Loading...
HomeMy WebLinkAboutRevenue Bond Isuue Engineering Report Augusta Richmond GA DOCUMENT NAME: ~tve(1ue,&(lcf ISSue Ll'7g;'rJe-en/1'j M6Y~ DOCUMENT TYPE: ~c2poy} YEAR: ;q q 0 BOX NUMBER: ;2 I ~~ 70 FILE NUMBER: NUMBER OF PAGES: f)7 I I I I I I I I I I I I I I I I I I I AUGUSTA - RICHMOND UTILITIES DEPARTMENT WATER AND SEWER CAPITAL IMPROVEMENTS 1996 REVENUE BOND ISSUE ENGINEERING REPORT October 18, 1996 Project 9614 PREPARED BY EEL 435 TELFAIR ST. AUGUSTA, GEORGIA ENGINEERS PHONE (706)724-5627 ZIMMERMAN, EVANS AND LEO~OLD, INC. ..... .. I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 TABLE OF CONTENTS 1. INTRODUCTION ................., .........,."""" .....' ........'.. ....., ....,. .-"." ........................ .............. 1 2. AUGUSTA-RICHMOND COUNTY WATER SYSTEM ................................................... 2 3. AUGUSTA-RICHMOND COUNTY SEWER SySTEM.................................................... 6 4. MANAGEMENT OF THE UTILITIES DEPARTMENT................................................... 10 5 . WATER AND SEWER CUSTOMERS...... ............................................................... ......... 11 6. WATER AND SEWAGE VOLUMES .............. .................................................................. 12 7 . WATER AND SEWER RATES............................................................................. ............ 14 8. REVENUE.............. ........... ........ ..... .........,.......... ................... ... ............... ....... ......... .......... 17 9. MISCELLANEOUS REVENUE ............................ ........................................ ....... ............. 18 10. OPERATION AND MAINTENANCE COSTS................................................................ 18 11. PROJECTS IN PROGRESS BY OTHER FUNDING....................................................... 19 12. DEBT SERVICE...... ......................... .................................................. ............. ................ 20 13 . CAPITAL IMPROVEMENTS PROGRAM ................................................... ~................. 21 14. RENEWAL AND EX1'ENSION ...................................................................................... 24 15. FORECAST REVENUE AND EXPENSES ..................................................................... 25 16. CONSTRUCTION PROGRAM ...................... .............. ............... ............................... ..... 29 17. ENGINEER QUALIFICATIONS.............................. ................................................. ...... 30 18. ENGINEER'S OPINION................................. ......... ....................................... ................. 30 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page i I I I I I I I I I I I I I I I I I ,I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 TABLES Table 1 - Combined Water System Statistics and History .............................................................6 Table 2 - James B. Messerly WWP NPDES Permit Discharge Limitations ..........................,........9 Table 3 - 1996 Water and Sewer Account Profile ............................................ ......................... ..12 Table 4 - Combined System Water and Sewer Account History ..................................................12 Table 5 - Water and Sewer Volumes - 1994 ......... ........................................................... .......... .13 Table 6 - Water and Sewer Accounts and Volumes - 1996 Predictions........................................ 13 Table 7 - Combined System ResidentiaVCommercial Use...........................................................13 Table 8 - Largest Water and Sewer Customers by Volume (1995) ..............................................14 Table 9 - Residential Rate Structure ....................................................................................,......15 Table 10 - Commercial (Non-Residence) Rate Structure.... .................... ...... ............................. ..15 Table 11 - Comparison of Selected Total Water and Sewer Monthly Bills ...................................17 Table.12 - 1996 Miscellaneous Revenue Estimate .................. ............. ................. ..:................. ..18 Table 13 - Summary of O&M Costs ........................................................................................ ..19 Table 14 - Phase I Combined Sewer Overflow Projects............................................................. ..19 Table 15 - Phase n Combined Sewer Overflow Projects .............................................................20 Table 16 - 1996 Debt Service Summary....... ..................................... ................ ............. ............20 Table 17 - Bonded Indebtedness as of January 1, 1997 .. ............ ....................... ................ ......... .21 Table 18 - 1996 Bond Issue Utilities Department Capital Improvement Projects..........................22 Table 19 - Description of Capital Improvement Projects ...... ........................ ......... ...... ........ ........23 Table 20 - Useful Life of Water and SeWer System Components.................................................24 Table 21 - Forecast Revenue and ExpenSes using Current Market Debt Amortization .................27 Table 22 - Forecast Revenue and Expenses Using Set Size and Rate Debt Amortization..............28 Table 23 - Estimated Construction Schedule for Bond Issue Projects ................:.........................29 GRAPHS Graph 1 - Residential Water and Sewer Bill Comparison ............................................................16 Graph 2 - Commercial 1-112" Meter Water and Sewer Bill Comparlson......................................16 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page ii I I I I I I I I I I I I I I I I I. I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report ,October 1996 APPENDICES Appendix A Water and Sewer System History Appendix B Revenue Calculation Appendix C Utilities Department Capital Improvements Program Appendix D Renewal and Extension Requirements Appendix E Existing Debt Service Appendix F Revenue and Expense History Appendix G Water and Sewer System Rate History 'ZEL, ENGINEERS, 10/19196:9614 rpt Bond Issue Page iii I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 1. INTRODUCTION Consolidation of the City of Augusta and Richmond County, Georgia governments has brougt.t about the opportunity for the newly created Augusta-Richmond Utilities Department to improve water and sewer services for their sixty thousand water and forty-six thousand sewer customers. For this purpose, the Department proposes a Revenue Bond Issue to (1) implement a five year Capital Improvement Program and (2) refinance and consolidate the existing debt of the former City and County systems. This engineering report describes the water and sewer system, projects revenues and expenditures, estimates the effect of implementing the improvement program, and gives an engineering opinion regarding the health of the system. The five year Capital Improvement Program (CIP) selected for funding consists primarily of projects remaining from the CIP's of the former City and County systems. Additional projects were added to extend service to priority areas and connect the two water systems. Water system projects consist of (WI) Modification to the clearwells at the surface water treatment plant (at Highland Avenue) to improve disinfection and ensure compliance with new Clean Water Act requirements, (W2) Modifications and line additions to merge the two systems,' (W3) construction of a new 10 million gallon per day (Mgd) well field and treatment plant, (W4) construction of a new 60 Mgd raw water line to deliver water from the Augusta Canal (or the 5avannah River) to the Highland Avenue plant, (W5) construction of a 1 Million gallon elevated storage tank, and (W6) extension of service to priority areas. 5ewer system projects consist of (51) land purchase for Phase m of the constructed wetlands project, (52, 53, and 55) rehabilitation and replacement of the Rae's Creek, 5pirit Creek, Rocky Creek and Butler Creek Trunk sewers, (54, 56, 59, and 510) extension of sewer service to developing industrial areas, (57) Rehabilitation of the main lift station at the J .B. Messerly Wastewater Plant, (58) Construction of a lift station and force main to augment the mid-city interceptor, (511) Odor control at the lB. MesserlyWWP, and (512) extension of service to priority areas. The list of projects selected for funding can be foUnd in' Table 18 on page 22 and a description of each project can be found in Table 19. 10/19/96:9614 rpt Bond issue Page 1 'ZEJ-, ENGINEERS I I I I I I I I I ,I a I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Because of consolidation of the Augusta and Richmond County governments, administrative unification of the City and County water and sewer systems was initiated in January, 1996. Because of the nature of the water systems, physical connection of the two systems will be made. The sewer systems are not likely to see significant operational changes since all City sewer lines and the majority of the County sewer lines already discharge to the J.B. Messerly WWP. Unification of water and sewer rates, begun in 1996, were designed to eliminate billing disparities and to produce the forecast revenue requirements of the combined systems. 2. AUGUSTA-RICHMOND COUNTY WATER SYSTEM The Augusta-Richmond County water system serves most of Richmond County. In 1995 the Augusta system served 32,443 water accounts (see Appendix A) with approximately half inside the City and half outside. The City system reached south to the Gordon Highway, northwest to the Columbia County line, and northeast to the Savannah River.. The fonner Richmond County system served the area south of the Gordon Highway and generally extended through the Spirit Creek basin on the south. Richmond County served 28,218 water accounts in 1995. Primary water lines of the two systems extend into 210 square miles (65%) of the total county area of 325 square miles. A connection to the Columbia County system currently provides a wholesale supply of approximately 3 Mgd from Augusta-Richmond in the spring and summer months. Augusta-Richmond County is located on the Savannah River at the fall line between the Piedmont Plateau and the Coastal Plain 220 miles upstream from the Atlantic Ocean and is in the recharge area for the Tuscaloosa Aquifer in the Tuscaloosa Geologic Formation. This aquifer provides the fonner Richmond County water system with raw water from well fields (23 Mgd, see Appendix A) which extract water from the TuscalooSa Formation. Water plant number 1 is located ori Peach Orchard Road at Lumpkin Road while plaiJ.t number 2 is located on the Highway 56 loop at 4H Club Road. Raw water is aerated, treated with fluoride and chlorine, and adj~for pH before' delivery: A corrosion control chemical is also'aclded to the finished water. Three wells having a capacity of approximately 2 Mgd serve the Pine Hill area and receive only disinfectiOn treatment. