Loading...
HomeMy WebLinkAboutSOMMERS CONSTRUCTION AUGUSTA REGIONAL AIRPORT TERMINAL AREA RENOVATIONS � =-�:-- Document A101TM - 2007 S#andard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum � AC�REEMENT �nade as of the day of April in the year 2011 {In worcls, a�rdicate day, month and�+ear:� ear $ETIIUEE�i the Qwner. � (Name; �+�ra4addr�s msd other information) This document has impwtant Ci�4�AuguSt�„ �OT',t�'te A�ug#tsta Aviahon Commission legal consequences. Consultation � � ���'����'���t with an attorney Au ta GA 3fl9a1 ' is encouraged with respect to its completion or modification. c11CliI the GcAlfcaGEOT': �(Name, �ega�-fffaft�-ad�e�5 and other information) AIA Document A201 *""-2007, General Conditions of the Sammers ConstruCtii� ConVact for Construction, is adopted in this document by 48$g S�erse,j,,,Driwe reference. Do not use with other �vans. GA 3p8�9 general conditions unless this frtit' �laefc�llowing Pt't�ect: document is mod�ed. k (Name, #eee�ie�locat�on. an�l detailed description) '� Au¢usta Re�ional Airnort Termu�t Area Renovations Administration Area Improvements 1501 A�atio� Way, Au�usta. G�r��a 30906 The Architect: # (Nume, �egel-s�sta�s Gamnbell & Paris Ea7�ineers, P.C, — A Vireinia Professional Coro 4��� Lafayette Center Drive, Suite 2 �hanrillv. Y�reinia 2�151 The ()wner and Contraetor agree as follows. AIA Document A701TM' — 2007. Copyright OO 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The Americ� IOit. Institute of Architects. All rights reserved. WARNING This AIA� Document is protected hy U.S. Copyright Law and In[ernational Treaties. Unauthorized .� reproduction or distribution of this AIA"' Document, or any portion of it, may result in severe civii and criminal penalties, and will be prosecuted to the � maximum extent possible under the law. This document was produced by AIA software at 16:35:45 on 04/21 /2011 under Order No.9761278469_1 which expires on 04/18/2012, and is not for resale. UserNotea: (725049942) TABLE QF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3< DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 ' CONTRACT StJ�il 5 PAYMENTS 6 t31�PU'�E R�S01.lJTION 7 ' "tERNNNATI�I bR SUSPENSION $ NII�uCE�.LAN�QtlS PROVISIONS 9 ENUMERATIfkt OF GONTRACT DOCUMENTS iU 4h1SURAt+ICE AND 8f}N� ARTICLE 1 TFi� �ON'!'EtAG'f DOCUMENTS "Yhe Ccrntract l3n¢uments c�msist of this Agreement, Conditions of the Contract (General, Supplementary and other Cond'itions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other docwnents listed iti this t�g��ement , �all of which form the Cantract, and are as:full� a part of the Contract as if attached to this Agreement or �epeste�incorporated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiatians, representations oa� agreernents, either written or oral. An enumerarion of the Contract Documents, other than a �eA�eaEie�appeazs in Article 9. ARTICLE 2 THE iN0�t1{ OF THIS �ONTRACT The C�tttr�ctoz shaIl''fully execute the Work described in the Contract Documents, except as specifically indicated in the Ccmttact DoCUrnents xo be the responsibility of others. AFtTTIGL� 3 DATE OF CO�IM��ICEMENT AND SUBSTANTIAL COMPLETION § 3.1 Th� d8te of commen€ement t�f tiie'Work shall be the date of this Agreement unless a different date is stated b�low or �"o�isicm is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will befzxed in a notice toproceecl.