Loading...
HomeMy WebLinkAboutCONTRACT MODIFICATION #6 WITH CHOATE CONSTRUCTION CO FOR CONSTRUCTION OF NEW FIXED BASE OPERATION Contract Modification #6 Airport: Augusta Regional Airport Date Initiated: 18 Jan 12 Owner: City of Augusta Project: New FBO Terminal Contractor: Choate Construction Company Project Number: 0733-17 The contractor is requested to perform the following work described upon receipt of an approved copy of this document or as directed by the engineer. Item Choate # Contract Mod # Description Unit Quantity Line Item Price 1 19 Water Cooler Revision LS 1 $1,410.27 2 22 AssistanYs Office #123, Delete/Add � 1 Doors $356.32 3 23 Fireplace Addition LS 1 $16,031.34 4 24 Misc. Electrical Revisions LS � $3,623.66 5 25 Site Water Line Revisions LS � $10,556.34 6 26 Misc. Steel Supports LS 1 $1,634.89 7 28 Unfaced Batt Insulation LS 1 $950.18 $31,950.00 Total Contract Amount Ori inal Contract Total $5,045,461.00 Previous Contract Modification Total CM #1 - 5 $99,261.56 This Contract Modification Total CM #6 $31,950.00 Revised Contract Total $5,176,672.56 Total Contract Time Ori inal Contract Time 250 calendar da s Chan es to Contract Time from Previous Contract Modifications 2 calendar da s Chan es to Contract Time from This Contract Modification 0 calendar da s Revised Contract Time Total 252 calendar da s This document shall become an amendment to the contract and all provisions of the contract will apply. Justification for Change Brief description of the proposed contract changes and locations: 1. Plumbing Fixture Revisions. During the value engineering pr ocess prior to contract execution, a cost savings change was proposed to the project Plumbing Fixture Package. This c hange included pr oviding a diffe rent drinking fountain and accessories. Upon review of the su bmittal for the proposed change, it wa s determined the quality did not m eet that of the building. Therefore, the originally planned dr inking fountain was recomm ended. This change resulted in an increase to the project of $1,410.27. Refer to Choate Change Order Proposal #19. 2. Assistant's Office #123, Delete/Add Doors. It was determined that an area of the main sitting area be conv erted in to an office for the FBO Manager's Assistance. As a result to the design ch ange, a credit in the amount of $356.32 will be added to the contract. Refer to Choate Change Order Proposal #22. 3. Fireplace Addition. During the value engineerin g process prior to contract execution, a cost savings change was pr oposed to eliminate a functioning wood fireplace in the main sitti ng area. However, after ca reful cons ideration it was determined a fireplac e would be preferred. Therefore, this it em represents including a propane fireplace to the project. This change resulted in an increase to the project of $16,031.34. Refer to Choate Change Order Proposal #23. 4. Miscellaneous Electrical Revisions. This item represents modification s associated with the building electrical, which inc ludes installing new power circuits and wireless access point data drops per the review of City IT department. This c hange resulted in an incr ease to the project of $3,623.66. Refer to Choate Change Order Proposal #24. 