Loading...
HomeMy WebLinkAboutAmendment 3A to work Authorization #3 Augusta Richmond GA . -#: DOCUMENT NAME: f\ J"'l B'jJr;j l"'€ ,J.,- S 11-1- 0 v.I b R , e.. jJ lJ 1"" 1-1-6 fH"Z-If'T1 04\) .3 DOCUMENT TYPE: YEAR: (C\ q <t BOX NUMBER: tp FILE NUMBER: \.~ ~ '1 2> NUMBER OF PAGES: LJ .' ~J J,Jt. II /.3 ~9 ,3 AMENDMENT 3A TO WORK AUTHORIZATION No.3 BUSH FIELD AVIATION COMMISSION . Amendment to Work Authorization for Professional Services CA 209003 (Project Identification No.) Three (3) (Work Authorization No.) TERMINAL ACCESS ROADWAY EXTENSION PROJECT: BUSH FIELD AIRPORT (Project Title) This AMENDMENT 3A adds the construction contract administration, construction inspection and quality assurance testing to the previously approved Work Authorization No.3 for the construction of the Terminal Access Roadway Extension Project at Bush Field Airport. A - DESCRIPTION OF ASSIGNMENTS: 1. The CONSULTANT shall provide Construction Phase services in accordance with Exhibit "C", SECTION I, Paragraph E of the MASTER AGREEMENT. 2. The CONSULTANT shall provide full time Resident Project Representative, in accordance with Exhibit "E" of the MASTER AGREEMENT. 3. The CONSULTANT shall provide construction engineering and quality assurance testing services during construction to assure that the work conforms to the requirements of the contract documents. These services will be performed by a qualified laboratory, as shown in Attachment 4. B - ESTIMATED TIME SCHEDULE: The services described in Section A above, to be performed for a period of 164 consecutive calendar qays from the date of the Gontractor's official Notice-to-Proceed. Services required beyond this 164 calendar days, with the exception of Final Inspection, Project Close-out and Record Drawing . preparation, will be provided and cost of which may be deducted from Contractor's progress payment as provided for in Article 3.3 of the Owner / Contractor Agreement. . C - ESTIMATED COST OF SERVICES: The CONSULT ANT shall be paid the following: Page 1 of2 101398 "1 1. For Construction Phase services as outlined in Section A above, the OWNER shall pay the CONSULTANT the lump sum fee of Twenty Seven Thousand Two Hundred and Twenty Four Dollars and No Cents ($27.224.00) as determined by Attachment 2. 2. For Resident Project Representative services as outlined in Section A above, the OWNER shall pay the CONSULTANT on the basis of actual cost plus fixed payment of $8.350.00 with a maximum not-to-exceed limit of Sixty Four Thousand One Hundred Dollars and No Cents ($64.100.00) as determined by Attachment 3. 3. For Construction Engineering and Quality Assurance Testing services as outlined in Section A above, the OWNER shall pay the CONSULTANT for the direct cost of the Subconsultant plus a lump sum administrative fee of $2.250.00 with a maximum not-to- exceed limit of Twenty Four Thousand Seven Hundred and Fifty Dollars and No. Cents $24.750.00) as determined by Attachments 3 and 4. Agreed as to scope of services, time schedule, and budget. RECOMMENDED BY: JP~- For THE LPA GROUP INCORPORATED Date: tl !Z-o/qr:y, Date: (~;;r4ff Date: Attachments: Attachment No. 1 (Fee Summary) Attachment No.2 (Construction Phase Fees) Attachment No.3 (RPR and Q/A Fees) Attachment No.4 (Quality Assurance Testing Services, 10 pages total) Q:\CLlENTS\Bush\Loop Rd. Ext\DOCS\DESIGN\CNTR&APP\AMENDMENT 3A.doc Page 2 of2 101398 ..... " > ~ ~ > (j == ~ ~ ~ ~ ~ ~ ~ ~~ o~ Zz ~~ ~~ ~(;J ~> ~ o~ zo ~~ ~o ~~ ~> ~cj ~~ 00= ~@ ~~ :;o~ ~~ o z z ~ (;J ~ ~ c:;~ i~ ~> t;j~ ~~ ~~ >~ ~~ o~ ~~ >> cj~ .~ ~ ~~ ~~ >z ~~ ~o oz :;o~ ~:;o >0 ;a ~ ~ ..., ~ w tv - n o '--' '--' '--' '--' 0 ..., A) :A:l :A:l (j 1;l > s::: (l) (l) 0 .... t"" a ~, 8 5l 2 00 ~' ~ a.. q l4. ~ s:::.. > ...... 