AMENDMENT 3A TO WORK AUTHORIZATION No.3
BUSH FIELD AVIATION COMMISSION .
Amendment to Work Authorization for Professional Services
CA 209003
(Project Identification No.)
Three (3)
(Work Authorization No.)
TERMINAL ACCESS ROADWAY EXTENSION PROJECT: BUSH FIELD AIRPORT
(Project Title)
This AMENDMENT 3A adds the construction contract administration, construction inspection
and quality assurance testing to the previously approved Work Authorization No.3 for the construction
of the Terminal Access Roadway Extension Project at Bush Field Airport.
A - DESCRIPTION OF ASSIGNMENTS:
1. The CONSULTANT shall provide Construction Phase services in accordance with Exhibit "C",
SECTION I, Paragraph E of the MASTER AGREEMENT.
2. The CONSULTANT shall provide full time Resident Project Representative, in accordance with
Exhibit "E" of the MASTER AGREEMENT.
3. The CONSULTANT shall provide construction engineering and quality assurance testing
services during construction to assure that the work conforms to the requirements of the contract
documents. These services will be performed by a qualified laboratory, as shown in Attachment
4.
B - ESTIMATED TIME SCHEDULE:
The services described in Section A above, to be performed for a period of 164 consecutive
calendar qays from the date of the Gontractor's official Notice-to-Proceed. Services required beyond this
164 calendar days, with the exception of Final Inspection, Project Close-out and Record Drawing
. preparation, will be provided and cost of which may be deducted from Contractor's progress payment
as provided for in Article 3.3 of the Owner / Contractor Agreement. .
C - ESTIMATED COST OF SERVICES:
The CONSULT ANT shall be paid the following:
Page 1 of2
101398
"1
1. For Construction Phase services as outlined in Section A above, the OWNER shall pay
the CONSULTANT the lump sum fee of Twenty Seven Thousand Two Hundred and
Twenty Four Dollars and No Cents ($27.224.00) as determined by Attachment 2.
2. For Resident Project Representative services as outlined in Section A above, the
OWNER shall pay the CONSULTANT on the basis of actual cost plus fixed payment
of $8.350.00 with a maximum not-to-exceed limit of Sixty Four Thousand One
Hundred Dollars and No Cents ($64.100.00) as determined by Attachment 3.
3. For Construction Engineering and Quality Assurance Testing services as outlined in
Section A above, the OWNER shall pay the CONSULTANT for the direct cost of the
Subconsultant plus a lump sum administrative fee of $2.250.00 with a maximum not-to-
exceed limit of Twenty Four Thousand Seven Hundred and Fifty Dollars and No.
Cents $24.750.00) as determined by Attachments 3 and 4.
Agreed as to scope of services, time schedule, and budget.
RECOMMENDED BY:
JP~-
For THE LPA GROUP INCORPORATED
Date:
tl !Z-o/qr:y,
Date:
(~;;r4ff
Date:
Attachments: Attachment No. 1 (Fee Summary)
Attachment No.2 (Construction Phase Fees)
Attachment No.3 (RPR and Q/A Fees)
Attachment No.4 (Quality Assurance Testing Services, 10 pages total)
Q:\CLlENTS\Bush\Loop Rd. Ext\DOCS\DESIGN\CNTR&APP\AMENDMENT 3A.doc
Page 2 of2
101398
.....
"
>
~
~
>
(j
==
~
~
~
~
~
~
~
~~
o~
Zz
~~
~~
~(;J
~>
~
o~
zo
~~
~o
~~
~>
~cj
~~
00=
~@
~~
:;o~
~~
o
z
z
~
(;J
~
~
c:;~
i~
~>
t;j~
~~
~~
>~
~~
o~
~~
>>
cj~
.~ ~
~~
~~
>z
~~
~o
oz
:;o~
~:;o
>0
;a
~
~
..., ~ w tv - n
o '--' '--' '--' '--' 0
..., A) :A:l :A:l (j 1;l
> s::: (l) (l) 0 ....
t"" a ~, 8 5l 2
00 ~' ~ a.. q l4.
~ s:::..
> ...... 0 ~ 0
C/l S' ~ -. =:I
~ ~ ~ g "":l
~ (l) -. > c:r
~ ~ Jg 0.. ~
('l -. en ~ tll
(l) g 8. t:l
~ 2. tll
C/l C/l C/l
.... .q ~
5- fS ...
