Loading...
HomeMy WebLinkAboutTask Order 2004 - 1 Augusta Richmond GA DOCUMENT NAME: IAS'l.. {){l..:t:>CR- ~O()y - \ DOCUMENT TYPE: YEAR: d.-t:b5" BOX NUMBER: ;;l S- Fll-E NUMBER: \ 1] {p r ~ NUMBER OF PAGES: 3 ..~ j.- Task Order 2004-1 ~-/~(}S 1f-J,6 WORK AUTHORIZA nON FOR PROFESSIONAL SERVICES Augusta/Richmond County, Georgia Daniel Field (AlP Project No,) 2004-1 (Task Order No,) I 0351,OO,A T (Project Ident. No,) It is agreed to undertake the following work in accordance with the provisions of our Agreement for Professional Services. Description of Assie:nment: The proposed project is described as follows: A, The scope of work under this project includes the Runway Rehabilitation and Security Improvements, The project will include design, bidding and construction, B, The following services are to be performed: I, Basic Services: a) Design, Bidding, and Construction Phase Services in accordance with Exhibit "C" of the Prime Agreement. This project is expected to be let as one (I) prime construction contract package. 2, Special Services: a) Predesign Field Surveys: Perform predesign surveys required for all items of work in project scope, b) Proiect Formulation: Prepare funding documents, and assist in project formulation and programmmg, c) Grant Services: Assist OWNER in submitting Grant Applications. d) Land Disturbing Permit: Assist in obtaining Land Disturbing Pennit. e) Reproduction of Bidding Documents: During the bidding phase CONSULTANT will provide bidding and other contract documents to potential bidders and as required for execution of the construction contract. f) Periodic On-Site Observation: During construction phase CONSULTANT will make periodic site visits to detennine that the project is progressing on schedule and to review: contractor's work effort. Period of Services: A. Design Phase: Upon OWNER's approval of this Work Authorization, Design Phase services will commence immediately, Bidding documents will be ready to advertise for bids within 30 days, r Task Order 2004-1 Page 2 of3 B, Bidding Phase: Bidding Phase services will be initiated immediately after GDOT approval to advertise for bids and will be completed within 30 calendar days, C. Construction Phase: Construction Phase services will begin immediately upon execution of construction contracts by the OWNER and continue through construction of the project until final closeout is processed. This time period is estimated to be 45 days, D, Services required beyond the above estimated time frames due to delays in obtaining agency approvals, extension of construction time, defective work by the contractor, or to other causes beyond the CONSULTANT's control may require additional compensation with an amendment to this WORK AUTHORIZATION, Basis of Compensation A. Basic Services: 1, As compensation for providing the Design Phase Services described above. The Owner shall pay the engineer the lump sum fee of Fourteen Thousand Five Hundred Dollars ($14,500,00), 2, As compensation for providing the Bidding Phase Services described above. The Owner shall pay the engineer the lump sum fee of Three Thousand Dollars ($3,000,00), 3. As compensation for providing the Construction Phase Services described above, The Owner shall pay the engineer the lump sum fee of Four Thousand One Hundred Dollars ($4,100,00), 4, Invoices shall be submitted monthly based on the percentage of work actually completed during that month. The Owner shall pay invoices within 30 days of receipt. B. Special Services: 1, Predesign Field Surveys: As compensation for performing predesign field surveys, the Owner shall pay the Engineer the lump sum fee of Three Thousand Five Hundred Dollars ($3,500,00), 2, Proiect Formulation: As compensation for providing project formulation services, the Owner shall pay the Engineer the lump sum fee of One Thousand Dollars ($1,000.00), 3, Grant Administration: As compensation for providing grant administration/program management services, the Owner shall pay the Engineer the lump sum fee of One Thousand Eight Hundred Dollars ($1,800.00), 4, Land Disturbance Permit: As compensation for assistance in obtaining a Land Disturbance Permit, the Owner shall pay the Engineer the lump sum fee of Three Thousand Five Hundred Dollars ($3,500,00), 5, Bid Document Reproduction: As compensation for providing document printing services, the Owner shall pay the Engineer the lump sum fee of Six Hundred Dollars ($600,00), 6, Periodic On-site Observation: As compensation for providing periodic on-site inspection, the Owner shall pay the Engineer the lump sum fee of Six Hundred Dollars ($600,00) per visit. It is ~, ~ Task Order 2004-1 Page 3 of 3 estimated that the project will require six visits throughout the construction period, The total estimated cost for periodic on-site observation is Thirty Six Hundred Dollars ($3,600,OO), Agreed as to scope of services, period of services and budget: * ~ F~~~VI Date: Date: OJ.c>,1.t?..s · Budget will not be exceeded without a Supplemental Work Authorization,