HomeMy WebLinkAboutSTEVENSON AND PALMER ENGINEERING CHANGE ORDER 3 DESIGN CONTRACT CHANGE ORDER
CO NUMBER 3
BID IT'EM Nr1
Dr1TE 2/23 / 1 t
PROJECT TITLE I�iaan Inter�tor Phase 2
ORIGINAL CONTRACT DATE 12 PROJECT NUMBER 8 00 7
OWNER 11UGUST�, GEORGIr1 PO NUMBER P12$070
The f ollowing c h a nge i hereby made to the contract foc the above project:
Description of Change (fox a moxe detailed description see attachment): T'he Utilities Department has
numerous projects under construction at this time and the in-house inspection staff is already spread quite
thin. Stevenson & Palmer Engineering has an experienced inspector available with numerous years of
background in engineering and construction practices and is available to utilize for this project under
Change Order Three to the Stevenson and Palmer Engineering Contract. Approved By Commission
at February 15, 2011 meeting.
Pr1YEE . Stevenson and Palmer Engineering
TOT11I..11MOUNT OF THIS CH�INGE ORDER $ 97,G30.00
The contract time will be INCREr1SED by 0 calendar days as a xesult of this change.
ORIGIN�IL CONTR�ICT �1MOUNT $ 530,789.00
PREVIOUS CH�INUE ORDER (1,2) (INCRE�SE) $ 151,550.00
THIS CHr1NGE ORDER (INCREr1SE) $ 97,630.00
TOTi1I, REL�ISED C ONTR� C T i1MOUNT WITH CHr1NGE ORDER $ 779,9G9.00
FUNDING NUMBER/r1CCOUNT NUMBER 507043420 5212115
80300007 5212115
PROPOSED BY: -�� ��,{� �,,� D �� : 0 2- a� .� o �l
DESIGN ENGINEER ,� �
,i� '� Dr1TE: .�/� _ r, ;
REQUEST'ED BY: - ���v' �
AUD PM/ENG. `(
�� D�r�: �. 3� Zc3 t l
SUBMI'ITED BY: �O�"�► � * �tbe -�,)
DEPARTMENT HF...AD
FIN�NCE ENDORSEMENT: �,,,�,� , ,�G1�7�j D ��� c�-�c� ��
�Z ��-�_�.p
COMP I.LER
�PPROVED BY: � D �� : � /�
ADMIN IS'I'RATOR
�1PPROVED BY �� � DATE Z�Zq !( 1
O
MAYOR