(JQ _.
o ....
::s o'
=:I
>
~ l-4
...... ~ ~ Et9 ~ >~
o tv 00 ~Vl' -.l 8'
w ~ ~ ~, ~
~ -.l Vl ,~ Vl 0 trl
\0 -.l 0 0 0 =-
00 00 0 Vl 0\ =:I dQ'
\0 .... ..
0"
;-
Z
~ 0
...... Et9 Et9 Et9 >9
N ___ ~Vl Et9 ~..,. 8 >
'0 ~ gj 0 ~ 0;"
00 tv 0 w S"":l
VI .....
~
dQ'
c:
;-
~
...... >
...... Et9 Et9 ~ 8""
0'\ tv 0\ Et9 tv '0
~ ~ ~ Vl tv 0 S'
:=3 ~ -- "tv '0 5-
.~ Vl 0 0 - ....
"'" 0 0 Vl \0
-9
6
iii'
::I
-
~
c
'"
::r
fi
o
::I
~
fi
~
.,
...
..
-
o
--
-
w
\0
00
, 7
ATTACHMENT 2
AMENDMENT No: 3A TO WORK AUTHOlUZATION No.3
BUSH FIELD AIRPORT, AUGUSTA GEORGIA
TERMINAL ACCESS ROADWAY EXTENSION PROJECT
PROFESSIONAL SERVICES FOR TERMINAL ACCESS ROADWAY EXTENSION (AlP ELIGIBLE)
CONSTRUCfION PHASE COST BREAKDOWN (A. J.P.)
PRE-CONSTRUCTION SITE REVIEW SUBMITTAL.' GENERAL FINAL RECORD
CONFERENCE VISITS & PAY REQUESTS COORDINATION INSPECTION DRAWINGS TOTALS
CLASSIFICATION HOURS HOURS HOURS HOURS HOURS HOURS HOURS
Project Manager 4 8 2 5 5 4 28
Construction Manager 0 12 12 12 5 10 51
Civil Engineer 4 5 20 0 0 8 37
Ass't Constr. Manager 4 18 44 36 5 16 123
Technician 2 0 0 0 0 40 42
Technical Assistant 2 0 0 8 0 0 10
Total Hours 16 43 78 61 15 78 291
Task Cost $1,\38 $3,425 $5,616 $4,122 $1,270 $4,810 $20,381
DIRECT COSTS
Travel $60 $180 $0 $0 $60 $0 $300
Per.Deim $25 $100 . $0 $0 $20 $0 $145
Reprod. $]0 $0 $45 $60 $0 $]25 $240
TelephoneIFax $20 $25 $125 $300 $15 $10 $495
Postage $30 $0 $75 $50 $5 $20 $180
Computer(CAD) $0 $0 $0 $0 $0 $240 $240
$145 $305 $245 $410 $100 $395
Subtotal: $1,600
SUBCONSULTANTFEES
Electrical Engineer $664
LPA Admin. Fee (10%) $66
Subtotal: $730
TOTAL CONSTRUCfION ADMINISTRA TIONIMANAGEMENT (AlP) $22,711
Q:\Oienu\Busb\CODstCnstrree
10/13198
. .
ATTACHMENT 2
AMENDMENT No. 3A TO WORK AUTHORIZATION No.3
BUSH FIELD AIRPORT, AUGUSTA GEORGIA
TERMINAL ACCESS ROADWAY EXTENSION PROJECT
PROFESSIONAL SERVICES FOR TOLL PLAZAILONG-TERM PARKING AREA (Non-AlP ELIGIBLE)
CONSTRUCTION PHASE COST BREAKDOWN (NON-A.I.P.)
PRE-CONSTRUCTION SITE REVIEW SUBMITTALS GENERAL FINAL TOTALS
CONFERENCE VISITS & PAY REQUESTS COORDINATION INSPECTION
CLASSIFICATION HOURS HOURS HOURS HOURS HOURS HOURS
Project Manager I I 0 0 I 3
Construction Manager I I 0 0 I 3
Sr.Architect 0 0 4 10 10 24
Civil Engineer 0 0 0 0 .0 0
Ass't Constr. Manager I I 2 2 1 7
Designer 0 0 4 0 0 4
Technician O. 0 0 o. 0 0
Technical Assistant 0 0 2 4 0 6
Total Hours 3 3 12 16 13 47
Task Cost $252 $252 $826 $1,256 $1,222 $3,808
DIRECT COSTS
Travel
Per Deim
Reprod.