0 ~ 0 C/l S' ~ -. =:I ~ ~ ~ g "":l ~ (l) -. > c:r ~ ~ Jg 0.. ~ ('l -. en ~ tll (l) g 8. t:l ~ 2. tll C/l C/l C/l .... .q ~ 5- fS ... (JQ _. o .... ::s o' =:I > ~ l-4 ...... ~ ~ Et9 ~ >~ o tv 00 ~Vl' -.l 8' w ~ ~ ~, ~ ~ -.l Vl ,~ Vl 0 trl \0 -.l 0 0 0 =- 00 00 0 Vl 0\ =:I dQ' \0 .... .. 0" ;- Z ~ 0 ...... Et9 Et9 Et9 >9 N ___ ~Vl Et9 ~..,. 8 > '0 ~ gj 0 ~ 0;" 00 tv 0 w S"":l VI ..... ~ dQ' c: ;- ~ ...... > ...... Et9 Et9 ~ 8"" 0'\ tv 0\ Et9 tv '0 ~ ~ ~ Vl tv 0 S' :=3 ~ -- "tv '0 5- .~ Vl 0 0 - .... "'" 0 0 Vl \0 -9 6 iii' ::I - ~ c '" ::r fi o ::I ~ fi ~ ., ... .. - o -- - w \0 00 , 7 ATTACHMENT 2 AMENDMENT No: 3A TO WORK AUTHOlUZATION No.3 BUSH FIELD AIRPORT, AUGUSTA GEORGIA TERMINAL ACCESS ROADWAY EXTENSION PROJECT PROFESSIONAL SERVICES FOR TERMINAL ACCESS ROADWAY EXTENSION (AlP ELIGIBLE) CONSTRUCfION PHASE COST BREAKDOWN (A. J.P.) PRE-CONSTRUCTION SITE REVIEW SUBMITTAL.' GENERAL FINAL RECORD CONFERENCE VISITS & PAY REQUESTS COORDINATION INSPECTION DRAWINGS TOTALS CLASSIFICATION HOURS HOURS HOURS HOURS HOURS HOURS HOURS Project Manager 4 8 2 5 5 4 28 Construction Manager 0 12 12 12 5 10 51 Civil Engineer 4 5 20 0 0 8 37 Ass't Constr. Manager 4 18 44 36 5 16 123 Technician 2 0 0 0 0 40 42 Technical Assistant 2 0 0 8 0 0 10 Total Hours 16 43 78 61 15 78 291 Task Cost $1,\38 $3,425 $5,616 $4,122 $1,270 $4,810 $20,381 DIRECT COSTS Travel $60 $180 $0 $0 $60 $0 $300 Per.Deim $25 $100 . $0 $0 $20 $0 $145 Reprod. $]0 $0 $45 $60 $0 $]25 $240 TelephoneIFax $20 $25 $125 $300 $15 $10 $495 Postage $30 $0 $75 $50 $5 $20 $180 Computer(CAD) $0 $0 $0 $0 $0 $240 $240 $145 $305 $245 $410 $100 $395 Subtotal: $1,600 SUBCONSULTANTFEES Electrical Engineer $664 LPA Admin. Fee (10%) $66 Subtotal: $730 TOTAL CONSTRUCfION ADMINISTRA TIONIMANAGEMENT (AlP) $22,711 Q:\Oienu\Busb\CODstCnstrree 10/13198 . . ATTACHMENT 2 AMENDMENT No. 3A TO WORK AUTHORIZATION No.3 BUSH FIELD AIRPORT, AUGUSTA GEORGIA TERMINAL ACCESS ROADWAY EXTENSION PROJECT PROFESSIONAL SERVICES FOR TOLL PLAZAILONG-TERM PARKING AREA (Non-AlP ELIGIBLE) CONSTRUCTION PHASE COST BREAKDOWN (NON-A.I.P.) PRE-CONSTRUCTION SITE REVIEW SUBMITTALS GENERAL FINAL TOTALS CONFERENCE VISITS & PAY REQUESTS COORDINATION INSPECTION CLASSIFICATION HOURS HOURS HOURS HOURS HOURS HOURS Project Manager I I 0 0 I 3 Construction Manager I I 0 0 I 3 Sr.Architect 0 0 4 10 10 24 Civil Engineer 0 0 0 0 .0 0 Ass't Constr. Manager I I 2 2 1 7 Designer 0 0 4 0 0 4 Technician O. 0 0 o. 0 0 Technical Assistant 0 0 2 4 0 6 Total Hours 3 3 12 16 13 47 Task Cost $252 $252 $826 $1,256 $1,222 $3,808 DIRECT COSTS Travel Per Deim Reprod. Telephone/Fax Postage Computer(CAD) $0 . $0 $0 $0 $0 $0 $0 $0 $0 $0 $10 $0 $0 $10 $0 $0 $10 $25 $10 $0 $45 $0 $0 $10 $25 $20 $0 $55 $60 $25 . $0, $25 $10 $0 $120 $60 $25 $20 $85 $40 $0 $230 SUBCONSULTANT FEES Landscape Architect LPA Admin. Fee (l0%) Electrical Engineer LPA Admin. Fee. $250 $25 $180 $20 TOTAL CONSTRUCTION ADMINISTRATION (NON-AlP) $475 G0 Q:\Clienls\B...b\Consl\CnSlrfee 10/13/98 . , ATTACHMENT 3 AMENDMENT No. 3A TO WORK AUTHORIZATION No.3 BUSH FIELD AIRPORT, AUGUSTA GEORGIA TERMINAL ACCESS ROADWAY EXTENSION PROJECT PROFESSIONAL SERVICES FOR TERMINAL ACCESS ROADWAY EXTENSION (AlP ELIGIBLE) RESIDENT INSPECTION (AlP) (26 WEEKS) RESIDENT INSPECTOR RATE SCHEDULE I. DIRECT SALARY COSTS Construction Inspector: 21 Wks@40Hrs/Wk@$15.62/Hr 5 Wks@45Hrs1Wk@ 15.62/Hr 2. LABOR AND ADMINISTRATIVE OVERHEAD Percentage Of Direct Salary Cost ( 164.57% ) 3. DIRECT NON-SALARY EXPENSES Supplies: Travel: Per Diem: Lodging: 26 Weeks @ $15 Per Week 26 Weeks at 90 miles/week X $0.325/mile 26 Weeks at 6 days/week at $18/day 5.75 Months@ $495 Per Month 4. SUBTOTAL OF ITEMS 1,2 AND 3. 