� I The date of commencementwill be set in a Notice to Proceed. Tf, prior tq the Co�nmencement of the Work, the Owner requires time to file mortgages and other security interests, the ihvner's timerequirerrtent sha11 be as follows: f 3.2 The Contract Time shall be measured from the date of commencement. I § 3.3 The Contractar shall achieve Substantial Completion of the enrire Work not later than Six ( 60 days from the daEe of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work.) AIA Document A701 T"' — 2007. Copyright 01915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American I�It. Institute of Architects. All rights reserved. WARNWG: This AIA'�' Document is protected by U.5. Copyright Law and International Treaties. Unauthorized 2 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the � maximum extent possible under the law. This document was produced by AIA software at 16:35:45 on 04/21/2011 under Order No.9761278469_1 which expires on 04/18/2012, and is not for resale. UserNotes: (725049942) Portion of Work Substantial Completion Date , subject to adjustments of this Contract Time as provided in the Contract Documents. (frt,sert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) ARTICLE 4 CONTRACT SUM § d,1 The £�vvner shalt pa�r the Contractor the Contract Sum in current funds for the Contractor's performance of the �ontract. The Contract Sum shall be Nintv Six Thousand Four Hundred Five Dollars ($ $96,405.00 l, subject to addirions and deductic�s as provided in the Contract Documents. §�4.2 The �ontract Sum is t�ased upan the following alternates, if any, which are described in the Contract Documents and ate heeeby accepted by �se Owner: (Stt�te tlte trumbers or other identification of accepted alternates. If the bidding or proposal documents permit the Llwnet'tft accept other dlt�rnates subsequent to the execution of this Agreement, attach a schedule of such other ctl#ernates s�awing �he ctmount for each and the date when that amaunt expires.) � e Sc�pe �f th� c�ttact tneludes the installarion of the Base Bid Items, as well as Add Alternatives 1, 2 and 3. § 4.3 Umt prices, if any, (Identify and state #Zre unit priee; state quantiiy limitations, if any, to which the unit price will be applicable.) ( �tem Units and Limitations Price Per Unit{�9�08� §+�4 Allowances includ� in the Contract Sum, if any: (�dent� ullawanee ats�dstate exclusions, if arry, from the allowance price.) #t�n Price AFtT(CL� � RAYMENTS � 5.1 Pl�l�C�tESS PAYMENTS § 5.1.4 $ased upon Applications fm Payment submitted to the Architect by the Contractor and Cerrificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Ccmtractor as provided below and elsewhere in the Cantract Documents. The terms of this contract sunersede anv and all nrovisions of the .4"reotgia Peompt Pav Act. § 5.1.2 'Fhe period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as fotlows: - § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 20th day of a month, ttte Owner shali make payment of the certified amount to the Contractor not later than the 2oth day of the followin� month. If an Application for Payment is received by the Architect after the applicarion date fixed above, payment shali be made by the Owner not later than Six ( 60 ) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractar in accordance with the Contract Documents. The schedule of values shall allocate the enrire Contract Sum among the AIA Document A101T"' — 2007. Copyright 81915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Iflit. Institute of Architects. All rights reserved. WARN WG: This AIA'�� Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3 reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the � maximum extent possib�e under the law. This document was produced by AIA soRware at 1635:45 on 04/21 /2011 under Order No.9761278469_1 which expires on 04/18/2012, and is not for resale. UserNotes: (725049942) various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis'for reviewing the Contractor's Applications for Payment. § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the peri4d covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by ' multiptying the percentage completion of each portion of the Work by