Telephone/Fax
Postage
Computer(CAD)
$0 .
$0
$0
$0
$0
$0
$0
$0
$0
$0
$10
$0
$0
$10
$0
$0
$10
$25
$10
$0
$45
$0
$0
$10
$25
$20
$0
$55
$60
$25
. $0,
$25
$10
$0
$120
$60
$25
$20
$85
$40
$0
$230
SUBCONSULTANT FEES
Landscape Architect
LPA Admin. Fee (l0%)
Electrical Engineer
LPA Admin. Fee.
$250
$25
$180
$20
TOTAL CONSTRUCTION ADMINISTRATION (NON-AlP)
$475
G0
Q:\Clienls\B...b\Consl\CnSlrfee
10/13/98
. ,
ATTACHMENT 3
AMENDMENT No. 3A TO WORK AUTHORIZATION No.3
BUSH FIELD AIRPORT, AUGUSTA GEORGIA
TERMINAL ACCESS ROADWAY EXTENSION PROJECT
PROFESSIONAL SERVICES FOR TERMINAL ACCESS ROADWAY EXTENSION (AlP ELIGIBLE)
RESIDENT INSPECTION (AlP)
(26 WEEKS)
RESIDENT INSPECTOR RATE SCHEDULE
I. DIRECT SALARY COSTS
Construction Inspector:
21 Wks@40Hrs/Wk@$15.62/Hr
5 Wks@45Hrs1Wk@ 15.62/Hr
2. LABOR AND ADMINISTRATIVE OVERHEAD
Percentage Of Direct Salary Cost ( 164.57% )
3. DIRECT NON-SALARY EXPENSES
Supplies:
Travel:
Per Diem:
Lodging:
26 Weeks @ $15 Per Week
26 Weeks at 90 miles/week X $0.325/mile
26 Weeks at 6 days/week at $18/day
5.75 Months@ $495 Per Month
4. SUBTOTAL OF ITEMS 1,2 AND 3.
5. FIXED PAYMENT 15%
SUB-TOTAL
6. RESIDENT INSPECTION TOTAL (AlP)
~OT-TO-EXCEED) SAY
QUALITY ASSURANCE TESTING
I. SUBCONSUL T ANT NOT- TO-EXCEED FEE (SEE A IT ACHMENT 4 PROPOSAL)
S&ME, INe.
Will mer Engineering, Inc.
Subtotal
2. ADMINISTRATIVE FEE FOR SUBCONSULTANTS
3. TOTAL QUALITY ASSURANCE TESTING ~OT -TO-EXCEED)
Q: IClienl,IB u,bICon,IICn,lrree
10/13/98
TOTALS
$13,121
$3,515
$27,377
$390
$761
$2,808
$2,846
$50,817
$7,623
$58,439
$58,500
$2,705
$18,003
$20,708.00
$2,070
$22,778
ATTACHMENT 3
AMENDMENT No. 3A TO WORK AUTHORIZATION No.3
BUSH FIELD AIRPORT, AUGUSTA GEORGIA
TERMINAL ACCESS ROADWAY EXTENSION PROJECT
PROFESSIONAL SERVICES FOR TOLL PLAZAlLONG- TERM PARKING (NON-AlP ELIGIBLE)
RESIDENT INSPECTION (NON-AlP)
(26 WEEKS)
RESIDENT INSPECTOR RATE SCHEDULE
TOTALS
I. DIRECT SALARY COSTS
Construction Inspector: 21 Wks@4HrslWk@$15.62/Hr
5 Wks @ 5HrsIWk @ l5.62/Hr
$1,312
$391
. 2. LABOR AND ADMINISTRATIVE OVERHEAD
Percentage Of Direct Salary Cost ( 164.57% )
$2,184
3. DIRECT NON-SALARY EXPENSES
Supplies:
Travel:
Per Diem:
Lodging:
26 Weeks@ $10 PerWeek
26 Weeks at 10 miles/week X $0.325/mile
26 Weeks at 6 days/week at $2/day
5.75 Months @ $55 Per Month
$260
$75
$312
$316
4. SUBTOTAL OF ITEMS 1,2 AND 3.
$4,850
5. FIXED PAYMENT 15%
$727
SUB-TOTAL
$5,577
6. RESIDENT INSPECTION TOTAL (NON-AlP)
(NOT-TO-EXCEED) SAY
$5,600
QUALITY ASSURANCE TESTING
I. SUBCONSUL T ANT NOT-TO-EXCEED FEE (SEE A TIACHMENT 4 PROPOSAL)
S&ME, INC.
$1,793
2. ADMINISTRATIVE FEE FOR SUBCONSULTA,NT
$179
3. TOTAL QUALITY ASSURANCE TESTING (NOT -TO-EXCEED)
$1,972
Q:IClienls\B ushlConsllCnslnee
10/13/98
.~-
---:
--
I,.!.:i:\
\\ --.,.~ ,,~
\.' .. . . ~"
RecydeclPaptf
ATTACHMENT 4
October 7, 1998
Mr. Mark Waller
The LP A Group, Inc.
Post Office Box 5805
Columbia, South Carolina 29250
Reference:
Proposal for Construction Materials Testing Services
Loop Road Extension
Bush Field Airport
Augusta, Georgia
S&ME Proposal No. l613-0862-98
Dear Mark:
We appreciate the opportunity to provide engineering and testing services during construction of
the loop road extension at Bush Field Airport in Augusta, Georgia.
The loop road extension will involve placement of about. 4,000 cubic yards of fill material,
placement of about 725 cubic yards of crushed aggregate base course material, and placement of
about 1000 tons of asphaltic concrete. In addition, concrete will be placed as road dividers and
curbing and a new toll plaza will be constructed. For the total project, site grading is expected to
take 2 to 3 weeks and paving is expected to take 4 to 5 days.
A portion of the project requires that a Disadvantaged Business Enterprise (DBE) be involved in
the quality assurance testing and engineering services. The portion of the project that is AlP
eligible includes:
.
The loop road extension through the existing long term parking lot.
The loop road extension located to the north of the existing air cargo access road.
.
S&ME. Inc. 400 Northeast Drive. Suite A. Columbia. South Carolina 29203
(803) 714-0006. Fax (803) 714-0016
Proposal - Construction Materials Testing Services
Loop Road Extension - Bush Field Airport, Augusta, Georgia
S&ME Proposal No. 1613-0862-98
October 1998
We propose that Wilmer Engineering, Inc. provide these services under our guidance. Wilmer
Engineering's prop,osal is attached.
The portion of the project that is not AlP eligible includes:
· An entranceway to be constructed through the median of the existing entrance road at the end
of the proposed loop road extension.
. The proposed toll plaza.
We are familiar with site conditions for this project having recently performed an on-site
. ..subsurface exploration reported as S&ME Project Number 1611-98-097 dated June 10,.1998.
SCOPE OF SERVICES
Wilmer Engineering will perform the following services related to site preparation and asphalt
paving operations on an on-call basis. S&ME will perform the following services for the non-
AlP-eligible portion of the work, and S&ME may help perform these services for Wilmer
Engineering, if or when Wilmer Engineering requires assistance.
Fill I Soil Testing (P - 152)
Examine exposed subgrade and observe proofrolling.
.Monitor undercutting of unsuitable soils.
Perform laboratory Proctor, gradation, and Atterberg limits tests of proposed fill material.
Conduct field density tests of fill material.
Concrete Sampling I Testing (P - 610)
Sample and test plastic concrete for slump, air content, and temperature.
Cast 6 inch by 12 inch cylinder specimens for testing.
Cure, test, and report concrete specimens.
2
. -.
Proposal - Construction Materials Testing Services
Loop Road Extension - Bush Field Airport, Augusta, Georgia
S&ME Proposal No. 1613-0862-98
October 1998
Asphalt (P - 403) / Base Testing cst - 305)
Perform laboratory Proctor and gradation tests of aggregate base course material.
Conduct field density tests of base material.
Conduct thickness measurements of compacted, in-place base material.
Perform laboratory tests to measure the asphalt content, air voids, gradation, and Marshall
stability of asphaltic concrete paving materials.
Obtain core samples of compacted, in-place asphalt from the contractor to test in-place
density, and measure asphalt thickness.
Field reports will be prepared by Wilmer's technicians daily, and by S&ME's technicians on
days when we visit the project. A summary report containing the testing and monitoring reports
will be provided after our field work is completed. Environmental assessment, sampling of
water, geologic hazards, air quality and noise impacts are excluded from this work.
BUDGET
We propose to perform our services for the unit rates shown on the attached Fee Schedule. We
will send you an invoice every four weeks for the services provided. We have attached a
spreadsheet with an itemized breakdown of estimated costs for our service~ on this project. The
AlP-eligible and the AIP-non-eligible portions are considered separately on the attached
estimate. We estimate a total budget of $22,500 for the services described above. Wilmer
Engineering's budget will account for approximately $18,003 of this total, and is broken down
on the attached Wilmer Engineering's proposal dated October 7, 1998. S&ME's budget will
account for the remaining amount: S&ME's cost breakdown is shown on the attached Cost
Estimate Sheet. We will not exceed the budgeted amount without approval by the LP A project
manager.
3
Proposal - Construction Materials Testing Services
Loop Road Extension - Bush Field Airport, Augusta, Georgia
S&ME Proposal No. 1613-0862-98
October 1998
AUTHORIZATION
We look forward to an opportunity to work with The LPA Group, Inc. and other project team
members. We have executed the Master Agreement for Services between LP A and S&ME, Inc.
If this proposal is acceptable please provide a work order referencing that agreement.
Please contact us if you have any questions concerning our proposal.
Sincerely,
S&ME, Inc.
Ron!Ftf!:i
Staff Professional
d~~
/!~~=ott Sammons, P .E. .
Branch Manager
Attachments:
Construction Services Fee Schedule
S&ME's "Cost Estimate Sheet"
Wilmer Engineering Company, Inc's Proposal dated October 7, 1998
4
Proposal - Construction Materials Testing Services
Loop Road Extension - Bush Field Airport, Augusta, Georgia
S&ME Proposal No. 1613-0862-98
October 1998
CONSTRUCTION SERVICES FEE SCHEDULE
".
S&ME, INC. - COLUMBIA, sC
ENGINEERING TECHNICIAN SERVICES
I. Level I Engineering Technician, per hour ................................................................................ $ 27.00
2. Level 2 Engineering Technician, C.E.T., per hour.................................................................... $ 36.00
3. Level 3 Senior Engineering Technician, C.E.T., per hour ........................................................ $ 48.00
4. Mileage, per mile....................................................................................................................... $ 0.35
PROFESSIONAL SERVICES
1.
2.
3.
4.
5.
6.
Staff Professional, per hour ....................................................................................................... $
Project Engineer; E.LT., per hour.............................................................................................. $
Senior Project Engineer, P.E., per hour ..................................................................................... $
Chief Engineer, P.E., per hour................................................................................................... $
Secretarial/Drafting Services, per hour.................................................................................... $
Mileage, per mile....................................................................................................................... $
LABORATORY TESTING
I. Standard Proctor Compaction Test on soil, each....................................................................... $
2. Modified Proctor Compaction Test on soil, each ...................................................................... $
3. Standard Proctor Compaction Test on base material, each........................................................ $
4. Modified Proctor Compaction Test on base material, each....................................................... $
5. Concrete Cylinders, compressive strength, each ....................................................................... $
6. Concrete Beams, flexural strength, each ................................................................................... $
7. Grain Size Tests, wash 200 sieve, each ..................................................................................... $
8. Grain Size Tests, with hydrometer, each................................................................................... $
9. Atterberg Limits, each ............................................................................................................... $
10. California Bearing Ratio, each set of 3 points (not including Proctor) ..................................... $
11. Asphalt Density, ASTM 2726, each set of3 ......................................:...................................... $
12. Asphalt Marshall Stability and Flow, each set of 3 ...................................................................$
13. Asphalt Specific Gravity, each .................................................................................................. $
14. Asphalt Extraction/Gradation, per sample................................................................................. $
EQUIPMENT USAGE
65.00
65.00
110.00
125.00
40.00
0.35
100.00
110.00
125.00
135.00
8.50
25.00
80.00
90.00
70.00
180.00
60.00
70.00
55.00.
110.00
1. Concrete/asphalt core drill rig and bit with generator, per site day........................................... $ 600.00
2. . Disposable concrete cylinder molds, each .............:................................................................... $ 1.20
3. Nuclear Density equipment, per day ......................................................................................... $ 50.00
4. Support Vehicle, per site day..........................:.............................................................:............ $ 25.00
5. Rental of any other equipment, subcontracting,-and supplies ................................. direct cost times 1.15
NOTES:
A. Overtime rates will be 1.3 times the regular rate indicated for labor.
B. Overtime includes all time in excess of 8 hours per day, 40 hours per week, Saturdays, Sundays and Holidays.
C. There is a 4 hour minimum technician charge for on-call work.
5
Cost Estimate Sheet
S&ME, Inc. - Columbia, South Carolina
.:1J?s~tijJpojJ
1fs~fm({tCd';Qi(ij.ff!i6:i.
