July 15,2002
~~
Mr. N. Max Hicks, PE
Director -:- Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Attn: Mr. Douglas A. Cheek, PE
Assistant Director - Engineering and Construction Division
Re: Proposal for Design of Water and Sewer Relocation
Davis Road from Washington Road to Robert C. Daniel Parkway
1-20/1-520 Interchange Improvements
Gentlemen:
GENERAL CIVIL
TRANSPORTATION
ENVIRONMENTAL
GEOGRAPHIC SCIENCES
Pursuant to our meeting at your office on June 19 where we discussed the referenced projects, we are
hereby submitting the attached proposed scope of services and fee. This scope and fee is for the design of
the water and sewer line relocation made necessary by the roadway improvements that we are designing for
the Georgia Department of Transportation. Our proposed fee for these services is a lump sum amount of
$77,053.00.
With our familiarity ofthese two projects and the extensive field data that we have on hand, we feel we are
in a unique position to provide quality services to Augusta Utilities for the design of your facilities. As you
know, we have experience throughout the state doing just this type of work.
In anticipation of working with the City of Augusta, we forwarded the Consultant Services Agreement that
you provided to our legal department for review. There are three items within the General Conditions that
make us uncomfortable:
1. Section 6 - Confidentiality. There is a conflict here. This section requires that all materials be
kept confidential. However, under Section 7, all records are public records. To fix this, we suggest the
following paragraph be added to this section:
. CONSULT ANT shall not be restricted in any way from releasing information, including
proprietary information, in response to a subpoena, court order, or other legal process.
CONUL T ANT shall not be required to resist such subpoena, court order, or legal process, but shall
promptly notify CITY in writing of the demand for information before CONSULTANT responds to
such demand. CITY may, at its sole discretion, seek to quash such demand,
2. Section 14, Paragraph 1. I believe the word "ensure" should be "insure."
C:\TEMP\WaterSewer Proposal Cover Letter.doc
"
-,
3. Also Section 14, last paragraph. G&O can not name the City as co-insured. That would mean
that our insurance would cover the City for the City's own acts. We can name the City as an
additional insured. That means that the City may make a claim against G&O's underwriter for
damages G&O causes to the City.
Please consider these comments. Ifnecessary, we can put our legal department in touch with the City for
further discussion.
We look forward to discussing this proposal with you at your earliest convenience and answering any
questions you might have about the proposal or the projects in general.
Sincerely,
GREENHORNE & O'MARA, INC.
Theon F. Grojean, PE
Transportation Project Director
Attachments: Scope of Services
Manhour Estimate and Fee Calculation
Cc: Project file
C:ITEMPIWaterSewer Proposal Cover Letter.doc
.,
SCOPE OF SERVICES FOR DESIGN OF WATER AND SEWER RELOCATION
Project Limits:
1. Davis Road Widening from Washington Road to Robert C. Daniel
Parkway.
Georgia DOT Project No. STP-7006(6) Richmond and Columbia County
P.I. No. 250560
2. 1-20/1-520 Interchange Improvements includes improvements to 1-520
from 1100 ft north of Scott Nixon Memorial Drive to 300 ft south of
Wheeler Road, the proposed interchange at I-520 and Scott Nixon
Memorial Drive, the improvements at the 1-20/1-520 Interchange, and all
associated frontage roads and collector-distributor roadways.
Georgia DOT Project No. NH-IM-520-1(l5) Richmond County
P.I. No. 210450
The following services and items shall be provided as part of this project:
. Consultant will visit the site and walk the project corridor to become familiar with the
scope ofthe project. Consultant will meet with the Client to review the project .
mapping and obtain input on the project scope before the start of design.
. Consultant will design the relocation ofthe Augusta Utilities Department water and
sewer lines within the project limits described above. Design will be in accordance
with the Augusta Utilities Department Design Standards dated September 2000.
Location and survey of existing water and sewer lines have been accomplished for the
Georgia DOT under separate contract and are not included in this Scope of Services.
It is assumed that existing water mains within proposed pavement limits will be
relocated outside the pavement but within proposed Right-of-Way were possible.
Existing sewer lines will be relocated only where they conflict with new construction.