5. Site Water Line Revisions. As a result to the rerouting of the site water layout from the east side of the bui Iding to the west side of the building modifications to the site water line were required per Augusta Utility Department design guidelines. The modifications included adding a bac kflow prev enter, PIV and vault for fire service, and a backflow preventer for domesti c service, and an additional fire hydrant , gate valv es, tees, fittings, tapping s leeves and v alves. This change resulted in an increase to the project of $10,556.34. Ref er to Choate Change Order Proposal #25. 6. Miscellaneous Steel Supports. This item represents modifications associat ed with the addition of the automatic sliding doors into the vestibule. Work is to include additional ov erhead supporting st eel for tube steel columns, and a bent plate needed to carry brick over door opening. Refer to Choate Change Order Proposal #26. 7. Unfaced Batt Insulation. This item represents a change in the type of insulation from faced batt insulation to unfaced batt insulation. As a result to this change, a credit of $950.18 will be added to the contra ct. Refer to Change Order Proposal #28. C&PE Project #: 0733-18 Contract Modificatian # 6 Recommended by: Januarv 19, 2012 Campbel Paris Engine Date Accepted by: .,� � �1� � Z� ,�. Choate Construction Company te �, Approved by: ' �._ :� - :� :5 1 ' �- Augu ta egional Airport Date Approved by: ���� _ _ � l7 /1 �. � City of Augusta Date � �� �f�1�2 Submit 4 original copies to the City of Augusta. ATTEST: -��: �,�,;.,� �.. �� �� `} � � � F �:, �, ; �1. � �� � C 1� r k o f � ca,��rt�'�� ���;o n ��* ��� � :' ,. ��� _ .� C1erk `:�(S�al��, � � � y ( :J .. � �.Y"• � � � � � , - -.r"'� [9 - -c'suv���`�' � iR.t» �. :,;�,� ,,�,�;�t'.. `,„ � Choate Construction Company � • lUl West Mulbesry Boulevard, Suite 200 �� Poolea; GA 31322 Phone; 9 i 2-79Q-0Ol l Change Order Proposal Owrtor : AUGUSTA-KiCNMOND COUNTY. GA C6�nge Order Proposal #: Owner #19 Projec� 2103-11 AUCt78TA FBO TERNIINAL Date: 10/Z6l1011 Areditect: Gmpbeil & Paris Ec$faeen Thc Contrt�ct ilocuments for the abovo refwcnced projea ars heroby chnr►ged as ut fath betmv. To avoid any schedule ddays in the work titat coald impact the cost end schedule, the Caiknciw is d'aected w proceed with this work immediatcty npon Owncr's suthorization in the space providcd txlow. Dascriptioa of Work: PlumbIng Fhctare - 5ubmittal Comments This COP is submitted in Tesponse to rewrned plumbiag fixture submitlsl aomments. This proposnl is valid through l l/9/11 at wluch tim� wo reserve the right to�revise besed upon impxcx to proJcct sc6e�le. Plumbing nxture items are being ro-suMnRted as-noted for.r�yicw and ap�rovat along with thesc assoeisted cost changes. Item : 1 Plumbina Fbcture - Submit C o mm ents P6asc Dsacripliop Cost Type Qwn� UM Ontt cmt ���us� 1i400- - PLUMHING 5YSTL•MS 4 SUB 0.00 LS 0.00 a1,29T.39 Coleman Construcflon: Rejerence caver letfer daJed ID/1&/1/ Rllached for a breokrlmvn of costs by ftem descrfptfat The biggest portion of cosl fs ��lated to rejeclion of drinking fourrtain that was part of �be acaepted revised Ptumbfng F.hhu�e package, Eshibit J, Irem #20. 5ubcontractors Tot�l 1,297,39 Sabtotat S1,297.39 Field ON & Supervisiou �.00 Overhesd 5�.00 Sataty SaAO PlauslPostaQdCourier 50.00 Builder's Itisk inaurapce 52.39 General Lia631iri lasuraace 5�.4? Fee 3.41°/. 570.74 P&P Bond 513.78 Business Liesase SO.UO SobBUard S18.1U Reqeested Total For Item i $1,410.27 Total For Change Order Proposal $1,410.27 ,-,., :�,, , ' �y , t . a Approved By: ( iiect) Snbmitted By: Ap �,plrovad �y: t�v�mer) `` 7,�� b � Campbell Pari E CHOATE CONSTRU OMPANY : AU�"aiJ`S'I$�1-Rl 4ND C GA ;, i �,:_� ° . '�� Slgnai. Signed. �t �� S�g»ed * � � : r�----�-.