HomeMy WebLinkAboutProposal Narrative
Augusta Richmond GA
DOCUMENT NAME:VVapO'::::Q \ . No..YYCtT\ V G
DOCUMENT TYPE: WD?O'2C'L I
YEAR:
BOX NUMBER: ~
FILE NUMBER: ~! '2JC)
NUMBER OF PAGES: ~
I.
II
I
I
I
I
I
I
I
I
I
--
I
I
II
-
II
,
II
~. ,.,~~ ' 1; ,!i~i"
/:;7~i') , i:;,t!~
~ '1 P, 1,,~I~'r~;"
~ ..... : 1{..~
" ..,1m",
Proposal for Stormwater Management Program Feasibility Study
RFP #04-0,53
1. Proposal Narrative
Earth Tech is a world leader in global water management, transportation, engineering, architecture, and environmental
services. With more than 8,000 employees operating from more than 200 offices, Earth Tech provides a full range of
engineering services to government, commercial, and industrial clients around the globe. In Georgia, our offices house a
staff of 120. Founded in 1970, the company is headquartered in Long Beach, California.
Through strategic growth, Earth Tech has steadily expanded its technical capabilities, geographic presence, and client base.
Through globalization of its business segments, the company is able to pursue worldwide opportunities for its diverse
services and provide seamless execution for its clients.
Earth Tech is involved in a broad range of areas, such as public and private water and wastewater infrastructure systems,
microelectronics, cleanup operations at closing military bases and industrial properties, helping industry meet air quality
emission standards, and airport, freeway and rail projects. Earth Tech enables clients to maintain environmental
stewardship while building profitable businesses and healthy communities.
Industry Recognition
In 2003, the Engineering News-Record (ENR) ranked Earth Tech among the top 20 firms overall in the Top 500 Design
Firms, the Top 200 Environmental Firms, and the Top 100 Design-Build Firms, and among the top 20 in each of the
following subcategories:
. Water
. Sewerage and Solid Waste
. Hazardous Waste
. Transportation
. Construction/Remediation
· Air Pollution Control
. Environmental Science
Our projects have won national and regional awards from industry organizations, including the American Society of Civil
Engineers, the American Consulting Engineers Council, the American Public Works Association, and the Construction
Management Association of America.
. Designers in International Markets
. Manufacturing
. Power
. Program Management Firms
. \Vastewater/Stortnwater Treatment
. Environmental Firms Working Abroad
Project Approach
Project Understanding
NPDES MS4 Permit Requirements - Augusta-Richmond County (Augusta) was issued a Phase I NPDES StoID1water
Permit (GAS000200) for Medium Municipal Separate Stormwater Sewer System (MS4) initially in 1995, and later renewed
in February 2000. The permit requires Augusta to establish a Stortnwater Management Program (Sw:MP) and a Water
Quality Monitoring Program (wQ:MP). The SW1vfP objective is to reduce Nonpoint Source (NPS) pollution. The WQMP
objective is to access the health of local watersheds and develop procedures to maintain water quality of Augusta's
streams. In response to the Georgia Environmental Protection Division (EPD) permit requirements, Augusta has
identified four major components in its SW1vfP:
. Sw:MP activity within drainage basin of impacted waterbody (such as water bodies on the 1998 active 303(d) list),
· Monitor illicit discharge,
. Monitor pollutants from industrial activity, and
. Public education and outreach.
Capital Improvement Program (CIP) - In 2003, the Augusta Department of Public Works and Engineering spent more
than $4.5 million on Capital Improvement Projects. Development and redevelopment within the County requires
increasing expenditures on a regular annual basis in:
EARTH@TIiCH
Page 1
II
II
II
I
II
II
II
I
I
II
II
I
II
I
I
I
I
I
II
@ii))~ ;Jf~:EI
~; , ,; . '(-'~.;;
~ ~_,E
'-"!!!'" ' , , '::.;. ,,; t;:;;' }:: ' '
Proposal for Stormwater Management Program Feasibility Study
. System modernization: bring a storm sewer/storm drainage system up to current standards by replacing old pipes
and/ or supplementing old pipes; and
· System modifications: re-routing storm sewers and storm water alignments away from sanitary sewers to reduce
infiltration of stormwater into sanitary sewer collection systems and, ultimately, into treatment plants.
Engineering Maintenance - Augusta currently provides regular engineering maintenance to its citizens, such as
clearing/maintaining drainage easements, street sweeping, and storm drain cleaning and repair. In 2003, Augusta swept
approximately 500 miles of roadways and cleaned/repaired more than 700 storm drains. Future development in Augusta
will likely intensify this demand, which will lead to increased budgetary needs.