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 2 I I I I I I I I ,I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Water is delivered to the ground water distribution system through high service pumps at nine locations which serve three interconnected water subsystems. The subsystems are defined by their operating elevations of 457,521, and 598 ft. above mean sea level (msl) and are served by approximately 3.2 million gallons (MG) of elevated storage tanks. Ground storage tanks (12.1 MG) provide water at elevations 417 and 437 ft. msl. The former City of Augusta system draws raw water from the Augusta Canal, which parallels the river. The canal was constructed in 1840 as a means of transportation for cotton barges and to provide water power for textile mills and other industries in the City. In 1860, the beginning of the present water supply system was established when river water, taken from the first level of the canal, was diverted into the City's bored log distribution system. The present site for raw water pumping originally included steam pumps in 1909, which later were replaced with electric motor driven centrifugal pumps. In 1939, water power was utilized to drive a pair oftw~ge centrifugal pumps, each having a capacity of 9.0 Mgd. which are still in service, but are rarely used. New water powered turbines were installed in 1952 (20 Mgd) and 1975 (30 Mgd) to deliver raw water from the Canal to the water treatment plant on Highland Avenue. A standby diesel driven pump (20 Mgd) also was installed in 1975 with the capability to deliver water from the canal or directly from the river. Today, canal water power provides a substantial economic benefit for the water system by reducing electrical costs. The Augusta Canal is a power and water supply canal operated under the regulation of the Federal Energy Regulatory Commission (FERC). A City of Augusta permit to apply for relicensing of the canal was dismissed in January 1994 for failure to complete an Instream Flow Incremental Methodology (IFIM) study to assess the effect of the canal diversion on the Augusta Rapids as a fishery. A new application by Augusta-Richmond County for permit to license was filed June 12, 1996 in competition with an application by Fall Line Hydro Company, Inc. FERC has exercised municipal preference and accepted Augusta-Richmond County's Application for Preliminary Permit. A contract has been signed with EDA W, Inc. Environmental Consuhants to perform the IFIM Fish Study in the affected reach of the Savannah River as initiation of further efforts by Augusta-Richmond County to license the canal. In a letter dated August 19, 1996, the Department 'ZEL, ENGINEERS I 10/19/96:9614 rpt Bond Issue Page 3 I I 'I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 of Interior expressed opposition to any "additional water withdrawals into the Augusta Canal for new generation caoacity.[emphasis added]" Because the raw water pumping station now uses 540 Mgd for power to pump 29 Mgd for water supply use, no restrictions on drinking water supply are anticipated but increases in withdrawal of canal water for power is not assured. The Highland Avenue water plant, remodeled in 1987, is designed to treat 60 Mgd using its 10 fihers. The plant is currently rated by the Georgia Environmental Protection Division (EPD) at 45 Mgd because of the water needs at the time the permit was granted. The Highland Avenue plant has an on-site potable water ground storage capacity of 15 MG at an elevation of 433 ft. msl which is sufficiently elevated to serve the center and lower City areas as well as portions of South Richmond County without additional pumping. A high service pump station at the Highland Avenue location serves remote elevated tanks in the western parts of the service area. Subsystems served from the high service pumps operate at elevations 564, 500, and 630 ft. IDSl. CUJ1'e:'lt production at the Highland Avenue Plant averages 22.6 Mgd of potable water of which 20 Mgd is metered and billed. The current maximum production rate in summer is approximately 39 Mgd. The river/canal water treated at the Highland Avenue plant customarily has a low turbidity (-4.5 NTU) which is attributed largely to the controlled flow released from Thurmond Lake and Steven's Creek Dam. Some increase in turbidity after a storm results from water carried to the river from Steven's Creek but only major storms generate significant turbidity. The quality of finished water from the Highland Avenue Water Plant customarily is well within all contaminant limits and has low turbidity (-0.2 NTU). Under typical conditions of high influent turbidity (-18 NTU) the finished water turbidity still is low (-0.3 NTU). The current operating permit of the Highland Avenue Plant was obtained in 1988 and will require renewal in February 1998. The current withdrawal permit also was obtained in 1988 and will require renewal in October 2010, Copies of the withdrawal permits are on file at the offices of the Augusta-Richmond Utilities Department. An aborted plan to add surface water treatment ~othe County system resuhed in a 1991 permit to withdraw 30 Mgd of surface water from the Savannah River at a point in Columbia County above IZEL; ENGINEERS I 10/19/96:9614 rpt Bond Issue Page 4 I I I I' I I 'I I I I II I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 the Augusta Canal. Personnel of the Environmental Protection Division of Georgia DNR have stated that they would look favorably on combining the two withdrawals at the canal pumping station site. The total of the two permits is 75 Mgd average daily withdrawal and 87 Mgd peak water supply withdrawal. Reliability of the combined water system will be improved by projects funded in this bond issue which interconnect the system supplied by wells in South Richmond County to the surface water supply available at the Highland Avenue Surface Water Treatment Plant. Connection of the ground and surface water systems will allow the 18.4 Mgd of permitted well water withdrawal available at the two existing groundwater treatment plants to be used more effectively. Planning is in progress to increase the use of surface water to lessen reliance on the well fields during nonnal use periods. This strategy will not only provide economic benefits due to the lower marginal cost of the surface water, but will allow greater withdrawal from the well fields during peak use periods without violating withdrawal limits. Construction of a third well field and ground water plant will provide a needed supplement for South Richmond County. Increased reliance on the surface water supply will help to relieve the demand on the Tuscaloosa Aquifer (lessening the drawdown of the aquifer is a stated goal of the Georgia EPD). Lowering withdrawal from the aquifer also will provide for a supply to the surface water system if an emergency were to limit water supply from the Highland Avenue Plant. Utilizing the well fields increasingly for peak supply periods also will extend the available supply beyond a 30 year growth forecast. Statistical summaries of the water systems are presented in the following table. 'ZEL, ENGINEERS I 10/19/96:%14 rpt Bond Issue Page 5 I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 1 - Combined Water System Statistics and History Water Treatment History 1991 1992 1993 Daily Maximum (Mgd) 49,9 52,0 55,0 Daily Average (Mgd) 35,3 34,1 35,8 Daily Minimum (Mgd) 16,7 23,8 23.3 Total Annual Volume (MG) 12,885 12,445 13,052 Number of Water Meters 58,071 58,718 59,206 1994 53,0 34.6 23.2 12,630 59,832 1995 52.4 34.9 25.6 12,737 60,661 Raw Water Capacities Surface Water Primary Pumping Surface Water Backup Pumping Raw Surface Water Supply Mains (30", 36", and 42" mains) Raw Surface Water Storage Reservoirs Well Pumping Well Water Supply Mains Treated Water Capacities Permitted Treatment Capacity Clearwell Storage Ground and Elevated Tank Storage High Service Pumps BaCkup High Service Pumps Booster Pumps Backup Booster Pumps Primary Water Distribution Mains (6" and larger) 50 Mgd 29 Mgd 60 Mgd 124 MG 23,1 Mgd 30 Mgd 68.1 Mgd 17MG 18.25 MG 57.9 Mgd 25.5 Mgd 20.0 Mgd 9.5 Mgd 1,010 Miles 3. AUGUSTA-RICHMOND COUNTY SEWER SYSTEM The present sewer system of Augusta-Richmond County serves all drainage basins from Spirit Creek North. These basins contain 135 square miles (42%) of the 325 square miles of the County. The Spirit Creek Basin is far from fully served but the primary trunk sewer for the basin is in place. Virtually all sewer customers also have water service while approximately 14,750 water customers are currently without sewer service. Two wastewater treatment plants serve Augusta-Richmond County. The principal plant, the James B. Messerly Wastewater Plant, serves the area formerly within the City limits and the portion of Richmond County north of the Spirit Creek Basin. After treatment at secondary levels, 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 6 I I I I I' I I I I I ,I I I -I I I I I I, Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 effluent is discharged through Phinizy Ditch to Butler Creek less than three miles from its " confluence with the Savannah River. The J .B. Messerly WWP has a current rated capacity of 46.1 Mgd. Primary treatment at the plant is accomplished by settling while secondary treatment is accomplished through aeration by fine air diffusion, secondary clarification, and chlorination of the effluent. Sludge is digested anaerobically followed by land application on farm land. The plant provides additional biological treatment and containment of overflows through aerated equalization tanks with a capacity of 15 MG. A constructed wetlands facility is currently Wlder construction to provide tertiary level or advanced treatment. This facility will provide biological treatment in a system of flooded cells filled with wetland flora to provide final polishing of effluent. The first phase of the wetland system is expected to be fully functional by 1998. In addition to the Messerly plant, the Spirit Creek Wastewater Treatment Plant has a capacity of 3 Mgd with a peak flow of 5 Mgd. The Spirit Creek Plant is a biological treatment plant consisting of aerated lagoons, chlorination, and baffled shallow ponds for polishing of the final effluent. The J.B. Messerly WWP construction history began in 1952 with the publication of the Master Plan for Sewage Collection and Treatment which called for construction of a separate collection system (previous collection was a combination of stormwater and domestic sewage) and construction ofprimarytreatmeni facilities to serve all of Richmond County. Construction of collector trunk ~ewe!S and main transmission ,interceptors proceeded through the 1950's and early 1960's. In 1966, the construction ofa 23 Mgd primary treatment plant began with the financial -assistance (30% gram) of the Federal Water Pollution Control Board (FWPCB). The design was keyed to IQW capital costs and ease of expansion in size and level of treatment. The treatment consisted of primary settling, anaerobic sludge digestion, and chlorine disinfection of the effluent. By its completion in early 1968, plans were prepared to add secondary biological treatment to the plant to include mechanical aeration, secondary settling, and aerobic digestion. This second phase of construction was also partly financed by 33% grant from the FWPCB under Public Law 84- 660. The remainder was funded locally by the City of Augusta through revenue bonds. The facilities were completed in 1975. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Hood Issue Page 7 I I I I, I~ I I I I I ,I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 The Messerly treatment facility is located in Southeast Richmond County adjacent to lands , historically used for agricultural purposes, The plant's effluent is presently discharged to the Phinizy Canal and then into Butler Creek. Treatment plant expansion and enhancement has been identified by the Augusta 201 Facilities Plan to be necessary to meet the increasing needs of the area. A flow rate of 11.6 million gallons per day for the treatment of infihration and equalized inflow was added into the flow design parameters for the plant expansion. In the 1980's, expansion of the treatment process provided a hydraulic capacity of 46 Mgd (average) and 60.5 Mgd (peak) and included additional new primary facilities, additional anaerobic digesters and rehabilitation/conversion of the existing secondary facilities to fine air diffusion type of aeration. Land application of digested sludge also was initiated. Also included was the renoVation of the main lift. station equipment. The design capacities buih into the treatment works included a reserve to be made available to future industries in the amount of 11 Mgd, 10,000 pounds of biochemical oxygen demand (BOD) and 10,000 pounds of suspended solids. This capacity is in addition to the capacities included for the forecast growth of the system through the year 2005. While the Messerly plant was being expanded., new plant maintenance facilities, new laboratory facilities and expanded administration facilities were constructed. Equalization facilities were added in 1995, which will moderate the 11.6 million gallons of inflow and infiltration. Three circular, prestressed concrete, open-top tanks currently provide a total of 15 million gallons of aerated equalization storage. The J .B. Messerly WWP currently opef31es under NPDES Permit No. GAOQ20087 which is reissued at five year intervals. When the pennit was issued on July 22, 1988, the EPD indicated that a survey of the plant's receiving stream, Butler Creek, would be performed to determine if additional treatment or discharge relocation to the Savannah River would be required. This survey, completed on January 5, 1993, included a new Wasteload Allocation for the Messerly Plant which required that the facility meet advanced wastewater treatment limitations in order to continue , discharging at the present location. EPD subsequently was requested to determine the effluent limitations based on a discharge to the Savannah River which would allow the discharge relocation option to be weighed against providing advanced treatment at the plant. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 8 1\ I I I I I I I I I I I: 'I I ,I ,; Ii I' I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 EPD reissued the NPDES permit on June 23, 1993. The new permit contains effluent limitations below the plant's current discharge levels. Because the facility is nOt: currently capable of meeting these limits, EPD issued an Administrative Order containing a thr~ year compliance schedule. During the interim, the effiuent limits specified under the old permit are maintained. Upon completion of the constructed wetlands project, the Plant will be capable of meeting the NPDES limits as summarized in Table 2, Table 2 - James B. Messerly WWP NPDES Permit Discharge Limitations Adm inistratlve Butler Creek Savannah Parameter Order NPDES River Unit 6/23/93 - Permit Preliminary 6/23/96 6/23/96 - Waste 6/23/98 Load Allocation Flow 46.1 46.1 46.1 Mgd Biochemical Oxygen Demand (80DS) 30 10 30 mg/L Chlorine - Total Residual ,011 mg/L Total Suspended Solids (TSS) 30 20 30 mg/L Ammonia as Nitrogen (NH3) 17.4 1,S 17.4 mglL Dissolved Oxygen (DO) minimum 2 mg/L The City of Augusta owns approximately 640 acres of agricultural fields between the J.B. Messerly WWP and the Savannah River. The fields are bordered by forests and the lower reaches of the Phinizy Swamp. This area was selected for Advanced Wastewater Treatment Facilities designed to meet the more stringent effluent c:qscharge limitations without a costly extension of an outfall line and penetration of the levee, for discharge into the Savannah River. The first phase of a constructed wetlands facility is under construction and funded by a SRF Loan. The project is the economical tertiary treatment process for Augusta and is eCologically friendly. The system makes use of wetland plants growing in flooded treatment cells to provide the final biological polishing of eftluent from the secondary treatment process. The second and final phase of the project is currently scheduled for Completion in December 1999 and will bring the facility to its design capacity of 46 Mgd.. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 9 I I I I, 'I I I: I I I 'I' I ,,- I I I ,I' 1/ I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 The wastewater collection system for the Messerly Plant is primarily a gravity system serving the general area north of Tobacco Road except for the Fort Gordon Military Reservation which has its own wastewater facilities. The primary trunk serving the wastewater plant is a 72" line which intercepts the principal basins along its path and receives all flow from the 48" diameter mid-city interceptor sewer, The current separation of the many combined sewers (CSO projects) connected to this system is also expected to moderate peak discharges. By ordinance, buildings must be connected to the sewer line if proximate to the property. The collection system for the Spirit Creek Basin includes 5 miles of 36" sewer and 5 miles of 30" sewer as the primary trunks. Peak discharges are significantly influenced by inflow and infihration: but do not exceed the recently expanded Spirit Creek plant capacity (5.0 Mgd peak flow). 4. MANAGEMENT OF THE UTILITIES DEPARTMENT The Augusta-:Richmond Utilities Department includes the Water Division, Wastewater Division, Sales/Collections/and Customer Service Division, and the Construction and Maintenance Division. The principal administrative personnel of the Department are as follows: Max Hicks,P.E. is the Director of the Utilities Department. He began his employment with the City on November 4, 1991 as the Assistant General Superintendent and became General Sup~rintendent in August 1992. From July 1, 1989 until November 1, 1991. Mr. Hicks was Public Works Director for the City ofToccoa, Georgia. Prior to that he was a partner, director, and vice president of the consulting engineering firm of Z~erman, EVans, and Leopold, Inc. of Augusta, Georgia. Professional registrations include licensed professional engineer in Georgia and South Carolina. Mr. Hicks studied Engineering and English at Charlotte College (now University of North Carolina at Charlotte) at Charlotte, North Carolina, as well as Economics and Accounting at the University of South Carolina at Aiken, S. C. , Alma Stephenson is the Superintendent of Sales, Collections, and Customer Service, Ms. Stephenson has been employed by the City for 27 years and was appointed 'ZEL; ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 10 I I I t I I I I ,I I 'I .1 I I ,I II I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 OirectorlManager in June 1995, after serving for 8 years as the assistant manager ()fthe waterworks office and sales. Thomas D. Wiedmeier, P.E. is Assistant Director of the Utilities Department and the Superintendent of Water Pollution Control. Mr. Wiedmeier was employed by the City of Augusta in the Engineering Department in August 1988. He was appointed as supervisor of Water Pollution Control for Augusta in February 1995 after serving as assistant City engineer. Mr. Wiedmeier graduated from the Georgia Institute of Technology in 1984 with a Bachelor of Civil Engineering degree. The Department has 210 employees, none of whom are represented by independent collective bargaining agents. Neither Augusta nor Richmond County has experienced work stoppages during its history. All City employees hired after March 1987 are covered by the Joint Municipal Employees Benefit Systems (JMEBS), an agent multiple-employer public employee retirement system which acts as a common investment and administrative agent for municipalities. Full-time employees are eligible to participate in this defined beDefit retirement plan after completing one year of service. Benefits vest after ten years of service. Employees are required to contribute three and one-half percent of gross earnings to the pension plan. Augusta-Richmond County makes annual contributions equal to the amount required by JMEBS, Most of the employees hired before March 1987 are covered , by the 1949 General Retirement Fund., a single-employer public employees retirement system. Employees contribute either five or eight percent of gross earnings depending on their date ofhire and Augusta';Richmond County contributes the remaining amount sufficient to provide for future penSIons. 5. WATER AND SEWER CUSTOMERS, The customer totals for Augusta-Richmond County in 1996 are classified as residential or commercial accounts. Table 3 shows the 1996 distribution between the two aCcount types while , Table 4 lists the combined account history of the City, of Augusta and Richmond County water and 'ZEL, ENGINEERS, 10119/96:9614 rpt Bond Issue Page 11 I I I' I' 'I I I ,I ',I' I 'I I 'I I I' I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 sewer systems for the previous five years, Appendix A contains additional customer history including active accounts data. Table 3 -1996 Water and Sewer Account Profile Residential Commercial TOTAL* *Includes up to 9% inactive accounts, Water 54,707 6,272 60,979 Sewer 41,562 4,396 45,958 Table 4 - Combined System Water and Sewer Account History Water Accounts Sewer Accounts 1991 57,307 44,076 1992 57,857 44,416 1993 58,367 44,596 1994 58,973 45,222 1995 60,257 45,587 6. WATER AND SEWAGE VOLUMES Essentially all billings are based on metered water volume. Exceptions to this role include a small number of sewer-only customers and industrial customers who have metered sewer service because of a substantial difference between their use of water and dischaIge of wastewater, Billed water and sewer volumes are shown in the following tables. Billed volumes are lower than actual water production or wastewater treatment records (the disparity between fihered water delivered to the system and the metered volume is approximately 12%), While a small part of this volume may result from minor system leaks, the majority is supply to unmetered or unbilled customers. Operations such as Municipal Buildings, Police and Fire Departments, the Municipal Golf Course, Cemeteries, Parks, and Parkways are unbilled users. The following tables show billed water and sewer volumes for 1994 and predicted 1996 values. Volume estimates for 1996 ar~ further divided in Table 7 by residential and commercial account type. 'ZEL, ENGINEERS I 10/19/96:9614 rpt Bald lssue Page 12 'I' I I' . 'I I I' I 'I I 'I' .1 'I I' I I I I: I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 5 - Water and Sewer Volumes - 1994 5/8 & 3/4 1" & Larger City Billed Water (kgal) Billed Sewer (kgal) County , Billed Water (kgal) Billed Sewer (kgal) Combined City & County Water Vol. Sewer Vol 2,228,010 1,878,882 5,046,440 4,851,906 3,070,008 1,385,033 1,311,380 1,092,099 5,298,018 3,263,915 6,357,820 5,944,005 Table 6 - Water and Sewer Accounts and Volumes -1996 Predictions City County Total Total Mgd Total Mgd Total Mgd Water Accounts 32,348 28,631 60,979 Billed Water (kgal) 7,347,376 20.10 4,489,500 12.30 11,826,000 32.40 Sewer Accounts 26,971 18,987 45,958 Billed Sewer (Kgal) 6,796,300 18.62 2,540,400 6.96 9,340,350 25.59 Total Ave. Mgd 7,274,450 19,93 6,730,788 18.44 4,381,388 12.00 2,477,132 6.79 11,655,838 31,93 9,207,928 25.23 Table 7 - Combined System Residential/Commercial Use Mgd (Avg) Water Residential Commercial Total Residential Commercial Total Customers 54,707 6,272 60,979 41,562 4,396 45,958 Sewer kgal/yr 5,245,000 6,581,000 11,826,000 3,314,000 6,022,500 9,336,500 32.40 25,59 Commercial, industrial, and institutional customers are all classified as commercial for billing purposes, Industries with high eoncentnitiOllS of Biochemical Oxygen Denuind (BOD)) and Suspended Solids (SS ) are monitored to establish the strength of their wastewater and are billed an industrial surcharge proportional to the excess amount. Billed water and sewer quantities for the fifteen largest Augusta-Richmond customers are listed in the following table along with their percentage of use, 'ZEL, ENGINEERS, ]0/19/96:9614 rpt Bond Issue Page 13 I I. I' I 'I .1, I' ..I 'I,' I I I 'I I' I I' I I" 'I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report , October 1996 Table 8 - Largest Water and Sewer Customers by Volume (1995) Water Sewer (Mg/Mo,) % of Total (Mg/Mo, ) % of Total Nutrasweet 38,50 4,0% 38,50 5,0% MCG Complex 36,89 3.8% 23.01 3.0% Proctor & Gamble 6.08 0,6% 13.69 1.8% Graniteville (Sibley Mill) 13.57 1,4% 13.57 1.8% Kendall 12.39 1.3% 12.39 1.6% King Mill 9,86 1,0% 9,86 1.3% Searle 8.97 0,9% 8.97 1.2% Ponderosa, Georgia 8,48 0.9% 5.18 0,7% University Hospital 8.43 0.9% 6.34 0.8% VA Lenwood Hospital 7.88 0.8% 7.88 1.0% Castleberry's 7,45 0,8% 7.45 1.0% Huron Tech, 6.98 0,7% 0.98 0.1% Sweetheart Cup 6.06 0.6% 6.06 0.8% E.Z. Go Textron 5.98 0.6% 0.45 0.1% Merry Brothers 5.63 0.6% 0.0% Total 183, 15 18.9% 154.33 20.2% Total Billed Volumes 967,55 100.0% 762.85 100.0% 7. WATER AND SEWER RATES In 1995 the annual costs of the water and wastewater systems were evaluated to determine the , , appropriate charges' for the various classes of customers in the system and to equalize rates , throughout the Augusta-Richmond service areas. Water and sewer rates were calculated to distribute the pro rata share of system costs to the customers. Rate history is shown in Appendix G. Current rates approximate the rate structure recommended in the 1995 study and include allowance for the costs of operation and maintenance as well as replacement, renewal, and extension. Effective September 3, 1996, the following-rates for Water and sewer were established for the Augusta-Richmond County Utilities Department: 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 14 'I' I I I ;1' .' ;I~ .J 'I' .1' 'I .1 '-' I' .1 I .1 Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 9 - Residential Rate Structure Meter Size < 3 kgal >3 kgal ALL METERS Water $8,00 Sewer $ 6,70 5,53+$O,76/kgal $ 9,40+$0, 87/kgal Table 10 - Commercial (Non-Residence) Rate Structure Meter Size 5/8" - %" 1" Water $6.00+$O.97/kga1 $8,&>+$O,97Jkgal $14,10+$O.97/kga1 $2O.25+$O.971kga1 $33.60+$O.97/kga1 $49,10+$O,97/kga1 $82.BO+$O.97/kga1 $120,10+$O,97/kga1 $1 &>.40+$O.97/kga1 $2t8.15+$O.971kga1 $ 8.