� Dato� �� � � � Date� 1 o Z (v /� ��� Date: �'7 �_ "*� 2� Page 1 of t 10/26/201 t 2:10:37 PM � '� �'t?L t�t� T IN(: . � Plumbing•�iping•Fsbrication P.O. �x1�47fl I3arlem, GA 30814 Phoue (708) 556-3400 Fax (106) 556-6116 Choate Construction ' Date:10/18/11 101 West Mulberry Blvd #200 Pooler, GA 31322 Attn: Rick Parrish Subject: Additional Charges for Fixture Changes Rick, Below find the additional charges for the change to the fixtures. Aiso attached is the remainder of the submittals requested. Feel free to contact me with any questions ar comments. Description Unit Cost Qty Total Change toilet seat from K-4731-SC-0 to K-4731-SA-0 $13..00 9 $99.00 P-6 Grid drain from mainline MV60 to Brushed Nickel i170-10BN $23.95 9 $215.55 P-12 Change from Oasis P8AC to Oasis MMRSL $1q76.34 1 $1076.34 P-14 change (1) to a P-10B Sterling 442007-U -$93.50 1 -$93.50 Total cost for all changes $1297.39 Thank you, 7im Coleman Project Manager ' Choate Construction Company . . 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 � • Phone: 912-'790-001 ] Change Order Proposal Owner : AUGUS7'A-RICHMOND COUNTY, GA Change Order Proposal #: Owner #22 Project: 2103-i1 AUGUSTA FBO TERMINAL Date: i2mnoii Architect: Campbcll & Paris Eugincers The Contract Documenis for the above referenced project are hcreby cha�iged as set forth below. To avoid any schedide delays in the work that could impact the cost and schcdule, the C�tractor is directed w proceed with t��is work immediately upon Owner's authorizatian in thc spnce provided below, Descr�p#aon of Work: AssistaAt's O,ffice #123, DelefeiAdd Doors: This CfJJF�is i"ssued in response to receipt af rev�sed "A". dwgs dated l Of27lI l "M" dwgs dated 1/18/1Z, and "E° dwgs dated l U8lI t iqcorp�ratipg.reuisions ta doors aad addiGon o€Assistant'� Qffice at Room #123. "' ` Nqte� Variqtj„c E1ecrR�eyisinns added on "E" dwgs vrider previous revision dates will be submitted.under � separa�e Ct�P Tliis COP is vand through 12!]"b✓I 1, ifapproval is nof received by this date, we reserve thg right fo adjust costltime based upQn unpachto project schedule: .: ° .. :;. � ltem : 1 Assistant's Office #123. Delete/Add Doors Phas� Descrintion Cost Type Quxnt OM Uoit Cast Amomrt 4200- - MASONRY 4 SUB 0.00 LS 0.00 g� pp S&N�: �ldj�estment to window /ayou� lvill be accommodated withorai additional cos1. 5104- - STRUCTURAL & MISC STEEL q 5UB 0.00 LS 0.00 $161.OD Snrith I�•omvorks: Provide galvanized sleel lintel for Windotiv Opening "D". Re-use lrntels fw• "B" and olher " 6400- - INTERIOR WOOD TRIM 4 SUB 0.00 LS 0.00 $fl ap U�on The Rock: No cost rinpact for revisions to wood trinz 6410- - CAB[NETWORK 4SUB 0.00 L5 0.00 $-3,1G7.32 RWP: Delete base cabinet and solid surface tnp pt waiting area #1Z3 830D- - AUTOMATIC SLIDING DOORS 4 SUB O.QO LS 0.00 $0.00 Besam USA: Rejerence COP Owner �21 for cost to incorporate(2) pair of s!lding interior doors per plan revisions. No additiona! cost in this COP. 9250- - TRUSSESJMTL. STUD/ DRYWALUIN: q$Ug 0.00 LS 0.00 $0.00 SCD, Inc.: No cost change for rttiscellaneous wa!!, sound it�s:tlation, and cei/ing revrsrons 9680- - C'iYCARPET / VCT / BASE 4 SUB 0.�0 LS 0.00 �-200.00 Based uponJlooring a!lowances included. 9900- - PAINTING 4 SUB 0.00 LS fl.00 $0.00 Painting: , No cost change for misc. wall and ceiling revisiars. 