the share of the Contract Sum ' allocat� to that portion of the Work in the schedule of values, less retainage of �ee�%�T� 10°/ Pending finai determination of cost to the Owner of changes in the Work, amounts not in ' dispute shall be included as provided in Section 73.9 of AIA Document A201T'"-2007, General ' Conditions of �tte Contract for Construcrion; ,2 Add thatpot'tion of the Contract Sum properly allocable to materials and equipment delivered and ' suitably stqred;at the site for subsequent incorporation in the completed construction (or, if approved in advance by the O�mer, suitably stored off the site at a location agreed upon in writing), less retainage af �l�{---�Yo};Ten ( 10% �; .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract a�YSaunts,<if any, for which the Architect has withheld or nullified a Certificate for Payment as provisied iri Sectian 9.5 of AIA Document A201-2007. § 5.1.7 The progCess payin�i �#nount determined 'm accordance with Section 5.1.6 shall be further modified under the fvilavwirig cirt�nstances: ,1 , Adcl, ktpon Substanrial Completion of the Work, a sum sufficient to increase the total payments to the fitll a�'tlount Uf tiie Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainag� applicable to such work and unsettled claims; and (Ssction 9.8.5 ofAIA Document A201-2007 requires release of applicable retainage upon Substantial Campletlon of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additia�at amounts,.payable in accordance with Section 9.10.3 of AIA Document A201-2007. §�.1.8 R�duction or limitati� pf retainage, if any, shall be as follows: (7f it is intended, p�ior to Substantiat �ompletion of the entire Work, to reduce or limit the retainage resuliing from the perce�tages in,serled in Sections 5.1. 6.1 and 51.6.2 above, and this is not explained elsewhere in the Contract 1)ocumems,, insert here provisiorts fnrsuch reduction or limitation.) § 5.1.9 Except with the Chvcter's prior approval, the Contractor sha11 not make advance payments to suppliers for materials or equipment whiCh have not been delivered and stored at the site. § 5.2 FINALi PAYMENT § 5.2.1 Fina1 payrrtent, consrituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the �ontractor wh�n .1 the Canh�actor has fully performed the Contract except for the Contractor's responsibiliTy to correct Work as provided in Section 12.2.2 of AIA Document A201 2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. §�.Z.2 The (3wtier's final payment to the Contractor shall be made no later than 30 days aRer the issuance of the AlchiteCk's final Certificate for Payment, or as follows: Init. '0'�A Document A101 T'" — 200�. CopyrigM 01915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and Intemational Treaties. Unauthorized 4 reproduction or distribution of this AIA'" Document, or any portion of it, may result in severe c+vil and criminal penalties, and will be prosecuted Fo the � maximum extent possible under the law. This document was produced by AIA soflware at 16:35:45 on OM21/2011 under Order No.9761278469_1 which expires on 04/18/2012, and is not for resale. UserNotes: (725049942) ARTICLE 6 DISPUTE RESOLUTION § 6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. (If thepctrties mutually agree, i»ser? the name, address and other contact information of the Initial Decision Maker, if Dther than the Architect.) § G;2 BINDING DISPUiE �ESOLUTION Fpr any Claitn subject tp, but not resolved by, mediation pursuant to Section 153 of AIA Document A201-2007, the method of binding dispute resolution shall be as follows: jG7aeck the uppropriuie bax. If the Owner and Contractor do not select a method of binding dispute resolution below, or do notsubsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resvlved �ty IitEgati�n rn a coul't of competent