&>+$O.97/kga1 Sewer $ 9.60+$1.10Jkga1 $ 14,15+$1.101/kga1 $ 23.65+$1,101'k9a' $ 34. 15+$1.10Jkga1 $ 57.&>+$1.10Jkga1 $ 83.3:>+$1,101kgal $1C>.BO+$1.10Jkga1 $ 204.40+$1.10JkgaJ $ 273,25+$1.10Jkga1 ' $ 346.C5+$1.10Jkga1 $ 14.15+$1.10Jkga1 1-114" & 1-112" Z' '$' 4" er e" 10" 12" 00 1. Levelized monthly bills for residential sewer service is based on each account's winter consumption, defined as the average of the previous December, January, and February consumption, 2. The industrial waste surcharge in addition to any sewer service charges defrays the cost of treating above "norma'" strength waste and is levied at the rate of $0.14 per pound each of BOD & SS. The following graphs show the average monthly combined water and sewer bill for residential and commercial 1-1/2 inch meter customers. Note that Augusta-Richmond, Columbia County, and North Augusta use levelized billing for residential sewer charges and the bills have been adjusted accordingly. Also, the commercial water and sewer bills do not include an industrial surcharge. 'I I 'ZEL, ENGINEERS, IO/19/96:9614rpt Bond Issue Page 15 'I l~ Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 I' I 'I~ Graph 1 - Residential Water and Sewer Bill Comparison $140 $40 -Columbia County' - - - North Augusta (Inside)' W North Augusta (outsidet - Aiken (inside) .. Aiken (outside) $120 $100 I, JI' iii >- ! $80 c o :IE &$00 III .. GI > or( " $20 $0 o 5 10 15 20 Average Water Use (thousands of gallons) 25 3J :1 * Bills adjusted for levelized sewer billing .Ii I' ,Graph 2 - Commercial 1-1/2" Meter Water and Sewer Bill Comparison $16,CXD $4,CXD - -Columbia County - - - North Augusta (inside) - - - North Augusta (outside) - . - . Aiken (inside) - - Aiken (outside) $14,CXD .1, 'I I' $12,lXX> iii >- $10,lXX> :E C ~ $8,CXD GI ~ III a; $6,aXJ > or( I, il $2,CXD $0 o 500 1,CXD 1.500 2,CXD 2,500 3,CXD 3.500 4.CXD 4,500 5,CXD Average Water Use (thousands of gallons) I, 'I' 'ZEL, ENGINEERS 10/19196:9614 rpt Bond Issue Page 16 I 'I I 1\ ;1. 'I' I :1' ". :1' .1 I' '.' 'I' I' I I' I '1\ I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Selected comparative bills for residential and 1-1/2" commercial customers from the above, graphs as well as for commercial 6" customers has been summarized in the following table. Comparisons for commercial customers with water meters larger than 6" cannot be made since the rate structures for the surrounding systems do not support the larger customers. Table 11 - Comparison of.Selected Total Water and Sewer Monthly Bills gallons Augusta- Columbia North North Aiken Aiken per Richmond County Augusta Augusta (Inside) (outside) month (inside) (outside) Residential 1,000 $14,70 $15,40* $17,19 $28,54 $13.25 $26.49 4,000 $21,45* $22,60* $23,79 $38.08 $21.24 $42.47 10,000 $28,22* $32.85* $34,94 $57.28 $38.95 $n.90 30,000 $50.78* $76.60* $71.26 $119.60 $120,89 $241,78 Commercial 1-1/2 Inch meter 10,000 $58,45 $76.00 $43.85 $70;88 ' $64,12" , $128.25 30,000 $99.85 $124.00 $101.70 $162.18 $122.41 $244.83 50,000 $141.25 $172.00 $158.90 $252,18 '$180.70 $361.40 100,000 $244,75 $292.00 $299,90 $473.18 $323,73 $647.46 Commercial 6 Inch meter 500,000 $1,258,60 $2,032.00 $1,448.95 $2,283,28 $1,767.23 $3,534,46 1,000,000 $2,293.60 $3,232.00 $2,808.95 $4,393.28 $3,213.86 $6,427. 72 5,000,000 $10,573,60 $12,832.00 $12,278.95 $18,003.28 $13,802.09 $27,604.19 * Adjusted for levelized billing 8. REVENUE 1996 revenue from the water and sewer sales and other miscellaneous revenue (described in the following section) is forecast at $32,755,537. These calculations are summarized in Appendix B for water and sewer sales and other miscellaneous revenue. With the exception of Capital Projects funded by Bonds or Loans, Canal Revenue, Sinking Fund Interest Revenue, and other Special Revenues, these funds constitute the reyenue available annually for operating the Water and Wastewater Systems. Appendix F shows revenue and expense history since 1991. 10/19/96:9614 rpt Bond Issue Page 17 'ZEL, ENGINEERS, ~I' t Ii I '1\ I ;1' ,,' 'I' .1 'J' .11 '11 ;1 1,1 :1' I 'I' I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 9. MISCELLANEOUS REVENUE Separate charges are made for water and sewer taps, laboratory serviCes provided for others, and septic tank sludge deliveries to the Wastewater Treatment Plant (Appendix B). Table 12 -1996 Miscellaneous Revenue Estimate Taps, Lab, Septic, Etc, Industrial Surcharges Interest Income Big Meter Income Total Misc. Revenue Total $ 728,551 $ 1,652.296 $ 800,000 $1,079,188 $ 4,260,035 10. OPERATION AND MAINTENANCE COSTS The Operation and Maintenance Costs for both the Water System and the Sewer System have been determined by using data developed in the 1995 Water and Sewer Rate Study. Operations and maintenance costs are forecast using unit costs applied to the forecast number of water and sewer customers. Because the additional customers added each year represent largely marginal costs, the unit costs 'are increased by a factor of 2% per year in which the marginal costs moderate the inflation rate. In the engineer's Opinion, this factor agrees more closely with the actual O&M cost growth realized by municipal water and sewer systems than would an adjustmelrt for the full rate of inflation. The 1996 forecasts used in determining rates are shown in the following table. 'ZEL, ENGINEERS, lO/19/96:9614Ipt Bond lssue' Page 18 'I' . '1\ / ,I (\ " 1- , \ I I '1\ ,', 1\ ,I: 'II, 1\ I, :1' I 'if I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 13 - Summary of O&M Costs City 1994- Actual County 1995 Budget Total Combined 1996 Predicted % Total % % Total Water O&M Expense 38% $ 3,243,438 53% $ 3,657,901 45% $ 7,085,726 Total Sewer O&M Expense 62% $ 5,210,728 47% $ 3,269,230 55% $ 8,705,576 Total O&M Expense 100% $ 15,791,302 · Because of financial constraints on the City in 1995, the expenses of 1994 are considered to be more representative of O&M costs. 11. PROJECTS IN PROGRESS BY OTHER FUNDING The following list of projects are completed or are nearing completion: Table 14 - Phase I Combined Sewer Overflow Projects Inner City East Basin Inner City West Basin, Phase I-A Glass Factory Avenue Basin, Phase II Metcalf Street Basin, Phase IV Chaffee Avenue Basin, Phase II Fifth Street Basin, Phase I Fifth Street Basin, Phase II Total 1,030,986.20 1,129,837,94 2,229,723.49 1,725,313.02 2,993,564.23 2,514,674.14 1,234,203.43 $ 12,858,302.45 For these projects, $12,000,000 is being financed by GEFA (4 % interest) loan. The additional program costs ($858,302) for this portion of the CSOs, will be financed from the system capital reserves of Augusta-Richmond Utility Department. In addition, costs are listed below for the remaining projects designed to eliminate the remaining combined sewer overflows by separation. These projects also are being funded from SPLOST funds with short term financing by SRF loan, if needed. 'ZEL, ENGINEERS I 10/19/96:9614 rpt Bood Issue Page 19 'I, j ,', I~ I, I: ;1\ I 11\ 'I.' , , 1\ .1 'Ii ;1\ I, ;1' ". ;1 I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 15 - Phase" Combined Sewer Overflow Projects Division Street Basin Inner City, Phase I-B Turknett Springs Basin, Phase I Turknett Springs Basin, Phase II Turknett Springs Basin, Phase III Glass Factory Avenue Basin, Phase III Metcalf Street Basin, Phase V Total 1,539,870,39 2,000,000 849,001,30 1,008,862.62 1,258,429,65 2,492,625,85 2,691,284.88 $11,840.074.69 12. DEBT SERVICE The Water and Sewer Systems at the present time have two City Bond Issues and three County Bond Issues requiring annual amortization payments. Previously refunded bonds are not included in the System's outstanding long-term debt since the System legally satisfied its obligation with respect to the refunded bonds through the refunding transactions. The debt service requirements for the five Bond Issues are listed in Appendix E for the City and the County and a summary is shown in the following table. Table 16 -1996 Debt Service Summary City Bonds and GEFA Loans County Bonds Total Debt Expense (Annual) $ 2,096,481 $ 2,284,000 $ 4,380,481 In calculating system expenses, this report assumes that the existing bonds will be refunded in full. The debt service shown in the Forecast Revenues and Expenses table (see Table 21) includes the debt service required to refund these bonds as furnished in preliminary form by the Bond Underwriter. The remaining principal on the five outstanding bonds is shown in the following table. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 20 'I, v I 'I 'r t: " ;1\ I If ,I 'II 'I~ 'I :1\ I ;1' ,I III I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report . October 1996 Table 17 - Bonded Indebtedness as of January 1, 1997 Richmond County Bond Series 1986 Richmond County Bond Series 1987 Richmond County Bond Series 1991 City of Augusta Bond Series 1972 City of Augusta Bond Series 1991 Total Debt $ 6,220,000 $ 2,924.592 $ 7,655.224 $1,125,000 $ 8,420,000 $ 26.344.816 13. CAPITAL IMPROVEMENTS PROGRAM The Capital Improvements Program was prepared to provide a perspective of the renewal and extension projects currently anticipated for the Augusta-Richmond water and sewer systems. Except for the combined sewer overflow projects and the constructed wetlands projects, ~e exhibit , is a comprehensive list of currently forecast capital replacements and extensions. Appendix C lists the known capital improvement projects for the City and County, respectively. These are revised lists largely identical to the Capital Improvement Plans (CIPs) that existed for the two systems. A new long-term comprehensive CIP for the water system is now in preparation as a part of the hydraulic network analysis of the combined water system. This analysis will further refine the cOmbined capital needs for the merged systems but is unlikely to depa~ from the needs of the current program. Beca1.isethe sewer system already was operated as a combined system, significant Changes in the planned program are not anticipated. From Appendix C, Table C-9, the five,Year Capital Improvements Program for the City and the County systems is $61,935,OOO.To allow the needed work of the City and County systems to proceed at once, however, the folloWing list has been selected for inclusion as the Capital Improvement Program for this bond issue. 'ZEL, ENGINEERS I 10/19/96;9614 rpt Hood Issue Page 21 'I \1, '1\ ',I I I: ~I: 't- II ,-' ,I :1 'I! 'I ;t \1 ;1' I. 'I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 18 -1996 Bond Issue Utilities Department Capital Improvement Projects Water Supply and Treatment Cost W1, Baffling and Repiping of Clearwells $ 1,100,000 W2, Distribution Improvements to Connect Urban and Suburban Systems $ 2,500,000 W3. Kimberly-Clark Wellfield and 10 Mgd Treatment Plant $ 4,200,000 W4. New 60. Raw Water Line - $ 9,400,000 W5. 1 MG Elevated Storage Tank $ 1,000,000 W6. Extensions to unserved areas $1,000,000 Subtotal Water Projects $ 19,200,000 Wastewater Collection and Treatment Cost S1, Site Purchase, Wetland Treatment Phase III $650,000 S2. Rae's Creek Sewer Replacement Phase I, II, III, and IV $ 5,600,000 S3, Spirit Creek Trunk Rehabilitation $ 2,000,000 54. Kimberly-Clark Trunk Sewer $ 700,000 S5. Sewer Rehabilitation: Rocky Creek, Butler Creek $ 2,000,000 S6, Upgrade Industrial Trunk, Goshen Industrial to WWTP $ 1,400,000 S7, Main Lift Station Rehabilitation $ 2,000,000 sa, Mid-City Supplemental Line $ 3,000,000 S9, RCCI Trunk Sewer Extension $ 400,000 S10. Lift Station Force Main, Bennock Mill to Intemational Drive $ 1,000,000 S11, Odor Control J.B, Messerly WWTP $ 2,750,000 S12. Extensions to Unserved Areas $ 2,000,000 Subtotal Wastewater Projects $23,500,000 TOTAL $ 42,700,000 The total of the programs of the City and County systems selected for funding in this bond issue is $42,700,000. Descriptions of the water supply and wastewater projects selected for funding in this bond issue follow: 'ZEL, ENGINEERS, 1O/19196:9614Ipt Bond Issue Page 22 'I I 'I' ~I. 