Loading...
HomeMy WebLinkAboutCHANGE ORDER 2 BLAIR CONSTRUCTION CO BUTLER INTERCEPTOR EAST PH 2 SANITARY SEWER PROJECT 6010821817 t � ' �3 � �� f CONSTRUCTION CONTRACT CHANGE ORDER CO NUMBER 2 BID ITEM 09-185 DATE 9/22/11 PROJECT TITLE Buflex Interce�tox East Ph 2 Sanitarv Sewex Project 60108 ORIGINAL CONTRACT DATE 5 4 2010 PROJECT NUMBER 60108 OWNER AUGUSTr�, GEORGIA PO NUMBER P182619 The following change is hezeby made to the contract for the above project: Description of Change: The requirements of the contract include upgades and replacement of the existing Butler Creek Interceptor sanitary sewer main. Phase II of the Interceptor upgrade includes 14,085 linear feet of 42" diameter D.LP., which then connects to the Phase I portion of the Interceptor Upgrade leading to the wastewater treatment plant. The main objective of this design modification is to provide sanitary sewer to a small pocket of businesses and residences along Dixon Airline Road and to complete the creek crossing of the new 24" water main along Mike Padgett Highway (Hwy 56). The project will consist of approximately 1,695 linear feet of 12" sanitary sewer main along Dixon Airline Road with service connections, and 820 linear feet of 24" ductile iron water transmission main crossing Butler Creek along the right-of-way of Mike Padgett Highway (Hwy 56). COMMISSION APPROVAL WAS PROVIDED ON 9/06/11. PAYEE Blair Construction Company, Inc. TOTi1L AMOUNT OF THIS CHr�NGE ORDER (2) $ 396,641.00 The contract time will be INCREASED by 150 calendar days as a result of this change. ORIGINr1L CON1'Ri�CT �MOUNT $ 4,183,676.26 PREVIOUS CHANGE ORDER (1) (INCREASE) $ 11,574.00 THIS CHANGE ORDER (INCREASE) (2) $ 396,641.00 TOTr1L REVISED CONTR��CT AMOUNT WITH CHr�NGE ORDER $ 4,591,891.26 FUNDING NUMBER/ACCOUNT NUMBER G/L 507043420 5425210 J/L 80360107 5425210 ' DATE: j PROPOSED BY: ""��(/� � �� • �"Z — �O / � CONTRACTOR _.. � DATE: � � � ` REQUESTED BY: Q PR J MANAGER SUBMITTED BY: / �`r�J�,,� � � � Dr�TE: '"� �'2� 6r j I I , �. �..+4►�.i"�. DIRECTOR D�TE: � FINANCE ENDORSEMENT: �� ��1� �,,��� � �_ �� �? - �� COMPTROLLER � DATE: / �PPROVED BY: �� `�' l � (1 ( AYOR