Loading...
HomeMy WebLinkAboutR W ALLEN EXHIBIT G-1 TEE CENTER Exhibit G -1 Authorization for Construction Pursuant to this agreement, the Owner and the Construction Manager hereby execute this Exhibit G -1 and further agree as follows: 1. The Construction Manager's Guaranteed Maximum Price ( "GMP ") proposal for the entire Project has been established. The Construction Manager's GMP for the TEE Center Project, dated December 7, 2010, attached hereto and incorporated herein, is accepted by the Owner. 2. The General Conditions Guaranteed Maximum Cost for the $1,082,670.00 Project, including this Bid Package, is 3. Preconstruction Services $26,400.00 4. The Subcontracts Cost is: Bid Package #1 $250,930.00 Bid Package #2 $1,796,647.00 Bid Package #3 $710,842.00 Bid Package #4 $3,199,543.00 5. The Lump Sum Fixed Management Fee for the Project, $780,000.00 including this Bid Package, is 6. The Guaranteed Maximum Price per attachment A (Value Engineering) for the Project is: $27,900,000.00 7. The Date of Substantial Completion shall be 24 months after Notice -to- Proceed Items 2, 3, and 5 above were previously agreed to and included in the agreement. Owner: Construction Manager: Augusta, Georgia R.W. Allen, LLC By: 0 , - - -e> v (Signature) (Seal) (Signature) (Seal) Ip#iv = 5 • Gvv 5d— .... T --.... sic_ (Name) (Name) Wilk oA— `Fi23 i o: (Titl -) i , (Title) / kil / (Attest) b y s ' ' (Street Address - No PO Box) (City Cle 1 ••••00,400 19 °^ 1 (City, State, Zip) �, � 4 mq�` Eot�C� 1 • • t.4-. 2. 1\ D /7/f7 Signature g'®`� Date of Signature 9 9 1 of 1 1 1015 Broad Street Augusta, Georgia 30901 Office 706,733.2800 I Fax 706.733.3879 www.rwallen.com wow 4 " P A Decernber 7, 2009 Ivir. Jacques Ware RWAllen Project Manager, Heery IDED Augusta Richmond County Capital Improvements Program Management 501 Greene Street Augusta, GA 30901 RE: Guaranteed Maximum Price Contract Augusta Tee Center Mr. Ware, It is our understanding that Augusta-Richmond County would like to execute a Guaranteed Maximum Price (GMP) contract with R.W. Allen, LLC. Based on our 75% pricing exercise we produced a GMP number of $29,471,109.00. After a thorough estimate reconciliation meeting with Heery, we were able to reduce the GMP nunaber. However, we still exceeded the established GMP of $27,900,000.00. Therefore, R. W. Allen has developed the attached list of scope clarification savings and value engineering (ongoing) items in an effort to achieve the desired GMP. R. W. Allen, LLC will execute the GMP contract in the amount of $27,900,000.00 based on the project cost reconciliation and the acceptance of the attached value engineering items which are required to achieve the desired GMP. If you have any questions or concerns regarding the attached items, please do not hesitate to contact us. Sincerely, R.W.. Allen, LLC Scott A. Clark President and CEO _p Construction Services ., ' Attachment A 2 2010 C._ 1 1171 5 Augusta Trade Exhibit & Event Center P k. Potential Savings . � . ' ^ ^ 75% GMP Estimate dated 11/17/10 $29/71,109 Potential Savings Design Contingency Reducton ($479885) Subtotal $28,991 Scope Clarifications Refine wood decking & gu-lam beam scope ($20,000) Metal Wall Panel Scope ($20,000) Door Hardware Scope ($15,080) Etiminate utility screen wall ($10,000) Elimiaate roof screen wall at Iow roof area ($G,OOO) Refine painting scope ($20'000) Refine flooring scope ($90,000) Refine eevator scope ($84,000) Refine fire protection scope ($05,000) Value Engineering Eliminato treatment for wood decking ($4,000) Eflminate FSC requirements for wood decking ($8,000) Eliminate treatment for glu-4am beams ($18,000) Eliminate fSC requirements for gIuiam beams ($21,000) Provide schedue 10 fire sprinkler pipe in Iieu of schedule 40 TBD Eliminate AVVI certified cabinet/millwork mariufacturer ($190,000) Reduce parapet @ courtyard along the kitchen roof ($40,000) Eliminate (J) toilets (#x~ tile, acr. &fianmin0) ($7,500) Eliminate utility screen wall ($12,500) Eliminate roofscreen wall at Iow roof area ($5,000) Install TPDin lieu nf metal roof panels ($40,000) Modify duct insulation & stainless wrap ($80,000) Reduce metal panel scope TBD Eliminate duct cteaning ($75,800) Provide metal coping in tieu of caststone @ stucco parapets ($20,000) Install ACT in tieu of stucco drive thru ceillag ($I5,000) Provide stucco in Iieu of brick @ the west elevation ($3,500) Provide 5000# standard size car wlth 46 bi-parting doors for freight elev. ($130,000) Provide holed hydrautic elevators in Iieu traction elevators ($65,000) �y�� � Total �" �P�|