15300- - F1RE PROTECTION 4 SUB 0.00 LS 0.00 $200.00 Key Fire Protectian• Acld heads to accontmodate layout revisions based upon wall locations I5500- - HVAC SYSTEM 4 SUB 0.00 LS 0.00 $1,085.00 Page i of 2 1 J20/2012 10:4b:45 AM Choate Construction Company � . 101 West Mulberry Boulevard, Suite 200 Poolcr, GA 31322 Phone: 912-790-0011 Change Order Proposal Owner : AUGUSTA-RICIIMOND COUNi'Y, GA Cbange Order Proposal �! : O+vncr N22 Project: 2103-1i AUGUSTAFBOTERI►tINAL Date: 17.�Jl1011 Architect: Gmpbell & Paris £nginecrs The Contract Docuairnts for the above rcfcrcnced project are hetcby c6anged ag sM forth bciow. To avoid a�ry schcduk detays in thc �vod: that could impact thc cost aad schcdule, d�e Cariractor is diractrd ro proaed with this wotk immedistey upa� Owner'a authotizaeion in ihe spaco provided below. Bardl; Fttrnrsh (I) ne►vlargercapackorfor V.9V-13, controls modifrca[ions, duchvork, d�users, erc to cwnpleie HYAC revlaion for petiv oJJ?ce oddltlon per referenced drawings ]6000- - ELGC7'RICAL q SUg 0.� LS 0.00 52,600.00 SACK CO: Ltghling, pmner, dnta, and ffre alonn revisions i�r accardame ivith O�ce Additio» revisfons dated !//8/1 L(See cos� related tn orher dated revJsons in aeparale COP.J subcoatrac�orsTotat 678,68 8100- - DOOItS 1 FRAMES / HDWR S PO 0.00 LS 0.00 5-1,033.Q0 DdcMlndusrries; lncorporate daodframd/xlwr chonges rn accordance with revised hardware schedrde as noled in Submrtlal returned by Architect as they correspond wiih plan revisions daJed 10/27/I L 8610- - WpOD WINDOWS S pp 0.00 LS O.OD 50.00 The Window Ga!lery: Na cost change required. Credit associated with window chcrnge tvas ezehanged for adding SDL spncers jor Type "�1 " windoivs. Pnrchase Ordero Toml -1,035A0 Subtotal �..��,3Z Over6ead SQ.00 P1nns/PostasdCourier �p,Op Genetal Ljability Insorance 50.00 P&P Bond 50.00 Sub¢uard gp,pp �eW OH & Sunervision SOAO Safetv 50.00 Buiidcr's Risk [nsurAace 50.00 Fee 0.00°!0 $0.00 Busiaess Licease sp,pp Requested Tota! For Item 1 $-356.32 Total For Change Qrder Proposal � 5-356.32 Approved By.� i'yct) Submittcd By: App#'oved 8y: (Owner) ti / � � �� ���:� �'�, �►P�� +4c P rs CHOATE CONS UCTI MPANY AUGU�'1' RICHMQ 6' ����5 , CA �,�,� � �r � y � � �� Sig d� Sigoed: �( � + : . f /�.' � , �, Date• � 2 � � Dete: 1 ! 2 a /1 Z � " y ' . � � ' ,,� - Datet ''� �" � / �� � s Page 2 of2 `'1%20f2U,1210:46:43 AM Choate Construction Company # • . i O 1 V�'est Mulbcrry Boulevard, Suite 200 Pooler, GA 31322 ' Phone: 912-790-0011 Change Order Proposal Owner : AUGUSTA-RICHMOND COUNTY, GA Change Order Proposal #: Owncr #23 Project: 2103-11 AUGUSTAEBOTERMiNAL Date: ���n�>> ArChitect: Campbeli 8e P Epgine The Contract Documents for the ubovc rcfcrenced project are hcreby changed as sct forth below. To avoid nny schednle delays in t)�e work that ccruld impnct the cost and schedule, the Conuactor is directed to procecd with thi� work immediately upon Owner's outhorization in the space provided below. Description of �Vork: �'areplace - Budget This COP is issued in response to request by Ownerto provide budget pricing for a fireplace addition;in accoMance:wi#h Dra�i+irigA2.12 notcd "For Revierv�by Owner" and;Drawing labeled "Gas" received 1 U1�C�/11 . This pncing is notesl as "buSgetsry" as ihere are open components that need to be defined to pro�ide firm prieing: No.eost for'extension �rf gas .,_' line,$eyot�d ihe gas meter location shawn on pInn is"mcluded as rouEing is xo be det�rmined. Affecf to project schedule is,undetennined at this titt�e: Once plans ar� ftnulized end firm pricing is approved, impact.tp projacf be ' assessed. Far this reason, there ate rio General Conditibns costs included in this proposal. " '° Item : 1 Fireolace AddiNon - Budget Phasc Description Cost 1'ype Quant UN1 Un;t Cast Amount 12600- - FIREPLACE UNIT 1 LAB 0.00 LS 0.00 $250.00 Labor to pick up and instat! firebox and Iogs. Labor Totul 250.00 12600- - FIREPLACE 1J?Jl'1' 3 MATL 0.