HomeMy WebLinkAboutCounty Contract Projects Construction Priority List
Augusta Richmond GA
DOCUMENT NAME: CO t) 10" to m-~ACT r l'Zo ~ t" C-T S c.." r-.)'& T RUc.T I 0 ,J
rRl~~;"7'-1. L,s'-
DOCUMENT TYPE:
YEAR: 19G ~
BOX NUMBER: l.p
FILE NUMBER: 1 Y b S '7
NUMBER OF PAGES: 5
~~.
DOT 531
..
'i
;
;-
DEPARTMENT OF TRANSPORTATION
STATE.O~ GEORGIA
APPROVED
JAN ~ tJ 1999
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: AUGUSTA-RICHMOND
(AIJGUSTA-RICHMOJ!.COlINTY r,OMMISSION)
DATE: JANUARY 19, 1999
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE
NEEDED. IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAIN WHITE PAPER TO THE BACK OF THI~ FORM. ALL
ADDITIONAL PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. ATTACH ONE MARKED MAP OF
YOUR COUNTY INDICATING THE PROJECTS SHOWN ON. THIS LIST. YOUR "DESCRIPTION OF PROJECT" SHOULD
INCLUDE: BEGINNING AND ENGING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
SIGNED:
~Authorized
/sea
VVJO .
PRIORITY
NUMBER
1
PRIORITY
NUMBER
2.
PRIORITY
NUMBER
3
\
.1
DESCRIPTION OF PROJECT:
BARTON CHAPEL ROAD, PHASE II
1.64 miles of widening to 3-lanes, including curbs, gutters and
sidewalks where nee"ded; From U.S. 1 to near Glenn Hills Drive,
then from South Old Barton Chapel" Road to Milledgeville Road.
. '- _. .' ..
Total Estlmated Constructlon Cost = $1,700,000.
to fUfn~sh designp:lC!n~..~nd qu~ntities.)
f'. .
(Local Government-
DESCRIPTION OF PROJECT:
2~ STREET OUFALL IMPROVEMENTS
)
C;onstruct 48" Outfall.Storm. Sewer -from 2nd Stre_~t-. to the S~vannah
River along Walk~r Str~et and Forsyth Street. pro~ect i~clJdes
two jack or bores u~qer the Augusta Levee.
Total Estimated consl~uction Cost = $1,400,000.
to furnish design plans and quantities.)
DESCRIPTION OF PROJECT:
(Local Government
DESCRIPTION OF PROJECT:
HEPHZIBAH-MCBEAN/BROTHERSVILLE ROAD
0.45 mile of widening to add a continuous turn lane in front of
high school; add decel lane and realign Storey Mill Road.
Total Estimated Construction Cost = $400,000.
to furnish design plans and quantities.)
(Local Government
APPROVED:
(DOT Commissioner)
DATE APPROVE!:):
, .
I'
~
.,
.-
-,
,
DOT S3~
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: AUGUSTA-RICHMOND
DATE: JANUARY ~9,1999
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE
NEEDED. IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAIN WHITE PAPER TO THE BACK OF THIS FORM. ALL
ADDITIONAL PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. ATTACH ONE MARKED MAP OF
YOUR COUNTY INDICATING THE PROJECTS SHOWN ON THIS LIST. YOUR "DESCRIPTION OF PROJECT" SHOULD
INCLUDE: BEGINNING AND ENGING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
DESCRIPTION OF PROJECT:
PRIORITY
NUMBER
4
. .
f
SR 56 @ OLD WAYNESBORO ROAD INTERSECTION IMPROVEMENTS
Add decel lar:e on SR 5,6, add l~nel on Waynesboro Road and close
another port~on of Old Waynesboro Road~ .
Total Estimated Construction Cost, = $420,000.
to furnish design plads and quantities.)
(Local Government
DESCRIPTION OF PROJECT:
PRIORITY
NUMBER
5
STEVENS CREEK ROAD
.'
,
o . 3 mile of maj or widening and reconstruct_ion from washington Road
to Claussen Road intersection.
Total Estimated Construction Cost = $1,000,000.
to furnish design plans and qu~ntities.)
(Local Government
DESCRIPTION OF PROJECT:
PRIORITY
NUMBER
6
LANEY WALKER IMPROVEMENTS
1.0 mile of milling, leveling, resurfacing and replacement of
curbs, gutters and sidewalks where needed on Laney Walker
Boulevard from.R. A. Dent Boulevard to Twiggs Street.
Total Estimated Construction Cost = $l,OOD,OOD.
to furnish design plans and quantities.)
(Local Government
APPROVED:
. (DOT Commissioner)
/sea
~
. -DATE APPROVED:
"
o
.'
DOT 531
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: AUGUSTA-RICHMOND
DATE: JANUARY 19, 1999
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE
NEEDED. IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAIN WHITE PAPER TO THE BACK OF THIS FORM. ALL
ADDITIONAL PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. ATTACH ONE MARKED MAP OF
YOUR COUNTY INDICATING THE PROJECTS SHOWN ON THIS LIST. YOUR "DESCRIPTION OF PROJECT" SHOULD
INCLUDE: BEGINNING AND ENGING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
pESCRIPT~ON OF ?ROJ~C+:
I
I
PRIORITY
NUMBER
7
ALEXANDER DRIVE
1.0 mile of widening, realignihg and reconstruction to a 5'-lane
Urban Section from Washington ~oad to Riverwatch Parkway.