'I Ii 1\ Augusta-Richmond Utilities Departnient Revenue Bond Issue Engineering Report October 1996 Table 19 - Description of Capital Improvement Projects I W1, A clearwell valving and baffling project for the Water System will increase the disinfection parameters of the water plant to meet mandated standards, W2, Distribution system improvements to connect the urban and suburban systems will provide the interconnections for transfer of water between the systems; this will add redundancy of storage and of supply source, By increased reliance on the existing surface water facilities, it also will permit the protection of the aquifer supplying the wells from long term drawdown, In addition, a project is included to reduce total trihalomethane (TTHM) residuals to bring system finished water tests within appropriate limits by construction of the Flagler Road-Powell Road looped line, W3. To strengthen the water supply in South Richmond County a 10 Mgd Well Field and Treatment Plant is planned for water drawn from the Tuscaloosa formation in a site owned by the Development Authority of Richmond County and known as the Kimberly Clark Site, The property is located near the intersection of Horseshoe Road and Highway 56. The plant will aerate to reduce iron and dissolved gases, will disinfect, adjust the acidity, and add corrosion control. W4. To replace a troubled 42" prestressed concrete cylinder pipe raw water line, a new 60" raw water pipeline is planned along an alternate route. The new line will increase capacity to the existing water plant and will provide for redundancy,of raw water supply, W5. A one million gallon elevated sto~ge tank is proposed for the Steven's Creek area near the Richmond County Line W6. Extension of water lines to unserved areas where primary service lines are in place. S1.ln anticipation of expanding the Wetlands Treatment system, the purchase will be made of the site adjoining the current phase I and phase II constructed wetlands project. S2, Because of a major population increase in the Rae's Creek Basin, the existing 18" diameter sewer line installed in the late 1950's is seriously overloaded and the concrete pipe is in very poor condition. This project will proceed with replacement with a 48" gravity sewer for the most deficient reaches of this line, S3, Rehabilitation is planned for the existing 36" and 30" diameter Spirit Creek trunk sewer line, This is a reinforced concrete pipe sewer line which is structurally sound but has serious leakage of the joints, Rehabilitation of this line will relieve the Spirit Creek Sewage Treatment Plant from the substantial inflow and infiltration now reaching the plant. 54, This project extends new sewerage into developing areas and an area planned for further industrial development. 85. Reduce infiltration, replace bad sections of pipe, and augment flow in the trunk sewers of Rocky Creek and Butler Creek to improve the integrity of the existing sewer and to upgrade where there is excess flow. 56. This sewer line in the Goshen Area requires rehabilitation to reduce infiltration and upgrade of the industrial waste pipeline to the J.B, Messerly Wastewater Plant. S7, Serious chemical penetrations into the concrete walls of the lift station wet well require prompt attention in order to maintain the integrity of the concrete structure of the lift station constructed in 1967, S8, This project will add a lift station and force main to transfer the increased flow from the Rae's Creek Basin by bypassing the 48" mid-city portion of the main trunk line to deliver the flow to the 72" trunk sewer to the Messerly WWTP. S9. A sewer line extension is needed to serve the new Richmond County Correctional Institution. S10. This Lift Station And force main from BennockMill Road to International Drive will provide sewer service to a developing industrial area, ' S11, Correction and control of odor at the J.B. Messerly wastewater treatment plant has been a recurrent problem which will be moderated by this project S12. Extensions of sewer lines in developing basins to serve current water only customers, /11 :1: ;11 ,I II :,' 'I :1' 'I' , I ,I 'ZEL, ENGINEERS 10/19/96:9614 rpt Bond Issue Page 23 'I I. " I I l I I, III I :,\ ,I 'I 1\ I :a' :1 'I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 14. RENEWAL AND EXTENSION To provide for systems with continuing vitality, Replacement Costs (Renewal) must be covered by Revenue. A Renewal Program is forecast in Appendix D for the City and the County Systems to provide future funding for replacement based on depreciation in accordance with the useful life estimates as follows: Table 20 - Useful Life of Water and Sewer System Components Pipelines Pumping Facilities Treatment Plants Storage Tanks 50 years 30 years 40 - 60 years 60 years The forecast net annual renewal and extension need is $2,388,000. This amount is smaller than the , , actual total R&E need since the proposed bond issue funds R&E projects. After the five year construction period for bond projects, the forecast annual R&E need is $11,600,000/year. In addition to the bond issue construction, however, completion of the current Capital Improvement 'Plan actually will spend $3,847,000 per year ofR&E funds for, the first five years and $6,589,000 per year for the five years thereafter (see Appendix C). These amounts are the R&E expenses that appear in the Revenue and Expenses spreadsheet (Table 21 and Table 22). The current R&E Reserve Account balance represents a minimal R&E need. To place a system on a' "pay-as-you-go',' plan requires a more conservative calculation of R&E needs based on Remaining Life of system components. In periods of reasonable bond interest rates, such a plan is not advisable since it places undue burden on current customers. It is recommended that the system instead continue the more traditional choice of relying substantially on revenue boDds for major replacement needs. To safeguard the system from unusual financial distress resuhing from sudden anellor catastrophic replacement needs, it is recormnended that the reserve fund be maintained with a goal ofa minimum of two years and a maximum offive years of Useful Life replacement needs. 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page 24 I' Ie '1 I, 'I I' 'I I I I ;1\ r/ ,I, 'I 1\ I ,I I 'I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 15. FORECAST REVENUE AND EXPENSES To provide a forecast of revenue and expenses for 10 years, the tabular information separately shown or developed in this report is combined in the following tables. Table 21 shows forecast revenue and expenses for a ten year period using current market estimates (as provided by the bond underwriter) to project debt service for the proposed bond issue. Table 22 shows the same information as the previous table except that debt service is forecast using worst case rates. Forecasts are based on the following assumptions, listed in order of their appearance in the tables: Industrial Surcharge is forecast to grow in proportion to the number of sewer customers. Miscellaneous Fee Revenue is forecast to grow in proportion to the number of total water and sewer accounts, Interest Revenue is assumed to remain at 1995 levels. Water and Sewer Charges are forecast to grow according to the Residential/Commercial and Water/Sewer account forecasts. Water and Sewer Charge forecasts assume that water and sewer demands per customer remain at 1995 levels. This assumption is supported by water and sewer production and treatment records. Operations and Maintenance Costs are forecast to increase according to the customer increase. In addition, the cost per customer is forecast to grow by 2% per year. The 2% increase reflects a conservative allowance for inflation moderated by the effect of O&M marginal costs. Debt Service for 1996 is based on the'required service under the existing bond issues. In Table 21, debt service for 1997 and beyond uses current market rate estimates as provided by the bond underwriter. In Table 22, debt service is forecast using worst case rates for $79.64M. GEFA and SRF Loans are forecast based on the existing amortization schedule. Renewal and Extension Needs are forecast to grow at 1 % per year to accoWit for growth of systeii1 infrastructure. Increases due to Inflation is assumed to be offset by returns from investment of unused R&E funds. 'ZEL, ENGINEERS, 10/19/96:9614 rptBond Issue Page 25 I I 'I ,..~ Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 I /1 I I I ,'I ,- I 'I, ,I, 'I 'I' I 1\ I I' I Customer growth in recent years has been approximately 0,5% per year in the city system ~d 2.0% in the county system. A linear 1.5% growth per year has been used to show the increase in customers and water use for the pwpose of forecasting revenue. Depreciation is accommodated by funding replacement costs through Renewal and Extension. 'ZEL, ENGINEERS; 10/19/96:9614 rpt Bond Issue Page 26 I I I I 'I I 'I' , , . I' I I I I II ....t: 5 0 e e- tel: GIS ~ =-c ~ .C ~t I' .~.5 .~ OJ) ::: c ...~ ~ ~ 1",= ~; -=c\O .~ 00\ ~=O\ I - GIS ~ '- .... = II) ll'Jc.o ~ ~ 0 =tu <~O I II ~I I c ~ o N :t:i ca N 1: 01 ~..- - ,Q Ql Q - Ql = 'fm ca..- ~ - C Ql t: .... ill Q c .iij ::lI ell U) 5:m c.... Ql Q. >< W 'a C ca Ql ::lI C Ql > CD ex: - ell C'lJ Co) e o L!. It) 8 N . 8 N CO) 8 N N 8 N 8 N I~ I~ ~ ~ ~ .... ~ I~ ~ ~ s ~ ~ . lB ai ~ ..... ~ N Pt ,..; ~ tit s ~ ai fB_ tit ~ i~ tit m M- .... ~ tit s ~ tit ~ N lB. ~ N cg 18 .... I~ I.... 113 fi .... I~ ~- ~_~_I~R.~~~~~ I~ ~. ~ ! I~ ~- ~.l8 ~ ~. ~ ....(1) CO....(I) COM.... ~ ~(")('l') ~~~~~~~~~~ ~ ~ .... ,..; It) .... ~ ~ fi .... ~ ~ ~ CD ,..; t! ~ i3 N t! ~ ~ ,..; M .... tit (I) CD ~ tit i ,..; N .... .... 8l ~ l=i .... 8!Q.........(I)(I).(I)IS~ oilSS~~&1J:::;::(")CD g~~W~~!~S~i "';ai -.iai"'; .-aiN ~ ....N('I) ~.................................... .... ~j~ ~ii ~ :> :> :2' ii CI) CI) III >_e....CI)_~ICI) - III '" - ID CI) ,!!!Oe-IlI.!!!Oe ~ -"'"CJ -"'CJ ~ ~ >0 ~ ~~~~~~~CI)~ 'Efti ,'Ejjj 'Ejjj._ E:::Ejjj.- E:::Ejjjjjj .i!:'::I-.i!:'::I... >0::1... III 0'" III 0...... '-8,0,- 0 0:t::8 0 Gl8- 0 Gl 0_ 0 0 o ~OO~O ~~ m~~om~~ ... N CD :is ca ~ 'ii~ E.,! !l e 'g:J CI) ,Q ~ 0 !~'R 1II a: Gl ~IJ..CI) I Gl i: Xl Iii ~o 1ij't:J~la ~;~B QI :J 5i ~ << ~i!!JI ~~~CI)~~ ~~8JS~8JS ~o ~o ~::iE QI all << 0 i ~ i i ~~ CI) ~QI ::I c:: QI ~ ~ -~ ~:; ::iE- all :g 00 ~ QI E e :; ! :!i 0lI o i ... ,2 '0 C III f ~ Q. W llll << fti c ~ '0 't:J III -g 2 .s ~ I 0:: Wrfi ~ ~~ i 1V5 &,- ,l!! QllIl't:Jlll i~!~ cia;~ :;'2~1ll ~~j~ 'iij l! ~ ...J Eii.,1J.. oil/lO:: -o::QlCI) '9.QlCIlC i/jJ::-g,g :1....-= .! '0 .~ :!i .s .~ ~ i .!!l118G1 !l.!!!8= c~c:s !~!; ~-eCPc Eo:E:J o III 0 .::: .2!t :!i E QI'O't:J lU ~cc:c $. ~ lU, QI l!! c( ~ _0..2(0 Q).........1l. C lii!!! c:: ..1!li 8-! XP- 0:: 0 .... <5 Z"':Nl'i. i~ ..I III N J C Gl i III C ~ GI ~ ~ i E l!! '5 "'" C"l CI) 01) nl Cl.. '" =' ] "" ~ e. ~ \0 0- -0 Q:: ~ o I I I I I I I D I I I I I ....'t = Q e e- t::=: CIII Oil e- .: Q ... I .~.~ .~ OJ) :: c ....row ~ ~ "0 = = ." Q ." e; "5=\0 :.:::l Q 01 I r;r;; = 0\ c1c~: .... = Q) "" =.0 = ~ 0 ?f~1i <=:0 I I I I !~i rlj ~ ~_~...en~~I~ ~~e.!!~~e !'2 -"C1)m-~CI) "'" >- >- €.8 ~ a; I~ .8 ~ a; en ~ >-$S>-$S>-~S~E~S~E~SS~ 58~58~58~~8ffi~~8m~~~ > ~ ~ s! ~~ c ~8 lIISN N :e o ~G) -I .c... 'CD Q J! lIIS ~G) "m c ... lIIS CD o~ en -..... :1 en c oc;j ::) , ell U) :: m c ... !. )( w " C lIIS Gl ::2 C Gl > Gl 0:: .... ell ftI U !! o lL N N Gl ::s ,ft1 ~ lO 8 N .,. ~ C') 8 N N 8 N 8 N tiE>> 't:'1ll 1ii.c. -6~ c: ~ en I~- ~ ... .... ~ ~~ ... co 2l ~ ... .,. lB aj ~ ... N pj ,..: ~ ... S! lti ~ ... ~ .~ ... ~ ri .... ~ ... 8 ~ ... ~ N lB. ... .D 3 u }'il'ii III t Cl I-u.en ~ .... ,..: 10 .... ... ~ ri .... ... ..- iD ,..: .,. .... ... ..- l"l co ~ ... 8 .... ,..: l"l .... ... co ... co ~ ..... ... i ,..: N ..... ... ~ - ti .... ... g lB .... 8 ~ ~ ~ I~ g ~ ~ I~ ~ ! s;i aj aj -:i. ..: 10- ,( ..: ..: &f ~ as~IO'fglllllSl8~....~ ,..: aj lti ..... aj cD Pi ,..: ..... ..-(")C") .............................. ... .... :B &f .... ... >!CON~;'!tIO.,.IO!;?;g!! ~~lBlO~~8.,.asNill ~. ai 10- ~~- '<l-IO-~'''': ,..:!- .............. 'lit...... co,.... WC>>.,. NN ..-... ,..:,..: cti"':aj cDNIIf .... ....(')fI) .............................. ~ Cl C II ~ ... E!l 1O'2~.l! ~l1Ienu QI ~ lii &i ~ ~ ..., ~~~IJ~ ~€~en€~ ~8~~~8~~ U 1-0 I-=: aD o S o I- ~ ~ e: QI &i I en ~ -~ ~~ III e: III ;:E- aD ell 08 ~ '01 E l!! 'S ~ ~ ,Cl/l o ~ ti ... $? 'a e: III .n 1j e- o. w Cl/l II:: 'iii 6 ie, 'a 'a 111 'a c: .2 .s ~ ~ ~ w~ ~ ~ $ ~ !~ E 6-,Q ,l!! Gll/!'alll 'ae:llle: 1lI~€1 c: GI III ~ ~ is ~~i! 'iij ~ ~ ..J Ec:~!:: .s&!Sl0 icuQlC: !l=~~ .! '0 .~ ~ OSj"': __ W ",10 ... -c Gl ~.!!8= C:~e:5 ~~!: -.2 CUe: Eo:E~ o cu 0 .t:~~E 01 'a 'a III ~~e:c !1 a. III CIl ~~l!! ii.s~~ c: 4i '- c: .. 