MEMORANDUM
TO: GEORGE R. KOLB, COUNTI ADMINISTRATOR
FROM: N. MAX HICKS, DIRECTOR, AUGUSTA UTILITIES
SUBJECT: W-1 CLEARWELL BAFFLING & CHEMICAL FEED REPLACEMENT PROJECT
DATE: 05/11/01
CC: FILE
Please find attached Change Order # 12 for the above referenced project. The change order
consists of the following changes to the routing of the 16" Ft. Gordon Connection piping at
the Highland Avenue Water Treatment Plant:
. Relocate Power Pole $ 277.00
. 8" , 16", and 20" fittings $6,214,00
. Gripper Gaskets for 16" piping $2,127.00
. Additional Concrete cap and flowable fill $ 243.00
. Deduction for Asphalt Overlay in Central Avenue -$2,100.00
$6,761.00
The routing of the 16" piping had to be changed to avoid unforeseen piping at the
facility, The total cost for the change order is $6,761.00,
~-
CHANGE ORDER
CO NUMBER 12
BID ITEM
DATE 5/15/2001
PROJECT TITLE
CIearwell Baffling and Chemical Feed Replacement Project
ORIGINAL CONTRACT DATE ffi.2.2..2
PROJECT NUMBER W-l
OWNER AUGUSTA COMlvilSSION
PO NUMBER
~
The following change order is hereby made to the proposal for the above project:
PAYEE
Aqua South Construction,
Inc.
TOTAL AMOUNT OF THIS CHANGE ORDER
$
6,761.00
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
1,207,688.00
PREVIOUS CHANGE ORDER (INCREASE)
$
602,583.10
THIS CHANGE ORDER (INCREASE)
$
6,761.00
TOTAL CONTRACT WITH CHANGE ORDER
$
1,817,032.10
FUNDING NU1liffiER/ ACCOUNT NUMBER
508043410
5425110
REQUESTED BY:
~4~~R
DATE:
,f;?ljtJ/
. ,
APPROVED BY:
DATE:
5/'7/(!)(
s/I"?Iol
5 -li'"-c) ,
SUBMITTED BY:
FINANCE ENDORSEMENT:
DATE:
RECOMMENDED BY:
Sllt/OJ./
ATE: Sj )8/6 I
DATE: sjZI /0 I
, .
NN
WO; 0 I c.nOl~
~' ~::!]O~(') NN "'U
N~O::l(J)'< COOO~ 0
.:.. q , ::E (') =::!l:3::!. = >< I ~::E ,-
(J) -::::OJ CO.j:o..O CD "0 !:!?........... I CD;-
=5:.j:o..s;r.....c.n::ECOCO CD (J)(J)~""" 3
5: c.... ::!l CD CD ::!l OJ ~ OJ CD _ = ~~ "0
c....Ul:=::....,('):=::s;rs::~<--.J';:+.....Q.
CD 3' == OJ 3' CD co CD CD ~ CD
urco "OCO::!lUlur
Ul -
o
CD
0.
c
Q..-l~-l
...., 0 c.n \0
0..... .....
""" OJ eft. OJ
o - -
<
CD
::!..
OJ
'<
-Ef) -Ef) -Ef) ~ -Ef) ~ -Ef) -Ef) -Ef) -Ef) -Ef) In
W~.j:o..- co- N.j:o...j:o..~NO
(J)(J)o~o~oooc.n---.l(J)
oooooc.nOOOO---.l.....
-Ef)-Ef) ~
N---.I-Ef)O')
:""'Nco(.)
OOlc.n(.)
aNoN
>
Q.
,,-,
s::
en
,.co
CD
0-
"0
::!.
n
CD
""'h
o
"'"
-n
f"+
G")
o
'"'l
C.
o
;:j
n
o
;::j
;::j
CD
(')
!:
o
:;j
rr~~~ONNOOO
~~~0;~::E~~~~~
""""UlUlUl~COCO""''''''_
o 0 CD CD CD """ 0. 0. 0 0 0
...., ...., ::E ::E ::E """ s:: s:: """ """ """
Ul Ul CD CD CD CD (') (') CD CD CD
r::c""'''''''''''.ocpco..!......!.......l....