Financing Stormwater - Augusta is looking for a
long-term and stable financial strategy to achieve the
desired level of service for stormwater management
and regulatory compliance. The challenge will be to
devise a way to adequately fund its stormwater
management programs.
A number of funding mechanisms can be used to
finance stormwater management programs. Table 1
contains a partial list of common altemativeJ],lllding
mechanisms. Table 1 also identifies those stormwater
management functions (i.e., administration, capital
improvements, operation/maintenance, and water
quality monitoring) best financed by each method. In
2003, the three largest single funding sources in
Augusta's budget were utilities (28%), general funds
(21%), and SPLOST (11%).
RFP#04-053
Table 1
Functional Progl"am Elements
Stormwalcl'
Management Capilal
Aclmirlistrallon hnprovcl11cnl Operation and Water QUillity
FUJutil19 Alternative and Design Prog,am Maintenance Monitoring
General Fun~ .-/ : -/ ..t:, . I -/
Specla' Taxing District -/ -/ -/
Sla1e GrantS -/ -/ -/
Homeowners' Associations -/ -/ -/
Gas:rax -/ I -/
Local OpUon Sales Tax -/
Bonds . '-/ ,
Pay-As-You-Go Sinking Fund -/ -/
SUbdivision' ExacUons ,-/
Fee~n-lleu.()f -/
Devoloperlncentlves -/
Bellerment Chargas -/
~enalUeslFlnes -/ ,,-/ .-/
FeeslPermlts -/
ty
Project Goals - Earth Tech's goal is to work with Augusta to develop a comprehensive financing strategy that generates
long-term and stable revenue to support the SWMP and meet regulatory requirements. The recommended funding
sources/ options should advocate a fair and equitable allocation of the costs for stormwater management to all responsible
parties. Our ultimate objective is to ensure that the project produces implementable solutions that can move Augusta from
a position of problem solving to proactive in stormwater management.
Technical Approach
The Stormwater Management Program Feasibility Study for Augusta will consist of five tasks: Task 1 Stormwater Program
Description, Problems and Needs, Task 2 Program Objectives and Priorities, Task 3 Projected Stormwater Program, Task
4 Basic Funding Feasibility, and Task 5 Summary Report with Recommendation.
Task 1- Stormwater Program Description, Problems, and Needs
The first step is defining the SWMP for Augusta, Earth Tech will develop a summary explaining why stormwater is a
problem about which the citizens of Augusta should be concerned. It is important to clearly explain which problems will
and will not be addressed by the new financing program. Problems should cover the full spectrum of stormwater
problems from drainage and flooding for the protection of public safety, to the protection and improvement of water
quality mandated by the County's NPDES stormwater permit and TIv1DLs for local water bodies.
Establishing Existing Level of Service - Earth Tech will conduct an audit of each element of Augusta's stormwater
program to determine what is currently being done and what should or needs to be done. This can be categorized into
five broad functional elements:
. Administration and Financing
. Planning and Engineering
. Capital Improvements
. Regulation and Enforcement
. Operations and Maintenance
EARTH@TECH
Page 2
II
-
II
I
-
-
-
II
II
II
II
I
I
I
I
I
I
I
I
ij'" .....""~ ' : ' '~"'~!';;."
,...~~ ~,....,~J,,'jli'
!~:) , .",..
~ ,r. ,.t"~i,,,,-
,~~~ ,,:: L' :1~~1
Proposal for Stormwater Management Program Feas,ibility Study
RFP #04.053
1bis analysis will summarize the services provided by Augusta's SWMP, along with associated costs. Earth Tech will also
review operating policies and the development of standards and ordinance. Costs for each program element will be
summarized in a similar format as Earth Tech compiled for the City of Racine, Wisconsin (fable 2).
Identifying Future Level of Service - Development and stormwater permitting requirements are increasing the
demands for services and infrastructure provided by Augusta. There will have to be a substantial investment in drainage
infrastructure to support the projected future growth in Augusta. Earth Tech will review the recommendations from
Augusta's NPDES Stormwater Permit, area TMDL Implementation Plans, and Watershed Assessments to identify
projects and programs currently not budgeted for by Augusta. Other regulation such as GASB34 may also require
increased expenditures to maintain the Augusta's financial rating and meet the long-term stormwater goals and.
Earth Tech's analysis will include a staffing needs assessment, similar to Table 3, to be completed for Augusta to
determine additional staff and equipment that might be needed to provide the necessary stormwater services. Changes to
existing policies, standards, and ordinances will be recommended as necessary to meet Augusta's long-term goals.
Institutional/Management Assessment - Earth Tech will audit the coordination of SWMP and institutional structures
among all of the Augusta government offices. The audit will identify the institutional barriers and financing obstacles that
need to be addressed if t!uly effective stormwater control is to be achieved. In Augusta, the majority of the stormwater-
related activities are scattered among the various offices within the Public \Vorks and Engineering Department. However,
departments like Planning and Zoning and Utilities may also playa role. If deemed appropriate, Earth Tech will suggest
changes to the existing organizational structure.