jurisdiction.) []' Arbitrarion �ursuant to Section 15.4 of AIA Document A201-2007 [] Liti�atiop �tt d court of competent jurisdiction � [ � �►�' ��e��1 � 3�f rg�t{g�p in Augusta �ountv Georgia #�RTlGIE 7 TERMlNATtC�N OR SUSPENSION § 7.1 T'he Gontract ttia� be tertttinated by the Owner or the Contractor as provided in Article 14 of AIA Document A202-2Q47'. § 7.Z 'Th� Work xnay be suspended by the Owner as provided in Article 14 of AIA Document A201-2007. ARTICCE 8 MISCELLA�[E(�JS PROVISIONS §$.1 Where reference is made in this 14greement to a provision of AIA Document A201-2007 or another Contract Document, the reference refers ta that provision as amended or supplemented by other provisions of the Contract Document�. § 8.� Paymezats due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, c� in the ahsence thereaf, at the;legal rate prevailing from time to time at the place where the Project is located. (Insert rute of interest agreed!upan, if any.) � � § 8.3 The (ha+ner's represen#ative: (Npm�, address and atherinfnrmation) Garv W. Le T�Ilirer,�AAE Executive Directar °' 1501 Aviation Wav " Augusta, Georgia 30906 § 8;� `f`�e Con#ractor's representative: �ame, addre�s and other information) I Patrick Sommers 4889 Sommerset Drive Evans. Georgia 30809 Init. aA Document A101TM — 2007. CopyrigM � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reaerved. WARNING: This AIA�' Document is protected by U.S. Copyright Law and International Treaties. lJnauthorized 5 reproduction or distribution of this AIA`"' Document, or any portion of it, may result in severe civil and criminal penalties, and wili Be prosecuted to the � maximum extent possitrie under the law. This document was produced by AIA soRware at 16:35:45 on 04/21/2011 under Order No.9761278469_1 which e�ires on 04/18/2012, and is not for resale. UserNotes: (725049942) § 8.5 Neither the Owner's nor the Contractor's representaYive shall be changed without ten days written notice to the other party. § $.6 t�er provisions: ARTI�LE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in die sections below. §�.1.1 The Ag�emea�t i%s #his executed AIA Document A 101-2007, Standard Form of Agreement Between Owner and Contra�or. §�.1.2 'F4�� �era[I �atsditions are AIA Document A201-2007, General Conditions of the Contract for Construction. § 9.1.3'�e Suppiana;e�tary �nd'other Conditions of the Contract: DocumeM Title Date Pages A c�►�nen � Sec. 1-10-104 4/21/2011 1_3 AuQUSta-Richmand contracts and contract clauses �ttachrn�nf C 4/21/2011 1 Modifications to the A201 General Conditions § 9.1.4'�'1ie Specificatiai�: (�itheX I}st ihe Speci�cafions here or refer to an ezhibit aitached to this Agreement.) I Sse atta�hed exhibit Litted "Specifications and Drawinss" dated 4/21/2011. � �le sate Aages � § 9.1.5 The Drawings: (Either list ihe Drasvings here or refer to an ezhibit attached to this Agreement.) #lu�e� �iHe sate �e attaehe�i exhibiC f�tted "Sp�cifications and Drawings" dated 4/21/2011. § 9.1,6 The Addenda, if any; Nurnber Date Pages ` Addendum #1 2/1/2011 51 Add�dum �2 2/15/2011 4 Portions of Addenda relating to bidding requirements are not part of the Conh�act Documents unless the bidding requirements are also enumerated in this Article 9. � 9.1.7 Additional documents, if any, forming part of the Contract Documents: .9 AIA Document E201T'"-2007, Digital Data Protocol E�chibit, if campleted by the parties, or the following: .2 Other documents, if any, listed below: AIA Document A101 T"" — 2007. Copyright � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American 1111Y. Institute of Architects. All �ights reserved. WARNING: This AIA'� Document is protected hy U.S. Copyright Law and International Treaties. Unauthorized s reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the � maximum eutent possibie