HomeMy WebLinkAboutCONTRACT MODIFICATION #4 TO REEVES CONSTRUCTION COMPANY'S CONTRACT AT AUGUSTA REGIONAL AIRPORT IN THE AMOUNT $16,403.60 PROJECT FRONT DOOR PARKING IMP Contract Modification #4
Airport: Augusta Regional Airport Date Initiated: 27 November 2011
Owner: City of Augusta Project: Front Door Parking Improvements
Contractor: Reeves Construction Project Number: 0733-18
Company _
The contractor is requested to pertorm the following work described upon receipt of an
approved copy of this document or as directed by the engineer.
Original
Original Revised Revised Original Revised
Item # Description Unit Quantity Quantity Unit Unit Price Price Price
Price
New-1 4" GABC SY 0 1,783 $0.00 $9.20 $0.00 $16,403.60
$0.00 $16,403.60
Total Contract Amount
Ori inal Contract Total $4,310,823.10
Previous Contract Modification Total CM#1, 2, & 3 +$153,809.65
This Contract Modification Total CM #4 +$16,403.60
Revised Contract Total $4,481,036.35
Total Contract Time
Ori inal Contract Time 250 calendar da s
Changes to Contract Time from Previous Contract 5 calendar days
Modifications
Chan es to Contract Time from This Contract Modification 0 calendar da s
Revised Contract Time Total 255 calendar da s
This document shall become an amendment to the contract and all provisions of the
contract will apply.
Justification for Change
1. Brief description of the proposed contract changes and locations:
Item New-1 is associated with the additional temporary parking area in front of the main
terminal building. It was determined that an additional row of parking could be added to
each temporary parking lot. This temporary parking will be used for over flow parking.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surface will be exposed aggregate.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surFace will be exposed aggregate.
�-i�s#�it�Q-#�e�be�-e�e-ea�e-i�-#�e-ee��#�
'11�St"d�t�'�j1���6f1 , 1019. '-�:" ,..,��
'I`8�6EE1�� •
2. Reasons for the changes:
Due to the current construction activities at the airport, existing parking spaces are
being taken out of service. Therefore, the need for the temporary parking lot is
required.
3. The sponsor's share of this cost is available from:
� L � - 0 - 3 -- •�0
The contract modification will result in an increase in cost of ��e�-�'. It is the option
of the sponsor whether to proceed with a portion or all of the work. tlw
4. Has consent of surety been obtained? �s Not Necessary■
5. Will this change affect the insurance coverage?p'es �No
C&PE Project #: 0733-18 Contract Modification # 4
� Nov 27, 2011
Recommended by: ---`- ----- -------------
Cam ell & Paris En eers Date
Accepted by: ,� _>
(�..,.�- /(- 29- /r
------------------------------- ---------------
Reeves Construction Company Date
Approved by:
� I�- � -ll
--- - - - --------------------- ---- -----------
Au us Reg o al Airport Date
�....f �- P
Approved by: . , _ j L � �' ! _� Z '---
-------`-"'= -�-�-- -- _ —=---
���, City of Augusta Date
������
Submit 4 original copies to the City of Augusta.
R E E V E S
1 APAC Industrial �Vay Post Officc Box 1129
Augusta, Georgia 30907 Rce��es Construction Compeny Augt�sta, GeorgiA 30903 '
Phone: (706) 731-5230 East Region Oflicc i'acsimile: (70G) 731-8G20
November 22, 2011 ,
Jack Ma�eld
Campbell and Paris Engineers
707 East Franklin Street, Suite C
Richmond, Va. 23219 '
RE: Augusta Regional Airport ,
Front Door Parking Improvements
Temporary Parking Proposal — Additional Square Yardage �
Mr.Mayfield,
i
Reeves Conshuction Company submitted a proposal to add two temporary parking areas on the
above referenced project. After the initial proposal, the total sc�uare yardage requested by the
airport increased by 1,783 SY. Our quote for this additional area is listed below. ;
Description Quantity Unit Unit Total '
Price
4" G.A.B.C. 1,783 SY $9.20 $16,403.60
Total Pro osal Re uest $16,403.60
r
If you have any questions, please don't hesitate to ask.
Si c ely,
all Sugg
Project Manager `
Reeves Construction Company
File: 508114
Grovetown Plant 504: (70b) 210-1082 • Augusta Plant 602: (706) 731-8G1G
Statcsboro PIAnt SOl: (9l2) G81-2992 • Millen PlAnt 804: (478) 982-0977
Statesboro Ofticc Phone: (912) G81-1491 Tacsimile: (912) C81-1887
Contract Modification #4
Airport: Augusta Regional Airport Date Initiated: 27 November 2011
Owner: City of Augusta Project: Front Door Parking Improvements
Contractor: Reeves Construction Project Number: 0733-18
Company
The contractor is requested to perform the following work described upon receipt of an
approved copy of this document or as directed by the engineer.
Original
Item # Description Unit Original Revised Unit Revised Original Revised
Quantity Quantity Price Unit Price Price Price
New -1 4" GABC SY 0 1,783 $0.00 $9.20 $0.00 $16,403.60
$0.00 $16,403.60 _
Total Contract Amount
Ori inal Contract Total $4,310,823.10
Previous Contract Modification Total CM#1, 2, & 3 +$153,809.65
This Contract Modification Total CM #4 +$16,403.60
Revised Contract Total $4,481,036.35
Total Contract Time
Ori inal Contract Time 250 calendar da s
Changes to Contract Time from Previous Contract 5 calendar days
Modifications
Chan es to Contract Time from This Contract Modification 0 calendar da s
Revised Contract Time Total 255 calendar da s
This document shall become an amendment to the contract and all provisions of the
contract will apply.
Justification for Change
1. Brief description of the proposed contract changes and locations:
Item New-1 is associated with the additional temporary parking area in front of the main
terminal building. It was determined that an additional row of parking could be added to
each temporary parking lot. This temporary parking will be used for over flow parking.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surface will be exposed aggregate.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surface will be exposed aggregate.
�#e�-PJe�i�-�,;��1 ��e;�#i�er-e�#�e-ee�+e-;,9-#�e-ee�dt��#
-insta�i�d-i�y-�i�-eon#�ra , •eri. T�:� ���le-�vas�-r�q�ired-#e-�e
�r•e�eea#�e-#i�e�e .
2. Reasons for the changes:
Due to the current construction activities at the airport, existing parking spaces are
being taken out of service. Therefore, the need for the temporary parking lot is
required. -
3. The sponsor's share of this cost is available from:
� 1 `� - 0 � 3 -- .��
The contract modification will result in an increase in cost of $�. It is the option
of the sponsor whether to proceed with a portion or all of the work. rN+-
4. Has consent of surety been obtained? �s Not Necessary■
5. Will this change affect the insurance coverage?Q'es ■No
C&PE Project #: 0733-18 Contract Modification # 4
� Nov 27, 2011
Recommended by: ---`— ---� --------------
Cam ell & Paris En eers Date
Accepted by: � _>
(]c.-,.-- /(� 29- /r
------------------------------ ----------------
Reeves Construction Company Date
Approved by:
-------------------------------- ----------------
Augusta Regional Airport Date
Approved by:
------------------------------ ---------------
City of Augusta Date
Submit 4 original copies to the City of Augusta.
R E E V E S
1 APAC industrial Way Post Officc Box 1129
Augosta, Georgia 30907 Rceves Construction Company Augusta, Georgia 30903
Phone: (706) 731-5230 East Region Ofiicc I+acsimile: (706) 731-
November 22, 2011
Jack Mayfield
Campbell and Paris Engineers —
707 East Franklin Street, Suite C
Richmond, Va. 23219 :
RE: Augusta Regional Airport
Front Door Parking Improvements
Temporary Parking Proposal — Additional Square Yardage �
f
Mr.Mayfield, �
Reeves Const�uction Company submitted a proposal to add two temporary parking areas on the
above referenced project. After the initial proposal, the total square yardage requested by the
airport increased by 1,783 SY. Our quote for this additional area is listed below. ;
�
Description Quantity Unit Unit Total '
Price
4" G.A.B.C. 1,783 SY $9.20 $16,403.60
Total Pro osal Re uest $16,403.60
If you have any questions, please don't hesitate to ask.
Si c ely, '
all s Sugg
Project Manager �
Reeves Construction Company
File: 508114
Groveto�vn Plant 504: (706) 210-1082 • Augusta Plant 602: (�06) 731-8G1G
Statesboro Plant 801: (912) G81-2992 • Millen Plant 804: (478) 982-4977
Statesboro Office Phone: (912� G81-1491 Ts�csimile: (912) (81-1887
Contract Modification #4
Airport: Augusta Regional Airport Date Initiated: 27 November 2011
Owner: City of Augusta Project: Front Door Parking Improvements
Contractor: Reeves Construction Project Number: 0733-18 _
Company
The contractor is requested to perform the following work described upon receipt of an
approved copy of this document or as directed by the engineer.