Total Estimated Construction c~st. == $2,100,000.
to furnish design plans and qudntities.)
(Local Gove~nmeht
DESCRIPTION OF PROJECT:
PRIORITY
NUMBER
8
WINDSOR SPR~NG. . ROAD 1 I'MPROVEMENTS
If ' .1
Widen to add lanes on approach to U.S. 25 (Pea9.h Orchard Road);.
remove and replace?-_efi!=i~nt .b~id$"e at t.:ttbut,ary... t.q ,Rpcl<;y. Creek
and improve horizontal curve near bridge.
Total Estimated Cost = $800,000.
design plans and quantities.)
(Local Government to furnish
DESCRIPTION. OF PROJECT.:
PRIORITY
NUMBER
9
WARREN ROAD IMPROVEMENTS
1.0 mile of minor widening with curbs, gutters, sidewalks and
additional lanes at intersections. From near Warren Road bridge
to Washington Road.
Total Estimated Cost = $1,000,000.
design plans'and quantities.)
(Local Government to furnish
SIGNED.:
()fj,J .(AU. thorized
/ sea.1'. _.~
APPROVED:
(DOT Commissioner)
DATE APPROVED:
..
'I"
DOT 531
DEPARTMENT OF
STATE
TRANSPORTATION
OF GEQRGIA
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: AUGUSTA- RICHMOND
DATE: JANUARY 19, 1999
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE
NEEDED. IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAIN WHITE PAPER TO THE BACK OF THIS FORM. ALL
ADDITIONAL PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL, ATTACH ONE MARKED MAP OF
YOUR COUNTY INDICATING THE PROJECTS SHOWN ON THIS LIST. YOUR "DESCRIPTION OF .PROJECT" SHOULD
INCLUDE: BEGINNING AND ENGING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
DESCRIPTION OF. PROJECT:
I
I
GLENN'HILLS DRIVE IMPROVEMENTS'
PRIORITY
NUMBER.
10
.i
1.0 mile of widening lncluding, curbs, gutters
Barton Chapel Road to Georgetown Drive.
arid sidewalks.
From
Total Estimated Construction Cost = $800,000.. (Local Government
to furnish design plans and-quantities.)
,
DESCRIPTION OF PROJECT:
PRIORITY
NuMBER
....,.'
11
EAST BOUNDARY STREET AND DRAINAGE IMPROVEMENTS
...85
and
and'
mile of curb and gutter, sidewalk, drainage, milling~ leveling
resurfacing on East Boundary between Laney Walker Boulevard
Broad S,treet. I
\.
Total Estimated Construction Cost = $750,000.
to furnish design plans and quantities.)
(Local Government
DESCRIPTION OF PROJECT:
PRIORITY
NUMBER
12
WALTON WAY IMPROVEMENTS @ ASU ENTRANCE
0.35 mile of widening along Walton Way to provide left turn lanes
at Katherine Street and main entrance to Augusta State University.
Also includes new traffic signal at Katherine Street and traffic
upgrade at main entrance.
Total Estimated Construction Cost = $900,000.
to furnish design plans and quantities.)
(Local Government
SIGNED, ~
~,(Authorized_c unty
(sea ofi:J
APPROVED:
(DOT Commissioner)
DATE APPROVED:
A
?
DOT 531
i'
DEPARTMENT .OFTRANSPORTATION
..' STATE OFGEORGI.A
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: AUGUSTA-RICHMOND
DATE: JANUARY 19, 1999
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE
NEEDED. IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAIN WHITE PAPER TO THE BACK OF THIS FORM. ALL
ADDITIONAL PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY 'OFFICIAL. ATTACH ONE MARKED MAP OF
YOUR COUNTY INDICATING THE PROJECTS SHOWN ON THIS LIST. YOUR "DESCRIPTION OF PROJECT" SHOULD
INCLUDE: BEGINNING AND ENGING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
PRIORITY
NUMBF,;F
13
PRIORITY
NUMBER
1'4
PRIORITY
NUMBER
SIGNED:
DESCRIPTION OF PROJECT:
BARTON CHAPEL ROAD, PHASE III
1.2 miles of widening to
sidewalks where .needed.
Road.
3-lanes, including curbs, 'gutters and
From Gordon Highway to near Wrightsboro
Total Estimated~onstruction Cost = $1,200,000. (Local Government
tq furnish 4~@i1gn. pl~ns and quantities. ).
I
DESCRIPTION OF PROJECT:
SOUTH AUGUSTA RECREATION C6MPLE~, PHASE II
0.6 mile of road~~y with curbs, gutters, storm drain system and
one parking lot.
Total Estimated Cost = $600,000.
design plans and quantities.)
(Local Government to furnish
APPROVED:
(DOT Commissioner)
DATE APPROVED: