�tic�n `���E�cc�r��� �•eqcz��°�� ���%������� c�� ���1�} �'c�t� �h��.} 8. Antenna and dish. �-.�a Card readers, electronic devices in ceilings, fire alarm panel, cameras, Mag-locks on doors, power supply in ceilings and Simplex Box downstairs. -- Same nate as #6 (�P �/� 7 —1�� �:c�st i���s��;�� �c�r; �������t� � c�f� t����� �t��ns.� lO.The county box and equipment box on the wali in Rick's office. 1 I.All acoustical ceiling tiles. — Qwner to remove quantity desired. 1`?':All parking lot signs. — We will forward this request to the Sitework subcontractor to deterznine if cost increase is applicable f�r selective demalition requested for reuse of these signs,{ �� 17 —(�ruri��� i s uf���c����� ��.� � �. �c�t si�;r h����te�����, ��Iac�r�tr�cta�° cl��:� � � ; � r�cr� ���a��� t� �������i���la�� fc�1� ��p�c�i�i�� c�������i4�z����� fc�t• ����cti��� cl��� l 3.The blast fenee vvili be dismantled in sectians and turned over �o the Owner. 14.Choate wi11 load the light poles �nd blast fence onto a trailer the Owners provide. If anyone shouid have an� questions coneerning the above items please call or email, Thank yau, Robbie l�oberson 706-945-2122 cell Choate Construction Company I OI West Mu�berry�Boulevard, �uite 200 �� �� o Pooler, GA 3I322 Phane: 912-790-q011 �'hang� �rcl�r Proposal Owaer : AUGiIST�-RIC1i11�OND CQIJNTY, GA Ghange Order Progosaf #: Owr�er #10 Praject: �I43-11 ALfGUSTA FBQ TERI�i[NAL �;�te; $l31/2U1 L ArCllitect: Campbel[ & P�ris �ngi The Concract Documents for the ataove referenced project are hcrehy changed as set Fotth belo�v. 7'o avoid any schedule delays in the work that could irnpact 1he cost and scl�edule, €hc Gontractor is directed to prnceed with this work immediately upon Owner's authorizatian in tf�e space provided bclotiv. Ilescript�on of Work: � •���Utzl�ty Backfill Revision �N�� � ';' ; _ - � Tkiis COP �i� in responsz to direchan given la� �c�cI' as related,fo baeltfilC c��utitity irenche�, �� _ _ �„ _ y � ' _ �u ,,�i4 • ' = The; C3nginal,C�ntra�t ineluiied a$2(�,30�:deduction {Ttem ## 12 of Exl�ibit J� for usEng s,and(cla� backfilI tn nttlif.y trenches wi#hin theA(�A area - � ,�e.. � �, �.. � �&.P ilirected��aaat� to�u�lize the star��ard�ac'1kf'itE�details�'in aec�zd�rce r�it� Cnniract T?t�eisr�ents fr�c�utiliiies;��tihin rh��AOA area= Sa�ti3lclay, would�be aeceptable to us� fQr aIL other ut�l�t� bacC�ll under pa�ed areas autside ti�£the A.QA are� � _� ; �� i � �: ,j ,;,� ,. * . , :.. _. XL n . ! r • � i° , _ p _ . . Th�projec�s�hedtrJ� is�not.