HomeMy WebLinkAboutHVAC Central Plant & Security Upgrandes
Augusta Richmond GA
DOCUMENT NAME: \-\ VAQ, Ger\T(o..,\ ?\Q\\\- J.; Se..cuY\~ U\-XjrOG\eJ
DOCUMENTTYPE:\)y~
YEAR: () \
BOX NUMBER: \ \
FILE NUMBER: \ ~ \ ()~
NUMBER OF PAGES: '6
"
AUGUSTA-RICHMOND COUNTY COMMISSION
JAMES B. WALL
CITY A DORNEY
LEE BEARD
ULMER BRIDGES
JERRY BRIGHAM
HENRY H. BRIGHAM
ANDY CHEEK
RICHARD L. COLCLOUGH
WILLIAM B. KUHLKE. JR.
STEPHEN E. SHEPARD
MARION WILLIAMS
BOB YOUNG
Mayor
P.O. Box2125
454 GREENE STREET
AUGUSTA, GA 30903
Bus. (706) 821-2488
FAX No: (706) 722-5984
E-MAIL: JWALL@co.RICHMOND.GA.US
WALTERS. HORNSBY, III
Interim Administrator
Wi\'!. "WILLIE" H. MAyS, III
Mayor Pro Tem
January 10,2001
Hand Delivered
Mr. Rick Acree
Facilities Maintenance
2nd Floor, City-County Bldg.
Augusta, GA 30911
RE: HV AC Central Plant & Security Upgrades
Dear Rick:
I enclose herewith the proposal which has been accepted by Augusta. This should
be signed by a representative of Siemens, with one original returned to Lena Bonner's office to
be included in the City's records.
With best personal regards, I am
(2: truly,
/ .
lies B. Wall
JBW/sjp
Enclosure
.
SIEMENS
,
The Landis Division of
Siemens Building Technologies, Inc.
December 4, 2000
Augusta-Richmond County
Municipal Building
530 Green Street
Augusta, Georgia 30911
Attn; Mr. Claude Andrews, Operations Manager
Scope of Work: HVAC Central Plant & Security Upgrades
Furnish and install all Labor, Equipment and Services outlined in the Siemens
Building Technologies letter of December 4, 2000
Total Cost of$ 2,187,000.00
A mobilization payment of 5 percent will be paid within two weeks of acceptance of
this proposal.
0911
Date:
This document contains SIEMENS BUILDING TECHNOLOGIES, Inc. Trade Secrd and Confidential Information to be used solely
by the addressee for evaluating the SIEMENS BUILDING TECHNOLOGIES, LANDIS DMSION, proposal. Addressee shall not
disclose the Confidential Information to any third party without express written COIlSfIl1 of SIEMENS BUILDING TECHNOLOGIES.
Arl~<:N! d1~1I m~lc-p.nn nthPr 11~P. in whnlp: or in ns:lrt nfthiq t:fWlfirlArti:ll TnfnnnAtinn Thiq nrnnnQ.,A1 iq vinhlp. m1il nnPfl for AlY'A'1f;m('P. for
~~~~~D~
.
l Kn~rM~ ~~A6ie...
~W ~U\WlJ rs;~u~
December 4, 2000
Augusta-Richmond County
Municipal building
530 Green Street
Augusta, Georgia 30911
Attn: Mr. Claude Andrews, Operations Manager
Re: HV AC Central Plant & Security Upgrades
Gentlemen:
Based on our discussion this morning I have modified our proposal to reflect the
changes requested. Siemens Building Technologies is pleased to present the following
proposal for the replacement and upgrade of your HV AC Central plant per current
operating performance standards. Under this proposal we will furnish the following
servIces:
1. Furnish and install two (2) Centrifugal Water Chillers
a. .546 kW/ton
b. 250 Tons Water Cooled
c. 2 stage compressors with R-123 refrigerant. 2 stage economizer
d. Under/Over phase protection
e. Star-delta starter
f Required piping and pipe insulation,
g. Required Electrical wiring and interlocks
2. Furnish and install one (1) Flat Plate Heat Exchanger.
3, Furnish and Install two (2) Chilled Water pumps with Variable Speed Drives
4. Furnish and install two (2) Condensing Water Pumps with Variable Speed
Drives
5. Furnish and Install Chilled Water Expansion Tanks and Air Separators
6, Furnish and Install two (2) Boilers with the same BTU capacity as the existing
7. Furnish and Install one (1) Heat Exchanger for production of Hot Water
8, Furnish and Install Two (2) Condensate Pumps
9. Furnish and Install One (1) Condensate Receiver
10. Furnish and Install One (1) Steam Pressure Reducing Station
11. Furnish and Install Two (2) Hot Water Pumps with variable speed drives
12. Furnish and Install Chemical Treatment Systems for each water system
13. Furnish and Install one (1) Hot water Expansion tank and Air Separator
14. Furnish all new Piping Mains with in the Basement Mechanical Room with
required Valves, strainers, thermometers, etc,
15. Color Code Markings (paint) on all piping mains
16. Furnish required labor and equipment (Cranes, Trucking, Disposal) to remove
the existing Water Chiller, Boiler, exchanger, piping, etc from the mechanical
room and site.
Siemens Building Technologies, Inc.
Landis Division
1000 Business Center Drive
Suite 70
Savannah, GA 31405
Tel: 1912) 239-9820
Fax: (912) 239-9754
..
.,
l SIEMENS
17. Furnish required labor, services (asbestos abatement), and equipment
(Trucking, and Disposal) to remove the existing piping and site.
18. Furnish and install one (1) Refrigerant Monitor with monitoring by the
Siemens Building Technologies Energy Management System
19. Furnish and Install a new Siemens Building Technologies Motor Control
Center and connect to all the new equipment
20. Furnish and install required Labor and Materials to interface Items 1 through
13 and item 18 & 19 to the existing Siemens Building Technologies
workstation and all required programming, engineering and database
sequences required to perform the required sequences of operation,
21. All required project supervision (on site) and as built documentation,
A. All equipment installed will be covered by a twelve-month warranty from the
date of project completion, as agreed to by Siemens Building Technologies
and Augusta-Richmond County's representatives.
B. All work will be coordinated to keep the shut down of services to the shortest
periods possible.
We at Siemens Building Technologies feel that this scheduling will provide the
highest level of comfort and the least disruption of normal operations to Augusta-
Richmond County, its employees and customers, With receipt of authorization to proceed
received by December 31,2000, This schedule will also allow completion of the work by
April 30, 2001, with most work during normal work hours.
We have put together a team of professionals to provide August-Richmond
County with a completed project in the most efficient and professional manner possible.
The Key members of the project team are
Mr. Tim Williams, Siemens Building Technologies, Augusta - Project Engineer.
Ms. Rebecca Howard, Siemens Building Technologies, Augusta -Project Engineer.
Mr. Mark Capers-Capers General Contracting, Augusta,
Mr. Pat Smith-Menk Mechanical Company, Augusta - Mechanical,
Mr. James Ansley, Ansley Electric Company, Augusta - Electrical,
Mr. Charles Hartman, Siemens Building Technologies, Savannah - Project Manager,
We thank you for the opportunity to again be of service to you and look forward
to the successful completion of this project. Should you have any questions concerning
the above please contact me and I will be happy to meet with you to go over them.
Very Truly Yours,
Gilbert T. Engelke Jr.
General Manager
Siemens Building Technologies - Savannah