� LS 0.00 $2,5173b Fireplace, Gri!!s, & More Furnisl� only LSTF36 Monessen Lo-Rider Y%F Box, A'BST27 �'/F Natrura! Bla�e See-Tikru Fiber logs a�rd burne�: , Material Total 2,517.3G 2100 - SI'CEWORK 4 gUg 0.00 LS -0.00 $0.00 11To cos! for site sleeves ar gas line exlension is mcl:eded. 6400 - INTLRIOR WOOD TRIM 4 SUB 0.00 LS 0.00 �� ��p UTR: F:trnish and instnit new crotivn mould at ceiJing, wood base, blocking, lrim at hear�h, and �»anlels. G410- - CABINET WORK q SUB 0.00 LS 0.00 $2,326.26 R�3'P: Furnish anct insta!! (2) cabinels on each end off►replace with solid su� face cou�ziers. 9250- - 'CRUSSES/MTL. STUD/ DRYWALL/[N; 4 SUB 0.00 LS 0.00 $3,I99.00 SCD, Inc.: Furnish and install all frtt�nrng and ctr}nva/! for new fireplace. 9680- - Cf/CARPET / VCT t BASE 4 SUB 0.00 LS 0.00 $1,000.00 AlJowance ja� Granite tlearth and Surround � 9900- - PAINTING A SUB 0.00 LS 0.00 $750.00 Lucas: ; Palnt drywall and wood h•inx 15400- - PLUMBING SYSTEMS 4 SUII 0.00 LS 0.00 g2���z p6 Page 1 of 2 12/9/201 l 2:l 7:42 PM ChoAte Construction Company , . 101 West Mu1E�ry Boulevard, Suite ?OU Pooler, GA 31322 Phone: 912-790-0U 11 Change Order Proposal Owner : AUCUSTA-RICHMOND COUN7'Y. GA Change Order Proposal #: OwnerllZ3 Project: 2103-1i AUGUSTA FBOTERMINAL pat�; 12/8/2011 Architec�t: C�tnpbeU & Paris Euginecro Thc Conunct Dooumenta for the abore sefaencsd project acc hereby chengcd as set farth below, To avoid any achedule delays in Ihc work th� could i�t the cost and schsdule, the Conuactor is d'mxtcd W proceed with th�s waric im�disteFy upai Ow�r's authorization in Ihc space provided below. Colemun ConstraclTon: lnsia113/4"gas line f�om n�eter locatfan Io firep/ace os sho�v►t on GAS plan I5500- - HVAC SYSTEM 4 SUB 0,00 1S O.OU 50.00 No HYAC changes are iacluded wlthln thts pricing, 16000- - ELEC7121CAL 4 SUB 0.00 LS 0.00 5750.00 The SACK Co: Allo►vo»ce ro add (2) EA recepraclea, nlocate {I) Type F,J)xture, add (!) Type Ffixture, and add power cinc:ril for gas log insert swirch. Sabeontr�ctors Totat 11,907.32 Subtotal S14,674.68 Field OH & Supervision 50.00 Overhead 50.00 Safetv SOAO Plans/PostagdCourier 573.3? Builder's Risk Insumace S29.S0 Geaeral Liabilitv ]nsurancr 589.19 Fee 5.419s �04.I8 P&P Bond S156.59 Business Llcense 50.00 Sub¢nard g'�pg,�3 Requested ?otat For Item 1 516,031.34 Total For Change Order Proposal 516,031.34 �" � '�> "* ,� ;, °.�{ ,' : , Y . ,._ , � ; ,. Approved By: I�i Snbmitted By: Ap�iroved�B}�,(Owner) ' � Campbel Pari e CHOATE CONST UCTI MAANY ATI�'iUS'�A- t � OND C tJNTY, GA� Sfgned: ' Si ned: / �� [ ��� SI � ,� . ; � S gn'ed t. J� Date• ! � /� Date• 12 �t �) ..