Original
Item # Description Unit Original Revised Unit Revised Original Revised
Quantity Quantity price Unit Price Price Price
New -1 4" GABC SY 0 1,783 $0.00 $9.20 $0.00 $16,403.60
$0.00 �16,403.60
Total Contract Amount
Ori inal Contract Total $4,310,823.10
Previous Contract Modification Total CM#1, 2, & 3 +$153,809.65
This Contract Modification Total CM #4 +$16,403.60
Revised Contract Total $4,481,036.35
Total Contract Time
Ori inal Contract Time 250 calendar da s —
Changes to Contract Time from Previous Contract 5 calendar days
Modifications
Chan es to Contract Time from This Contract Modification 0 calendar da s
Revised Contract Time Total 255 calendar da s
This document shall become an amendment to the contract and all provisions of the
contract will apply.
Justification for Change
1. Brief description of the proposed contract changes and locations: —
Item New-1 is associated with the additional temporary parking area in front of the main
terminal building. It was determined that an additional row of parking could be added to
each temporary parking lot. This temporary parking will be used for over flow parking.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surface will be exposed aggregate.
The temporary parking lot will consist of 4" of Graded Aggregate Base Course (GABC)
and surFace will be exposed aggregate.
�#e�-�e�-is-assoei�#ec�-w�#�-G9�4GAE�-�e�l�g-t��-#i�e�o�e-ea��e-i��e-ee�dt��# ��� �
-insfia�l-by-#i��-�o�#raet , etior�--����e��e�vas�-r��+re��e-�e
�e�eea#�d-dtie�e�� -F�e��Beer-�e�{eiflg��:e#.
2. Reasons for the changes:
Due to the current construction activities at the airport, existing parking spaces are
being taken out of service. Therefore, the need for the temporary parking lot is
required.
3. The sponsor's share of this cost is available from:
� IG � `� � 0 � 3 �� .�� -
The contract modification will result in an increase in cost of �r3�9�-E�7. It is the option
of the sponsor whether to proceed with a portion or all of the work. r1�^�
4. Has consent of surety been obtained? �s Not Necessary■
5. Will this change affect the insurance coverage?p'es �No
C&PE Project #: 0733-18 Contract Modification # 4
� Nov 27, 2011
Recommended by: ----- ----- -------------
Cam ell & Paris En eers Date
Accepted by: � � �
/(- 29- Ir
------------------------------ ----------------
Reeves Construction Company Date
Approved by: ��^ � _ � I
----- - - ------------- ----------------
Aug ta egi I Airport Date
Approved by: _`_� , -- ' �� � t 't_. -
' �- - - -----� ------
------- � -------------
�J�� City of Augusta Date
��
�.���/«
Submit 4 original copies to the City of Augusta.
R E E V E S
I APAC Industrial �Vay Post Officc Box 1129
Augnstn, Georgia 30907 Rceves Construction Comp�ny Augusta, GeorgiA 30903
Phone: (706) 731-5230 East Region Of'fice Racsimile: (706) 731
November 22, 2011
Jack Ma�eld
Campbell and Paris Engineers
707 East Franklin Street, Suite C
Richmond, Va. 23219
RE: Augusta Regional Airport
Front Door Parking Improvements
Temporary Parking Proposal - Additional Square Yardage �
�
Mr.Mayfield, �
Reeves Constiuction Company submitted a proposal to add two temporary parking areas on the
above referenced project. After the initial proposal, the total square yardage requested by the
airport increased by 1,783 SY. Our quote for this additional area is listed below. ;
Description Quantity Unit Unit Total ' -
Price
4" G.A.B.C. 1,783 SY $9.20 $16,403.60
Total Pro osal Re uest $16,403.60
If you have any questions, please don't hesitate to ask.
Si c ely,
all Sugg
Project Manager
Reeves Construction Company :
File: 508114
Grovctotvn Plant 504: (706) 210-1082 • Augusta Plant 602: (705) 731-SG1G
Statesboro Plant SOL• (912) G81-2992 � Millen Plent 804: (478) 982-4977
Statesboro Ofticc Phone: (912) G81-1491 I�ACSimile: (912) (81-iR87
__ _
.� 1 � �� ,�� Office of the Adminis �
.. ��..,m.aE" .FL aF,:. �
� � � ..� "t .. �i,s
=sT.t ..x �fi;1, ` a � .