5. FIXED PAYMENT 15% SUB-TOTAL 6. RESIDENT INSPECTION TOTAL (AlP) ~OT-TO-EXCEED) SAY QUALITY ASSURANCE TESTING I. SUBCONSUL T ANT NOT- TO-EXCEED FEE (SEE A IT ACHMENT 4 PROPOSAL) S&ME, INe. Will mer Engineering, Inc. Subtotal 2. ADMINISTRATIVE FEE FOR SUBCONSULTANTS 3. TOTAL QUALITY ASSURANCE TESTING ~OT -TO-EXCEED) Q: IClienl,IB u,bICon,IICn,lrree 10/13/98 TOTALS $13,121 $3,515 $27,377 $390 $761 $2,808 $2,846 $50,817 $7,623 $58,439 $58,500 $2,705 $18,003 $20,708.00 $2,070 $22,778 ATTACHMENT 3 AMENDMENT No. 3A TO WORK AUTHORIZATION No.3 BUSH FIELD AIRPORT, AUGUSTA GEORGIA TERMINAL ACCESS ROADWAY EXTENSION PROJECT PROFESSIONAL SERVICES FOR TOLL PLAZAlLONG- TERM PARKING (NON-AlP ELIGIBLE) RESIDENT INSPECTION (NON-AlP) (26 WEEKS) RESIDENT INSPECTOR RATE SCHEDULE TOTALS I. DIRECT SALARY COSTS Construction Inspector: 21 Wks@4HrslWk@$15.62/Hr 5 Wks @ 5HrsIWk @ l5.62/Hr $1,312 $391 . 2. LABOR AND ADMINISTRATIVE OVERHEAD Percentage Of Direct Salary Cost ( 164.57% ) $2,184 3. DIRECT NON-SALARY EXPENSES Supplies: Travel: Per Diem: Lodging: 26 Weeks@ $10 PerWeek 26 Weeks at 10 miles/week X $0.325/mile 26 Weeks at 6 days/week at $2/day 5.75 Months @ $55 Per Month $260 $75 $312 $316 4. SUBTOTAL OF ITEMS 1,2 AND 3. $4,850 5. FIXED PAYMENT 15% $727 SUB-TOTAL $5,577 6. RESIDENT INSPECTION TOTAL (NON-AlP) (NOT-TO-EXCEED) SAY $5,600 QUALITY ASSURANCE TESTING I. SUBCONSUL T ANT NOT-TO-EXCEED FEE (SEE A TIACHMENT 4 PROPOSAL) S&ME, INC. $1,793 2. ADMINISTRATIVE FEE FOR SUBCONSULTA,NT $179 3. TOTAL QUALITY ASSURANCE TESTING (NOT -TO-EXCEED) $1,972 Q:IClienls\B ushlConsllCnslnee 10/13/98 .~- ---: -- I,.!.:i:\ \\ --.,.~ ,,~ \.' .. . . ~" RecydeclPaptf ATTACHMENT 4 October 7, 1998 Mr. Mark Waller The LP A Group, Inc. Post Office Box 5805 Columbia, South Carolina 29250 Reference: Proposal for Construction Materials Testing Services Loop Road Extension Bush Field Airport Augusta, Georgia S&ME Proposal No. l613-0862-98 Dear Mark: We appreciate the opportunity to provide engineering and testing services during construction of the loop road extension at Bush Field Airport in Augusta, Georgia. The loop road extension will involve placement of about. 4,000 cubic yards of fill material, placement of about 725 cubic yards of crushed aggregate base course material, and placement of about 1000 tons of asphaltic concrete. In addition, concrete will be placed as road dividers and curbing and a new toll plaza will be constructed. For the total project, site grading is expected to take 2 to 3 weeks and paving is expected to take 4 to 5 days. A portion of the project requires that a Disadvantaged Business Enterprise (DBE) be involved in the quality assurance testing and engineering services. The portion of the project that is AlP eligible includes: . The loop road extension through the existing long term parking lot. The loop road extension located to the north of the existing air cargo access road. . S&ME. Inc. 400 Northeast Drive. Suite A. Columbia. South Carolina 29203 (803) 714-0006. Fax (803) 714-0016 Proposal - Construction Materials Testing Services Loop Road Extension - Bush Field Airport, Augusta, Georgia S&ME Proposal No. 1613-0862-98 October 1998 We propose that Wilmer Engineering, Inc. provide these services under our guidance. Wilmer Engineering's prop,osal is attached. The portion of the project that is not AlP eligible includes: · An entranceway to be constructed through the median of the existing entrance road at the end of the proposed loop road extension. . The proposed toll plaza. We are familiar with site conditions for this project having recently performed an on-site . ..subsurface exploration reported as S&ME Project Number 1611-98-097 dated June 10,.1998. SCOPE OF SERVICES Wilmer Engineering will perform the following services related to site preparation and asphalt paving operations on an on-call basis. S&ME will perform the following services for the non- AlP-eligible portion of the work, and S&ME may help perform these services for Wilmer Engineering, if or when Wilmer Engineering requires assistance. Fill I Soil Testing (P - 152) Examine exposed subgrade and observe proofrolling. .Monitor undercutting of unsuitable soils. Perform laboratory Proctor, gradation, and Atterberg limits tests of proposed fill material. Conduct field density tests of fill material. Concrete Sampling I Testing (P - 610) Sample and test plastic concrete for slump, air content, and temperature. Cast 6 inch by 12 inch cylinder specimens for testing. Cure, test, and report concrete specimens. 2 . -. Proposal - Construction Materials Testing Services Loop Road Extension - Bush Field Airport, Augusta, Georgia S&ME Proposal No. 1613-0862-98 October 1998 Asphalt (P - 403) / Base Testing cst - 305) Perform laboratory Proctor and gradation tests of aggregate base course material. Conduct field density tests of base material. Conduct thickness measurements of compacted, in-place base material. Perform laboratory tests to measure the asphalt content, air voids, gradation, and Marshall stability of asphaltic concrete paving materials. Obtain core samples of compacted, in-place asphalt from the contractor to test in-place density, and measure asphalt thickness. Field reports will be prepared by Wilmer's technicians daily, and by S&ME's technicians on days when we visit the project. A summary report containing the testing and monitoring reports will be provided after our field work is completed. Environmental assessment, sampling of water, geologic hazards, air quality and noise impacts are excluded from this work. BUDGET We propose to perform our services for the unit rates shown on the attached Fee Schedule. We will send you an invoice every four weeks for the services provided. We have attached a spreadsheet with an itemized breakdown of estimated costs for our service~ on this project. The AlP-eligible and the AIP-non-eligible portions are considered separately on the attached estimate. We estimate a total budget of $22,500 for the services described above. Wilmer Engineering's budget will account for approximately $18,003 of this total, and is broken down on the attached Wilmer Engineering's proposal dated October 7, 1998. S&ME's budget will account for the remaining amount: S&ME's cost breakdown is shown on the attached Cost Estimate Sheet. We will not exceed the budgeted amount without approval by the LP A project manager. 3 Proposal - Construction Materials Testing Services Loop Road Extension - Bush Field Airport, Augusta, Georgia S&ME Proposal No. 1613-0862-98 October 1998 AUTHORIZATION We look forward to an opportunity to work with The LPA Group, Inc. and other project team members. We have executed the Master Agreement for Services between LP A and S&ME, Inc. If this proposal is acceptable please provide a work order referencing that agreement. Please contact us if you have any questions concerning our proposal. Sincerely, S&ME, Inc. Ron!Ftf!:i Staff Professional d~~ /!~~=ott Sammons, P .E. . Branch Manager Attachments: Construction Services Fee Schedule S&ME's "Cost Estimate Sheet" Wilmer Engineering Company, Inc's Proposal dated October 7, 1998 4 Proposal - Construction Materials Testing Services Loop Road Extension - Bush Field Airport, Augusta, Georgia S&ME Proposal No. 1613-0862-98 October 1998 CONSTRUCTION SERVICES FEE SCHEDULE ". S&ME, INC. - COLUMBIA, sC ENGINEERING TECHNICIAN SERVICES I. Level I Engineering Technician, per hour ................................................................................ $ 27.00 2. Level 2 Engineering Technician, C.E.T., per hour.................................................................... $ 36.00 3. Level 3 Senior Engineering Technician, C.E.T., per hour ........................................................ $ 48.00 4. Mileage, per mile....................................................................................................................... $ 0.35 PROFESSIONAL SERVICES 1. 2. 3. 4. 5. 6. Staff Professional, per hour ....................................................................................................... $ Project Engineer; E.LT., per hour.............................................................................................. $ Senior Project Engineer, P.E., per hour ..................................................................................... $ Chief Engineer, P.E., per hour................................................................................................... $ Secretarial/Drafting Services, per hour.................................................................................... $ Mileage, per mile....................................................................................................................... $ LABORATORY TESTING I. Standard Proctor Compaction Test on soil, each....................................................................... $ 2. Modified Proctor Compaction Test on soil, each ...................................................................... $ 3. Standard Proctor Compaction Test on base material, each........................................................ $ 4. Modified Proctor Compaction Test on base material, each....................................................... $ 5. Concrete Cylinders, compressive strength, each ....................................................................... $ 6. Concrete Beams, flexural strength, each ................................................................................... $ 7. Grain Size Tests, wash 200 sieve, each ..................................................................................... $ 8. Grain Size Tests, with hydrometer, each................................................................................... $ 9. Atterberg Limits, each ............................................................................................................... $ 10. California Bearing Ratio, each set of 3 points (not including Proctor) ..................................... $ 11. Asphalt Density, ASTM 2726, each set of3 ......................................:...................................... $ 12. Asphalt Marshall Stability and Flow, each set of 3 ...................................................................$ 13. Asphalt Specific Gravity, each .................................................................................................. $ 14. Asphalt Extraction/Gradation, per sample................................................................................. $ EQUIPMENT USAGE 65.00 65.00 110.00 125.00 40.00 0.35 100.00 110.00 125.00 135.00 8.50 25.00 80.00 90.00 70.00 180.00 60.00 70.00 55.00. 110.00 1. Concrete/asphalt core drill rig and bit with generator, per site day........................................... $ 600.00 2. . Disposable concrete cylinder molds, each .............:................................................................... $ 1.20 3. Nuclear Density equipment, per day ......................................................................................... $ 50.00 4. Support Vehicle, per site day..........................:.............................................................:............ $ 25.00 5. Rental of any other equipment, subcontracting,-and supplies ................................. direct cost times 1.15 NOTES: A. Overtime rates will be 1.3 times the regular rate indicated for labor. B. Overtime includes all time in excess of 8 hours per day, 40 hours per week, Saturdays, Sundays and Holidays. C. There is a 4 hour minimum technician charge for on-call work. 5 Cost Estimate Sheet S&ME, Inc. - Columbia, South Carolina .:1J?s~tijJpojJ 1fs~fm({tCd';Qi(ij.ff!i6:i. AlP-Eligible Portion of the Work Project Engineer, E.I.T., to review reports, prepare final report, and provide consultation: Estimate 14 hours 65.00/hr. 910.00 Subconsultant fee 18003.00 Subconsultant markup 18,003 x .10 1800.30 SUBTOTAL $ 20713.30 AIP-Non-Eligible Portion of the Work Level 2 Engineering Technician to monitor undercut and placement of fill material: Estimate 8 hours 36.00/hr. 288.00 Level 2 Engineering Technician to perform asphalt testing: Estimate 8 hours 36.00/hr. 288.00 Levell Engineering Technician to monitor concrete placement and cast samples: Estimate 8 hours 27.00/hr. 216.00 Project Engineer, E.l.T., to review reports, prepare final report, and provide consultation: Estimate 6 hours 65.00/hr. 390.00 Laboratory and Equipment Estimate 12 concrete cylinders 8.50/ea. 102.00 I Estimate 1 modified stone Proctor 135.00/ea. 135.00 Estimate 1 Atterberg limit tests 70.00/ea. 70.00 Estimate 1 grain size analysis 80.00/ea: 80.00 Estimate 1 day nuclear gauge 50.00/ea. 50.00 Mileage Estimate 3 round trips x 170 miles .35/mile 178.50 Subconsultant markup 0.00 SUBTOTAL $ 1797.50 PROJECT TOTAL $22,510.80 SAY: $22,500.00 6 ~ WILLMER ENGINEERING INC. ENVIRON..ENT", .. "EOTE<:HN'CA, 5 E.~ V I c: r: s October 8, 199& S & ME. Inc. 400 Northeast Drive. Suite A Columbia. SOllth Carolina 29203 Allention: Mr. Scott Sammons: SUBJECT: ProposAl for Quality A!iliUrQnC~ Testing Services Terminal Loop Road and Parkillg Tmprovements Bush Field Airport .Augusta, Georgi" WE) Proposfll No. P98-396 Dear Mr. Sammons: WiUmer Engineering Jnc. (WED appreciates the opportunity .to submit this proposal to proVide qualifY asS1.U"ance testing services tor the proposed T~nnina1 Loop Road ~d Parking Improvements Project at Bush Field Airport in Augusta, Georgia. This proposal describes our lU1derstanding of the pr~iect. discllsses tho work scope, and presentl'l the cost and schedul~. Project Informlttion S & ME, Inc. Performed a geotechnical exploration for the propose~ improvements under contract to The LP A Group, Inc. S & ME will provide maml.gement of construction quality control services to be provided by WEt. The proposed construction is' us follows: · A Loop Road Externion through the existing long term parkin~ lot and the existing air cargo uccess road. · A North Loop of the loop road eh1:ension, located to the north ofthe existing air cargo access road. i]7~ PLEAS....NTDAlE ~D. . SUITE 1 t\.~ · AH^NTA. tiA 3Q340-Q:!70 . (nOlll:iB-OIHI9 . F^X (770\ 9:19-42~O Proposal for Quali~ Assurance Tesung Services WE! PropasaJ No. f98w98-331 Page 2 Qualifications . WET is a woman-owned professional engineering consulting cOlJloration bflsed in Atlanta, Georgia. Tncorpunated in 1982. the focus of lhe firt~ is ~o provide high-quality, responsive, professional geotcchnictl.l. con~truction mnteriflls, and environmental engineering, testing, and consulting sefVice~. We St:rve a wide variety of cliepls, including engineers, flrchitects, and locol, state, 'llld feder'll government ~geucies. Purlng our many years of experience, our personnel have worked on projects throughout the Southeast, Mid-Athmtic. Midwest, and OulfCoast Regions. We cne familiar with the s1.lbsurface condiLiollS, geology, conslnIction materials, "nd