1! Gi !. l8 Sll-II::O-, '0 Z"':NM..r i~ .J III N ... J c ~ ~ 111 c: ~ Gl .c. I- .,; i E l!! ':; co N ~ co a.. ~ .. ~ "c:I ~ e. .,. \C '" ~ '" 0\ - .::; I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 16. CONSTRUCTION PROGRAM The construction schedule is predicated upon the status of readiness, the lead time, and time needed for construction of the various projects. The current status of program projects is as follows: WI, S2 (Sec. 1,2,3) . Design drawings complete; ready for bid W2, W6, Sl, S2 (Sec. 4), S3, S4, S5, S9, SIO . Projects with a short lead time W3, W4, S6, S7, S8, Sll, S12. Projects with longerleadtimes Project costs coupled with estimates of time for construction of the projects have been evaluated to produce the earliest completion practical in the following schedules for construction and the time schedule for expenditures. Table 23 - Estimated Construction Schedule for B()~d I,ssue Projects 1897 1898 $3 :" . !:::j::.~.L::f"'" ~ $2 o ~ .. c ~ ~ $1 <It '.. ,... ,... , . '~~., en '-.. a a ~ ~ ... ._. ;... _R ~ . . m co ~ ..... N N . .... ;:;:;:~:r::~.:'. ...... - ~ t;'-; 12. ~ - ..... <<! ;:~'t'):':i:~,,~,;ffi:;:5.' ~,~ -~,'~ ~ Je',Je'~e :':2: ,.....,....., " 0.',0' $0 'ZEL, ENGINEERS, 10/19196:9614 rpt Bond Issue Page 29 I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 17. ENGINEER QUALIFICATIONS ZIMMERMAN, EVANS AND LEOPOLD, INC. (ZEL) has been the principal Consuhing Engineer for the 9ty of Augusta Water and Sewer Departments since 1958 and since 1946 through its predecessor company. Similarly, ZEL has provided guidance in the development of the Richmond County Water System by design of Water Plants No, 1, No.2 and their associated well fields as well as the design of the Spirit Creek Basin Sewage Treatment Plant. The firm has provided similar services during this period for the central and upper Savannah River area. ZEL is led by six Professional Engineer partners, each with 20 to 40 years water and wastewater experience supported by its staff of professional engineers, graduate engineers, draftsmen, and other staff. While the City and County historically have provided routine engineering services and construction management for most of the water and sewer system needs, both ~ve made'extensive use of its community Consulting Engineers to assist with engineering studies, engineering design and contract management. Through this combined effort the City and County have been provided economical, efficient, and progressive solutions to the water and wastewater programs. Consulting engineers for the projects included in this Bond Issue are Augusta firms as follows: ZEL Engineers, PM & A., Inc., W. R. Toole Engineers, Brian G. Besson and Associates, James G. Swift and Associates, and CRW, Inc. aU of which have practiced as Consulting Engineers for 20 years or more in Augusta. 18. ENGINEER'S OPINION Because ofZEL Engineers' knowledge of the Augusta-Richmond County water and wastewater systems which resuhed from preparing reports, design projects, inspection of the water and wastewater facilities and interviews with the Augusta-Richmond water and wastewater staff the following conclusions are drawn with respect to this Bond Issue. 1. Forecasts of growth of the water and sewer system and the resulting revenues from the water and sewer services can be expected to fully fund this bond issue, as well as provide adequate 'ZEL, ENGINEERS, 1O/19/96:9614lpl Bond Issue Page 30 I I I I I a I I I I I I I I I D I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 funding for other projects of the Capital Improvements Program including the needed renewal. The designated funds from SPLOST will refund the construction costs of the Phase II CSO projects and the constructed wetlands projects financed in part by GEF A and SRF loans, 2. The Capital Improvements Program of Appendix C is sufficiently comprehensive and accurate to represent the capital improvement needs of the Augusta-Richmond Utility water and sewer systems, 3. The Water and Sewer Departments have continued to maintain the systems in satisfactory repair and operating condition, and in the opinion of ZEL Engineers, the water and wastewater systems have been operated and maintained in accordance with standard utility practice or better. The Augusta-Richmond Utility Department staff is considered to have reasonable experience and qualifications for the responsibilities of operating and maintaining the water and sewer systems. 4. The useful life of the projects included in this bond issue will substantially exceed the 25 year term of this bond issue. Provision also has been made in the Capital Improvements Program to provide renewal and extensions to ensure the continued viability of the systems. 5. The combined sewer overflow (CSO) elimination projects now under construction are projects which eliminate sewage discharges by separation of the stormwater and the sanitary sewage collection systems. This a conservative and effective method of eliminating the discharge of untreated wastewater, and is a conventional solution for this type of work in Georgia. 6. Completion of the CSO projects and the constructed wetlands project will provide the facilities to bring the Augusta wastewater discharges into compliance with the NPDES Permits and wasteload allocations of the City. 7. The budgets for the Capital Improvements of this bond issue are reasonable and it is our opinion that the projects will be completed promptly and well within the financial capabilities of the system. 'ZEL, ENGINEERS I 10/19/96:9614 rpt Bond Issue Page 31 I I I I I I I I '1 I I I I I I, I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Appendix A: WATER AND SEWER SYSTEM HISTORY Table A-i. City of Augusta Water and Sewer Customer History Water Customers* Sewer AcCounts* Year In-C' Out Total t:. % In-Ci Out Total t:. % 1971 26,674 1979 28,575 1,901 O,9%/yr, 24,650 1988 31,230 2,655 1.0%/yr. 15,929 9,896 25,825 1,175 O,5%1yr. 1994 16,602 15,082 31,684 454 0.2%/yr, 15,969 10,868 26,837 1,012 0.6%/yr, 1995 32,227 297 1.7%/ r. 26,943 0,2%/ r, Table A - 2. Richmond County Water and Sewer Customer History Water Accounts* Sewer Accounts* J,B, Messerly Spirit Creek Sewer Year Total Change Total Change Total Change Total 1979 14,189 12,242 12,242 1988 24,413 10,224 6,2%/Yr, 16,815 4,573 3.6%/yr, 16,815 1992 26,653 2,240 2.2%/yr, 17,144 329 0.5%/Yr. 787 17,931 1993 27,101 448 1,7%/yr, 17,310 166 1,0% /yr. 798 11 1.4% /yr. 18,108 1994 27,289 188 O,7%/yr, 17,544 234 1.4%/yr. 841 52 6.5% /yr. 18,385 1995 28,030 741 2,7%/yr. 17,788 216 1.2% /yr, 856 14 1.7% /yr, 18,615 Table A - 3. Augusta-Richmond Customer History 1995 City of Augusta System 1995 Richmond County System Water Accounts 32,227 28,030 TOTALS 1996 Residential 1996 Commercial TOTAL 60,257 54,707 ,6,272 60,979 Sewer Accounts JBM 26,943 JBM 17,788 Spirit Creek 856 45,587 41,562 4,396 45,958 *includes up to 9% inactive accounts, Active acCounts used in determining revenue 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page A-I I I I I I I I I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table A - 4. Forecast of Active Water and Sewer Accounts 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 W~ter Residential 49,537 49,785 50,033 50,284 50,535 50,788 51,042 51,297 51,553 51,811 Commercial 6,270 6,395 6,523 6,654 6,787 6,923 7,061 7,202 7,346 7,493 Total 55,807 56,180 56,557 56,937 57,322 57,710 58,103 58,499 58,900 59,304 Sewer Residential 38,625 38,818 39,012 39,207 39,403 39,600 39,798 39,997 40,197 40,398 Commercial 4,394 4,482 4,572 4,663 4,756 4,852 4,949 5,048 5,148 5,251 Total 43,019 43,300 43,584 43,870 44,160 44,452 44,747 45,045 45,346 45,650 Table A - 6. Surface Water (Former City) Water System Statistical History Water Treatment History, Daily Maximum (Mgd) Daily Average (Mgd) Daily Minimum (Mgd) Total Annual Volume (MG) Number of Water Meters Raw Water Capacities Primary Pumping Backup Pumping Raw Water Supply Mains (30",36", and 42" mains) Raw Water Storage Reservoirs Treated Water Capacities Permitted Treatment Capacity Clearwell Storage Elevated Tank Storage High Service Pumps Backup High Service Pumps Primary Water Distribution Mains (6" arid larger) 1991 34.0 24.3 10.0 8,858 32,025 1992 35.0 22.6 16,0 8,249 32,065 1993 38,0 23.6 15.5 8,614 32,105 1994 35,7 22.6 16.0 8,249 32,146 1995 34.2 22,7 16.0 8,283 32,443 50 Mgd 30 Mgd 60 Mgd 124 MG 45 Mgd '15MG 2,75 MG 34,5 Mgd 19.6 Mgd 460 Miles 'ZEL ENGINEERS 10/19/96:9614 rpt Bond Issue Page A-2 o I I I I I I I I I I I I I I I I I I, Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table A - 6. Ground Water (Former County) Water System Statistical History 1991 15,9 11,0 6,7 4,027 26,046 Water Treatment History Daily Maximum (Mgd) Daily Average (Mgd) Daily Minimum (Mgd) Total Annual Volume (MG) Number of Water Meters Raw Water Capacities Well Pumping Well Water Supply Mains Treated Water Capacities Permitted Treatment Capacity Clearwell Storage Ground and Elevated Storage Tanks , High Service Pumps Backup High Service Pumps Booster Pumps Backup Booster Pumps Primary Water Distribution Mains (6" and larger) 1992 17,0 11,5 7,8 4,196 26,653 1993 17,0 12.2 7.8 4,438 27,101 1994 17,3 12.0 7.2 4,381 27,686 1995 18,2 12.2 9.6 4,454 28,218 23.1 Mgd 30 Mgd 18.4 Mgd 2MG 15,5 MG 23,4 Mgd 5.9 Mgd 20.0 Mgd 9.5 Mgd 550 Miles 'ZEL, ENGINEERS, , 10/19/96:9614 rpt Bond Issue Page A-3 I I I I I I I '~ I I I I I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Appendix 8 - Revenue Calculation Table B-1. 1996 Estimated Revenue Rates Residential Base , Unit ,per acct. per kgals Water $ 5,53 $ 0,76 Sewer $ 9.40 $ 0.87 Water $ 6.00 $ 0.97 Sewer $ 9.90 $ 1.10 Commercial Predicted Revenue Consumption Annual Revenue Accts. MGD ' kgalslyear Base Charge Unit Charge Total Res. Water 49,537 14.4 ' 5,245,050 $ 3,287,268 $ 3,986,238 $ 7,273,506 Comm. Water 6,270 18.0 6,580,950 $ 451,436 $ 6,383,522 $ 6,834,957 Big Meters $ 455,774 Total Water 55,807 32.4 11,826,000 $ 3,738,704'. $ 10,369,760 $ 14,564,237 Res. Sewer 38,625 9.1 3,314,200 $ 4,356,910 $ 2,883,354 $ 7,240,264 Comm. Sewer 4,394 16.5 6,022,500 $ 522,026 $ 6,624,750 $ 7,146,776 Big Meters $ 623,414 Total Sewer 43,019 '25.6 9,336,700 $ 4,878,936 $ 9,508,104 $ 15,010,453 Total Water and Sewer Sales $ 29,574,691 Tap fees; lab fees, septic tank fees, etc. , $ 728,551 Industrial Surcharge $ 1 ,652,296 Interest Income $ 800,000 Total Water and Sewer Income $ 32,755,537 Table B-2. 1996 Miscellaneous Revenue Estimate , Source Wastewater Lab Taps and Cut-On Fees Septic Tank Sludge Sewer Extension Fees Total Miscellaneous Revenue Revenue $ 54,480 572,617 70,221 31,233 $ 728,551 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page B-1 I I I I I I I I I I I I I I, I I I I I Augusta-Richmond Utilities Departolent Revenue Bond Issue Engineering Report October 1996 Appendix C: Utilities Department Capital Improvements Program Table C - 1. Former City Water System Improvement Projects Funding Source 1995 - 2000 2000 - 2005 Raw Water . Remodel Repair Turbine's, Drives, & Pumps #1 & tf2. R&E 415,000 . Refurbish Turbine Pump #3 R&E 590,000 . Realign & Refurbish Diesel & Pump #4 R&E 300,000 . Refurbish Turbine Pump #5 R&E 420,000 . Supplement Pumping (To 60MGD) R&E 5,800,000 . Replace 42" Raw Water Line R&E 5,220,000 . Add 60. Raw Water Line Bond (W4) 9,400,000 . Canal License R&E 300,000 . Facilities for Emergency bypass of Wastewater Spills R&E 1,800,000 Flowing Into the Canal Water Treatment . Replace Mise, Valves & Equipment R&E 890,000 . Supplemental Construction to Reduce Short Circuiting R&E 100,000 . Additional High Service Pumps (System Stations) R&E 250,000 200,000 . Replacement Contingency R&E 200,000 200,000 Ground Storage . Construct Additional Storage (Remote) R&E 1,000,000 . Baffling and repiping Clearwells Bond (W1) 1,100,000 . Verify Integrity of Existing Tanks & Repair as Needed R&E 100,000 Elevated Storage . Construct 1 MG Additional In High Systems Storage Bond (W5) 1,000,000 . Paint & Repair Existing Elevated Tanks R&E 200,000 200,000 Water Distribution . Lines to connect Surface, Ground Water Systems Bond (W2) 2,500,000 , . All projects, except elevated tank, from 9/89 R&E 2,450,000 1,700,000 Distribution System Master Plan . TTHM Reduction R&E 400,000 Support Facilities . Office Facilities R&E 530,000 . Remodel Shop Facilities R&E 300,000 . Area Water Laboratory R&E 550,000 . Turknett Retention Basin Reconstruction R&E 250,000 Total $ 24,060,000 $ 14,305,000 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page C-l I I I I I D I I I I I I I II Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table C - 2. Fonner County Water System Improvement F!rojects Funding Source 1995 - 2000 2000 - 2005 Water Production . 