DESIGN CONTRACT CHANGE ORDER
CO NUMBER 5
BID ITEM
DATE 9/6/11
PROJECT TITLE Design conrrac[ change for Fort Gordon - 1.0 Million Gallon Elevated Stordge Tank •
Projecc
ORIGINAL CONTRACT DATE 4 26 01 PROJECT NUMBER 00�2
OWNER AUGUSTA-RICHMOND COUNTYCOMMISSION PO NUMBER P40360
The following change is hereby made to the conuact for the above pxoject:
Descxiption of Change (for a more detailed description see attached proposal):
To complete this task a boostex pump station will need to be installed to raise the e�sting (HGL) Hydraulic
Gxade Line to the level xequired by the system. JLA �vill perform the pxelirsunary site inspecrion, engineering
analysis, coordination meetings, and design of the booster station, bid-package preparation, and construcuon-
�hase support services duxing construcrion.
PAYEE Johnson, Laschober & Associates, and P.C.
TOTAL AMOUNT OF THIS CHANGE ORDER � 92,500.00
ORIGINAL CONTRACT AMOUNT $ 131,250.00
PREVIOUS CHANGE ORDER (INCREASE) $ 137,027.00
THIS CHANGE ORDER (INCRF,ASE) $ 92,500.00
TOTAL REVISED CON'TRACT AMOUNT WITH C IIANGE O RDER $ 360,777.0
Fi;ivi I'iviJ iVUiviBER/t1CCOUNT NULIBER 509043410 5212i1�
80110425 5212115
PROPOSED BY: DATE: � ��
ES NGINEER
REQUESTED BY: DATE: G� _'j� �
� �yv
E R
�}�` °e,
SUBMITTED BY: ._., �.. •�. � "X�^+. DATE: � �'�„a �' :
i%
DEPARTMENT HEAD
FINANCE ENDORSEMENT: � Z�� ����� j DATE: ���_�� '
COMPTR E
RECOMMENDED BY: DATE: 4 a�' !/
ADMINISTRATOR
APPROVED BY: <�,,,,�� ` __ DATB: � j� / � t
t
YOR
�
G3CC����;�� [�
�a�C��;v;��tor s
`�' Z�J��: i
SEP 2 3 2011
Accounting Department
`; % �