. Plan sheets will be provided for both the Davis Road Widening and the I-20/I-520
Interchange Improvements showing the relocated water and sewer lines in accordance
with the Augusta Utilities Department Design Standards. The Davis Road plan sheets
will be at 1"=20' scale.. The Interchange plan sheets will be at 1"=50' scale.
. Profiles will be provided for all relocated sewer lines. Profiles will not be provided
for water main relocation except where necessary to indicate required design detail.
· A construction plan sheet indicating the Summary of Quantities will be provided in
Georgia DOT format using GeorgiaDOT pay items. These pay items may differ
from those normally used by Augusta Utilities. A construction cost estimate will be
provided based on these pay items.
. Special Provisions to the Georgia DOT Standard Specifications will be provided as
necessary. It is assumed that the August Utilities Department Construction
Specifications can be incorporated by reference with general notes on the
construction plans. Conflicts with the state specifications will be resolved.
. It is assumed that the Augusta Utilities Department standard construction details can
be incorporated by reference with general notes on the construction plans.
-,
. All relocated water and sewer lines will be within the proposed Right-of-Way were
possible. Easement plats will be provided in the event that permanent utility
easements become necessary.
. It is assumed that the Water and Sewer Relocation Plans will become part of the
Roadway Plans that will be let for bid by the Georgia Department of Transportation.
All bid services (Pre-Bid meeting, Contractor selection, etc.) will be by the Georgia
DOT. All construction services (observation/inspection, measurement for payment,
etc.) will be by the Georgia DOT.
· As-Built Drawings/Record Drawings are not included in this scope of services.
However, the Consultant will provide digital drawing files in Microstation format to
the Augusta Utilities Department upon completion of the design.
\\A TLFS I VOBS\ Trans\0085\PM\ Water and Sewer Scope of Services.doc
~
"
..
".
Augusta Utilities Department
Date: 08/30102
Project:
Davis Road Widening
1-20/1-520 Interchange Improvements
Phase:
Water and Sewer Relocation
.. ..
" "
", " 0::
"' 0:: .. "' Oi
0:: 'So " 'C:; Oi '0
"' " g
Item! Task Description ~ 0:: 0:: '2 u E-
Task "-l '1:
'So ..c: " 0 '-
t; 5 0:: U 0 E- o
" "-l " 't!.
B '2 E-
ct "
Vl
0 0.00%
DA VIS ROAD 0 0.00%
1 Site Visit & Scope Mtg. With Augusta Utilities 8 8 16 1. 98%
2 Design of Relocated Water System 24 80 32 40 176 21.73%
3 Design of Relocated Sewer System 24 40 40 24 128 15.80%
4 Sewer Pro tiles 8 16 24 8 56 6.91%
5 Staging Coordination with Roadway Project 4 8 4 16 1.98%
6 Summary of Quantity Sheets 8 8 16 4 36 4.44%
7 Construction Cost Estimate 2 2 4 8 0.99%
8 Special Provisions 2 4 6 0.74%
9 Easement Plats 4 8 8 4 24. 2.96%
10 Address Client Review Comments 8 16 16 8 48 5.93%
11 Project Management & Coordination 24 16 40 4.94%
0 0.00%
0 0.00%
0 0.00%
1-20/1-520 INTERCHANGE 0 0.00%
12 Site Visit & Scope Mtg. With Augusta Utilities 0 0.00%
13 Design of Relocated Water System 16 32 16 16 80 9.88%
14 Design of Relocated Sewer System 8 16 16 8 48 5.93%
15 Sewer Profiles 2 8 8 4 22 2.72%
16 Staging Coordination with Roadway Project 4 8 4 16 1. 98%
17 Summary of Quantity Sheets 2 4 8 2 16 1.98%
18 Construction Cost Estimate 2 2 4 8 0.99%
19 Special Provisions 2 4 6 0.74%
20 Easement Plats 4 8 8 4 24 2.96%
21 Address Client Review Comments 4 8 8 4 24 2.96%
22 Project Management 8 4 12 1.48%
0 0.00%
0 0.00%
0 O.OO~
0 0.00.
0 0.00.
0 0.00.
01 Totals II 1681 280 I 2161 1261 20 II 8101 lUU. UU'7.