FRANK DANCHETZ
CHIEF ENGINEER
f})epartment Of Transportation
State of (jeor;gia
# 2 Capito[ Square, S. W
.9l.t[anta, (jeorgia 30334-1002
August 26, 1996
G. CHARLES LEWIS
DEPUTY COMMISSIONER
WAYNE SHACKELFORD
COMMISSIONER
JAMES A. MARTIN
TREASURER
Mr. Clifford A. Goins
Assistant Commissioner of Public Works and
Director of Engineering
Room 701, Municipal Building
530 Greene Street
Augusta, Georgia 30911
Dear Mr. Goins:
Re: Augusta Canal Multi-Use Trail TEA Project
STP-000E(96), PI # 271120. Richmond County
Enclosed is your copy of the executed Innovative Financin~ MOU for the Augusta Canal Multi-
Use Trail TEA Project. Please pay particular attention to t~ose items agreed to in the executed
MOU. These are considered the m.ost critical elements of the design phase. In order to apply
allowable Preliminary Engineering expenditures toward the project's local match, you must be
able to document those costs. Therefore it also is critical you maintain proper accounting
records. This letter serves as your Notice to Proceed with Preliminary Engineering.
As this project is not located on the State Highway System, Departmental review of the plans
is not required. If the design will include structures such as bridges or retaining walls. you are
required to secure a consulting firm pre-qualified with the Department. On May 29, 1996 we
forwarded a list of consultants pre-qualified for both Bicycle/Pedestrian Facilities (3.13) and
Minor Bridge Design (4.01). If you would like a new listing, or if you have any questions, .
please contact Cora Cook at (404) 657-6687.
Sincerely,
dnv:~~
Toni Dunagan
State Transportation Planning Administrator
TD/CJC
'i
;'" -~ ~
;-.
'.
~
'C
:.
TRANSPORTATION ENHANCEMENT ACTIVITY
MEMORANDUM OF UNDERSTANDING
BETWEEN
Augusta-Richmond County, hereinafter called the "SPONSOR", and the Georgia p~partment
of Transportation, hereinafter called the. "DEPARTMENT', ,
RELATIVE TO
" The SPONSOR assuming responsibility for tasks associated with Preliminary Engineering
" for the Augusta Canal Multi-Use Trail, STP-000E(96), PI # 271120, Richmond County; hereinafter
called the "PROJECT'. .
WHEREAS the DEPARTMENT has reviewed information supplied by the SPONSOR and,
based 'on that information, approved the SPONSOR'S accounting and procurement systems:
I. IT IS THE INTENTION OF THE PARTIES:
That the SPONSOR fund 100% of the Preliminary Engineering for the PROJECT; and that
the DEPARTMENT may apply said expenditure toward the SPONSOR'S Federal-Aid 20% match of
the PROJECT'S Total Cost, subject to the DEPARTMENT and the Federal Highway Administration's
approval.
II. IT IS AGREED:
A. That the SPONSOR certifies that local funds have been budgeted to undertake
Preliminary Engineering for the PROJECT; and that an" accounting system has been
established to track project-specific Preliminary Engineering expenditures. '
B. That the SPONSOR will be responsible for all Preliminary Engineering expenditures
above those originally budgeted by the SPONSOR.
C. That prior to construction of the PROJECT, the SPONSOR will certify; to the
DEPARTMENT, the amount of eligible expended funds allowable toward the PROJECTS
Total Local Match. . ,
D: That if the PROJECT includes structures such as bridges or retaining walls, the
SPONSOR will be required to use consultants pre-qualified with the DEPARTMENT.
III. IT IS AGREED:
A. That the SPONSOR will observe processes, standards, and requirements contained in
the TEA Sponsor's .Guidebook entitled "Road to Success", or revisions thereto.
B. That the SPONSOR will establish a project team to oversee PROJECT design and
coordinate with the DEPARTMENT and other agencies throughout the design process;
and that the SPONSOR will hold team meetings as required to guide PROJECT
development. '
C. That the SPONSOR will hold the PROJECT Concept Meeting; thatthe SPONSOR will
seek public comment during the PROJECT'S design phase; and that the SPONSOR will
. ensure PROJECT design plans reflect safety, access, and design standards appropriate
and required for completion of PROJECT construction.
...
~
."
.,
" '
".
l'
..
.~.
D. That the SPONSOR will perform all tasks necessary to secure historical/environmental
clearances and will observe Federal and State Right-of-Way laws, regulations,
requirements, and procedures. . .
E. That the SPONSOR will adhere to the scope of ~ork as recommended by the
Transportation Enhancement Advisory Panel and programmed by the State
Transportation Board. All proposed changes to the scope of work will require review and
approval of the DEPARTMENT.
IV. IT IS AGREED:
\
A. That Right-of-Way negotiations, if appropriate, will not begin until the SPONSOR
receives historical/environmental clearances through the DEPARTMENT.
B. That construction funding will be dependent upon the SPONSOR receiving
historical/environmental clearances through the DEPARTMENT; certifying existing or
acquired Right-of-Way to the DEPARTMENT; producing a complete set of biddable
construction plans meeting appropriate safety, access, and design standards; and
preparing and forwarding construction bid procedures and documents for the
DEPARTMENT'S review.
V. IT IS FURTHER AGREED:
A. That nothing contained herein shall obligate the DEPARTMENT to proceed with
subsequent stages of the PROJECT.
S. That the SPONSOR'S expenditure prior to execution of an Agreement with the
DEPARTMENT for construction of the PROJECT shall be at the sole cost and risk to the
SPONSOR. Should the SPONSOR or the DEPARTMENT determine that for any reason
the PROJECT is unable .to enter subsequent stages, the DEPARTMENT is not
responsible for reimbursement of local funds expended on the PROJECT.
..
~
~" ~;
'~'. ..
. '.
~
l'
. f.
day of
parties hereto have executed this Memorandum of'Understanding,
,1996.
this
RECOMMENDED:
dJu'~
te Transportation Planning Administrator
GEORGIA DEPARTMENT OF
TRANSPORTATION
BY: 4~ ~
Commissioner
~.~
W~~,-?n'~, "
. ~.
, ~'V
:,.-{~ .. ,. .... ~
v
Q ry Public, Pike County, Georgia'
ommlsslon Expires JuI~ U~, lege
r.,t'" r
;0- .,
'\....
.... '\"
.--............., .r
AUGUSTA-RICHMOND COUNTY
IN THE PRESENCE OF:
~4'~""
Wi ness . .'. '~"~': \. II>,.". {. .: :~:\,
. ......: .
'IJ{)...~ tU. m~
Notary Pu c .,
No1aty Public, ColumbIa County, Georgia
My Commission Expires June 21, 1998
"'-
-:.
A ,0
...~...
CHARLES T. DILLARD
Commissioner of Public Works and
Director of Engineering
Room 701, MunicIpal Bldg.
530 Greene Street
Augusta, Georgia 30911
Telephone: (706) 821-1706
FAX: (706) 821-1708
DATE:
9/24/96
MEMORANDUM OF TRANSMITTAL
TO: Ms. Lena Bonner, Clerk of Commission
FROM:
OFFICE OF THE CITY ENGINEER
CITY OF AUGUSTA
ATTENTION: Drew Goins ~
93-036(B)
JOB NO:
We are sending this data via (attached) ~X~) the
following:
Attached please find the original "Memorandum of
Understanding" Transportation Enhancement Activity
for the Augusta Canal Multi-Use Trail TEA Project.
A cOpy is retained for our file.
se acknowledge this receipt by returning signed copy of this
memoran our earliest convenience.
"