�ffected bythis�changeas we havc pmaeeded with.utility �nsta�lati�n.ia accordance.with this d�recii+�n��. ���.° ��,,� ,'� Item : 1 L)tititv Backfill ltevision Phase Destription C,ost Type Quant Ur�i Unit Cost Antuunf 2IOC1- - SITEWORK 4 SUH 0.00 LS 0:00 $5,140.00 1. Use Cont��aci Doctu�:ent details fo�• bac�ll of utifities ivithin tlae ,40.�i area - tIDD $20, 30� 2. Use excctvated "on site"sancttclay ntaterials to bac�!! utility U•errches in accordance tivith "Pipe Bedding Detail in Non-Pcrvecf:lreas" on C2.6 for�anitary Sewer and Stortin Drafnage This detaif applies to utilities irzsta!/ed rn "Paved" a�rct 'Nan-Faved" areas outside of 1he .4CL1 area -DEDUCT {'Sl.i,164) (See tivarksheet attached far Cosl Check by Choate.) Net Chan�e -�1 DD S�,140, �p Subcontractors T�txi 5,140.fl0 s�bto��s �s,xa�o,ao �'ie[d OH � Supervision �O.dO Overhead $0.00 Safetv $fJ.00 Plans/Postage/Courier $25.'i0 ' Bueider's Risk Insurance $1p.33 General Liabi[itv Insuranee $30.54 Fee 5.41/a �281.68 ' P&I' Boncl �54.88 Business I.icense $OAO ' Su6QUard $72.06 Eteqoested Total Por item 1 $5,615.19 ' Total For Change Order Propos�'�'���` `'� �5,615.14 i �„ ,, 6 4.t;:�°�e ,. . �, F "=� ...ctrza� ��� � � �• � a� M � Approved By: {tlrchitect} Submitted By: A�s�Ye�'�y� (Owner�„� s.��,� � � O�� � ��,; �' �` �,t4' e Campbell & Paris Engineers CHOATE CONS j % �' -�QMPANY ��JQU�iT OL'���q �f f ( f rt j t' l J ����� C' r „ e '� ��� A � �1 / 1 ' G; ! ��.� � ... � . Signed• Signed• ' �� ������ _ T � Date: Datc; �'� �! �� ?��� e" '`�, /'�, �',� Z � ``� � � ~ `� �� a,�� �' � � -: :. ' . ' Page 1 of 1 � '`' �`� .. �.�° SY31l201 I 3:d$:33 PM ; � �� � 5��.`� a �" -� �. i _ __.___--. _ _ - _ ... — _ ..___i . ----- . __ , �_ ..�_ � .� �_—= _-- .�._ � �� �, � � � �,� �7 �� ��� t,#i_i;�P,'i t'( 3" � :}{EC'I'I 5i-ic� � �.� , Gl - 3-rW,.,t �� � ; � � �1 �� � .�,� } � G�'- � - c��7 t3�.Tt!� i. � :_���� �,� �._'-.i � , . _.._. � � 2. Ca ` r*fEbQ �.� �� G. il�roj�ci, __��__i �`°� — --.._. _____—. ._ ---- _ f '� �sti tat�i� :� Leca�c�n: ' � � Fs�tra�a� �_ —. ���lters; iiVnt: -'�1?.�rrt�,_ �3r`�ct�-�-'t!� ���n4yar� "�� �� `i'r�+l�=� t�1��"3� Uf�: �____._.�e.._...,.. T�o_ faEJnenSioftS ' -- � ] Dss�`iptiian v� l �� t; � Tc7T/�! 5ta�t s�,�°�� ��. �.,�v� — Av �„ ��� �� F'C� ��'+��� ' 5p `"� `� ��.� � �II S� �>��} ""' �"^a• `�,"7 +�.ESS l �i�Yt E. $S' 1��# 3�rf�": 5 Ta �II r'� 5p � � 7�c� ° (ss 5 �S �_�_� '�r' _ � 5` � " " _ ���, !