Loading...
HomeMy WebLinkAboutCHANGE ORDER 2 KHAFRA ENGINEERING CONSULTANTS INC $227,558.00 � � (r-�L�C't�'���� SEP 2 6�SIG CONTRACT CHANGE ORDER Accountinc� Department CO NU:�ER 2 BID ITEM 08-173 DATE 9/6/11 PROJECT TITLE n��ign conttaet for Augusta Utilities Dc�artment project Water hiain Rc.�laeements for l�ort Gordon Recrcation Area at'I'hurmond I,ake ORIGINAL CONTRACT DATE 1] 25 PROJECT NUMBER QQ7Q OWNER <�UGUSTA-RICHATOND COUN'TYCO��ISSIOti PO NUMBER P158506 The following change is hereby made to the contract for the above project: Descriprion of Change (for a more detailed descriprion see attached pxoposal): The privatizarion of utiliries contract between Fort Gordon and Augusta Richmond County was awaxded September 2007. The requirements of the contract include executing the capital upgrades of the water and wastewater s}stems throughout the installarion oFFort Gordon. The objective of this capital project is to replace the lift-station based sanitary sewer system with an 8-inch gravity sewer system that will service to the Fort Gordon Recrearion Area at Thurmond Lake in Columbia County, GA. The project will consist of approximately 15,000 linear feer of 8" P�'C sewer main throughout the recreational area with service connections. PAYEE Khafra Engineering Consultants, Inc TOTAL :1�IOUNT OF THIS CH.�INGE ORDER � 227,558.00 ORIGINAL CONTRr1CT AMOUNT $ 147,753.00 PREVIOUS CHANGE ORDER (INCREASE) $ 0 THIS CHANGE OR.DER (INCREASE) $ 227,558.00 TOT:�I. REVISED CONTRACT AM4UNT WITH CHANGE ORDER $ 375,311.00 FUNDING NU�iBERJACCOUNT NU'�IBER 507043410 5212115 88880070 5212115 PROPOSED BY: DATE: -- + n�� �+rn�� �¢ �.t--- I)ES1GN ENGII�SI;F,R � DATE: REQUESTED BY: � .NGINLI3R SL`BMITT'ED BY: �t+Wti (�}�,t� DATE: �� ��r � r 1 IUI:PAR'1 M1;N'I' I il?,AD FINANCE ENDORSEMENT: r'� �� DATE: �/U✓YtG�� �:��C.J�G/ � ��`f, COl� IROI,I.,I�.R DATE: / � y `/ RECOb�Ll�1�DED BY: / / f DMINIS'I12AT'OR < DAT'E: �� - j APPROVED BY: � � �.---"....---- _...�.. � ��iC� � I � � OR . a