Loading...
HomeMy WebLinkAboutCHANGE ORDER 5 JOHNSON, LASCHOBER & ASSO AND PC $92,500.00 To: Mayor Copenhaver, for signature. 09/27/11 sh . ,� DESIGN CONTRACT CHANGE ORDER CO NUMBER 5 BID ITEM DATE 9/6/11 PROJECT TITLE Design conrrac[ change for Fort Gordon - 1.0 Million Gallon Elevated Stordge Tank • Projecc ORIGINAL CONTRACT DATE 4 26 01 PROJECT NUMBER 00�2 OWNER AUGUSTA-RICHMOND COUNTYCOMMISSION PO NUMBER P40360 The following change is hereby made to the conuact for the above pxoject: Descxiption of Change (for a more detailed description see attached proposal): To complete this task a boostex pump station will need to be installed to raise the e�sting (HGL) Hydraulic Gxade Line to the level xequired by the system. JLA �vill perform the pxelirsunary site inspecrion, engineering analysis, coordination meetings, and design of the booster station, bid-package preparation, and construcuon- �hase support services duxing construcrion. PAYEE Johnson, Laschober & Associates, and P.C. TOTAL AMOUNT OF THIS CHANGE ORDER � 92,500.00 ORIGINAL CONTRACT AMOUNT $ 131,250.00 PREVIOUS CHANGE ORDER (INCREASE) $ 137,027.00 THIS CHANGE ORDER (INCRF,ASE) $ 92,500.00 TOTAL REVISED CON'TRACT AMOUNT WITH C IIANGE O RDER $ 360,777.0 Fi;ivi I'iviJ iVUiviBER/t1CCOUNT NULIBER 509043410 5212i1� 80110425 5212115 PROPOSED BY: DATE: � �� ES NGINEER REQUESTED BY: DATE: G� _'j� � � �yv E R �}�` °e, SUBMITTED BY: ._., �.. •�. � "X�^+. DATE: � �'�„a �' : i% DEPARTMENT HEAD FINANCE ENDORSEMENT: � Z�� ����� j DATE: ���_�� ' COMPTR E RECOMMENDED BY: DATE: 4 a�' !/ ADMINISTRATOR APPROVED BY: <�,,,,�� ` __ DATB: � j� / � t t YOR � G3CC����;�� [� �a�C��;v;��tor s `�' Z�J��: i SEP 2 3 2011 Accounting Department `; % �