HomeMy WebLinkAboutNPDES
DOCUMENT NAME: l.)\)\:)( S
DOCUMENTTYPE:\)~~
YEAR: D~
BOX NUMBER: ~ 9
FILE NUMBER: \ 1.9<6~ \
NUMBER OF PAGES: l..9-
Augusta Richmond GA
Jul-lB-03 lO:36A
P.02
,
e
USINFRASTRUCTURE, INC.
CONSULTING ENGINEERS
July 18,2003
Mr. Allan Saxton
Augusta Utilities Department
360 Bay Street, Suite 180
Augusta, GA 30901
Subject:
Proposal for Completing the National Pollutant Discharge Elimination
System (NPDES) Permit Applications for the Butler and Spirit Creeks Water
Pollution Control Plants (WPCPs)
Dear Mr. Sax.ton:
Pursuant to your request, VSInfrastructure, Inc. (USI) is pleased to submit the attached proposal
for preparing the NPDES Permit applications for the Butler and Spirit Creeks WPCPs. As you
requested, we have divided the proposal into two phases as follows: Phase I - Collection of the
Data Required to Complete the NPDES Pennit Applications, and Phase II - Preparation of the
NPDES Permit Application Packages.
USI appreciates the opportunity to submit the attached proposal. We consider our
client/consultant relationship with the Augusta Utilities Department (AUD) to be of the utmost
importance, and we cannot overemphasize our interest in continuing to serve the AVO in such a
vital capacity.
If you have any questions or need additional information regarding our proposal, please do not
hesitate to contact me at your earliest convenience.
Sincerely,
USInfrastructure, Inc.
~.'
Francis T. Kung'u, Ph.D., P.E.
Senior Vice President
Research . Planninl: . E~int't'rinl: . Management
3500 Piedmont Road NF. . Suite 612 . AUanlll, Grorgia . 30305
(770) 640-6652 . Fax (770) 640-11446
Jul-IB-03 IO:36A
P.03
Proposal for Completing the National Pollutant Discharge Elimination System
(NPDES) Permit Applications for the Butler and Spirit Creeks Water Pollution Control
Plants (WPCPs)
The following is USI's Proposal for completing the NPDES Permit applications for the
Butler and Spirit Creeks WPCPs. The scope of work for this project will involve collection
of the data required to complete the NPDES Permit applications, preparation of the NPDES
Permit application packages including associated documentation, and submittal of the
NPDES Permit application documents to the Georgia Department of Natural Resources
Environmental Protection Division (EPD), Water Protection Branch.
This proposal is divided into two Phases: Phase I - Collection of the Data Required to
Complete the NPDES Permit Applications and Phase II - Preparation of the NPDES Permit
Application Packages.
Phase I - CoUection of the data required to complete the NPDES Permit applications
This Phase will involve meeting with the AUD to discuss the NPDES Permit application
process and to gather preliminary data about the Butler and Spirit Creeks WPCPs; contacting
the EPD to verify the data needed to complete the NPDES Permit applications; developing
lists of data to be collected, including effluent sampling and analysis; performing data
collection and analysis; and compiling data. Based on the information included in the April
16, 2003 letter from the EPD to Mayor Bob Young and the instructions for completing Form
2A - Application for an NPDES Permit (as published in the Federal Register / Vol. 64. No.
149/ Wednesday, August 4, 1999/ Rules and Regulations, USI has developed the following
list of field and laboratory data needs (Note: USI recommends that the AUD verify this list
with the Georgia EPD before commencing field sampling and laboratory analysis):
· Effluent Testing Data as required under Question A-12 (Page 6 of2l) of Form 2A.
USI and our subconsultant CSRA Analytical Laboratories, Inc. (CSRA) will collect and
analyze three (3) samples (one during the Fall of 2003, one during the Winter of
2003/2004, and one during the Summer of 2004). Samples will be collected no fewer
than 4 months and no more than 8 months apart.
· Ejjluent Testing Data as required under Question B-6 (Page 8 of 21) of Form 2A.
USI and CSRA will collect and analyze three (3) samples (one during the Fall of 2003,
one during the Winter of 2003/2004, and one during the Summer of 2004). Samples will
be collected no fewer than 4 months and no more than 8 months apart.
