C�NSTRUCTION CUNTRACT CHANGE ORDER
CO NUMBER 1
BID ITEtii 09-156
DATE 3/29/11
PR�JECT TITLE Eisenhower Hos�ital Area Gravity Sewer System
ORIGINAL CQNTRACT DATE 4 1 10 PROJECT NUMBER I�'U_�
OWNER AUGUSTA-RICH�i fOND COUNTYCOiI�i IISSION PO NUMBER P178 7
The following change is hexeby made to the contcact for the above project
Description of Change (for a more detaited descripii.om see attached p�oposal}:
The modification to this contract will consist of the installation of an additiona1700 T.F of sewex main and
1,171 I.F of water main. This change also include some adjasrinents to addzess the additional connections to
the existing infrastructure, extra cleaiing, overlay, and septic tanks removals izi conflict with the proposed
sewex main.
PAYEE Bla� Con ����� D
TOTAL AMOUNT OF THIS CHANGE ORDER � 377,564.50
'I1�e contract time will be INCRE,ASED by 0 calendar days as a result of this chan . M A R 3 1 2 � � �
ORIGINAL CONTRACT AMOUNT $ A''FF�,��Department
PREVIOUS CF�ANGE ORDER $ 76,805.00
THIS CHt1NGE ORDER � 377,564.50
TOTt1L REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 1,225,747.G3
FUNDING NUMBERJt1CCOUNT NLJVfBER 507043420 5425210 ;
8 0069 5425210
� r
� DATE:
PROPOSED BY: , � �
c x
REQUESTF.,D BY: DATE: ./ I I�
'NGTN . ..R
� . .
SUBtiiI'ITED BY: ���,,,ti,� i? . t�,D �.,� D'�T�: - 3 s! x.� �
DEPARTMENI'HBAD
FI's�IANCE ENDORSEME�i'T: �� DA1�: 3 �_ � �
�t�iYt v►C,�'Gc�c.�Q�e�'s ��'
co�rxc�L�.r.x
RECOV�IENDED BY: � s � e 2✓ ' DAT'E: ��, ��
!�
ADbtINISTRAT'Olt
f
APPROVED BY: -/C� �f _______y_ Dr1TE: �3� - ,
n�YOx