Task 2 - Program Objectives and Priorities
We recommend at least one public input session to discuss and prioritize existing and additional program elements,
Public involvement at this early stage is an opportunity to begin their education and, at the same time, we will learn about
the expectations from citizen's perspective. This input will be used to evaluate the costs of providing services that meet
the goals and objectives specified by the community,
Earth Tech will develop project-ranking factors to assign priority to the final recommendations, The intent is to assist
Augusta with the scheduling of the projects as funds becomes available. Potential factors may relate to magnitude of
problem, permitting and construction, and water quantity and quality benefits. For instance, reactive projects are those
that are of higher priority to address problems that are already identified in the past studies or reported and verified by
citizen complaints. Proactive projects are those aimed to prevent potential stormwater problems such as meeting
regulatory control requirements.
Task 3 - Projected Stonnwater Program
Earth Tech will prepare a multi-year cash flow analysis to establish Augusta's anticipated changing annual financial needs
and obligations (Table 2), Earth Tech will discuss the options for financing capital improvement with Augusta staff (e.g.,
on a pay-as-you-go basis or carrying a debt service). We recommend at least one input session with elected officials and
the financing department to get their buy in to the annual budget. This is another opportunity to get the public involved,
so they begin to understand the magnitude of the financial issue facing the city government.
Task 4 - Basic Funding Feasibility
Earth Tech will assist Augusta to develop a long-term funding strategy that is fiscally responsible, stable, and fair and
equitable to Augusta residents and businesses. The strategy will be developed based on Earth Tech's financing alternatives
evaluation. For instance, the strategy may focus on the establishment of a new user fee system to provide the financial
umbrella needed to support the long-range planning and obligations of the city. It may also include refining financial
policies related to SPLOST, developer fee, and other potential grants. Earth Tech's financial alternative evaluation will
examine all funding mechanisms (fable 1) Augusta could take advantage of to supplement existing revenue sources.
.E ART H @ TEe H
Page 3
I
.
I
~
~
.J"';....~1ii~" ':.~,
~ ,J" ,
\ ~ :.
~./J . ,.,'.....", "
~: "';"}~::;.
. .. . . ~ ,'I..';: k;,
Proposal for StormwaterManagement Program Feasibility Study
RFP#04.053
Table 2: Example Cash Flow Analysis from City of Racine, Wisconsin
ell .ego ry
AdmlnlatrllUon
Dave 10 pm ont of II Storm weter Me Mgement and Ero.lon Control Ordlnanc.
Public Infonnatlon
Form .18WPPP', for City FaclBtlu (ZoolDPWlPublc Trllnaport)
Public partlcfpatlon
Oovelop & Implem ont FortlUur, Postlclda, Management Plan (Municipal)
Develop roadway do--tclng policy & program
Devolopmont ala Stonnweto, UtlBty
"0,000
S10,OOO
510,000 $10,609 $10.927 $11.255 $11,593
511,000 $12,020
All $10,000 $10,300 $10,609 $10,927 $11.256 $11,593
5~.000 $5.305
'5,000 $5.150
"0,000 $60,000
Subtobll $1".000 $132,100 $711."'3 S81,705 '"0,80e $81.148
Add City Stonnwa.., E nglnn,
Ero.lon Conlroland SW MaNlgamont lnap.c:tlonlEnforcementITralnlng
Ollelt Dl:.ctulrge O.tecHon
DUclt Olllcharg. Monitoring & Control
Wot W..ther Monitoring Grou p Permit Req.
Bank SUlbiJlullon ASlSlJ8lImanl
S80,OOO
S~O.OOO
$30.000
55.000
S7.~00
S 1 83,~OO
$90.000
$61,500
$30, gOO
$8.000
$7,725
51 88,12~
$53,04 5
$31.627
556,275
$33.755
$57,964
$34,776
A'
All
1
An
$54,636
$32.762
$7.957
5'12,828
$6.441
11I8,482
$6.695
$101,438
$6.195
$9~.B14
Subto"l
opll"'lm pro\lcmonl
Silo 1: Retrofit W.Q.. Pond (High Ridge Shopping Contor)
Sil:o 2: Now W.O. & Q. Pond (Regency Mall)
SJI:o 3: RetrofItW.Q.. & Q. Pond (Prftcherd Park)
Site 4: RotrofItW.Q.. & Q. Pond (Rullrv~r Park)
Bite 5: RetrofHW.Q.. & Q. Pond (N. of Jon.. Schl.)
Sit. 8: Rotroflt W. Q. &. au Pond (Me nerd Shorn Sub.)