AlP-Eligible Portion of the Work
Project Engineer, E.I.T., to review reports,
prepare final report, and provide
consultation: Estimate 14 hours 65.00/hr. 910.00
Subconsultant fee 18003.00
Subconsultant markup 18,003 x .10 1800.30
SUBTOTAL $ 20713.30
AIP-Non-Eligible Portion of the Work
Level 2 Engineering Technician to monitor
undercut and placement of fill material: Estimate 8 hours 36.00/hr. 288.00
Level 2 Engineering Technician to perform
asphalt testing: Estimate 8 hours 36.00/hr. 288.00
Levell Engineering Technician to monitor
concrete placement and cast samples: Estimate 8 hours 27.00/hr. 216.00
Project Engineer, E.l.T., to review reports,
prepare final report, and provide
consultation: Estimate 6 hours 65.00/hr. 390.00
Laboratory and Equipment Estimate 12 concrete cylinders 8.50/ea. 102.00
I Estimate 1 modified stone Proctor 135.00/ea. 135.00
Estimate 1 Atterberg limit tests 70.00/ea. 70.00
Estimate 1 grain size analysis 80.00/ea: 80.00
Estimate 1 day nuclear gauge 50.00/ea. 50.00
Mileage Estimate 3 round trips x 170 miles .35/mile 178.50
Subconsultant markup 0.00
SUBTOTAL $ 1797.50
PROJECT TOTAL $22,510.80
SAY: $22,500.00
6
~
WILLMER ENGINEERING INC.
ENVIRON..ENT", .. "EOTE<:HN'CA,
5 E.~ V I c: r: s
October 8, 199&
S & ME. Inc.
400 Northeast Drive. Suite A
Columbia. SOllth Carolina 29203
Allention: Mr. Scott Sammons:
SUBJECT: ProposAl for Quality A!iliUrQnC~ Testing Services
Terminal Loop Road and Parkillg Tmprovements
Bush Field Airport
.Augusta, Georgi"
WE) Proposfll No. P98-396
Dear Mr. Sammons:
WiUmer Engineering Jnc. (WED appreciates the opportunity .to submit this proposal to proVide
qualifY asS1.U"ance testing services tor the proposed T~nnina1 Loop Road ~d Parking Improvements
Project at Bush Field Airport in Augusta, Georgia. This proposal describes our lU1derstanding of the
pr~iect. discllsses tho work scope, and presentl'l the cost and schedul~.
Project Informlttion
S & ME, Inc. Performed a geotechnical exploration for the propose~ improvements under contract
to The LP A Group, Inc. S & ME will provide maml.gement of construction quality control services
to be provided by WEt.
The proposed construction is' us follows:
· A Loop Road Externion through the existing long term parkin~ lot and the existing air cargo
uccess road.
· A North Loop of the loop road eh1:ension, located to the north ofthe existing air cargo access
road.
i]7~ PLEAS....NTDAlE ~D. . SUITE 1 t\.~ · AH^NTA. tiA 3Q340-Q:!70 . (nOlll:iB-OIHI9 . F^X (770\ 9:19-42~O
Proposal for Quali~ Assurance Tesung Services
WE! PropasaJ No. f98w98-331
Page 2
Qualifications
. WET is a woman-owned professional engineering consulting cOlJloration bflsed in Atlanta, Georgia.
Tncorpunated in 1982. the focus of lhe firt~ is ~o provide high-quality, responsive, professional
geotcchnictl.l. con~truction mnteriflls, and environmental engineering, testing, and consulting sefVice~.
We St:rve a wide variety of cliepls, including engineers, flrchitects, and locol, state, 'llld feder'll
government ~geucies.
Purlng our many years of experience, our personnel have worked on projects throughout the
Southeast, Mid-Athmtic. Midwest, and OulfCoast Regions. We cne familiar with the s1.lbsurface
condiLiollS, geology, conslnIction materials, "nd techniques used throughout these areas. WET seeks
to esu.plish long-lasting relationships with aUf clients. Our success is basec! on developing and
maintaining tmsted relationllhips and Olll" ability to deliver quality engineering services, Most of OLlr
business comes from repeat clients flud their referrals. The firm is organized to involve principals
in fictive participation in projects and direct involvement with each client.