· Expanded Effluent Testing Data as required under Part D (Page 10 of 31) of Form 2A.
USI will collect and analyze three (3) samples (one during the Fall of 2003, one during
the winter of 2003/2004, and one during the Summer of 2004). Samples will be
collected no fewer than 4 months and no more than 8 months apart.
Jul-1B-03 lO:37A
P.04
· Toxicity Testing Data (Whole EjJluent Testing, WET) as required under Part E (Page 15
of2l) of Form 2A.
USI will perform quarterly WET sampling and analysis as follows: Fall of2003, Winter
of 2003/2004, Spring of 2004, and Summer of 2004.
The following is a breakdown of the tasks that USI will complete under Phase I including the
levels of effort and estimated budgets:
· Meet with the Augusta Utilities Department (AVD) to discuss the NPDES Permit
application process and to gather preliminary information about the two WPCPs.
- Project Manager 10 hours @ $120.00 per hour
- Environmental Engineer/Scientist 10 hours @ $ 85.00 per hour
Subtotal
$1.200.00
$850.00
$2.050.00
· Contact the EPD to verify the data needed to complete the NPDES Permit applications.
Project manager 4 hours @ $120.00 per hour
Subtotal
$480 00
$480.00
· Coordinate with CSRA and other laboratories regarding effluent and Whole Effluent
Toxicity (WET) sampling and analysis.
- Project Manager 8 hours @ $120.00 per hour
- Environmental Engineer/Scientist 16 hours @ $ 85.00 per hour
Subtotal
$960.00
$1.360.00
$2,320.00
· Discuss Quality Assurance/Quality Control (QNQC) procedures with CSRA and other
lab ora tori es.
- Project Manager 4 hours @ $120.00 per hour
- Environmental Engineer/Scientist 8 hours @ $85.00 per bour
Subtotal
$480.00
$680.00
$1.160.00
· Coordinate with CSRA and other laboratories throughout the data collection period,
report to the AVO, and coordinate with the EPD after each sampling and analysis
event.
- Project Manager 20 hours @ $120.00 per hour
- Environmental Engineer/Scientist 80 hours @ $85.00 per hour
Subtotal
2
$ 2.400.00
$ 6.800.00
$ 9.200.00
Jul-lB-03 lO:37A P.OS
. Laboratory Analyses (Please see Attachments). $30,180.00
- Effluent Testing Data (Question A-12, page 6 of21, Form 2A)
- Effluent Testing Data (Question B-6, page 8 of21, Form 2A)
- Expanded Effluent Testing Data (Part 0, page 10 of 21, Form 2A)
- Toxicity Testing Data (Part 0, page 15 of21, Form 2A)
Subtotal $ 30,180.00
. Gather all other data/information needed to complete the NPDES Permit application
Packages (data/information other than effluent and WET testing): see Parts A, B, and F
of form 2A.
- Project Manager 10 hours @ $120.00
- Environmental Engineer/Scientist 60 hours @ $85.00 per hour
- GIS Analyst 40 hours @ $75.00 per hour
Subtotal
Total Proposed Budget - Phase I
Phase II - Preparation of the NPDES Permit Application Packages
$ 1.200.00
$ 5,100.00
$ 3,000.00
$ 9.300.00
$54.690.00
Phase II will involve compiling data gathered under Phase I, developing maps and figures
needed for the NPDES Permit application, completing the NPDES Permit application
packages, reviewing the application packages with the AVD, incorporating the AVO's
comments, submitting the NPDES Permit application packages to the AVO for submittal to
the EPD, and responding to the EPD's comments. The following is a breakdown of the tasks
that will be performed under Phase II including the associated levels of effort and budgets.
· Compile Data and Develop Maps as Needed for the NPDES Permit application
Packages.
- Project manager 10 hours @ $120.00 per hour
- Environmental Engineer/Scientist 60 hours @ $85.00 per hour
- GIS Analyst 40 hours @ $75.00 per hour
Subtotal
$ 1.200.00
$ 5.1 00.00
$ 3.000.00
$ 9.300.00
· Complete Forms 2A, including all required maps, figures, and reports, for Butler and
Spirit Creeks.
