Loading...
HomeMy WebLinkAboutDEPARTMENT OF TRANSPORATION DAVIS ROAD WIDENING PROJECT TEMPORAY STATE ROUTES 1056 1056TA DAVIS ROAD WIDENING PROJECT ENGINEERING DEPARTMENT Abie L. Ladson, P.E. Director Jim Williamson Land Acquisition Manager MEMORANDUM TRANSMITTAL DATE: APRIL 4, 2008 TO: LENA BONNER, CLERK OF COMMISSION ABlE L. LADSON, P.E., DIRECTOR ENGINEERING DEPARTMENT FROM: MICHAEL D. GREENE, INTERIM DIRECTOR PUBLIC SERVICES ~~JJ~ .11M WILLIAMSON, LAND ACQUISITION SECTION GEORGIA DEPARTMENT OF TRANSPORTATION THROUGH: SUBJECT: DAVIS ROAD WIDENING PROJECT STP-7006(6) P.I. 250560 Temporary State Routes 1056 and 1056TA Order of the Commissioner 3296 and Contract for Maintenance of Highways 3296A File reference: 08-014(A) The attached letter was sent to Mayor Deke Copenhaver in reference to temporary State Routes 1056 and 1056TA (Davis Road Widening Project STP-7006(6) P.I. 250560); Order of the Commissioner 3296 and Contract for Maintenance of Highways 3296M. Please refer to the attached letter for information. Thanks for you assistance in this matter. JW iiI Attachments Land AcquisitionlRight-of-Way 522 Greene Street, Augusta, GA 30901 (706) 796-5044 - Fax (706) 821-1708 WWW.AUGUSTAGA.GOV (J)epartment of rrransportation GENA L. ABRAHAM, Ph.D. COMMISSIONER (404) 656-5206 GERALD M. ROSS, P.E. CHIEF ENGINEER (404) 656-5277 State of qeorgia #2 CapitofSquare, S. W ;4.tfanta, qeorgia 30334-1002 BUDDY GRATTON, P.E. DEPUTY COMMISSIONER (404) 656-5212 EARL L. MAHFUZ TREASURER (404) 656-5224 March 28, 2008 66(1127H) ColurnbialRichmond Honorable Deke Copenhaver, Mayor City of Augusta - Richmond County 530 Greene Street, Room 806 Augusta, Georgia 30911 Dear Mayor Copenhaver: Subject: Approved State Highway System Revisions in Columbia and Richmond Counties: Temporary State Routes 1056 and 1056TA (Davis Road Widening Project STP-7006(6), P.I. 250560); Order of the Commissioner 3296 and Contract for Maintenance of Highways 3296M !. Reference is made to our letter of distribution dated January 29,2002, which transmitted an Order of the Commissioner 3296. This Order approved the widening of Walton Way Extension, Davis Road (Richmond County Road 1505 and Columbia County Road 572) and the relocation of Toucan Road onto new alignment at its junction with Davis Road. To accommodate this project, it was necessary to add sections of existing and projected roadway to the State Highway System as State Routes 1056 and 1056TA until construction was completed. By copy of this letter, the improvements have been completed. Therefore, the Contract for M(lintenance of Highways 3296M has been terminated, and all other related revisions under Order 3296 are now in effect. While the State Route designations have been removed from the subject roadways, this transfer does not alleviate the contractor from any outstanding responsibilities associated with this project. We wish to thank you for your cooperation in providing a more efficient State Highway System. If you have any questions, please contact Michael Henry at (770) 986-1366. Sin rely, d J J Jj/ . 'VJIP /1. ~/ll7~ e H. Smith State Transportation Data Administrator JRS: EW:ew Enclosure cc: Mr. Bill Kuhlke, Jr., 10th District DOT Board Member Mr. Tony Collins, Tennille District Engineer 3296 66(1127H) ORDER OF THE COMMISSIONER OF THE GEORGIA DEPARTMENT OF TRANSPORTATION TO THE COMMISSIONERS OF COLUMBIA AND AUGUSTA-RICHMOND COUNTIES. WHEREAS, the Georgia Department of Transportation (hereinafter called the Department) is planning to support preconstruction activities for the widening of Walton Way ExtensionlDavis Road and the relocation of Toucan Road onto new alignment at its junction with Davis Road in Columbia and Richmond Counties, under Project STP-7006(6); and WHEREAS, to accommodate preconstruction activities for this project, it will be necessary to temporarily add these sections of roadway, as shown on the attached sketch map, to the State Highway System as temporary State Routes 1056 and 1056T A until construction is completed; and WHEREAS, Columbia and Augusta-Richmond Counties have executed a Contract for Maintenance of Highways 3296M agreeing to continue to maintain Walton Way Extension and Davis Road (Richmond County Road 1505 and Columbia County Road 572) while being improved and after improvements are completed; and WHEREAS, Augusta-Richmond County has executed a resolution agreeing to accept for maintenance and as part of their local road system, the new alignment of Toucan Road (SR~ 1056T A) when removed from the State Highway System. NOW THEREFORE, in the public interest, the Commissioner of the Georgia Department of Transportation, under the authority vested in him pursuant to the laws of the State of Georgia, does hereby order and direct that the State Highway System be revised as described in the following paragraphs. (1) Add to the State Highway System sections of Walton Way Extension and Davis Road (Richmond County Road 1505 and Columbia County Road 572), to be temporarily designated as State Route 1056 until Project STP-7006(6) is completed, beginning at its junction with' Skinner Mill Road (Richmond County Road 585) and extending in a northerly direction to its junction with Washington Road (State Route 104). Addition of 1.22 miles (1.96 krn) in Richmond County. Addition of 0.44 mile (0.71 krn) in Columbia County. Continued.. . 3296 66(1127H) PAGE TWO OF TWO (2) Add to the State Highway System a section of projected alignment, to be temporarily designated as State Route 1056T A until Project STP-7006(6) is completed, beginning at its point of junction with Davis Road (Richmond County Road 1505) and extending easterly to its point of junction with Toucan Road (Richmond County Road 1347) and Ravenwood Drive (Richmond County 1318).. Addition of approximately 0.12 mile (0.19 krn) projected in Richmond County. The foregoing descriptions are in conformity with sketch map 3296 and plans for Project STP- 7006(6); appearing in the General Office files of the Georgia Department of Transportation, of which a copy of the sketch map is attached for reference. + .i>- ____ This)! LO day oD '41~^(j ,200~ J. Tom Coleman, Jr., Cornrnissi ner GEORG A DEPARTMENT OF TRANSPORTATION Attest ~ ~ ~ -J~/ BIlly F. Sharp, Treasurer GEORGIA DEPARTMENT OF TRANSPORTATION t.. ''','"1 /. .:,\., 4 ~ <t....;' "}, A / ' " ....../J , ~ B Cl. ~ 0 f.J <~ ....~ ""~ \ ~8 . .... ~ 0: a:, "'.... ...'" -' ....- 0:.... ii~ ~o ~o: ~Cl. ....oJ Q~ 0> t~~~ .', ~ ;;;l :Il ~I i Vl ;: ~I ~ ! ..~ ;;5 _0 .... a:'" (,.)z ~ ~ or. c ~ f: