Loading...
HomeMy WebLinkAboutProfessional Service for Lake Olmstead Park Augusta Richmond GA DOCUMENTNAME:VyoteS".:)\OYlQ\ c;e'lV ices tOy LoL ~-e D\ YYlv-\-eod ----PL\.V\C DOCUMENT TYPE:'VV~ \ YEAR: 1004 BOX NUMBER: 7J FILE NUMBER: \ ! 7- 'L ~ NUMBER OF PAGES: ~ g;.-e.- . Architectural Firm Davis Design CGlf(Q)u][p) I 120 Fifth Street Augusta, Georgia 30901 706. 724. 4666 E-mail: ddg@duesouth.net March 31, 2004 Mr. Ron Houck Planning & Development Manager Augusta Richmond County Rec. & Parks Dept. P.O. Box 5605 Augusta, Ga. 30916-5605 Re: Professional Services for Lake Olmstead Park - Julian Smith Casino improvements Dear Ron: It is with pleasure that we submit this proposal for professional services for the above project. We will provide bid documents and construction administration to accomplish the following work: 1) New doors for the rear ofthe building leading to a new flagstone terrace with an arbor and new steps to a four row amphitheater. 2) Replace all of the windows in the tower. 3) Rework the lighting inside the casino to be more in keeping with the period of the structure. 4) Coordinate with Ga. Power for additional site lighting at the rear of the building. 5) Replace the block steps at the lower front and back of the building to include railings. 6) Restore the existing rock fountain to working order. 7) Replace the fencing around the mechanical equipment. 8) Installation of a lighted 50' floating fountain in the lake. 9) Landscape and irrigation of the areas to the rear of the building. We are in a position to begin work immediately and complete the documents within 90 days. Roger W, Davis GA #306 . SC #16 Registered Landscape Architects Fax 706' 724 . 4666 R, Scott Davis GA #1008 . , COST ESTIMATE - CASINO AREA Prepared by: Davis Design Group 120 5th Street Augusta, GA 30901 3/25/04 - GRADING - Grading I.s. $ 5,000 - Topsoill.s. 3,000 TOTAL $ 8,000 - DEMOLITION - I.s. $ 8,000 TOTAL $ 8,000 - LAYOUT & STAKING - I.s. $ 3.000 TOTAL $ 3,000 - CONCRETE & STONE WORK - 20 cu.yds. cone. walls @ $600 $ 12,000 - 2862 sq.ft. conc. walks @ $3.50 10,017 - conc. steps I.s. 11 ,000 - flagstone 1024 sq. ft. @ $28' 28,672 TOTAL $ 61,689 - RAILINGS & HANDRAILS - railings 50' @ $401ft. - handrails I.s. $ 2.000 1,000 TOTAL $ 3,000 - LIGHTING & ELECTRICAL - Ga. Power 5 poles @ $950 ea. $ 4,750 - Electrical service 8,000 - Casino lights 40,135 TOTAL $ 52,885 - LANDSCAPING - Sod $ 2,600 - Landscaping 11 ,500 - Irrigation 5,000 TOTAL $19,100 - ARBOR - I.s. $ 12,000 TOTAL $ 12,000 - SANITARY SEWER - Bury existing sink drain line I.s. $ 1,000 TOTAL $ 1,000 - NEW DOORS & WINDOWS - doors I.s. $ 12,015 - windows & doors for tower I.s. 11,097 - painting 3,300 . . TOTAL - FLOATING FOUNTAIN - I.s. $ 33,000 TOTAL - ROCK FOUNTAIN RESTORATION - I.s. $ 1,000 TOTAL - SITE FURNITURE - 6 benches @ $1100 ea. - 2 picnic tables @ $1500 ea. $ 6,600 $ 3,000 TOTAL MECH. eQUIP FENCING - 64'@$15 TOTAL $ 960 TOTAL CONSTRUCTION 10% CONTINGENCY TOTAL 15% OH&P CONSTRUCTION TOTAL PROFESSIONAL FEES $ 26,412 $ 33,000 $ 1,000 $ 9,600 $ 960 $239,646 $ 23,965 $263,611 $ 39,542 $303,153 $ 25,768 . . G~~[D) 101~!L ~~2l&p~2~