~ ~ (') (') (') s:: Ul Ul 000
o' o' 0 0 0 CD _ ..... (') (') (')
-. -. ::l ::l ::l Ul 0 0 OJ OJ OJ
~ ~ :?:?:?CONNg.gg
..........Q..Q..Q..0'00::l::l ::l
(')(')(')(')(')(i3 = =000
00 tl:l tl:lOJ..... ....,....,....,
< < s:: s:: s:: tl:l ..... ~ .....
~ ~ Ul Ul Ul 3' (J) (J) (J)
CD CD CD CD = = =
~~o.o.o.o. =.=.=.
N N ..... ..... ..... ~. CD CD CD
o 0 ~ ~ ~ ~. -. -. -.
==---::l ::l::l::l
=. =. "Q. "Q. "Q. ur
CD CD "0 "0"0 _
-. -- CD CD CD ::r
::l ::l 0' 0' 0' (3
s::
0. 0. 0. co
-. -. -. ::r
< < < 0
CD CD CD s::
0.0.0.-
CD CD CD
CD CD CD
"0 "0 "0
CD CD CD
""" """ """
""" """ """
CD CD CD
.0 .0 .0
s:: s:: s::
:::;' ::;. :::;"
CD CD CD
0. 0. 0.
tl:l tl:l tl:l
0.0.0.
0. 0. 0.
;::;: ;::..' ;:::::;.:
o' o' o'
::l ::l :::l
~~~
::'1~~
..... --
-..... -
3' 3' 3'
co co co
Ul Ul Ul
0"
o 0
::l """
::;- tl:l
tl:l 0'
(') 0
..... <
~ CD
Ul :3
:3 CD
tl:l ::l
""" .....
"" -.
o
c ::>
"0 CD
0.
co
:3
Ul
o
<
CD
::!..
tl:l
'<
m
"""
co
CD
.....
CD
0.
....,
o
"""
o
CD
~
"""
tl:l
)>
<
CD
....,
o
"""
=.
CD
::l
~~
0....
o co
ON
"'U
::!.
(')
CD
.....
o
o
<
CD
::!..
tl:l
'<
"0
tl:l
...,
Co
::l
co
tl:l
"""
CD
tl:l
~
tl:l
.....
::r
OJ
Ul
"0
"""
o
<
CD
::l
0'
0'
CD
::l
"0
o
o
...,
(')
o
::l
0.
a:
o
:::l
I~
~
-l
o
.....
tl:l
tl:l
E:
c
~
CD
0.
"0
:::l.
(')
CD
n
o
CJ)
.....
....,
o
...,
N
C
><
.....
0')
1
:J
(')
s::
0.
:J
co
3
CD
co
~
s::
co
Ul
-Ef)
-.j
t.)
c
o
CD
0.
s::
Q..
N
~
><
.....
~
~
en
s::
C"
I
-l
o
.....
OJ
o
CD
0.
-l~
o .....
..... 0
OJ <
-CD
::!..
tl:l
'<
:t>
n
-Ef)-Ef)~~~-Ef)~-Ef)-Ef)-Ef)2'
N(J)- - - (J)- .j:o.......NOJ
.j:o..Ol.....N.....CO.....~CO---.l-
WOl(J).....N CO N.j:o.. W---.I n
N W ---.I co 0
CJ)
.....
-Ef)-Ef)
(J) _co -Ef) -Ef)
---.lc.n.j:o..N~
---.lw(J)---.I....n
Ol COOl
-Ef)
Ol
Ol
(J)
~
-Ell -Ef)
O')N
-.j ~
0') 0
....0
-Ef)
---.I
N
o
tT1
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 04/17/2001
Original Contract Price - W-1A (Clearwell Baffling)
Original Contract Price - W-1B (Chemical Addition)
Total Original Contract Price
Total Change Orders to Date
Total Revised Contract Price
Total Change Orders Percent of Original Price
Total Pending Change Orders
Total of Change Orders & Pending Change Orders
Total Pending & Final Change Orders Percent of Original Price
$1,207,688.00
$818,758,29
$2,026,446.29
$609,344.10
$2,635,790.39
30.07%
$0,00
$609,344.10
30.07%
, i ;Revtsed: Contract o/ci of OrigfnaJ'
: ~
AUD CO 41 . CO~$C.rIotiOtl :CQ Amount ~. Amount'(W~1A): . . Contract
Chanqe Order No.1
Repair of high service pumps 2 and 4, clean medium voltage
1.1 MCC $11,495.00
1.2 Repair 30. line at post flash mixer $7,665.00
1.3 Replace 30. line, clean and reuse fittinqs $38,618.00
1.4 Replace oil valves 2-5 and 2-7 and place in 8x8 vaults $65,862.00
Install additional cribbing, temporarily remove electric
1.5 ductbank, substitute 6' precast manhole for vault. $12,487.00
1.6 Remove and dispose of oil contaminated soil $1,791.00
1.7 Replace 30. street elbow with 30. MJ elbow $4,084.00
1.8 Inspect, drain and dispose of qear oil in oil lubricated valves $2,484.00
1.9 Replace oil valve 1-2 $28,689.00
New stuffing box for horizontal mixer. Startup services for
1.10 horizontal mixer from U. S. Filler. $4,931.30
1.11 Diver and crew standby at 20. iunction box. $2369.00
1.12 Replace leakinq valve 1-1. $31,355.00
1.13 Install ductbank manhole in Central Avenue. $3,825.00
1 Chanqe Order No.1 Total $215 655.30 $1,423,343,30 10.64%
04117/2001
1 of 3
W-1 Change Order Summary
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemeial Addition
Summary of Change Orders
Revised: 04/17/2001
-, Revised Contract % of Orlgil1al
AUD CO 4/ , co Des~rfotibn , COA.mo~nt . Amount (W;"1A). . .. Contract
ChanQe Order No.5
Connection of Auxiliary Pump Station and the Fort Gordon
5.1 Pumoinq Station $83,676.00
5 ChanQe Order No.5 Total $83,676.00 $1 652.697.81 4.13%
Chanqe Order No.6
6.1 Lime Removal from Clearwell NO.5 $23,993.49
6.2 Repair of cracks in the slab of Clearwell NO.5 $15,436.80
6.3 Investiqation to locate valve 5-3 stopole valve $11,625.00
6 Chanae Order No.6 Total $51 055,29 $1,703,753.10 2.52%
Chanqe Order No.7
7 Clearwell No. 1 Crack Repair $6,000.00
7 ChanCle Order No.7 Total ' $6,000,00 $1.709,753.10 0,30%
Change Order No.8
Clearwell NO.2 - Dissassemble 3 - 30' Pipes and install 6'
8 sauare access hatch. $9,354.00
8 Chanae Order No.8 Total $9.354.00 $1.719,107,10 0.46%
Chanqe Order No.9
9.1 Investiaate Valve 5-3 bv diver $1,590.00
9.2 Remove brick veneer at clearwell #5 $953.00
9.3 Replace brick veneer at clearwell #5 $1,144.00
9.4 Reoair of Vertical Joints at Clearwell #5 $1,881.00
9 Chanqe Order No.9 Total $5.568.00 $1,724,675,10 0,27%
Chanae Order No.1 0
10.1 Install Stopole Valve for Valve V5-3 Installation $45,153.00
10 Chance Order No.1 0 Total $45.153,00 $1,769,828.10 2.23%
ChanCle Order No. 11
11.1 Restoration of the 72' Concrete Finished Water Line $34,445.00
Installation of 2 D-O-L InnerFlex Assemblies in the 54' 01
11.2 Finished Water Line $5,998.00
11 Chance Order No. 11 Total $40,443,00 $1810.271.10 2,00%
Change Order No, 12
12.1 Modifications to Fort Gordon Connection Piping $9,538.00
12.2 Deduction for return of 24' x 16' Tee -$677.00
12.3 Deduction for deletion of asphalt overlay in Central Avenue -$2,100.00
12 Chanl~e Order No. 12 Total $6,761.00 $1817,032.10 0.33%
04/17/2001
3 of 3
W-1 Change Order Summary