techniques used throughout these areas. WET seeks to esu.plish long-lasting relationships with aUf clients. Our success is basec! on developing and maintaining tmsted relationllhips and Olll" ability to deliver quality engineering services, Most of OLlr business comes from repeat clients flud their referrals. The firm is organized to involve principals in fictive participation in projects and direct involvement with each client. WEI is experienced in providing geOLechnical engineering flnd comrtruction materials testing and inspection services'. Routine materials testing services are performed in flccorc!8.Jlce wjth the applicable industry stanaards sllch us ASTM, AASHTO, ACl, Asphalt Institute, etc. WET is f.lccreaited by AASHTO for testing of soH,concrcte. and asphalt. We have exceptionally well- quali lieet flnd experienced engineers and technici~ms f1vQilable for assiglUuent to the Bl.aSh Field Airport project. Work Scope WET is toprovide fielc! earth work services including verification of stripping and undercutting und density testing of compacteQ fill and ~E~e stone. WEI will also provide asphalt plant inspection and Lesting during placement of asphalt at the rOQdwa}l$l und parking areas. Vo'U h'lve lrltlicQted that the project ha~ n 5 monili duration. Our services will consist of a maximum 01'3 weeks of earth work te~tins(4000 yl), testing of725 y3 of base stone and a maximum of 5 daYIi uf asphult pJant inspection (l000 tons). Some minor concrete salUpling ~nd l~sting may be needed far curbs cmd guU~rs. Cost Compensation for our services will be on a unit rate basis in i1ccordance with l.ht:: flttached fee sched~,de. Based llpon the c:lescribed work: scope and the applicable unit rates, we eslimate the cost ofthis work will be $1 &,000. We suggest this amount be established as a budget tor our work. We will not exceed thjs buclget withuut your prior wriUen authorization. If unexpected conditions are encountered where additional testing may be in the owner's best interest, we wiU contact you for upproval prior tu proceec!ing with /:tny additional wcwk. The following is an i~emized breakdown of the cnM estilllu-l:e. Proposal for Quality Assurance Testing Services WEI PropasaI No. P98-98-331 Page 3 SHe Earthworl.; Technicif.lll 3 weeks @ 40 hours/wk @ $36,00/h1' 3 weeks @ 20 hr OT/wk @ 1.3 x $36,OOIhr 15 days per dieIl1 @ $8S/Q~y J mobiJlClcmob round trips @ 5hrx $36,QOIhr+300miles @ $0.35/mile 15 cfays on-site vehicle @ $25.00/day 3 pt(lctors @ $100 ea 4320 2808 1275 855 375 300 $9.933. B[I~e Stone Technici&n 5 Tripl\ @ H lu- @ $36.00/hr 5 Trips @ 300 @ $O.35/mile 1 Proctor @ $125 ea 1.440 525 .l2L $2,090. "~pha It Pl'lt:!t TechniciR11 5 d&ys @ R hr/day @ $48.00/hr 20 hrs OT @ $48.001hr x [,3 1 mobil/clemob @ Shr x $36:00/hr+300 miles @ $0.35/mile 5 day:>> per Diem @ $SS.OO/clay .5 clays On-site Vehicle @ $,25.00/cl&y 1,920 1248 285 425 .ill $4.003. Concrete Te~hnician 1 set of 4 cyt @ $8.50ea 1 trip @ 8hr @$36,OO/hr 1 trip @ 300 miles @ $O.J5/mile 34 288 .lJlS.. $427. Project Mt\nEl~em~nt J 5 hrs Project Engineer @ $65.00 3 hr Principal ConsultMt @ $125.00. 5 hI' Word Proc~ssor @ $40.00 975 375 2JliL $1.550 Estimated Total Cost $18.003 . ,. ."' .'" ~ Proposal for Quality Assurance Testing SCr\1ices WE! Prop4Sal No. P98-98-331 Page 4 Closure Thank you for considcring Wi1lmer Engineering Tnc. for this work. If this proposf\l is acceptable, please sigu ane! retl:lm one copy orthe Proposal Acceptance i:tnd Agreement for Professional Services form to provide lfS with a~lhorization. If YOlo) have uny questions or need ~ny . further assistance, please cull. Sincerely, WILLMER ENGINEERING INC. ~(.. ~ J~e~L, Wi11mer, r.E. President ERE:dsi pDII.JJ I