WEI is experienced in providing geOLechnical engineering flnd comrtruction materials testing and
inspection services'. Routine materials testing services are performed in flccorc!8.Jlce wjth the
applicable industry stanaards sllch us ASTM, AASHTO, ACl, Asphalt Institute, etc. WET is
f.lccreaited by AASHTO for testing of soH,concrcte. and asphalt. We have exceptionally well-
quali lieet flnd experienced engineers and technici~ms f1vQilable for assiglUuent to the Bl.aSh Field
Airport project.
Work Scope
WET is toprovide fielc! earth work services including verification of stripping and undercutting und
density testing of compacteQ fill and ~E~e stone. WEI will also provide asphalt plant inspection and
Lesting during placement of asphalt at the rOQdwa}l$l und parking areas.
Vo'U h'lve lrltlicQted that the project ha~ n 5 monili duration. Our services will consist of a maximum
01'3 weeks of earth work te~tins(4000 yl), testing of725 y3 of base stone and a maximum of 5 daYIi
uf asphult pJant inspection (l000 tons). Some minor concrete salUpling ~nd l~sting may be needed
far curbs cmd guU~rs.
Cost
Compensation for our services will be on a unit rate basis in i1ccordance with l.ht:: flttached fee
sched~,de. Based llpon the c:lescribed work: scope and the applicable unit rates, we eslimate the cost
ofthis work will be $1 &,000. We suggest this amount be established as a budget tor our work. We
will not exceed thjs buclget withuut your prior wriUen authorization. If unexpected conditions are
encountered where additional testing may be in the owner's best interest, we wiU contact you for
upproval prior tu proceec!ing with /:tny additional wcwk. The following is an i~emized breakdown of
the cnM estilllu-l:e.
Proposal for Quality Assurance Testing Services
WEI PropasaI No. P98-98-331
Page 3
SHe Earthworl.; Technicif.lll
3 weeks @ 40 hours/wk @ $36,00/h1'
3 weeks @ 20 hr OT/wk @ 1.3 x $36,OOIhr
15 days per dieIl1 @ $8S/Q~y
J mobiJlClcmob round trips @ 5hrx $36,QOIhr+300miles @ $0.35/mile
15 cfays on-site vehicle @ $25.00/day
3 pt(lctors @ $100 ea
4320
2808
1275
855
375
300
$9.933.
B[I~e Stone Technici&n
5 Tripl\ @ H lu- @ $36.00/hr
5 Trips @ 300 @ $O.35/mile
1 Proctor @ $125 ea
1.440
525
.l2L
$2,090.
"~pha It Pl'lt:!t TechniciR11
5 d&ys @ R hr/day @ $48.00/hr
20 hrs OT @ $48.001hr x [,3
1 mobil/clemob @ Shr x $36:00/hr+300 miles @ $0.35/mile
5 day:>> per Diem @ $SS.OO/clay
.5 clays On-site Vehicle @ $,25.00/cl&y
1,920
1248
285
425
.ill
$4.003.
Concrete Te~hnician
1 set of 4 cyt @ $8.50ea
1 trip @ 8hr @$36,OO/hr
1 trip @ 300 miles @ $O.J5/mile
34
288
.lJlS..
$427.
Project Mt\nEl~em~nt
J 5 hrs Project Engineer @ $65.00
3 hr Principal ConsultMt @ $125.00.
5 hI' Word Proc~ssor @ $40.00
975
375
2JliL
$1.550
Estimated Total Cost
$18.003
. ,.
."' .'" ~
Proposal for Quality Assurance Testing SCr\1ices
WE! Prop4Sal No. P98-98-331
Page 4
Closure
Thank you for considcring Wi1lmer Engineering Tnc. for this work. If this proposf\l is acceptable,
please sigu ane! retl:lm one copy orthe Proposal Acceptance i:tnd Agreement for Professional Services
form to provide lfS with a~lhorization. If YOlo) have uny questions or need ~ny . further assistance,
please cull.
Sincerely,
WILLMER ENGINEERING INC.
~(.. ~
J~e~L, Wi11mer, r.E.
President
ERE:dsi