�� � �� --- ----------�—_ ,� _____— �" � " �:� (�� �t � �x�ss}�' ���' ��' '� " _ 3 � ..� �tZ. c.y 5� W ``� �1 � � ( � Sk � �a,f7� '3""u f � 5 � "� „ _ ,; _ -�`� � � C`� ____ ' .�____ � � P? t � svu��,� � ` "'t r zC J_,_ e, � ,._� u� r 1 y 55� � y �a c�„' `� „ " - °�'' 3? �i +- ia y 5'= Y .t � ;� �o � ( 6 s t � S S� �{' {� � `� � �' ' �� tE 3 ! C`� i ��� j �,�-�, � �.� � �,� i , z.. `�� � -----_--.____ ___ � �5 U ' � _ 5 � ~! ; �3 r� vG ____ � �'�`=R.�^� �7Sv�llf'tr�e:,',,, a a'� 5 *� I��� {� �I'°� � �7r5 Ig" �;, -� , r� . L __ 1 :� 3� c �( �� � � , � . � �la (�5, �3 # �d- " � a? � � �E . 1� l? � �,.. � `� � � � �� � � � S?��? _� �tt � S � � °�, y �{ '� — �� _ � � 0 ' �� _ 5i t �' � �,c�� �,.� �1t C`� �. � ! ��,� �`� � 1 `� Z Trd —.--,.._.._r. 5 ��, rt � �� v f�. + � �, �`� �` ,��LL3n.'�"j. ✓ ��,:.,� �;� i .�_��' . � � 7 � � 92 2'� � r�rt7"#G � I G}Z:�? �.:.w, .. . . �r�^/1 � 1��`t ..�� ��B'� � ^.� �_________y__�� _'.�""------�. ._... � . k'f"��� Yl �{.. � ��v�'� .�}�.ry ?"V , i � ���.,_._. � � -----_._... f ____..�. _ _ ,...__ _.�..�_.�._.1 __ �� j i _._._�..___ � � _ s' ' _—�_ ` —.-----�, i ,,-- Choate Construction Company . 1 QI West Mulb�rry Boutevard, Suite 2U0 a�' ' Pooler, GA 31322 Phone: 912-790-0011 Ch���� Ord�r Froposal Owner » =�UGUSTA-RICHMOND COUNTY, GA Change Order Proposal #: Owner #12 Project: 2103-1t AUGUSTAFSQTERMiNAL p�fe; 91F6/2UIf Architect: Can�pbeil & Paris Enginccrs The Contract Dociaments for thc above referenced praject are hereby changed as set forEh below. To avoid any sclredule deluys in the work that cou[d impact the cost mid scHedule, the Contractor is directed to proceed witlt this work immediately upon O��ner's authorization in the space prnvided belnw. ,. q E Descr� tian o Wn � � _`��� ; _ - � _ � �� � i, , p i f rk.:°` �-' Tem�go�ary �'arking Lo� L�ghi�ng ° ° ; �;' ' � _`- � � € _ y � � � Thi`s is issued per Owi�er`s reqnest to prov�de temporaay 3igtiting tawers ua.e�isfmg parktn� lot� � k�'; Item : 1 Temoorarv Parkin6 Lot Li�htin� I'L�sc DescripYion Cast Tyne Quunt UNI Uait Cost Arr�ount 160d- - CHOATE EQUIP RENTAL 3 MATL O.dO E.S 0.00 $1,Q09.65 Sun6elt Re�itals -(2) G.� Diesel Liglat Totivers froin 8/9/11-$/23/11. (Refer•e�rce Invoice Attaclaed) Materi�l Total 1,009.b5 subtoral $1,009.65 Fictd OH & Su�crvision $p,pp Ovenc�ad �p,pp Safety gp,pp Plans/Posta�elCourier �p,pp Builder'S Risk Insurance $Z.02 Generat Liability Insurance $g,9� Fee 5'.41°l0 �55.05 P&P Bond " $10.73 Business License . $0.00 Sub�uard $14.08 Requested Total For Ttem 1 $I,U97.5U Total For Change Qrder Proposal $1,Q97.50 , r ,� ��,Ap` �� ' �� p �' ' 9 Appraved By: (Architect) Su6mitted By: `�P��r�sd By (Owner�°o �'�, � ,, } � � ��� r '�'�. � p s �� r Campbell 8; Paris Engineers CHOATE CONSTI�UCTF 4MPANY �.EJ�U �i D C�3'�V�S', GA � � , ���� „� ����.