?"y, � � hy <f. y�''� �� F
G$; � j „� �f H�� ��tt� A fr�erick L Russell, Administrator Room 801 , Municipal Building
S30 Greene Street-AUGUSTA, GA. 30901
Tameka Men, Deputy Administrator (706) 821-2400 - FAX (706) 82 i-2819
V1�illiam P. Slianahan, Deputy Administrator www.augustaga.gov
v
January 17, 2012 ��
D
� �� ��
Mr. Gary Le Tellier �� �
Director—Augusta Regional Airport �
1501 Aviation VYay
Augusta, GA 30906 ��' .
DearGary: ���.� v�!�� ��� F"��:��
The Augusfa-Richmond County Commission, at their regular meeting held on Tuesday, January 17, 2012 took action on the
following items.
� � � � �.. _�� ,�,. _ � T
�u � ,>..,�
� ,. „ ,.<• �. . , ,�_ . ., � � . ,. _ . -
� . ,.
_.. _ r �� _ , �
�.,,
, > e
,..
, . . "
13 Approved the Fourth Amendment to the Republic Parking Management Agreement at Augusta Regionai Airpbrt in the
amount not to ezceed Sfi5,347.11 fo� fiscal year 2012. {Approved by �ubiic Servic'es Committee January 9, 20Y2}
14. ApproVed an Ordinance amending Title I General Gove�nmeM, Chapter 3, Aviation Commissions Anicle S AiPpbrts
and Aviation, Section 1-3-43 of the Augutta, Georgia Code of Ordinances to adopt new Rules and Regulations for fhe
operafion of Augusta Regional Airport at BUsh Ffeld• to p�bvide an effective date and for other purposes. �Approved
by Publit Services Committee January 9, 2012)
16. Approved the Contract Closeout between Augusta Regional Airport and Sommers Construction at a cost not to exceed
$9,782.00. {Approved by Public Services Committee January 9, 2012)
29. Approved the Contract Modification #5 to the Choate Construction Company Contract at Augusta Regional Ai�pbrt in
an amount not to exceed $33,027.01. (No retommendation from Public Services Committee lanuary 9, 2012}
33. Approved the ratificatian of the Commission's Authorization letter dated January 3, 2012 regarding the
construction o# a hanger and support space for a State Patrol Helicopter.
If you have any questions, please contatt me.
Your uly, _ -
�
,`
ty Adrnlnistrator
Ol-i7-12 # 12, #13, #14, #t16, #t29, #33
cc: Ms. Donna Williams
Ms. Geri Sams
�- 5 ��� , - ;�=—�- AUGUSTA LAW DEPARTMENT
G ; E' (� , R �3: I , 'A
Matt Aitken
ANDREW G. MACKENZIE Corey 7ohnson
GENERAL COUNSEL Joe Bowles
Augusta Law Department Alvin Mason
DAVID S. COPENHAVER Bill Lockett
Mayor WAYNE BROWN Joe Jackson
Senior StaffAttorney Jerry Brigham
Jimmy Smith
KENNETH S. BRAY J. R. Hatney
JODY SMITHERMAN Don Grantham
Aivirr NLasox KAYLA COOPER
Mayor Pro Tem Staff Attomeys FREDERICK L. RUSSELL
Administrator
January 25, 2012
Mayor Deke Copenhaver
Augusta, Georgia
530 Greene Street, Suite 802
Augusta, Georgia 30901
Dear Mayor Copenhaver:
Please fmd enclosed the Reeves Construction Modification #4 in the amount of $16,403.60 at _
Augusta Re�ional Airport that have reviewed as to form and substance. Augusta, Richmond County
Commission approved this contract on January 17. 2012.
I have tabbed the applicable portions of the lease for your signature with flags. After your signature and
dating, the lease may be executed by the Clerk of Commission, Ms. Lena Bonner.
Please return the copies of the contract to the originating department and the attention of: Mr. Gary Le
Tellier, Director, 1501 Aviation Regional Airport, Augusta, Georgia 30906.
Thank you for your consideration in this matter.
Sincerely,
,:, �� ��
,a �
w a .� �f .� ,:! :y :, i