HomeMy WebLinkAboutCONTRACT MODIFICATION #3 REEVES CONSTRUCTION FRONT DOOR PARKING IMP AUGUSTA REGIONAL AIRPORT � '
Cantract Modification #3
Airport: Augusta Regionai Airpart Date Initiated: 21 Septemb�r 2011
Owner: Ciiy of Augusta Froject: Front Door Parking Improvemen#s
Cantractor: Reeves Constructiort Project �lumber: 0733-18
Gnmpany —
The contractor is requested to pertorm the follawing work described upon receipt of an
approved copy of this dacument or as directed by the engineer. �
,
Item Description Unit Quanfity Unit Price ���e �tem
# Price
1 COMCAST Duct 8ank Canstruction LS 1 $16,368.00 $16,368.Q0
2 Gear ia Power Line Relocation L.S 1 $37 280.00 $37,280.00
3 Dual Retention Pond Consfruction LS 1 $16,652.Ofl $16,652.00
4 Toll Booth Additions LS 9 $43,960.a0 $43,960.00
5 2.5" Pressure Reducer and 9.5° Valve LS 1 $2 270.OQ $2,27d.00 —
Slotted Board Dam - Erosion
� Protectian � � $1,950.40 $1950.40
7 Wheel Sto lnstailation and Removal LS 1 $5,032.00 $5 032.00
8 Li ht Plant Rental and Maintenan�e LS 1 $36,a40.�C1 $36 000.00
Contract Madification #3 Sub Total $159,512.40
Total Confract Amount
Ori inal Contract Total $�t,310 823.10 �
Previous Contract Modification Tota1 CM#1 -$39,362 75
Previous Contract Modification Total CM #2 �$33,660.00
This Contract Madification 7'otal CM#� +159,512.40 _
Revtsed Contract Total $4,464 632,75
Total Contract T'ime
Ori inal Contract Tims 250 calendar da s
Ghan es fo Contract Time from Previous Cantract Modifications 5 calendar da s
Chan es to Contract Time from This Contract Modification a calendar da s
Revised Cantract Ttme Total 255 calendar da s
Addiiionat time and cast ipdicated above covers only ihe actual construction duration of the
lisfed items. The avera(I impact of the utility conflicts shall be determined once relocations are
camplete. _
This document shall become an amendmenf to the contract and all provisions of the contract
wiil apply.
�
�
I
I
�
�
�
JustificaEion for Cban�e
1. Brief descr�ption af the praposed contract changes �nd' locat►ons:
1. ReE an existing COMCAST Duct Bank line in order to nat obstnact F'atking �.ot
cohsi�uc#lon.
2. Reroufe Georgia Power Line in oMerto not obstruct Park)ng Lo# constn�ctian.
3, FZedeslgn layout o� the retenfion pand in order tv nat affeot the existing AT&T cable
crossing Alrport prop�rty.
4. Redesign to1! booth based ot� Rspublic Pafking's request for changes.
5, fnstall � pressure r�ducir�g vaiva sssaciated wftM the 9.5" w�ter service line elong
Hangar Road. A#sa ins3aA a valva an the s�stf�g dornestic service i�ne t� the farmer
FBO.
6. insteii add€tianai eroslon ptotection devia�s to the retsntic�n basln as a resuif ta the
redesign per item 3 above.
7. InstaH whest stops for tt�e ter�po�ary Parking lots ln the front of the termfinai building.
8, InstaJ! and mainta[n requested light ptants for the temporary parking lots lns#alled in tha ,
front ofi the terminai build(ng.
I '
C&PE ProJe�t #; 073 �98 Contract Modificafion # 3
Recommended
bY: ,l� a /1
Ca beti � paris En n� t� ate
Accspfed by: � � �� j,
!
l / �,.
Reeves Con�tructdon �ompany �ate
Approved byc �J' —2�' !!
Aug st Regia�a Alrport DatA
Appraved by:
�
Clty of gusta Date
Approved by: ��� � k
. 1
. __f� � Davi Copenhaver, Mayor Date
Attest; � �{ �
I
Ierk of C'ommission �
Clerk (Seal) i
�
�
Approved as to farm: �
County Attorney �
. r