91141 1: New W.O. & Q. Pond (Dillon Induatrlal Park.)
Site 14: Storm..wer or atoRlgn . ft. matlvoa to prevent flooding
Site 51; Ret,ofltW.Q.. Pond (Mound Cametery.)
Site 13: New W.O.. Pond or InnM (N. of 21.t Indlllne.Ohlo)
Slto 15: N.w Sedbnont ChamberBtu.RlverVelley
Sa. 17: Exl.tl.ng FC Pond (Lockwood Park)
S" 18: Retrofit w.a.. Pond 1St MUY'8 Hoapltal)
Sfte 8: Flood ConlrolStorm 9 ewer (E. of "emorlel Or) OptJon 1 :fconnocllon to tho gO Inch neer
RR) Option 2:(connectJon ot 21at and Memorial)
Small Projectlmprovoments
$75.000
$200,000
$76,000
$126.000
$45.000
$76.000
$7~,OOO
$ 200,000
17~,OOO
$ 125,000
$4~,000
$7~,OOO
'380,000
$1,600,eoo
5308.000
S 27~,OOO
$ e~o,ooo
5 ~30,OOO
52~.000
$316,270
$413,751
$291,748
$562.277
$27.316
$109,273 $112.551 $115.927
$1,377,048 $139,1168 511~,827
$327.616 $337.663 $347,762
$66.642 $70,907 $73,034
$68,325 588.916 $g1,583
$66.325 $88,916 $91,563
$85.564 567,631 $69.556
5534.874 S6~3.821 SB73,~38
52.278, 7~0 $1,073,118 51 ,054.783
$ 885,000
$665,000
All
$103.000
$1.383,000
$100,000
$5,158,800
$108,090
$424,360
Subtotal
pCf.llion .:Ind r,1oll1lononco
StrutSw..plng All $ 300,000 $309,000 $316,270
Loaf Pick up All $63,000 $64,690 $66.637
Catch Buln Sum p Ctoonlng (1) All 578.000 $61,370 $63,611
BMP Malntenanca Pbn (Manual) 1 53,~00 $3,500
BMP Malntenonce ImplementaUon (existing) An $78,000 $61,370 $83,811
BMP Mefntanancelmplementatlon (tutu,..) All 580.000 $61,800 $83,654
Subtotal 5 ~84.~00 5501.830 S518,383
Annual10talll $2,35~,~~~ S1,287,3H
One goal of the evaluation is to attempt to direct the financial burden onto those who are creating the problems, The
limitations, advantages, and disadvantages that restrict the usefulness of the various funding mechanisms will also be
presented. Our discussion of the alternatives will address issues that may select or eliminate certain options because they
could possibly fund a specific activity, could not generate sufficient revenue, may be limited for only specific purposes, or
may have legal limitations.
Task 5 - Summary Report with Recommendation
Earth Tech will prepare a summary of the findings and recommendations from the study. The report will also layout the
sequencing of decisions that will have to be made to follow through with the selected alternative, The report will describe:
Goals and objectives of Augusta's stormwater program,
Summary of the stormwater problems the program will have to address,
Existing services Augusta is providing, along with their associated costs,
Services that will ultimately be needed to provide the desired drainage, flood protection, and regulatory compliance
for water quality,
Recommendation on staffing and institutional management,
Recommended primary and secondary financing mechanisms, and
Sequencing of events to implement the recommended financing alternatives,
.
.
.
.
~
.
.
E A A
TH@)TECH
Page 4
:
, Proposal for St6rmw~t~t,Ma'i~g~h;~&~p~,8gr~~';:~~j~IbHity~~t~~~~
,...., : . :~;,~~;.:~:>:~~~~~r~,~~~.t~?~1~;t~f,~~~{#,64~~~~
Table 3: Sample Staffing Needs Assessment
Inventoried Recommended Recommended Existin'g Staff Additional Annual
Stormwater Facility Maintenance Staff Field
Units Frequency Days Field Days Maintenance Costs
1 Inlets & manholes 13,000 Annual 1,040 $208,000
2 Storm Sewers 200 miles 5-yr CYcle 317 375 $0
3 Ditches & Culyerts 4,5 miles 5-yr Cycle 59 5 $27,000
9 Detention Basins 5 3 Mowings Annually 8 20 $900
Dredging 10-yr Cycle 3
10 System Repairs 15,000 20-yr Cycle 1,125 250 $262,500
Total Field Days 3748 1,070
Additional Staff Required 17
Additional Annual Maintenance Costs $601 200
Project Schedule (insert project schedule - two month project)
Earth Tech will perform the proposed scope of work in two months as shown below. We anticipate that there will be two
workshops/presentations.
1.0
2.0
3.0
4.0
5.0
" ,