Architectural Firm
Davis Design CGlf(Q)u][p) I
120 Fifth Street
Augusta, Georgia 30901
706. 724. 4666
E-mail: ddg@duesouth.net
March 31, 2004
Mr. Ron Houck
Planning & Development Manager
Augusta Richmond County Rec. & Parks Dept.
P.O. Box 5605
Augusta, Ga. 30916-5605
Re: Professional Services for Lake Olmstead Park - Julian Smith Casino
improvements
Dear Ron:
It is with pleasure that we submit this proposal for professional services for
the above project. We will provide bid documents and construction
administration to accomplish the following work:
1) New doors for the rear ofthe building leading to a new flagstone
terrace with an arbor and new steps to a four row amphitheater.
2) Replace all of the windows in the tower.
3) Rework the lighting inside the casino to be more in keeping with the
period of the structure.
4) Coordinate with Ga. Power for additional site lighting at the rear of
the building.
5) Replace the block steps at the lower front and back of the building to
include railings.
6) Restore the existing rock fountain to working order.
7) Replace the fencing around the mechanical equipment.
8) Installation of a lighted 50' floating fountain in the lake.
9) Landscape and irrigation of the areas to the rear of the building.
We are in a position to begin work immediately and complete the documents
within 90 days.
Roger W, Davis
GA #306 . SC #16
Registered Landscape Architects
Fax 706' 724 . 4666
R, Scott Davis
GA #1008
. ,
COST ESTIMATE - CASINO AREA
Prepared by:
Davis Design Group
120 5th Street
Augusta, GA 30901
3/25/04
- GRADING
- Grading I.s. $ 5,000
- Topsoill.s. 3,000
TOTAL $ 8,000
- DEMOLITION
- I.s. $ 8,000
TOTAL $ 8,000
- LAYOUT & STAKING
- I.s. $ 3.000
TOTAL $ 3,000
- CONCRETE & STONE WORK
- 20 cu.yds. cone. walls @ $600 $ 12,000
- 2862 sq.ft. conc. walks @ $3.50 10,017
- conc. steps I.s. 11 ,000
- flagstone 1024 sq. ft. @ $28' 28,672
TOTAL $ 61,689
- RAILINGS & HANDRAILS
- railings 50' @ $401ft.
- handrails I.s.
$ 2.000
1,000
TOTAL $ 3,000
- LIGHTING & ELECTRICAL
- Ga. Power 5 poles @ $950 ea. $ 4,750
- Electrical service 8,000
- Casino lights 40,135
TOTAL $ 52,885
- LANDSCAPING
- Sod $ 2,600
- Landscaping 11 ,500
- Irrigation 5,000
TOTAL $19,100
- ARBOR
- I.s. $ 12,000
TOTAL $ 12,000
- SANITARY SEWER
- Bury existing sink drain line I.s. $ 1,000
TOTAL $ 1,000
- NEW DOORS & WINDOWS
- doors I.s. $ 12,015
- windows & doors for tower I.s. 11,097
- painting 3,300
. .
TOTAL
- FLOATING FOUNTAIN
- I.s.
$ 33,000
TOTAL
- ROCK FOUNTAIN RESTORATION
- I.s.
$ 1,000
TOTAL
- SITE FURNITURE
- 6 benches @ $1100 ea.
- 2 picnic tables @ $1500 ea.
$ 6,600
$ 3,000
TOTAL
MECH. eQUIP FENCING
- 64'@$15
TOTAL
$ 960
TOTAL CONSTRUCTION
10% CONTINGENCY
TOTAL
15% OH&P
CONSTRUCTION TOTAL
PROFESSIONAL FEES
$ 26,412
$ 33,000
$ 1,000
$ 9,600
$ 960
$239,646
$ 23,965
$263,611
$ 39,542
$303,153
$ 25,768
. .
G~~[D) 101~!L
~~2l&p~2~