HomeMy WebLinkAboutAuxiliary Pump Station Improvements
Augusta Richmond GA
DOCUMENT NAME:o..LXi \ \\ 0-'< Lj ~ ':::;'\();\\a:1 \ \Y)~me0\- S
DOCUMENT TYPE: ?~C)\XJSa.L
YEAR: 0\
BOX NUMBER: \5
FILE NUMBER: \SC\ a l
NUMBER OF PAGES: ~
:1:leI::8a"..:::I. _~..."'---..c~~& et=e.lm_=...
, l
Jan-09-02 09:34A
/'.
:~~,.......... ::.r.":'C1::::-.
l-706-7?4-,57B9
P.Ol
F~lE COpy
Z'EE35 Telfair Street
_ . ~ Augusta. Georgla 30901.2494
Ted W. Ellts, P.t::.., o,m. 'l/ Board, Em...rttuD [ ~_
.J~ph J, Tank"f!Iley, P.E.. President E N GIN E E R S
JOfge E, Jlrni!ne~, P.E,. Vke.Pre"ldent -- -___.
C!t~rles D. DroIVll. P,E.. TrctlslJre' ZI1\IM:ERl\oIA1.V, EYANS f\.ND LEOPOLD, INC~
(706) 724~5021'
~",",,,,,,r.Z:fJI;jF.:NG 1~.EE..R S.CO~j
Kenneth E, Green. P.E., SeCr.,t5~Y.
.fohn R. EvanB. r.E.
l~, NftlMon WlIlt/lms. PE
John R. .A.rmstron'l. P.E., R:etiro!!d
December 6, 2001
2000-P14
Mr, fun RUsh, Program Project Engineer
CH2M l-llLL
Augusta 2000 Program Office
360 Bay Street
Suite 100
Augusta, Ga 30901
~ .
Re: Auxiliary Pump Station Improvements - Electric/Generator ImProvements
Dear TIm:
We have prepared a proposal for the engineering sernces as outlined in our meeting of November 15
in reference to the Auxiliary Pumping Station and the Power Gen-Set needed at t,he station.
We have identified the tasks needed to accomplish the project and the costs associa.ted with the
engineering services required. They are:
Preliminary level tasks: $8,013
I Review existing conditions and preliminary work
3 Consider relevance to future expansion project
4 Compile proper project scope
5 Cmnpile Project Schedule fur Professional Services
6 Preliminary design
7 Field measurements existing fucilities
9 Coordination/consultation with wrP stafr
Project design level tasks:
$41,959
10 Drawing: New Electric/Generator Bldg.
11 Drawing: Yard Piping
12 Drawing: Elet..'trical - Controls
12 Drawing: Electrical- Power
12 Drawing: Electrical - Details
13 Contract Do(."Uments
14 Project Review Definition (30/60/90)
15 Compile Project Schedule for Construction sequence
Project oonstmction phase level tasks: $9,856
2000 P 14 AlJD No. 7U300 A.uxilinry Punl'
StJItim ~".kzLdoc
RECEIVED: 11 9/02 9:35~ ->CH2M HILL; #242; PAGE 2
"
Jan-09-02 09:35A
1-706-7?4-,57S9
P.02
.Mr, Tun Rush, Program Project Engineer
Re: Auxiliary Pump Station Improvements - Electric/Generator Improvements
December 6, 200 1
.Page 2
16 Bidding Assistance
17 Construction Administration
18 Fmal Inspection
22 Reimbmsable costs (printing costs)
The total fur all items is $59,828, If you have any questions in regard to the plan or the costs
summarized herein, please let us know,
Sincerely,
EVANS AND LEOPOLD, Inc.
RECEIVED: 1/ 9/02 9:35~ ->CH2M HILL; #242; PAGE 3
; ~t
Jan-09-02 09:36A
.
/'",
py
1-706-724-.5789
Toed W. EW5, P.E., Chm. 01 Boord, Emeritus
Joseph J. T3I'1kersley. P. E.. President
Jorge E. Jimenez, P.E.. Vice.f>re$Jdent
Charles D. Drollll\, P.E.. Trell$Urer
ZI:vrMERMAi........, EVANS .:\ND LEOPOI.JD, IlS"c.
(70(1) 72"1:-5li27
~"W.ZF.LENG.t"'Jtll:R S.COM
December 6, 200 1
Mr. Jim Rush, Program Project Engineer
CH2M HlLL
Augusra 2000 Progrnm Office
360 Bay Street, Suite 100
Augusta, 03, 30901
Re: Auxili3.lY Pu:mp Station Improvements -- Budgeting Costs
Dear Jim:
P.03
i\",nnll:th E, Qreen, P, E.. Secreta rv
John R. EVll.ns, P.E. .
R. Nelson \'I11JIam.5. ? 1:;.
John R. Armstrong, P.l::.. Rl!I;r~d
0101-00
We have compiled a revised budgeting cost estimat.e fur the wod<: incorporating both our ,:J resent project and the
generator project as follows:
Item Quantity Description
1 I 4000 gpm Gould pump
2 1 8000 gpm Gould pump
3 I 100 HP Motor for Unit 4
4 4 MCC slow start
5 1 Gen Unit
6 3 Vaults
7 ] Yard Piping
8 '2 16' electric check valve
9 1 24" PRV, Reducers
10 1 MCC Bldg
II 1 Rework Header
12 2 Mag Meters
13 Contractor's mobilization, bond and
Ulsurance
Total Construction Costs
Material Installed
$22,000 $44,000
$130,000 $195,000
$30,000 S50,000
$20,000 525,000
$200,000 $300,000
$]0,000 $10,000
$60,000 $45,000
$ L4,000 $24,500
$23,000 $34,500
$50,000 $5{),OOO
$15,000 $22,500
S12,000 $24,000
$30,000 $30,000
Total
$44,000
$195,000
$50,000
$100,000
$300,000
$30,000
$45,000
$49,000
$34,500
$50,000
$'22,500
$48,000
$30,000
If you have any questions in regard to the plan or-the costs summarizOO herein, please let UE. know.
S998,OOO
Sincerely,
.. ',?VANS AND LEOPOLD, Inc.