- Project manager 16 hours @ $120.00 per hour
- Environmental Engineer/Scientist 40 hours @ $85.00 per hour
- GIS Analyst 20 hours @ $75.00 per hour
Subtotal
3
$ 1,920.00
$ 3.400.00
$ 1,500.00
$ 6,820.00
Jul-IB-03 IO:37A
Total Proposed Budget - Phase II
Total Estimated Budget (phase I and In
$16.120.00
$70.810.00
4
P.06
c:
(JI
ro
11
~
><:
::0:
to
o
(J)
::0:
tI:l
t-<
t-<
><:
o-,l
o
;p.
Cl
rt
~
III
I-'
rt
o
g
~
III
I-'
to
~
p.,
lQ
ro
rt
o (J)
11 tI:l
lQ t-<
tI:l
::>: ()
ro t-:3
'<
o
11
lQ
::>:
ro
'<
111
o
G) en
t-< 0
""
(J) \.oJ
1-" \.oJ
p., I-'
ro 0
G)
t-<
,
G)
ro
::l
ro
11
III
I-'
t-<
ro
o-,l p.,
1-" lQ
rt ro
I-' 11
ro
o
-..J
........
N
I-'
........
o
\.oJ
to
tI:l
I
to
ro
11
3
III
::l
ro
::l
rt
to
~
p.,
lQ
ro
rt
"%]
><:
10
rt
to
ro
111
o
en
,
o
""
I
\.oJ
\.oJ
I-'
o
II
I
1
II
II
II
II
II
II
II
II
II
II
II
II
-..J
o
0'
LJ.
ro
Cl
rt
o
ro
(JI
Cl
11
1-'-
'0
rt
1-'-
o
::l
to
~
p.,
lQ
ro
rt
II
I
f
1111111111111111111111111111111
NNNNNN NNNN
N 1-'1-' I-' I-' 1-'",..'1-' I-' 1-'1-'
N\.oJ\.oJ\.oJ\.oJ\.oJ NNNN
1-'1-'1-'1-'1-'1-' 1-'1-'1-'1-'
1-'1-'1-'1-'1-'1-' ,NNNI-'
o \0 -..J en 111 "" '~,' \.oJ N 0 CO
1[,;'
It.
G)OtO(J)::o:g: '()G)t-<(J)
III rtroro III 11' ororo,<
11::r'(JI~rtrt ~::llQOJ
O'rortroro I1rolllrt
III 11 11 11 3:: rt 11 I-' ro
lQ () ro.', III 3
ro o-,lO o-,lo-,lro ;p.1-'
ro::lrorort '0 ;p.
Clrt(JI(JI1-' 'Ot-< ::l
::r'l1rtrt::l rtro III
o 1-'- l-'-lQ lQ I-'
(J)I-'::l::l t-<Ill '<
ro lQlQ::O rol-' en
11 '0 lQ rt
<: 11 Ill"%] OJ
(JI I-' OJ
3:
ro
(JI
(JI
(1)
11
I-'
'<
::0:
III
(JI
rt
ro
~
III
rt
ro
11
to
I-'
III
::l
rt
;p.
()
rt
~
III
I-'
o
\.oJ
\.oJ
tI:l
::l
()
~
5-
11
III
::l
Cl
(1)
to
III
I-'
III
::l
Cl
ro
1-'\0
ll1\.oJ
00
00
00
0000
0000
0000
,
11["
;1~~~' ~
'I;,," .......0
~b::' NO
.. .fj~;:, ... ...
~I' \.oJN
en \!:j:,enen
CO 0 0 0 0 OJilCl \.oJ 0 0 0
. . . . . ..,',~' . . . .
\0 0 0 0 0 u1i' N "" 0 0
"" 0 0 0 0 enr ,"" en 0 0
j,: I
;, ~, '
i.."
f' ~
'I'
" CO
IJl.) CO
~~~~~~r"P~~~
ooooooQiloooo
OOooooOoenoo
00000
00000
00000
~/-.111
1\l<IL.>N
Nq,-..J-..J
... .I. -;. ..
, -..JI''''CO
en \O"'\.oJl11
\00000\0 '-..J-..JOO
'11')
o 0/
;a ;a