underthe law. This documentwas produced byAlA software at 16:35:45 on 04/21/2011 under Order No.9761278469_1 which e�ryires on 04/1 S/2012, and is not for resale. UserNotes: (725049942) (List here arry additional documents that are intended to form part of ihe Contract Documents. AIA Document A201-2007 provides that bidding requirements such as advertisement or invitation to bic� Instructions to Bidders, sample forms and the Contractor's bid are not part of fhe Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) � All documents and requirements issued as Instruction to Bidders issued bv the City of Aueusta arepart of the contract documents. ARTICLE 10 ` INSURAW�E AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201-2007. (SYate bondi»g requarements, if arry, and limits of liability for insurance required in Article 11 ofAIA Document A2111 20(I7.) � Type of ir�suran�ce or }mnd Limit of liability or bond amount 0.00 This Agreernient ent�ed into as of the day and year first written above. �� 5�,ONSOR AU�"rUSTt�, GE{>RGIA '�Aa � ��--�P�` ' -s �Z_� /� r D id Co enhaver ar Date t � � , � �tt t: Lena n r Clerk o ommission Date �Rri�ted name andstftle3 � AIA Document A101T"" — 2007. Copyright � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA�' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 7 reproduction or distribution of this AIA�'"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the � maximum extent possibte under the law. This document was produced by AIA software at 16:35:45 on 04/21/2011 under Order No.9761278469_1 which e�cpires on 04/18/2012, and is not for resate. UserNotes: (725049942) ('�-'„,°�'� �� ��� �yr���� .�Ire�e . �"���ll�lQ � 1�v�i �> Date I j � Ir � �� ev������� ��,�; ��� �'.,� (Print d name and title) {� � � - �G ��/ C N m rs Gt�nstruction Date �Gt�� �, � • �,,,�` r� +�. !� S [/�NvL� (Pr�nted name anrllitle) AIA Document A101'"' — 2007. Copyright � 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American ���� Institute of Architects. All rights reserved. WARNING: This AIA�' Document is protected by U.5. Copyright Law and International Treaties. Unauthorized 8 reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the � maximum extent possible under the law. This document was produced by AIA software ffi 1635:45 on 04/21/2011 under Order No.9761278469_1 which a�ires on 04/1 S/2012, and is not for resale. UserNotes: (725049942) Augusta Regional Airport Administration Improvement Area Attachment A 4/26/2011 Specifications and Drawings: List of Drawin�s C0.1 Title Sheet, Index of Drawings A1.0 Demolition Plan A2.0 New Floor Plan A2.0 Alt 1 Office E239 — Alternate One A2.0 Alt 3 Office D144-D145 Alternate Three A2.1 Cabinet Elevations A3.0 Door Schedule / Finish Schedule A4.0 Reflected Ceiling Plan M1.1 Mechanical Plans M2.1 Mechanical Specifications E1.1 Lighting Plan E1.2 Power Plan E1.3 Signal Plan E1.4 Alternate Electrical Plans E2.1 Electrical Details Page 1 of 1 SECTION 00 01 11 TABLE OF C�NTENTS bOCUMEN75 0-- INTRODUCTORY INFORMATION, BlDDING REQUIREMENTS, AND CONTRACT FtEQUlREMEAITS 00 01 09 - PROJECT TITLE PAGE 00 01 11 - TABI.E OF CONTENTS 00 01 15 - LIST OF DRAWINGS 0019 13 - BID SOLICI7ATION 00 21 13 - fNSTRUGTIONS TO BtDDERS AIA DOCUMENT A70'1 - INSTRUCTIONS TQ BtDDERS 00 22 00 - SUPPLEMENTARY INSTRUCT TO BIDDERS OQ 41 00 - B1D FORM AIA DOCUMEN7 A305 - CONTRACTOR'S QUALIFICATION STATEMENT 00 S2 00 - AGREEMENfT AiA pOCUMEPIT A701 - STANDARD FORM �F AGREEMENi' BETWEEN OWNER AND COfVTRACTOR 00 60 00 - BONDS ANQ CERTlFICATES OD 72 00 - GEN�RAL CONDITIONS AfA DOCUMENT A2d1 - GENERAL CONDITI(1PIS 00 73 00 - SUPPLEAAENTARY CONDITIONS DIVISfON 1 -- GENERA� REQUIREMENTS 01 10 00 - SUMMARY 01 23 00 - ALTERNATIVES 04 30 00 - ADMINISTRATtVE REQUtREMENTS 01 3216 - CONS3RUCTION PROGRESS SCHEDULE 01 50 00 - TEMP01�4RY