HomeMy WebLinkAboutCHANGE ORDER 3 STEVENSON AND PALMER ENGINEERING MAIN INTERCEPTOR PHASE 2 $97,630.00 DESIGN CONTRACT CHANGE ORDER CO NUMBER 3 BID IT'EM Nr1 Dr1TE 2/23/i t PROJECT TITLE biain Interce�tor Phase 2 ORIGINAL CONTRACT DATE 12/18/O6 PROJECT NUMBER 80300007 OWNER �1UGUST:�, GEORGIr1 PO NUMBER P128070 T h e f change is hereby made to the contxact for the above project: Description of Change (for a moxe detailed descriprion see attachment): The Utilities Depar[ment has numerous projects under construction at this time and the in-house inspection staff is already spread quite thin. Stevenson & Palmer Engineering has an experienced inspector available with numerous years of background in engineering and construction practices and is available to utilize for this project under Change Order Three to the Stevenson and Palmer Engineering Contract. Approved By Commission at February 15, 2011 meeting. PAYEE Stevenson and Palmer Engineering TOTr1I, r1MOUNT OF THIS CH�INGE ORDER $ 97,630.00 The contract time will be INCREr1SED by 0 calendar days as a result of this change. ORIGIN�II. CONTR�ICT �1MOUNT $ 530,789.00 PREVIOUS CH�INGE ORDER (1,2) (INCREI,SE) $ 151,550.00 THIS CHr1NGE ORDER (INCREr1SE) $ 97,G30.00 TOTr1L REVISED C O N TRi1 C T �1MOUNT WITH CHr1NGE ORDER $ 779,969.00 FUNDING NUMBER/ACCOUNT NUMBER 507043420 5212115 80300007 5212115 PROPOSED BY: '"` ��� � Dr1TE: � � Z , � p �� DESIGN ENGINEER ,� j '� ,% Dr1TE: .—J f , ,,,, REQUESTED BY: � .� ��t:�'' i� r AUD P1GI%ENG. `( SUBMITTED BY: �aM�► �. ��,H,,,a+ D�1TE: �s �►� Z.O �� I DEPARTMENT HEAD � FIN.�NCE ENDORSEMENT: �� D:1TE; .�a� � 11 _.[ G/7�� �-*�Zc� �f Oh1P LLER r1PPROVED BY: C D �� : � /� ADMINIS'IRATOR � lJ � � . /� DATE � ! / r1PPROVED BY (x��,/V v= 2 l Z�j MAYOR � � I I L ------ -- - ------