� p „� � u s,3 Signed• Signed� l.u�,�(, ���d � � �' � DaYc: Dafe: tts l�� �l`J�� ..� �� �"�`_� �� '��� - ��Q• �r :.� � � ��'� � , � t , Page 1 of F �"��.�„ : ��9/16l2011 1:10:57 PPv1 1 ! �1t0iCE SEN�} ALL PAYi�1�TS TQ: SU�I8EL7 RE�fT�LS, fiVC ��?��a� 37€I�5064•�Q� �� na r�.�. s � P�} BQX 4492°I1 A7LA�VTA, GA 3�384-9211 Accaurrr�u��e� �23� �rava�c�4a� 813Q1�1 INU�ICE if] PAGE '( RECEEVEI7 SY CfH'kTiiAGT 1�€tfv18ER cc-�aT� c��s���c�a�-��r���� c,���. �►c� ,���� sas�aa� ATTN;AA?DY CQL1�I�IS A�RCf�ASE4Rf3€fiMJMBEit 23�17 i�EERFI�..[3 t�Rt11E F�RT�11�, SC 2973a = �'f03-'t� .tfla ruun�a� JOB Af3UtiE55 1 - BI��SF� ��£�E} '1#�t3 Dl�f7� BAR[V�Rft, Rt3G�STA B�arar.�t A�TA PCfl�S Sl1SH �J�l3� t�85 7454} 1�E}�� BAFti�ARB 2530 P�AGFE t7�tC(�AR�3 �IC! AUGidSTA GA 3��06-9E17 A�G�lSTA� � 309U�-241 i C�: &38-8�2-'f2�#Q J�:91�-429-�873 7(Y6-772-�859 4�"� ��30IFME�Ii � Min Day Aee}: 4�Ieek Panount 1 4Q00 i�ATT TOWB�;}INA AiBSEI, LIGHT �.O��R 75.f}0 ?�_00 150.0@ 350.a0 300.00 3�`5332 t�ke: P1vIBr� t�lUdel: RL40QQ Ser �: RZ4IZ-287B H.R OUT: 85.300 H?t IN: 245.SG0 T4?A3,: 159.200 HAS CHG; 297.pQ Bi11ed irom 8At79121 thzu 8f231i1 � §QOt� �3FETT 10�n'HEHiNII BIE3EL LIGHT TOrr7E° ZS.00 75.Q0 's50.00 350.00 30Q.U� 3�5333 Phake: F�MID� Aiodel: RL9000 Sez #: �$Z3-2877 T.:R QU�: 79.S�t� f':R It�t": 242.SQC T(�TAL: 2o3.QQ0 iiRS GAG: 931.25 SALv9 ITE;f+SS: � ~'" ��29 DYeSE�,usaber L7��t Pr��e � A `�� ?21.84 2 3 a IXXXQ�1? 2 9 B'+_£sr^.L Et3 ��'' z 3° r �, ry 214 � X?�X� 40 �, 1_ 1. S Q r '~ r � . . �• � Flttt�-L BILL. 81(i9/11 05: f70 P�F"`� .n ;:23/3.1 0 . �..,.. , �� '� � �r ,� �: U f�� �!�/f� hi� ! ������Izf�:�7...-,. . "'�s�� �i'��1; ��� ;;� � W sz4Z�c5ao TG �;vVc 1 c-�: ! t:'�. ���3;�,, � �'� a� . "t . "'�,,.����i,'1(�7 1^t� '�j"�,. e .L�J"� �. }' , Q ^� � �.✓t � ` :�� .� � a 1 � � a.. � � � tsr . ! � � — �� � . . 't'✓ '�.�iJ�7 �l 7 <i7 'T� }��-` . � � � C1 c.. �} , �. �? _. _--- '� A�1 �or�r Equipr�ler�f l�teeds._. 5iJE70TRt 1 51 5� 4ne C�rrrpan,�. NET D�tE UP�N RECEIP i Tf�X 3_. 69 RE�lT�t RETU�N ��[uoac� �raTat 5s . s 4 . � .c.vu:ni a«avzr.00i � ..,. . _ � __r_ .._ _._ .. _... .. - _..—."'_ . "_"' _— _ • ' . _' "".._„_ —_� � �