FACIi.ITIES AND CONTROLS 07 60 00 - PRODUCi' REQUIREMENTS 01 7$ QO - CL�SEOUT SUBMITTALS D1VIStON 2-- SITE CONS7'RUCTlON - NOT USED DIVtS10N 3-- CQNCRETE - NOT USED DIVISION 4-- MASONRY - NOT USED DIVISION 5— METALS - NOZ USED DIVISION 6— WOOD AND PLAS7ICS 0610 00 - ROUGH CARPENTRY 06 20 00 - FINISH CARPENTRY 2010141Augusta RegionalAirport RenovaGons Ofl 01 1'E - 1 TABLE QF CONTENTS 08 44 00 - CUSTOM CABINETS DIVISION 7- 3HER�AAL AND MOfSTURE PROTECTION 07 24 00 - FIBERGU4S3 INSULATf4N 07 84 00 - FIRESTOPPING fl7 9� 05 - JOINT SFALER5 DlViS10N 8-- DOORS AND WiNDOWS Q$11 13 - HOLi„OW ME7AL FRAMES 08 94 76 - W0�3D DOORS 08 71 00 - D�OR HARDWARE �iV[SION 9 -- FINISHES 0$ 21 16 - GYPSUM BOAR� ASSEMBLtEB 0� 51 00 - ACOUSTfCAL CEIltNGS 09 65 00 - RESILIENT FLOORENG 09 68 flQ - CARPETING 09 90 40 - PAINTS AND CQATIPIC3S DIVISION 10 -- SPECIALTIES ?014 00 - IDENTIFICAT'fON DEVICES D1ViSION 91 -- EQUIPMEN7 - NO�' USED DtV1SION 12 -- FURNiSHtNG$ 12 36 00 • COUN7ERTQPS DIVISIUAI 13 -- SPEClAL CONSTRUCTION - NOT lJSED DINISION 14 -- CONVEYING EQUlPMEN7 - NO'C USED DIVlSION 21 -- FIRE StJPPRESSION 29 00 Ot1- GENERA! FIRE SUPi'RESSION PROVt510NS 21 05 00 - COMMON WQRK RESULTS FOR FIRE SUPPRES$ION 24 Q5 60 - ffRE SUPPRESSIDN PtPINf3 DIVISION 22 - PLUMBING - NOT US�� DIVISI�N 23 -- HEATING, V�NTILATfNQ, AND AiR CONDITlONING 23 0� 00 - GENERAI. HVAC PROVISiONS 23 05 00 - COMM�N WORK RESULTS FOR HVAC 23 OS 93 - Ct3MMOM MOTOR REQUtREMENTS FOR HVAC EQUIPM�NT 23 Q5 23 - i3ENERA►L DUTY VALVES FOR HVAC iPlNG 23 Q5 2S - HANGERS AND SUPAORTS FOR HVAC PIPIPIG AND EQUIPMENT 23 05 93 - TESTiNG ADJUSTiNG AND BALANCING 201014 ! Augusta Regional Afsport Renovatlons 00 01 11 - 2 TABLE OF CONTENTS 23 07 00 - HVAC INSULATION 23 OS 80 - CON7ROL SYSTEM EQUIPMENT 23 09 93 - SEQtJENCE OF OPERATION 23 31 13 - META� DUCTWQRK 23 33 d0 - DUCT ACCESSORIES 23 3713 - DIFFUSERS, REGISTERS, GRILLES AND LOUVERS DIVISION 25 — lNTEGRATED AUTOMATION - NOT USED DIVISION 26 — ELECTRICAL - (SEE DRAWINGS) DIVISIQN 2T — COMMUNICATIONS - NOT USED DIVISION 2$ — ELECTRONIC SAFETY AND SECURITY - NOT USED DlVISIQN 31 -- EARTHWORK - NOT USED DIVISION 32 -- EXTERIOR IMPROVEMENTS - NOT USED DIVISION 33 -- llTtUTIES - NOT USED DIVISION 34 -- 7RANSPORTQ710N - NOT USED DIVISION 35 -- WATERWAYS AND MARINE CONSTRUCTION - NQT USED END OF TABLE OF CONTENTS END ATTACHMENT A 20'lO1A/AugustaRegionalAirportRenovations 0009 91 -3 TABLEOFCONTENTS Augusta Regional Airport Administration Area Improvements Attachment B 4/26/2011 Contractor acknowledges that this contract and any changes to it by amendment, modification, change order or other similar document may have required or may require the legislative authorization of the Board of Commissioners and approval of the Mayor. Under Georgia law, Contractor is deemed to possess knowledge concerning Augusta-Richmond County's ability to assume contractual obligations and the consequences of Contractor's provision of goods or services to Augusta-Richmond County under an unauthorized contract, amendment, modification, change order or other similar document, including the possibility that the Contractor may be precluded from recovering payment for such unauthorized goods or services. Accordingly, Contractor agrees that if it provides goods or services to Augusta-Richmond County under a contract that has not received proper legislative authorization or if the Contractor provides goods or services to Augusta-Richmond County in excess of the any contractually authorized goods or services, as required by Augusta-Richmond County's Charter and Code, Augusta-Richmond County may withhold payment for any unauthorized goods or services provided by Contractor. Contractor assumes all risk of non-payment for the provision of any unauthorized goods or services to Augusta- Richmond County, and