�'��jate• � �� '�"2� Page 2 of 2 12/9/20l t 2:17:42 PM Choate Constri�chon Company I . , 101 West Mulbcm� Boulevard, Suite 200 Ponler. GA 31322 Phone 4I2-79�-0011 Change Order Proposal Ow�ncr : AUCIrSTA-RICHMOND COl!NTl', G.4 Change Ordrr Proposal #: Owncr i�24 Projeel: 2103-11 AUGUSTAFBOTER9i1NAl. I)att: �2/8/20�1 �lrchitect: (:ampbdl & Paris Engineers The Contract Dax�ments for ihe above refer�nced pro�ect are hereby cl�a�iE�ed as se1 fonh belm� To avoid airy sehedi�e delays in tlie wor1: that coidd impact ihe cost and schedule, lhe Con�racior is dircaed In proa:cd with this wwk mm�edietely upon Owner's aidhorization in Ihe space Ptov�ded below ltem : 1 Misc Electric�lltevision� Phasc Descripiion Cost 1'}'pe Quani UM Unit Cost Amouat 16000- - i:LECT'R[CAL qSLig 0.00 LS 0.00 �;i3�7� The SACK Co. Furnisl� nll lnhor, raaterials, equiy�r�enl, ric !o furn�sh and nrstull nc tc pmrer circuits. and u•irele.ss necess pnrnl dola drops p�r drmvhigs referenced abore. A'ofe: I.ight frature added ro pluns ot sh�+•er ii/-f5 rs exch�ded per• pre��ioas discussior�s. A'eir cm�d r eader shmrn at l�oor �IOZ �s carcluded per O�vner's direcriw�. Snbcontraators 7oM1 3,317.00 Subtmal $3,3] 7.00 Ficld OH & Supervisioo 50.00 Safeh� ��� Buildcr's Risk Insursace SG.67 FCC SAI°,u SIS1J7 Rusiness I.icense 50.00 Orcnc�ad S0.(10 Plans/PoslaEelCourier S16.54 Geaeral l.iAbilih� Insurance S19.71 P&P Bond S35.d2 Sub¢uard S46 i0 Requested Total For ttem 1 S3,b23.66 Total For Change Order Proposal 53,623.6G i,. � ,, ,,� ' �. , Approved Ay: (AroM SubmiUed By: r#pproeedBy�p,(.Q�yne+') '�' "�% �: � �`� � a�,, Campbell Pari n � CI30ATE CONS'IR(JCTION C'OMPAPIY �LrGll�TA-`RlCH3tAOND COUN'I'Y G� y r. ;_ � � � Signe . Signed: r � Signed: lJ�'� - / �/> Date: � / � Z' Date: ����,�Date: �� �� �/�'�— P�ge 1 of I I/7I2012 726 35 t?M Choate Construction Company • . I01 West (vlulUerry Boulevard, Suite 200 Pooler, GA 31322 ' Phone: 912-790-0011 Change Order Proposal Owner : AUGUSTA-RICIiMOND COUNTY, GA Change Order Proposal #• Owner #ZS Project: �103-11 AUGUSTAFBOTERMINAL Date: 12/9/20t1 Architect: C�mP��� & Paris Enginccrs '!'he Contract Documents for the nbove refercnced project are hereby chunged ns sct forth below. To avoid any schedule delays in ihe work t4at could impact U�e cost and schedule, the Contrector is directed to proceed with this �vork immediately upon Owners authorization in the space provided below. Descriptio�.of Workc . : Site Water Line Revisions This C�P'is issued in response to receipt of revised C4.O and C4.1 dated 4 11122/l l. ' This propi��al is valid through 72l16/11 at whi�li time we reserve the righf�o adjust;based upon change m�natenai ci�st oi impact3o project schalule. ; , Item : 1 Site Water Line Revisions Phase Dcscription Cost Type Quene UM Un;t Cast Amount 2100- - SITEWORK 4 SUB 0.00 LS 0.00 $9,263.00 Furnish a�rd insta!(site water lines, including 8" aruf 6" nrain piping, 2"domestic service, fire line baek�lo►v preventer and vault including PI � in accordance wilh A UD standard detai! attached, 2" bnckflotiv preventer rn enclosure for domestic service, fire /rydra�:t, gate vabes, tees, orrd i ttings, Japping sleeve anct valves. BacLfi!! to be installed pei� "Prpe Bedding Delail in Non-Paved Areas" on C2.6 jorpiping located o:etside of.90A area per previously accepted Y. E. Depih of underground water lrne will 6e raised as needed to r:rn abme previously installed sanitary sewer lines per previous discussions. )3'a►er �rteter is not included in lhis amount as size is currently unknotivn. Curi•ent [f�crrer Line Pricing -$62, 512. 00 Value of Water Line already ineluded in Contrnet -$53,249.00 Ne1 Cost Add - $9,263.Ot1 15300- - i'IRE PROTECTfON 4 SUB 0.00 LS 0.00 gqpp Key Frre Proteclion: Revise hydraulic ca/c:�lations and shop drawings for building frre protection syslenr to reJlect site waterline revisions as re�:aired for sub�nission to AHJand Engineer for approval. Subcontractors Total 9,6G3.80 Subtotal S9,663.00 Field OH & Sunervision $p,pp Overhead $0.00 Safetv 50.00 Plans/Postage/Courier $48.32 Builder's Risk Insurance $19.42 Ceneral Liabilitv Insurance $57.41 Fee 5.4t% $529.54 P&P Bond $103.18 Business License • $0.00 Subeuard 5135.47 Requested Total For ltem 1 $10,556.34 i Tota! For Change Order Proposal $10,556.34 Page 1 of 2 12/9/2011 4:41:54 PM Choate Construction Company , . 101 West Mulbcrry Boulcvard, Suite 200 � Pooler, GA 31322 Phone: 912-790-p0]1 Change Order Propos�l Owaer : AUGUSTA-RICHMOND COUNTY, GA Cbaage Order Proposal #• Owner tR25 Project: 2103-i1 AUGUSCAFBOTERMINAL DatG 12/9/2011 Arcfiihct: Campbell & Paria Eaglncers The Cantracl Documents far tl� ebove referenced projcct are hereby changcd as sd torth belrnv. To avovl mry schedule delays ia Ux work that co�ld impact the twst and schedule, tlu Contractor is dirccied �o proceed wiUi this wari: immediaiely upon Owner's euthorization in tha space providczd below. t Approvecl By: h' ct Submitted By: ApAroved By: {Owner) i ; Campbe 8c paris C}�OATE CONS UC� fl MPANY AUGUSTA-RICHMOND CO , GA ��( : �1 � � ` Sig Signeds � S ed: oa�e. � z ,z) S /1, ��� nac�: Dac�: °� ? r z-- Pege 2 of 2 12/�/201 l�:41:54 PM � � U ,� � � A- � A ,� iF �AR #� � 12` , � g t y . 140Gi101t 9-� B Jit` X 3t' WU fib 51 � fSMt 1N44!!t MUil1s ( p�.l�.N CR ��ill4ll bE�'�1I0� WAT�ER VAI3LT DET.A�II. AaAG.�!�C��'G!� 'V, FQA �'VA.T`�RT.IN� 6GIZ�SI 3" A1+m A8t3VS C� : 5' DkC�'� (MIN Sl'2:E: S+ DSEP. 'S' 'WI��:, '7' 3:,CEN't"`s) +l�. V L '° �.�'�+ .i �L .s.� �.�.:l. roP sue� r �crc�� � � smurtu�. � �oeau�� �wa � �t. t+ r���a, pi �� �u�� : V � �i7 7�QP ��N�S7DEL� At��ltl KiD�CI1I�OR OR E4llA! Y�1L,v€ ' 1'—d" lltN. ��� t�tG4fT 5£AL ttYP. ti'YP.1 �� A0�1�'f#CMI ` � �� .4'ERVICE �� � CJl1�E N.Vff fT1+l; E�A Cal.11ltl % � ---•—;•- � F1AW 3 b' N. �� �.. .. .. . • .. . . ��� � � . � °--._ oa a �o� . . . � .. . RdDS �T?P� j 4� � t_."r�.y.� �� W. �'f 167 �6 tXaNT. tTkP) Ami oP�TmiG A94vE sT01� AT 3U1� s� �iUPF�* 8 30b5 �T+D CEIiTDt OVFJt t30CY ��N, �qrDi �SF.+CT'ION ✓AL'�VE �S3EI1rI�tLY > s.,��� n�u�.n�a v�v� ��� st�aucrua,� ' x�ar " � ,.'< e• �` . ��� ow � �tE�1 i'0 95X 4iN ��It�ICAI'l31t �� ' • 1 � 3#�CA1Eb ON SPRlNKLER �.� •�� 3 105 CCNT. STYF') 8' C!Rl1Sl�D SiG� GIP �,AC�4 tlR POtN� �A AL4'I'E.RNA'I`6 ItVI'�t1CA �'Ol�t 7TIG. Y fi� tAib�l� BTA�i�D � k� �.�..T��cNAT�e �AUw�r ��� �'�'�� A'IJ�1 = DE�CA�.Yi� 27 .�� �,.._��.�`,.�r�i� �����`� ���� '�/�.t"�1.���' Choate ConsWciion Company • . 101 West Mulberry Boulevard, Suite 200 Pooler, GA 31322 Phone: 912-790-0011 Change Order Proposal Owner : AUGUSTA-RICHMOND COUNTY, GA Change Order Propasal #: ��►n �� Projec� 2103-ti AUGU3TA FBOTERI1tINAL Date: 12/15/201] Architect: Cempbcll & Paris Engineera The Convact Docmnents for q�e above reterenced projea are Lereby changed es set forth bclow. To avoid any schcdulc ddays in 1hc work that eould impact tbe sost and sshcdule, the Contracror is directed W proceed with lf�is wod: immediatNy upon Owna's authaizntion in the space provided below. .Deacription ofVl-ork:` Misc Steel Supports; 7 his CQF is 9ssued m c�wnse to rcquic+eapenf W edd overhead support stcel for tube steei columns located betwe� Column Line 7 aad 8 on H.b as needed for automatic entiaacc fiaming. ln addition, bent plate as ncedod to carry btidc over openiag �I105 is incladod; T'his proposel is valid thmugh 12/2U1,1 at �vhich_tune we reserve the right to rEVise based:u_pon unpact to ihe project schedule. Item ; 1 Misc Stee! Snonorts Phase Dcuriptioa CoatType Qwat Ubi UnitCost almount 5100- - STRUCTURAL &MISC STEEL A 5UB 0.