HomeMy WebLinkAboutDEPARTMENT OF TRANSPORATION DAVIS ROAD WIDENING PROJECT TEMPORAY STATE ROUTES 1056 1056TA DAVIS ROAD WIDENING PROJECT
ENGINEERING DEPARTMENT
Abie L. Ladson, P.E.
Director
Jim Williamson
Land Acquisition Manager
MEMORANDUM TRANSMITTAL
DATE:
APRIL 4, 2008
TO:
LENA BONNER, CLERK OF COMMISSION
ABlE L. LADSON, P.E., DIRECTOR
ENGINEERING DEPARTMENT
FROM:
MICHAEL D. GREENE, INTERIM DIRECTOR
PUBLIC SERVICES
~~JJ~
.11M WILLIAMSON, LAND ACQUISITION SECTION
GEORGIA DEPARTMENT OF TRANSPORTATION
THROUGH:
SUBJECT:
DAVIS ROAD WIDENING PROJECT
STP-7006(6) P.I. 250560
Temporary State Routes 1056 and 1056TA
Order of the Commissioner 3296
and Contract for Maintenance of Highways 3296A
File reference: 08-014(A)
The attached letter was sent to Mayor Deke Copenhaver in reference to temporary State
Routes 1056 and 1056TA (Davis Road Widening Project STP-7006(6) P.I. 250560); Order
of the Commissioner 3296 and Contract for Maintenance of Highways 3296M. Please
refer to the attached letter for information.
Thanks for you assistance in this matter.
JW iiI
Attachments
Land AcquisitionlRight-of-Way
522 Greene Street, Augusta, GA 30901
(706) 796-5044 - Fax (706) 821-1708
WWW.AUGUSTAGA.GOV
(J)epartment of rrransportation
GENA L. ABRAHAM, Ph.D.
COMMISSIONER
(404) 656-5206
GERALD M. ROSS, P.E.
CHIEF ENGINEER
(404) 656-5277
State of qeorgia
#2 CapitofSquare, S. W
;4.tfanta, qeorgia 30334-1002
BUDDY GRATTON, P.E.
DEPUTY COMMISSIONER
(404) 656-5212
EARL L. MAHFUZ
TREASURER
(404) 656-5224
March 28, 2008
66(1127H) ColurnbialRichmond
Honorable Deke Copenhaver, Mayor
City of Augusta - Richmond County
530 Greene Street, Room 806
Augusta, Georgia 30911
Dear Mayor Copenhaver:
Subject:
Approved State Highway System Revisions in Columbia and Richmond Counties:
Temporary State Routes 1056 and 1056TA (Davis Road Widening Project STP-7006(6),
P.I. 250560); Order of the Commissioner 3296 and Contract for Maintenance of Highways
3296M !.
Reference is made to our letter of distribution dated January 29,2002, which transmitted an Order of the
Commissioner 3296. This Order approved the widening of Walton Way Extension, Davis Road (Richmond
County Road 1505 and Columbia County Road 572) and the relocation of Toucan Road onto new alignment at
its junction with Davis Road. To accommodate this project, it was necessary to add sections of existing and
projected roadway to the State Highway System as State Routes 1056 and 1056TA until construction was
completed.
By copy of this letter, the improvements have been completed. Therefore, the Contract for M(lintenance of
Highways 3296M has been terminated, and all other related revisions under Order 3296 are now in effect.
While the State Route designations have been removed from the subject roadways, this transfer does not
alleviate the contractor from any outstanding responsibilities associated with this project.
We wish to thank you for your cooperation in providing a more efficient State Highway System. If you have
any questions, please contact Michael Henry at (770) 986-1366.
Sin rely, d J J Jj/ .
'VJIP /1. ~/ll7~
e H. Smith
State Transportation Data Administrator
JRS: EW:ew
Enclosure
cc: Mr. Bill Kuhlke, Jr., 10th District DOT Board Member
Mr. Tony Collins, Tennille District Engineer
3296
66(1127H)
ORDER OF THE COMMISSIONER
OF
THE GEORGIA DEPARTMENT OF TRANSPORTATION
TO THE COMMISSIONERS OF COLUMBIA AND AUGUSTA-RICHMOND
COUNTIES.
WHEREAS, the Georgia Department of Transportation (hereinafter called the Department) is
planning to support preconstruction activities for the widening of Walton Way ExtensionlDavis
Road and the relocation of Toucan Road onto new alignment at its junction with Davis Road in
Columbia and Richmond Counties, under Project STP-7006(6); and
WHEREAS, to accommodate preconstruction activities for this project, it will be necessary to
temporarily add these sections of roadway, as shown on the attached sketch map, to the State
Highway System as temporary State Routes 1056 and 1056T A until construction is completed;
and
WHEREAS, Columbia and Augusta-Richmond Counties have executed a Contract for
Maintenance of Highways 3296M agreeing to continue to maintain Walton Way Extension and
Davis Road (Richmond County Road 1505 and Columbia County Road 572) while being
improved and after improvements are completed; and
WHEREAS, Augusta-Richmond County has executed a resolution agreeing to accept for
maintenance and as part of their local road system, the new alignment of Toucan Road (SR~
1056T A) when removed from the State Highway System.
NOW THEREFORE, in the public interest, the Commissioner of the Georgia Department of
Transportation, under the authority vested in him pursuant to the laws of the State of Georgia,
does hereby order and direct that the State Highway System be revised as described in the
following paragraphs.
(1) Add to the State Highway System sections of Walton Way Extension and Davis Road
(Richmond County Road 1505 and Columbia County Road 572), to be temporarily
designated as State Route 1056 until Project STP-7006(6) is completed, beginning at its
junction with' Skinner Mill Road (Richmond County Road 585) and extending in a
northerly direction to its junction with Washington Road (State Route 104).
Addition of 1.22 miles (1.96 krn) in Richmond County.
Addition of 0.44 mile (0.71 krn) in Columbia County.
Continued.. .
3296
66(1127H)
PAGE TWO OF TWO
(2) Add to the State Highway System a section of projected alignment, to be temporarily
designated as State Route 1056T A until Project STP-7006(6) is completed, beginning at
its point of junction with Davis Road (Richmond County Road 1505) and extending
easterly to its point of junction with Toucan Road (Richmond County Road 1347) and
Ravenwood Drive (Richmond County 1318)..
Addition of approximately 0.12 mile (0.19 krn) projected in Richmond County.
The foregoing descriptions are in conformity with sketch map 3296 and plans for Project STP-
7006(6); appearing in the General Office files of the Georgia Department of Transportation, of
which a copy of the sketch map is attached for reference.
+ .i>- ____
This)! LO day oD '41~^(j
,200~
J. Tom Coleman, Jr., Cornrnissi ner
GEORG A DEPARTMENT OF TRANSPORTATION
Attest ~ ~ ~ -J~/
BIlly F. Sharp, Treasurer
GEORGIA DEPARTMENT OF TRANSPORTATION
t.. ''','"1 /.
.:,\., 4
~ <t....;' "},
A / '
"
....../J
,
~
B
Cl.
~
0
f.J
<~
....~
""~
\ ~8
. ....
~ 0: a:,
"'....
...'"
-' ....- 0:....
ii~
~o
~o:
~Cl.
....oJ
Q~
0> t~~~
.',
~
;;;l
:Il
~I
i
Vl
;:
~I
~
!
..~
;;5
_0
....
a:'"
(,.)z
~
~
or.
c
~
f: