Loading...
HomeMy WebLinkAboutCONTRACT MODIFICATION #3 REEVES CONSTRUCTION FRONT DOOR PARKING IMP AUGUSTA REGIONAL AIRPORT � ' Cantract Modification #3 Airport: Augusta Regionai Airpart Date Initiated: 21 Septemb�r 2011 Owner: Ciiy of Augusta Froject: Front Door Parking Improvemen#s Cantractor: Reeves Constructiort Project �lumber: 0733-18 Gnmpany — The contractor is requested to pertorm the follawing work described upon receipt of an approved copy of this dacument or as directed by the engineer. � , Item Description Unit Quanfity Unit Price ���e �tem # Price 1 COMCAST Duct 8ank Canstruction LS 1 $16,368.00 $16,368.Q0 2 Gear ia Power Line Relocation L.S 1 $37 280.00 $37,280.00 3 Dual Retention Pond Consfruction LS 1 $16,652.Ofl $16,652.00 4 Toll Booth Additions LS 9 $43,960.a0 $43,960.00 5 2.5" Pressure Reducer and 9.5° Valve LS 1 $2 270.OQ $2,27d.00 — Slotted Board Dam - Erosion � Protectian � � $1,950.40 $1950.40 7 Wheel Sto lnstailation and Removal LS 1 $5,032.00 $5 032.00 8 Li ht Plant Rental and Maintenan�e LS 1 $36,a40.�C1 $36 000.00 Contract Madification #3 Sub Total $159,512.40 Total Confract Amount Ori inal Contract Total $�t,310 823.10 � Previous Contract Modification Tota1 CM#1 -$39,362 75 Previous Contract Modification Total CM #2 �$33,660.00 This Contract Madification 7'otal CM#� +159,512.40 _ Revtsed Contract Total $4,464 632,75 Total Contract T'ime Ori inal Contract Tims 250 calendar da s Ghan es fo Contract Time from Previous Cantract Modifications 5 calendar da s Chan es to Contract Time from This Contract Modification a calendar da s Revised Cantract Ttme Total 255 calendar da s Addiiionat time and cast ipdicated above covers only ihe actual construction duration of the lisfed items. The avera(I impact of the utility conflicts shall be determined once relocations are camplete. _ This document shall become an amendmenf to the contract and all provisions of the contract wiil apply. � � I I � � � JustificaEion for Cban�e 1. Brief descr�ption af the praposed contract changes �nd' locat►ons: 1. ReE an existing COMCAST Duct Bank line in order to nat obstnact F'atking �.ot cohsi�uc#lon. 2. Reroufe Georgia Power Line in oMerto not obstruct Park)ng Lo# constn�ctian. 3, FZedeslgn layout o� the retenfion pand in order tv nat affeot the existing AT&T cable crossing Alrport prop�rty. 4. Redesign to1! booth based ot� Rspublic Pafking's request for changes. 5, fnstall � pressure r�ducir�g vaiva sssaciated wftM the 9.5" w�ter service line elong Hangar Road. A#sa ins3aA a valva an the s�stf�g dornestic service i�ne t� the farmer FBO. 6. insteii add€tianai eroslon ptotection devia�s to the retsntic�n basln as a resuif ta the redesign per item 3 above. 7. InstaH whest stops for tt�e ter�po�ary Parking lots ln the front of the termfinai building. 8, InstaJ! and mainta[n requested light ptants for the temporary parking lots lns#alled in tha , front ofi the terminai build(ng. I ' C&PE ProJe�t #; 073 �98 Contract Modificafion # 3 Recommended bY: ,l� a /1 Ca beti � paris En n� t� ate Accspfed by: � � �� j, ! l / �,. Reeves Con�tructdon �ompany �ate Approved byc �J' —2�' !! Aug st Regia�a Alrport DatA Appraved by: � Clty of gusta Date Approved by: ��� � k . 1 . __f� � Davi Copenhaver, Mayor Date Attest; � �{ � I Ierk of C'ommission � Clerk (Seal) i � � Approved as to farm: � County Attorney � . r