it waives all claims to payment or to other remedies for the provision of any unauthorized goods or services to Augusta-Richmond County, however characterized, including, without limitation, all remedies at law or equity." This acknowledgement shall be a mandatory provision in all county contracts for goods and services, except revenue producing contracts. The Owner must promptly provide Contractor evidence of proper authorization and approval by the Board of Commissioners and the Mayor for the Contract and any changes, modifications, change orders, extra work and disputed work before requiring Sommers Construction to perform any such work. Use of County Landfill All contracts for contractors performing demolition and/or construction projects for Augusta-Richmond County shall contain a provision requiring that all debris, trash and rubble from the project be transported to and disposed of at the Augusta-Richmond County Solid Waste Landfill in accordance with local and state regulations. The contractor shall provide evidence of proper disposal through manifests, which shall include the types of material disposed of, the name and location of the disposal facility, date of disposal and all related fees. All contractors and subcontractors entering into contracts with Augusta- Richmond County for the physical performance of services shall be required to execute Page 1 of 2 an Affidavit verifying its compliance with O.C.G.A. §13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with Augusta-Richmond County has registered with and is participating in a federal work authorization program [any of the electronic verification of work authorized programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A. §13-10-91 and shall continue to use the federal authorization program throughout the contract term. All contractors shall further agree that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to its contract with Augusta-Richmond County the contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A. § 13-10-91 on the subcontractor affidavit provided in Rule 300-10-01-.08 or a substantially similar form. All contractors shall further agree to maintain records of such compliance and provide a copy of each such verification to Augusta- Richmond County at the time the subcontractor(s) is retained to perform such physical services. END OF Attachment B Page 2 of 2 Augusta Regional Airport Administration Area Improvements Attachment C 4/26/2011 Modifications to AIA Document A201 General Conditions of the Contract for Construction a. Section 2.12 Delete language regarding mechanic's lien and replace with "prepare a Notice of Commencement " b. Section 10.3.3 delete in it's entirety as Georgia law does not permit the county to indemnify any entity or person c. Section 10.3.5 add the word "gross" before negligence d. Section 10.3.6 change word indemnify to reimburse e. Section 11.1.4 add "and its employees" after the word Owner f. Section 113.7 Neither the Owner nor the Contractor waive their rights subrogation. END OF Attachment C Page 1 of 1 ��.�� m�rs Cons ruction 4689 SOMERSET DRIVE, EVANS,GA 30809 � LETTER OF TRANSMITTAL DATE: 4-26-2011 TO: PROJECT: Clarence Fennell Augusta Regional Airport Terminal Area Renovations Administration Area Improvements. WE ARE TRANSMITTING: DRAWINGS CHANGE ORDER VIA: SUBMITTALS OTHER US MAIL x CONTRACT UPS PLANS FED EX SPECIFICATIONS x BY HAND BONDS PICKED UP CLOSE OUT DOCUMENTS FAXED APPLICATION FOR PAYMENT COPIES NO. DESCRIPTION 1 Contract Documents (15) pages AS CHECKED BELOW: FOR APPROVAL REVIEWED FOR YOUR USE FURNISH AS CORRECTED x AS REQUESTED REVISE AND RESUBMIT REJ ECTED REMARKS: W W W.SOM MERSCC.COM 4889 Somerset Drive P.O. Box 950 Evans, Ga. 30809 Phone: (706) 855-7694 Fax: (888) 260-1674 E-Mail: psommers@sommerscc.com `