Loading...
HomeMy WebLinkAboutHorseshoe Rd. Water System Augusta Richmond GA DOCUMENTNAME:hx~ 'l2d. u.JOn ~s,-\-e1Y) DOCUMENT TYPE: ?'(C>\J::YSGJ YEAR: C() BOX NUMBER: \ \ FILE NUMBER: \'5 ds ~ NUMBER OF PAGES: ~ ". , Southern Partners, Inc. Engineering - Surveying - Planning G.P.S. Control Surveys r' December 26, 2000 DEe 2 i r" " " .. ,:,..1 (-, Mr. Max Hicks, P.E. Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, Georgia 30901 , Attn: 2000, CIP Program Manager RE: Horseshoe Road Water System Improvements Project No. 10350 Dear Mr. Hicks: Southern Partners, Inc, is pleased to submit this proposal to provide professional services for the design of approximately 10,000 linear feet of 12" water main and appurtenances to serve properties along Horseshoe Road from Hephzibah-McBean Road back to Hephzibah McBean Road. Our fee for these services is Forty Four Thousand Six Hundred Forty Dollars and No ~ (:, Cents ($44,640.00). , i ( '-.., We propose to furnish the following services: 1. Conduct field surveys of Horseshoe Road to determine property boundaries, utilities and other physical encroachments. 2. Prepare conceptual plans (30% submittal) for determining routing, sizing and design considerations unique to this project. 2, Prepare preIiminary plans (60% submittal) for the installations of these lines. PreIiminary plans will be reviewed with Augusta Utilities Department and the Program Manager before work is started on the final plans. 3, Prepare final construction plans (90% submittal) and bid documents, including a construction cost estimate. 4. Discuss bid results with the program manager to determine any items that may cause the selection of a contractor other than the low bidder. o 1233 Augusta West Parkway Augusta. Georgia 30909 Phone (706) 855-6000 Fax (706) 869-9847 . ~ t' (- Mr, Max Hicks December 26, 2000 Page 2 5, Prepare easement plats as needed for lines that cross private property. 6. Monitor the general progress (surveillance) of the project and review all job submittals. Augusta Utilities Department will provide all available maps and plans for sanitary sewer and water lines in and adjacent to the project area, all GIS information (digital and paper), pressure and flow tests at the nearest fire hydrant and all other pertinent information available in the public records. This project can be ready for concept review within 30 days of receipt of your purchase order and authorization to proceed. An estimated schedule is attached. Payment for services will be based on percentages completed, Invoices will be submitted in accordance with a mutually agreed upon schedule to allow time for review by the Program Manager. We appreciate this opportunity to be of service to Augusta Utilities. If you have any . questions, please call me. ( \, Sincerely, y.D~. David W. Simoneau, P.E. Senior Engineer Attachment L) . , . , . , . . . r HORSESHOE ROAD WATER EXTENSION ESTIMATED DESIGN SCHEDULE i '- AUTHORIZATION TO PROCEED: JANUARY 29,2001 SURVEYS COMPLETE, INCLDUING DRAFTING: FEBRUARY 19, 2001 CONCEPT PLANS (30%) COMPLETE: FEBRUARY 28,2001 PRELIMINARY PLANS (60%) COMPLETE: APRIL 9, 2001 FINAL PLANS (90%) COMPLETE: MAY 7, 2001 READY FOR BIDS: JUNE 4, 2001 ( , \.. .I