Loading...
HomeMy WebLinkAboutDeans Bridge Road, Bath - edie Rd. Water Main, Etterlee Road Water Main Augusta Richmond GA DOCUMENT NAME: o.m~ 'o'(\QQIL '(oodJ'ooMl-eO\e. ~~( fnQ\f) I e..*~,<~c:e ~ ~ rna.m DOCUMENT TYPE: YEAR: 0 \ BOX NUMBER: \ \ FILE NUMBER: \~5S NUMBER OF PAGES: OJ --....~:--_.._- ------------ __'-fTJ_..__ Z_.__~'''I__ .Feb'02 01 10:20a, James G. Swift & Asssocia 706-868-5464 .. p.1 JAMES G. SWIFT & ASSOCIATES ~ING ENGINEERS Phone #706-868-8803 Fax #706-868-5464 February 1, 2001 AUGUSTA UTILITIES DEPT. c/o Ms. Shondra Neumeister CH2M Hill Via Fax: 303-2429 RE: I. Deans Bridge Rd (Hwy 1) / Bath-Edie Road Water Main (Project #10375) II, Etterlee Road Water Main (Project #10235) Dear Shondra: With regard to the above referenced project, we appreciate the opportunity to submit the following proposal for engineering, surveying and design services. I. Deans Bridge Road & Bath-Edie Road Water System Improvements. The project will consist of approximately 14,000 LF of 12" water main, 28 fire hydrants, 62 water services, 315 LF of 22" steel casing road bores, and various other appurtenances. The total project construction cost is estimated to be $600,000, A. Surveying and Mapping Services. . . . , , . . . . , . . . . . . . . . , . . . . . $7,200 B. Conceptual Design .... . . . . . . . . . . . . . , . . . . . . . . . . . . , . . . . . . $2,200 C. Engineering Design. . . . , . . . . . . . . . . , , . , , . , . . , . . , , . , , , , . . $41,000 D. Contract Documents and Specifications, , . , . . . . , , , . , , . . ... , , . $1,200 E. Period Inspections During Construction .', . . . . . , . . , . . . . . . , . . $7.200 Subtotal ............................................ $58,800 This project will be completed within 60 days of receipt of Notice to Proceed. II Etterlee Road, Tree Haven Road, and Unnamed Road Water System Improvements. The project will consist of approximately 5800 LF of 10" water main, 3000 LF of 6" \/Vater main, 15 fire hydrants, 66 water services, 320 LF of 20" steel casing road bores, 240 LF of 12" steel casing road bores, and various other appurtenances, The total project construction cost is estimated to be $406,452. A. Surveying and Mapping Services . . . . . . , . , , . . . . . . . , , . . , . . . $11,300 B. Conceptual Design ..,...."......,..,....,.......,.,... $2,200 C, Engineering Design. . . . . , , . , . . . . , . . , , . , . , , . . . . , , , . . , . . . $32,500 D. Contract Documents and Specifications , . , . . , . . , , . . . . , , . . , , , $1,200 E. Period Inspections During Construction ,..... , . . , . . . , . . , , . . . $4.800 Subtotal ............................................ $52,000 This project will be completed within 80 days of receipt of Notice to Proceed. 1206 Interstate Parkway · Augusta, Georgia 30909 n.,~c.Lvr::.u. <t::/ I/UI II..:::....; .~F,eb.'91 01 11:24a, --vn<t::M n.LLLj "00; ~AUc ~ 3ames G. SwiFt & Asssocia 706-868-5464 p.2 Page 2 RE: Bath-Edie Road and Etterlea Rd In the event there is a need for additional services beyond the scope of the work, such work will be compensated on a unit fee basis as shown below: Engineering = $1 05/hr. Inspector = $65/hr, Computer Disk = $5/each Field Crew = $105/hr. Drafting = $45/hr. Mylar = $1,50/SF Surveyor = $87/hr. Secretarial = $320/hr. Blueprints = $0.50/SF Easement or Right-of-Way Plats = $135/parcel Mail/Correspondence = Cost + 25% Compensation for services will be billed at the completion of said services, Payment will be due within 30 days of the billing date, A service charge of 1.5% per month will be assigned to late payments. The owner or his representative shall provide all information, records, plans, soil tests, environmental assessments, or other such data incidental to completion of plan design, The owner or his representative shall be responsible for all fees incidental to the plan submittal, review, and approval process, including but not limited to wetland delineation. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. Should you have any questions or comments, please do not hesitate to call. Sincerely, JAM . SWIFT & ASSOC/A rES David L. Hargrove Vice President PLH:psh