10 Mgd Well Field and Water Plant Bond (W3) $ 4,200,000 Water Distribution . Priority I Lines Bond (W6) 1,000,000 . System Reinforcement and Extension to Unserved R&E 130,000 2,000,000 Areas Elevated Storage . Two Elevated 0.5 MG Elevated Tanks (Willis Foreman R&E 800,000 Rd., Wilson Rd.) . Renovate 3 Exist Elevated Tanks (Pine Hill, R&E 400,000 Georgetown, Tobacco Rd,) , . Booster Station at Brown Rd, Tank R&E 50,000 Total $ 6,580,000 $ 2,000,000 I I I I I ( 'ZEL, ENGINEERS 10/19/96:9614 rpt Bond Issue Page C-2 I Augusta-Richmond Utilities Department I Revenue Bond Issue Engineering Report October 1996 0 Table C - 3. Fonner City Wastewater System Improvement Projects Funding I Source 1995 - 2000 2000 - 2005 Collection System . Mid-City Supplemental Line Bond (S8) 3,000,000 I . Repair &lor Replace Leaking Lines R&E 4,750,000 . Extend Sewerage to Water Only Custom'ers R&E 2,500,000 2,500,000 . Rae's Creek Sewer, Replacement./Additions Bond (S2), 5,600,000 4,000,000 I R&E . Gordon Hwy, Sewer" R&E 320,000 . Molly Pond Sewer R&E 50,000 I . Martha Lane Sewer R&E 45,000 . Misc. Projects R&E 170,000 I '. Mis~. Replacements & Contingency R&E 500,000 . Combined Sewer Separations SPLOST ' Lift Stations I . Repair Main Lift Station Bond (S7) 2,000,000 . Repair & Replacement R&E 40,000 40,000 . Valley Park Lift Station R&E 50,000 I . Second Street Lift Station R&E 1,500,000 , Wastewater Treatment I . Belt Thickener R&E ,1,200,000 . ' Odor Control: J.B. Messerly WWTP Bond (S11) 2,750,000 Effluent Facilities I . Site Purchase, Constructed Wetlands Bond (S1) 650,000 . Advanced Wastewater Treatment to eliminate SPLOST Savannah River outfall requirement I ' Land Application .. . Equipment Replacement R&E 250,000 250,000 .' Land Lease/Or Purchase R&E 100,000 I Total S 20,125,000 S 12,140,000 I I' I I 'ZEL, ENGINEERS 10JI9!96:96141Jl1 Bond Issue Page C-3 I I I, ,I I I I I I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table C - 4. Former County Wastewater System Improvement Projects Funding Source 1995 - 2000 2000 - 2005 . Spirit Creek Trunk Rehabilitation Bond (S3) $ 2,000,000 . RepairlReplace Butler Creek Trunk Sewer Bond (S5) 1,000,000 . Repair/Replace Rocky Creek Trunk SeWer Bond (S5) 1,000,000 . Extend Sewer lines to Water Only Customers Bond (S12) 2,000,000 . Kimberly Clark Trunk Sewer Bond (54) 700,000 . RepairlExtend Other Priority lines R&E 1,670,000 4,500,000 . Upgrade Industrial Trunk Bond (S6) 1,400,000 . RCCI Trunk Sewer Extension Bond (S9) 400,000 . Lift Station and Force Main: Bennock Mill to IntI. Blvd, Bond (S10) 1,000,000 Total $11,170,000 $ 4,500,000 Notes: 1. The combined sewer overflow projects (CSO's) no longer appear in th~ list of Capital Improvements , because construction is almost complete: Phase I: $ 12,858,302 and Phase II: $11,840,075. 2. Other unlisted projects between 1995 and 2000 included in the funding by the Special Purpose Local Option Sales Tax (SPLOST) are the advanced wastewater facilities (Phase I $6,000,000 and Phase II $4,000,000), I I I I I I I I 10/19/96:9614 rpt Bond Issue Page C-4 'ZEL, ENGINEERS I I I I I I I I I' I I I I B I I I' I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table C - 5. Combined Water System Five Year Capital Improvement Plan Funding Water System Capital Improvement Projects Source 1995 - 2000 . Raw Water Pump Station - Refurbish Turbine Pump #3 R&E $ 590,000 . Replace 42" Raw Water Line R&E 5,220,000 . Add 60" Raw Water Line Bond (W4) 9,400,000 . Canal License R&E 300,000 . 10 Mgd Well Field and Water Plant Bond (W3) 4,200,000 . Highland Ave, WTP - Construction to Reduce Short Circuiting R&E 100,000 . Highland Ave, WTP - Additional High Service Pumps R&E 250,000 . Highland Ave. WTP - Replacement Contingency R&E 200,000 . Baffling and repiping Highland Ave. Clearwells Bond (W1) 1,100,000 . Verify Integrity of Existing Surface Water Tanks & Repair as Needed R&E 100,000 . Elevated Tanks (0.5 MG at Willis Foreman Rd., and Wilson Rd.) R&E 800,000 . Renovate Elevated Tanks (Pine Hill, Georgetown, Tobacco Rd.) R&E 400,000 . Booster station at Brown Rd. Tank R&E 50,000 " , . Construct 1 MG Elevated Tank - Surface Water System Bond (W5) 1,000,000 . Paint & Repair Existing Elevated Tanks - Surface Water System R&E 200,000 . Ground Water System Priority I Lines Bond (W6) 1,000,000 . Ground Water System Reinforcement and Extension to Unserved R&E 130,000 Areas . Lines to connect Surface, Ground Water Systems Bond (W2) 2,500,000 . All projects, except elevated tank, from 9/89 former City Distribution R&E 2,450,000 System Master Plan . TTHM Reduction - Highland Ave. WTP R&E 400,000 . Turknett Retention Basin Reconstruction R&E 250,000 Subtotal Bond $19,200,000 Subtotal R&E $11,440,000 Total Water System Capital Improvement Projects $30,640,000 Table C - 6. Combined Water System Five Year CIP Expense Summary 1996 1997 1998 1999 2000 Total Bond $8,256,410 $6,605,128 $4,338,461 $19,200,000 R&E $457,600 $2,745,600 $2,745,600 $2,745,600 $2,745,600 $11,440,000 Total $457,600 $11,004,007 $9,352,726 $7,086,060 $2,745,600 $30,640,000 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page C-5 I I I I I I I I' 'I I I I I I I- I' I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table C -7. Combined Sewer System Five Year Capital Improvement Plan Sewer System Capital Improvement Projects . Spirit Creek Trunk Rehabilitation · Repair/Replace Butler Creek Trunk Sewer · Repair/Replace Rocky Creek Trunk Sewer . Former County - Extend Sewer Lines to Water Only Customers . Kimberly Clark Trunk Sewer · Former County - Repair/Extend Other Priority Lines . Upgrade Industrial Trunk . RCCI Trunk Sewer Extension . Lift Station and Force Main: Bennock Mill to IntI. Blvd, . Mid-City Supplemental Line . Former City - Extend Sewerage to Water Only Customers . Rae's Creek Sewer, Replacement./Additions . Gordon Highway Sewer . Molly Pond Sewer . Martha Lane Sewer . Former City Misc. Projects . Former City Combined Sewer Separations . J.B. Messerly - Repair Main Lift Station . Former City - Repair & Replacement . Valley Park Lift Station . Second Street Lift Station . J.B, Messerly - Belt Thickener . J,B. Messerly - Odor Control . Site Purchase, Constructed Wetlands . Advanced Wastewater Treatment to eliminate Savannah River outfall requirement . J,B, Messerly land application - Equipment Replacement Subtotal Subtotal Total Sewer System Capital Improvement Projects Funding Source Bond (S3) Bond (S5) Bond (S5) Bond (S12) Bond (S4) R&E Bond (S6) Bond (S9) Bond (S10) Bond (S8) R&E Bond (S2) R&E R&E R&E R&E SPLOST Bond (S7) R&E R&E R&E R&E Bond (S11) Bond (S1) SPLOST R&E Bond R&E 1995 - 2000 $ 2,000,000 1,000,000 1,000,000 2,000,000 700,000 1,670,000 1,400,000 400,000 1,000,000 3,000,000 2,500,000 5,600,000 320,000 50,000 45,000 170,000 2,000,000 40,000 50,000 1,500,000 1,200,000 2,750,000 650,000 250,000 $23,500,000 $7,795,000 $31,295,000 'ZEL, 10/19/96:9614 rpt Bond Issue Page C-6 ENGINEERS I, I I I I I 'I I' 'I I I I' I I I I' I I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report 'October 1996 Table C - 8. Combined Sewer System Five Year CIP Expens~ Summary 1996 1997 1998 1999 2000 Total Bond $9,007,742 $12,540,242 $1,952,016 $23,500,000 R&E $311,800 $1,870,800 $1,870,800 $1,870,800 $1,870,800 $7,795,000 Total $311,800 $10,880,539 $14,413,040 $3,824,815 $1,870,800 $31,295,000 Table C - 9. Combined Water and Sewer System Five Year CIP Expense S~mmary 1996 1997 1998 1999 2000 Total Water $457,600 $11,004,007 $9,352,726 $7,086,060 $2,745,600 $30,640,000 Sewer $311,800 $10,880,539 $14,413,040 $3,824,815 $1,870,800 $31,295,000 Total $771,396 $21,886,543 $23,767,764 $10,912,874 $4,618,400 $61,935,000 Table C -10. Expense Summary for CIP Projects Not From Bond Proceeds 1995 - 2000 $11,440,000 $7,795,000 $19,235,000 $3,647,000 Combine Water System Combined Sewer System Total Water and Sewer Average Per Year ' 2000 - 2005 $ 16,305,000 $16,640,000 $32,945,000 $6,589,000 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page C-7 I I. I I I I I Ii 'I I I' I I Ii I I' I' I I; Augusta-Richmond Utilities Department Revenue Bond issue Engineering Report October 1996 Appendix 0: Renewal and Extension Requirements Table 0 - 1. Former City System Renewal (additional R & E req'd above current program) Item Criteria Replacement Years of Annual Avg. Cost Life Cost Water Lines 490 miles @ $15/L.F. $ 38,808,000 50 $ 776,160 Water Plant 45 Mgd @ $1,50/gal $ 67,500,000 60 $ 1,125,000 Raw Water Facilities 50 Mgd @ $0.30/gal $ 15,000,000 35 $ 428,571 Storage Tanks 20M gal @ $0.60/gal $ 12,000,000 60 $ 200,000 ....................................................... ..............u................................................. .......................................... ..-...................... ....-...................................... Water System Total $ 103,308,000 $ 2,529,731 Sewer Lines 400 miles @ $30/L.F. $ 63,360,000 50 $ 1,267,200 Wastewater Planti 46.1 Mgd @ $1.50/gal $ 69,201,000 40 $ 1,730,025 Pumping Facilities 60 Mgd @ $0,30/gal $ 18,000,000 30 $ 600,000 ...............................-.......................... ....n............................................................ .......................................... ............................. .......................................... Sewer System Total $ 150,561,000 $ 3,597,225 Total Gross Renewal $ 253,869,000 $ 6,126,956 CSO Projects' Cost (GEFA2+SPLOST) $ (26,350,000 ) 50 $ (527,000) Const. Wetlands2 Cost (SPLOST) $ (10,000,000) 30 $ (333,333) Clearwell & TTHM2 Cost (SPLOST) $ (1,600,000) 35 $ (45,714) -Total Credits' Other Fund $ (37,950,000) $ (906,047) Total Gross Renewal $ 215,919,000 $ 5,220,909 iJ,8, Messerly WWP serves both City and County 2Projects are funded from sources other than water and sewer system revenue, The projects are deducted from the current gross renewal requirement since they are not using water and sewer revenue. Table D - 2. Former City System Extension Extension costs of the systems are calculated to match the forecast system growth of 0.5% per year based on the gross renewal requirement. 0.5% x $ 253,869,000 = $ 1,269,345. 'ZEL, ENGINEERS, ' 10/19/96:9614 rpt Bond Issue Page D-l I' I 8, ,I I' I, I I 'I' I I' I 'I: I I' I' I I I, Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 0 - 3. Former County Sys~m,Renewal (additional R & E,req'd above current program) Item Criteria Replacement Years of Annual Avg. Cost Life Cost Water Lines 650 miles @ $15/L.F, $ 51,480,000 50 $ 1,029,600 Wells 24 Mgd @ $O,09/gal $ 2,160,000 35 $ 61,700 Raw Water Lines 80,000 ft. @ $25/L.F. $ 2,000,000 50 $ 40,000 Water Plants (2) 24 Mgd @ $O,20/9al $ 4,800,000 50 $ 96,000 Storage Tanks 10,7M gal @ $O,50/gal $ 5,350,000 60 $ 89,167 Water System Total $ 65,790,000 $1,316,467 Sewer Lines 450 miles @ $30/L.F. $ 71,280,000 50 $ 1,425,600 Spirit Creek WWTP 3.0 Mgd @ $1,OO/gal $ 3,000,000 30 $ 100,000 Pumping Facilities 15 Mgd @ $O,30/gal $ 4,500,000 30 $ 150,000 Sewer System Total $ 78,780,000 $1,675,600 Total Gross Renewal $ 144,570,000 $ 2,992,067 Table 0 - 4. Former County System Extension Extension costs of the systems are calculated to match the forecast system growth of 1 % per year based on the gross renewal requirement. 1% x $ 144,570,000 = $ 1,445,700. 'ZEL, ENGINEE.RS , 10/19/96:9614 rpt Bald Issue Page D-2 I' I I' I; I' ,I, 'I I' 'I J 'I' I '1\ I' I 'I' I ,. I I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table 0 - 5. Combined Current Renewal and Extension Needs City system Gross Renewal (annual) Extension Requirement (annual) Gross Renewal (annual) Extension Requirement (annual) $ 5,220,909 1,269,345 2,992,067 1,445,700 $ 10,928,021 ($ 8,540,000) $ 2,388,000 County system Total Annual R&E Need Bond Issue Credit $ 42,700,000/5 years Calculated Net R & E Requirement Notes: 1, From Appendix C, the Capital Improvement Program (CIP), the actual renewal and extension expense needed to fund the CIP shown for 1995-2000 is $3,847,000 per year in addition'to the bond ' construction projects, This amount was used in the revenue and expense spreadsheets (Table 21 and Table 22) beginning in 1996, Annual funding for the five year CIP following the bond construction period is estimated to be $6,589,000 per year., 2. Long term R&E requirements must be met from the R&E Reserve Fund and/or from responsible financing. In periods of reasonable bond rates, additional funding can be accomplished economically through revenue bonds. This report recommends that the reserve fund be maintained with goals of at least two years and no more than five years of Useful Life replacement needs. 'ZEL, ENGINEERS 1O/19/96:9614Ipt Bond Issue Page 0-3 't, I' I' I '1- , ' ,J 'I I 'I' I :1' t' 'I, I' I 'I' I 'I, I' Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Appendix E: Debt Service Table E -1. Total Bonded Indebtedness as of January 1,1997 Bond Richmond County Bond Series 1986 Richmond County Bond Series 1987 Richmond County Bond Series 1991 City of Augusta Bond Series 1972 City of Augusta Bond Series 1991 Total Debt Expense (Annual) Table E - 2. Total Outstanding Loans as of June 30,1996 City of Augusta GEFA Loans 1 and 2 Remaining Principal $ 16,357,772 Refunded bonds are n~ included in the System's outstanding long-term debt since the System legally satisfied its obligation by consummation of refunding transactions. The above bonded indebtedness will likely be refinanced as a part of the 1997 bond issue. The existing debt and the new Capital Improvement Projects may be funded from the same, or separate, bonds. The following amortization schedule was provided by the Managing Underwriter of the Bond(s) and assumes two years of Capitalized Interest 'ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page E-l 'I.- Augusta-Richmond Utilities Department I Revenue Bond Issue Engineering Report October 1996 I' Table E - 3. Proposed 1996 Bond Issue Amortization Schedule- Current Market Year Ending Principal ' Interest Accrued Capitalized Net Debt I October 1 Interest Interest Service 1997 $980,000.00 $3,460,801.28 $231,534.46 $2,102,617.69 $2,106,649,13 1998 $1,025,000.00 $3,892,865,00 $2,548,627,50 $2,369,237.50 'I' 1999 $1,075,000.00 $3,839,615.00 $4,914,615.00 2000 $1,110,000.00 $3,781,347,50 $4,891,347,50 2001 $1,170,000.00 $3,719,787.50 $4,889,787.50 I, 2002 $1,235,000.00 $3,653,820.00 $4,888,820.00 2003 $1,305,000,00 $3,583,090,00 $4,888,090.00 '!I' 2004 $1,370,000.00 $3,520,450.00 $4,890,450,00 2005 $1,435,000.00 $3,453,320,00 $4,888,320.00 2006 $1,510,000,00 $3,381,570,00 $4,891,570.00 I 2007 $1,585,000.00 $3,304,560.00 $4,889,560.00 2008 $1,670,000.00 $3,222,140.00 $4,892,140.00 2009 $1,755,000,00 $3,135,300.00 $4,890,300.00 1\ 2010 $1,845,000.00 $3,042,285,00 $4,887,285,00 2011 $1,945,000.00 $2,942,655.00 $4,887,655.00 2012 $2,045,000.00 $2,837,625.00 $4,882,625.00 I' 2013 $2,155,000.00 $2,730,262,50 $4,885,262.50 2014 $2,265,000.00 $2;617,125.00 , $4,882,125,00 2015 $2,390,000.00 $2,498,212.50 $4,888,212.50 .~I' 2016 $2,510,000.00 $2,372,737,50 $4,882,737.50 2017 $2,650,000.00 $2,240,962.50 $4,890,962.50 2018 $2,780,000.00 $2,101,837,50 $4,881,837.50 I 2019 $2,925,000.00 $1,955,887,50 $4,880,887.50 '. 2020 $3,080,000.00 $1,802,325.00 ' $4,882,325,00 'I 2021 $3,245,000.00 $1,640,625.00 $4,885,625.00 2022 $3,415,000,00 $1,470,262.50 $4,885,262,50 " 2023 $3,590,000,00 $1,290,975.00 $4,880,975,00 ,1\ 2024 $3,780,000.00 $1,102,500.00 $4,882,500.00 2025 $3,980,000.00 $904,050.00 $4,864,050.00 2026 $4,190,000,00 $695,100,00 $4,885,100.00 I' 2027 $4,410,000.00 $475,125.00 $4,885,125.00 2028 $4,640,000,00 $243,600,00 $4,883,600,00 $75,065,000.00 $80,912,818.78 $231,534.46 $4,651,245.19 $151,095,039.13 'I' Note: The total principal includes Capital Improvements of $42,700,000 (see Table 18), Refunded Bond 1/ Principal of $26,344,816 (see Table 17), and miscellaneous fees, 'I' 'ZEL, ENGINEERS , 10/19/96:9614 rpt Bond Issue Page E-2 I, '1\ Augusta-Richmond Utilities Department I Revenue Bond Issue Engineering Report October 1996 I Table E - 4. Proposed 1996 Bond Issue Amortization Schedule - Set Size and Rate Year Principal Interest Accrued DSRF Capitalized Net Debt I Ending Interest Interest Service Oct. 1 1997 $1,000,000 $4,484,617.14 $73,969,93 $317,783,51 $2,749,349.63 $2,343,514,07 'I' 1998 $1,060,000 $5,050,057,50 $(274,679,66) $385,192.14 $3,332,545.00 $2,667,000,02 1999 $1,110,000 $4,986,087,50 $501,290,39 $385,192,14 $5,209,604.97 2000 $1,145,000 $4,916,520.00 $385,192,14 $5,676,327,86 I 2001 $1,215,000 $4,842,920,00 $385,192,14 $5,672,727,86 2002 $1,275,000 $4,763,555.00 $569,977.33 $5,468,577.67 2003 $1,190,000 $4,679,045,00 $371,266.50 $5,497,778,50 'I' 2004 $1,260,000 $4,612,405.00 $371,266.50 $5,501,138,50 2005 $1,330,000 $4,540,585.00 $371,266,50 $5,499,318.50 2006 $1,410,000 $4,463,445,00 $371,266.50 $5,502,178,50 I 2007 $1,490,000 $4,380,255,00 $371,266.50 $5,498,988,50 2008 $1,580,000 $4,290,855,00 $371,266,50 $5,499,588,50 '1' 2009 $1,675,000 $4,194,475,00 $371,266.50 $5,498,208.50 2010 $1,780,000 $4,090,625,00 $371,266.50 $5,499,358.50 2011 $1,890,000 $3,979,375,00 $371,266,50 $5,498,108,50 I' 2012 $2,010,000 $3,860,305.00 $371,266.50 $5,499,038,50 2013 $2,140,000 $3,730,660.00 $371,266,50 $5,499,393.50 >,. 2014 $2,280,000 $3,592,630.00 $371,266.50 $5,501,363.50 'I' 2015 $2,425,000 $3,445,570.00 $371,266.50 $5,499,303.50 2016 $2,580,000 $3,289,157.50 $371,266.50 $5,497,891,00 2017 $2,750,000 $3,122,747.50 $371,266,50 $5,501,481.00 I, 2018 $2,925,000 $2,943,997.50 $371,266.50 $5,497,731,00 2019 $3,120,000 $2,753,872,50' $371,266.50 $5,502,606,00 2020 $3,320,000 $2,551,072.50 $371,266.50 $5,499,806.00 ,I 2021 $3,535,000 $2,335,272.50 $1,851,315,66 $4,018,956.84 2022 $3,765,000 $2,105,497,50 $274,679.66 $5,595,817.84 ,1\ 2023 $4,015,000 $1,858,890,00 $274,679,66 $5,599,210.34 2024 $4,275,000 $1,595,907.50 $274,679,66 $5,596,227.84 2025 $4,555,000 $1,315,895.00 $274,679,66 $5,596,215.34 I 2026 $4,855,000 $1,017,542,50 $274,679.66 $5,597,862,84 2027 $5,170,000 $699,540,00 $274,679.66 $5,594,860,34 2028 $5,510,000 $360,905.00, $4,483,735,31 $1,387,169.69 1\ $79,640,000 $108,854,284.64 $300,580,66 $17,094,455.33 $6,081,894,63 $165,017,354.02 Note: The total principal includes Capital Improvements of $42,700,000 (see Table 18), Refunded Bond I~ Principal of $26,344,816 (see Table 17), and miscellaneous fees. ,1\ 'ZEL, ENGINEERS , 10/19/96:9614 rpt Bond Issue Page E-3 I' II ,I I' ,I, "' ,I, II I ~t :1, ~- I' ,I 'Ii Ii I 'I' I' :1' I: ...... , Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report ' October 1996 Appendix F: Revenue and Expense History Figure F - 1. Five Year Revenue and Expense History 1991 1992 1994 1993 1996 Industrial City $ 949,300 $ e55,556 $ 961,759 $ 968,023 $ 974,348 Surcharge County $ 535,912 $ 539,38:2 $ 542,894 $ 546,-<<> $ 560,cm Total $ 1 ,485,~ $ 1,494,946 $ 1,504,663 $ 1,514,453 $ 1,524,348 Taps/Lab City $ 277,666 $ 279,492 $ 281,330 $ 263,186 $ 285,061 Fees! County $ 422,154 $ 424,931 $ 427,725 $ -<<>,547 $ 433,397 Septic Total $ 009,820 $ 704,423 $ 709,CE5 $ 713,734 $ 718,458 City $ 77,775 $ 290,385 $ 161,111 $ 41,719 $ 9,711 Interest County $ 344,913 $ 463,639 $ 415,493 $ 579,E54 $ 911,023 Revenue Total $ 422,688 $ 754,024 $ 576,004 $ 621 ,373 $ 920,734 Residential Water $ 5,316,100 $ 6,150,254 $ 6,598,668 $ 6,625,413 $ 7,073,478 Commercial Water $ 5,328,009 $ 6,164,819 $ 6,614,2$ $ 6,641,103 $ 7,000,229 Water Big Meters (Water) and Total Water $10,644,808 $12,315,072 $13,212,964 $13,266,516 $14,163,707 Sewer Residential Sewer ,$ 5,1E1,072 $ 5,878,337 $ 6,:D5,926 $ 6,332,488 $ 6,760,744 , Charges Commercial Sewer $ 5,223,484 $ 6,043,006 $ 6,483,636 $ 6,509,975 $ 6,950,233 Big Meters (Sewer) Total Sewer $10,760,201 $12,448,571 ,,$13,356,196 $13,410,329 $14,317,246 Total W&S Sales $ 21,4(5,009 $24,763,643 $26,569,160 $ 26,676,845 $28,480,953, Total Revenue $ 24,012,820 .'&1,111,036 $ 29,368,472 $ 29,526,404 $ 31,644,493 Water City Water $ 2,474,152 $ 2,819,878 $ 3,162,368 $ 3,310,944 $ 3,181,148 County Water $ 2,790,312 $ 3,180,216 $ 3,566,473 $ 3,734,033 $,3,587,E51 'O&M Total Water $ 5,264,464 $ 6,cm,094 $ 6,728,843 $ 7,044,977 $ 6,768,799 Cost Sewer City Sewer $ 3,974,836 $ 4,530,260 $ 5,1EO,488 $ 5,319,179 $ 5,110,656 County Sewer $ 2,493,827 $ 2,842;~ $ 3,187,517 $ 3,337,273 $ 3,206,444 Total Sewer $ 6,468,662 $ 7,372,$2 $ 8,268,005 ,$ 8,656,452 $ 8,317,100 Total O&M $11;733,126 $13,372,666 $14,996,847 $15,701,428 $16,086,899 Net Revenue , $12,279,694 $ , . , , . .v...~,81ti, $ 1ti.568,694 City Bonds $ 603,868 $ 1,466,180 $ 1,517,485 $ 1,527,436 $ 1,524,373 Debt County Bonds $ 1,215,242 $ 2,290,926 $ 2,286,6519 $ 2,288,7D4 $ 2,290,064 Service Total DebtService $ 1,819,l10 $ 3,757,106 $ 3,804,144 $ 3,616,140 $ 3,614,437 Coverage RatIo 6.8 3.8 3.8 3.6 4.3 Loans Total GEFA Loans $ , 339,103 Note: I. Operations and Maintenance expenses include estimated overllead. 2, Totals are calculated from City of Augusta and Richrnond'County Financial Statements for the years indicated. Sub-Totals are estimated where actual numbers were not: available. 'ZEL, ENGINEERS 10/19/96:9614 rpt Bond Issue , Page F-l I, ,I I: 'I' I' I ',1\ I; t ,I: 'I I, 'I' :1: I ' I 'I' I :1' I Augusta-Richmond Utilities Department, Revenue Bond Issue Engineering Report October 1996 ,Appendix G: Water and Sewer Rate History Table G -1. County Water Rates October 1,1991 - March 1996 Meter Size 5/8 " 3/4" 1" 1 112" , 2" 3" 4" 6" 8" 10" 12" Use (in Gallons) 0- 3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 0-3,000 Minimum Charge $9,30 9.30 9,90 10.30 54.00 66,00 78:00 102.00 150,00 180.00 210.00 Additional Charges All Meter Sizes kgal 3-9 9 -14 14 - 19 19 - 999 1 ,000 + $ / kgal $1,55 $1.40 $1,35 $1.25 $1.10 "ZEL, ENGINEERS, 10/19/96:9614 rpt Bond Issue Page G-l 'a ,I I' D B: ,Dr ,I) U ,'\ I 'm: I '1\ :1' I. 'I' I :1: I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Meter Size Table G - 2. County Sewer Rates October 1,1991 - March 1996 5/8" - 1 112" 2" 3" 4" 6" 8" 10" 12" All Meters Water Use (kgal/month) 0-3 3-9 9-14 14-19 19-29 , 29-39 39-49 49 - 59 59 - 69 69 - 79 79 - 89 89 - 99 99 - 109 109 -119 119 - 129 130 - up 130 - up 130 - up 130 - up 130 - up 130 - up 130 - up 130 - up Above 130 Residential Rate $5.40 11,00 12,60 13.25 16,00 19,00 23,75 26,75 27,60 32,50 33,75 34.25 41,00 42.00 43.50 69.50 150.50 162.50 175.50 200,50 210.50 240.50 270.50 above + $ 0,50 I kgal per 1,000 gals Table G - 3. City Residential Water Rates (Monthly) Comm./lnduSt. Rate $ 13.25 17.00 20,50 24.00 27,75 31.25 35:00 38.50 42,00 45,75 49.00 53.00 60.00 63,00 66,00 69,52 150.52 162,52 175,52 200.52 210,52 240.52 270.52 above + $ 0.52 I kgal per 1,000 gals In-City Out-of-City Date Effective Base Costlkgal Base Costlkgal March 1, 1992 $3.00 $.70 $5,00 $1.05 January 1, 1993 3.50 ,75 5,75 1.10 January 1, 1994 4,00 ,75 6.50 1.10 January 1, 1995 4.50 .80 7.25 1.15 June 1, 1995 4.95 .88 7,98 1.27 January 1, 1996 5,00 ,80 8,00 1,15 10/19/96:9614 rpt Bond Issue 'ZEL, ENGINEERS, Page G-2 't I I I, I' ,I 'I :1, 'I, 'I 'I: 0"1". I' :1\ ,I' ,I 'I' I 'I! I Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October'l996 Table G - 4. City Residential Sewer Rates' (Monthly) In-City Out~f-City Date Effective Base CosUkgal Base CosUkgal March 1, 1992 $4,00 $,70 $6,00 $ 1.00 January 1, 1993 4,75 .75 7,00 1,05 January 1, 1994 5,50 ,80 8.00 1,10 January 1, 1995 6.25 ,85 9,00 1,15 June 1, 1995 6,88 ,94 9,90 1,27 January 1, 1996 7.00 ,90 10.00 1.20 Table G - 5. Water and Sewer Rates April '96 through August '96 Water Sewer < 3 kgal $8,00 $6,70 > 3 kgal $5.53 + $O,76/kgal $9,40 + $,87/kgal Commercial 5/8 & ~ meters' $6,00 + $O,97/kgal $9.90 + $1,10/kgal , Rate also includes graduated base rate for residential and commercial large meters, Table G - 6. Residential Water and Sewer Rates Effective September 3,1996 Water Use Water Sewer < 3 kgal $8.00 $6.70 > 3 kgal $5.53 + $O,76/kgal $9,40 + $.87/kgal' , Residential sewer bill is level average of December, January, and February use, 'ZEL, ENGINEERS I 10/19/%:9614 rpt Bond Issue Page 0.,-3 II, I, I I I' I, 'I I rl\ I' II! I '1\ :1 I 'I, I :1, I' Augusta-Richmond Utilities Department Revenue Bond Issue Engineering Report October 1996 Table ,G -7. Commercial Water and :sewer Rates Effective Sept~mber 3,1996 Meter Size Water Sewer 5/8" - 3/4" $6,00 + $O,97/kgal $9,90 + $1 , 10/kgal 1" $8,50 + $O,97/kgal $14,15 + $1 ' 10/kgal 1-1/4" & 1-1/2" $14,10 + $O,97/kgal $23,65 + $1,10/kgal 2" $20.25 + $O,97/kgal $34.15 + $1.10/kgal 3" $33,90 + $O,97/kgal $57,50 + $1,10/kgal 4" $49,10 + $O,97/kgal $83,30 + $1,10/kgal 6" $82.80 + $O,97/kgal $140,80 + $1,10/kgal 8" $120,10 + $O,9711<gal $204,40 + $1 , 10/kgal 10" $160,40 + $O,97/kgal $273.25 + $1,10/kgal 12" $208,15 + $0.97/kgal $346,05 + $1.10/kgal 00 $8,50 + $0.97/kgal $14,15 + $1.10/kgal 'ZEL,-ENGINEERS, 10/19196:96 I 4 rpt Bond Issue Page 0-4