Loading...
HomeMy WebLinkAboutEtterlee Road Water Lines Augusta Richmond GA DOCUMENT NAME: 8tte.-'(\ee~ wme~ \\\le~ DOCUMENT TYPE: "?'((J \X&} \ YEAR: C) \ BOX NUMBER: \ \ FILE NUMBER: \ ~5 ~ NUMBER OF PAGES: L\ -r;;" tit. 6{- ~ ~/~Jo/ UTILITIES DEPARTME . ,~ " TO: FROM: DATE: RE: CAPTION: BACKGROUND: AUGUSlA-RICHMOND COUNiY ADMINt$TRATOR/8 (}ff.7e;:: ANAL YSIS: raul APPROVED T r [ }; ;~,~: ~ l~. ,-l N, MAX HICKS, PE, DIRECTOR ADMINISTRATION 36~l~~~~!S1!fIl1'E~T: SUITE lS'CJ) I AUGUSTA, GA 30901 (706) 312-4154 - FAX (706) 312-4123 AGENDA ITEM___~ Honorable Bob Young, Mayor Members of the Commission Honorable Ulmer Bridges, Chairman, Engineering Services Committee Walter S, Hornsby, Interim Administrator , N. Max Hicks, PE, Director Utilities Department February 5, 2001 February 12, 2001 Committee Meeting Engineering proposal for 2000 Bond CIP Project J 0235: Etterlee Road Water Lines. Approve proposal from James G. Swift and Associates in the amount of $52,000 for engineering services required for design and construction of the Etterlee Road Water Lines project. (Funded by Account No. 509043410- 5212115/80110235-5212115) The Etterlee Road Project will provide approximately 5,800 linear feet of 10" water main, and 3,000 linear feet of 6" water main, 15 fire hydrants, 66 water services, 320 linear feet of 20" steel casing road bores, 240 linear feet of 12" steel casing road bores, and various other appurtenances to residents in the Etterlee Road area. Survey of the proposed water main routes to determine property boundaries, utilities, and other physical encroachments will be conducted, and easement plats as needed, will be prepared for lines that cross private property. Additionally, this proposal provides for periodic inspections during construction of this project. Accepting this proposal will provide for the design of water service to customers within the Etterlee Road area. Ii Agenda Item ~ February 5, 2001 February 12, 2001 Committee Meeting Page 2 FINANCIAL IMPACT: $52,000 for the Etterlee Road project from the 2000 Bond Issue, under account number 509043410- 5212115/80110235-5212115 ALTERNATIVES: No practical alternatives. RECOMMENDATION: We recommend approving the proposal of James G. Swift and Associates in the amount of $52,000 for engineering services required for design and construction of water lines for the Etterlee Road area project. (Account Number 509043410-5212115/80110235-5212115 FUNDS AVAILABLE ON THE FOLLOWING ACCOUNTS: 509043410-5212115 /80110235-5212115 DEPARTMENT Il .AI! ~ DIRECTOR: -1 L( /f(~ , COUNTY _ j J /~~ ADMINISTRATOR: ?YJ4~ ,-(J( f(tr .Cj.)i- z41o/ ~lIU"''''___ FINANCE: AOC??/na/fCJ~(;1it/J COMMITTEE ACTION: .._....~_.._~ ------------- ...,..ltJ_..__~~._"A'.I__ "Feb 02 01 10:20a James G. Swift & Asssocia 706-868-5464 p. 1 JAMES G. SWIFT & ASSOCIATES ~INGENGINEERS Phone #706-868-8803 Fax #706-868-5464 February 1, 2001 AUGUSTA UTILITIES DEPT. c/o Ms. Shondra Neumeister CH2M Hill Via Fax: 303-2429 RE: I. Deans Bridge Rd (Hwy 1) I Bath-Edie Road Water Main (Project #10375) II. Etterlee Road Water Main (Project #10235) Dear Shondra: With regard to the above referenced project, we appreciate the opportunity to submit the following proposal for engineering, surveying and design services. r. Deans Bridge Road & Bath-Edie Road Water System Improvements. The project will consist of approximately 14,000 LF of 12" water main, 28 fire hydrants, 62 water services, 315 LF of 22" steel casing road bores, and various other appurtenances. The total project construction cost is estimated to be $600,000. A. Surveying and Mapping Services . . . . . . . . . . . . . . . . . . . . . . . . . , $7,200 B. Conceptual Design ...........,......,.................. $2,200 C. Engineering Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $41,000 D. Contract Documents and Specifications. . . . . . . . . . . . . . . . . . . . . $1,200 E. Period Inspections During Construction ..................... $7.200 Subtotal ............................................ $58,800 This project will be completed within 60 days of receipt of Notice to Proceed. /I Etterlee Road, Tree Haven Road, and Unnamed Road Water System Improvements. The project will consist of approximately 5800 LF of 10" water main, 3000 LF of 6" water main, 15 fire hydrants, 66 water services, 320 LF of 20" steel casing road bores, 240 LF of 12" steel casing road bores, and various other appurtenances. The total project construction cost is estimated to be $406,452. A. Surveying and Mapping Services. . . , . . . . . . . . . . . . . . . . . . . . . $11,300 B. Conceptual Design .............,....,................,. $2,200 C. Engineering Design. . . , . . . . . . . . . . . . . , . , . . . . . . . . . . . . , . . . $32,500 D. Contract Documents and Specifications. . . . . . . . . . . . . . . . . . . . . $1,200 E. Period Inspections During Construction ....... . . , . . . . . . . . . . . $4,800 Subtotc::1 ............................................ $52,000 This project will be completed within 80 days of receipt of Notice to Proceed. 1206 Interstate Parkway · Augusta, Georgia 30909 nc::.vC..LVI:::U. ~I I/VI II..::....; --vn'::::M n..LL..L-i WOO'; r-AUt: ~ \ , ~eb 01 01 11:24a James G. SwiFt & Asssocia 706-868-5464 p.2 Page 2 RE: Bath-Edie Road and Etterlee Rd In the event there is a need for additional services beyond the scope of the work, such work will be compensated on a unit fee basis as shown below: Engineering = $1 as/hr. Inspector = $65/hr. Computer Disk = $S/each Field Crew = $1 as/hr. Drafting = $45/hr. Mylar = $1. SO/SF Surveyor = $87/hr. Secretarial = $320/hr. Blueprints = $O.SO/SF Easement or Right-of-Way Plats = $13S/parcel Mail/Correspondence = Cost + 25% Compensation for services will be billed at the completion of said seNices. Payment will be due within 30 days of the billing date. A service charge of 1.5% per month will be assigned to late payments. The owner or his representative shall provide all information, records, plans, soil tests, environmental assessments, or other such data incidental to completion of plan design. The owner or his representative shall be responsible for all fees incidental to the plan submittal, review, and approval process, including but not limited to wetland delineation. We appreciate the opportunity to submit this proposal and look forward to working with you on th is project. Should you have any questions or comments, please do not hesitate to call. Sincerely, JAM . SWIFT & ASSOCIA TES David L. Hargrove Vice President PLH:psh