� LS 0.00 51,504.02 Smilh b•onwor�: 1. Channet - C8 s I/.S� !S'-DIl2" 2. Bent Pltue - 1/4"x 4"x 7"x I3=5" A�aferials (Jnch�ding t¢x, de/fvery) -5807.85 LaGor ro Insia!! - $500.00 Subotol - 51,307.85 Ovhd � Fee - 1 �16. l7 ToralCost-Sl,SO� 02 Subeoatrncton Totsl 1,50d.OZ subrorai �],5o4.oz Field OH & Supervision $0.00 Overhead Sp,pp Safety S'D.00 Plans/Posta�dCourisr 50.00 Builder's Risk Insurance 53.01 General Liabilitv Insuraace S8.89 F� 5.41°� S8Z.01 P&P Bond $15.98 Busincss Liccnse 50.00 Sub�uard �0.98 Rcquested Total For Item 1 51,634.89 Total For Change drder Proposal � 51,634.89� Approved SY. (Arch' ) Submitted BY. Approked-�y: (Chvner) �� Campbcl Pa ' in CHOATE CON UCT MPANY Ai}t;USTA-1�ICHMOtdfJ � IJPI'f��, t��;AA i _ /y Sigoe : Signed. C � igaed: �t--(�� : � � Date: � f �Z Date: �2 �S jl �J�'/D�e: � '7 '� Z'' .; I P elofl � � 12/!S/20112:35:36PM � CE J08: 12.1007 DATE: 71/17/11 � � � w � NSS COL. m � v r- 3 j ;�I 6 L.,.�� C8x11,5 ' SECTION A-A 7 � A A T/STL. EL. +22'-5" caxia,s � ' r - ... cax� y s �r-�—�- � .�.,.� BASE PL, 3/g x 6 x � \ � o�-s� w� �z� sre^ `t-- (z� �a• eo�Ts EXP. fN}CHOR3 HS56x3x1/A HSS8x6 HFA��R �3�c3x1/4 HSS6x3x1/4 HSS COL, caor�o. F.F. a.. +a-o• wi E►ac�t. OWGS. �: - � = •• . r., FOR 1 � —„'� QOOR ROUGN � �.�...''' OPT10N A • (AT DOOR � 05) ' DETAIL NO SCALE Choate Construction Company � . 101 West Mulbcrry Boulevard, Suite 200 Poolrs, GA 31322 Phone: 912-790-0011 Change Order Proposal Owner : AUGUSTA-R1Cti1►10ND COUIV7Y, GA Change Order Proposal i! : Owaer #28 Project: 2103-11 AUGU3'I'A FBOTERMINAL Date: 1/SD12012 ArchEtcM: �'-amp & ParLs Ca=inecrs The Contract Documertts f� ihe abovc rcfcrcnced project are hereby changed as set forth below. To avoid w�y schcdu�e delays in the work Ihat could im�ct Ihe cost and schedule, ihe Ca�tredor is dirested to procecd with this worl+ immediately upon Owtcei's authorization in Ihe spscc provided bebw. Descriptioo of Work: Unfaced Batt'Insulatlon This CoP'is issue� in respoose to Architect's ca�i�espondence changing the batt iasulativn at exterior walls from Foil Faced Fiber� Insulation to t)nfaced F'bergiass Insulation to mat Butlding Codc�reqairwnents. We have proceeded with this change in order to prevent delay to the project. Please review for approval as soon as possible. It� : 1 Uafaced Fiberalass Insulation Phrse Deseriplfon Coat Type Quant llM Untt Cmt Amoaot 9250. - 7TtUSSESIMTL. STUD/ DRYWA4L/JNt 4 SUB 0.00 L5 0.00 S-950.18 Furntsh ond ins�al! tl�/'aced Fiberg/ass /nsulation in /ieu of Fofl Face Fiberglass insulation in exJerior walls as required by Bui(ding Code for SmoG•e and l7ome Spread characterisrlcs. SCD, lnc. /2,686 SFx (5.071SF) _ (5888.02) +Tar = (�950.18) Subcantnctors Totai 950.18 Subtotal 5-950.18 Uverhead 50.00 Genera! Lin6ilitY Insnraace 50.00 Buaiaess Licease 50.00 Safetv 50.00 P&P Boad 50.� Field OH & Supervlsion 50.00 Plans/PostaedCourier 50.00 Fce o.o�°� 50.00 Subsnard SO.DO Builder's Riak Insnrancc S0.00 Requested Totai For Ytem 1 5-950.18 Total For Change Order Proposal 5-950.18 � � ��. �, �, �� �"' � �1��`'�;'"� �,�, s � ,�.. � �'� Approved B• ch'tect Submiited By: Appro �bwner) .°o� ✓� �,� l , ,�d�Yi , j �"' � a',� s� Camp & ' c�ers CHOATE CONSTRU MPANY'� AUC�S'l�A�'�tl �t? ��� �G� �� / �� +_ '" 3 .'� . � 4 7�+ � Sig Signed: � Si ed. � " � gn . � Date. � 2 1 Z Date: _ 1 Z� Z '3�1�,,�t� ' 'I Z:.� ; Page 1 of 1 1l20/2012 1 L• 15:21 AM