Loading...
HomeMy WebLinkAboutStevens Creek Road (2) Augusta Richmond GA DOCUMENT NAME: ~en~ G--eev... ~ DOCUMENT TYPE: ffit:r'\)D'(O\'Cu'fY) YEAR: O() BOX NUMBER: \9 FILE NUMBER: \Lols'lG. NUMBER OF PAGES: -3 " " , PU:~lic Works and Engineering Department t Teresa C. Smith, P.E., Director Pre-Construction Section Eric A. Edwards 1815 Marvin Griffin Road Augusta, Georgia 30906 (706) 796-5040 Fax (706) 796-5045 www.augustaga.gov Errick L. Thompson, P.E., Assistant Director Engineering Division MEMORANDUM OF TRANSMITTAL Date: To: September 22, 2003 Betty Clerks Office From: Eric Edwards Subject: Project No.: Stevens Creek Road - Change Order #6 323-04-296823235 File Reference No.: 03-014(A) We are sending you 0 attached 0 under separate cover: Description Change Order #6 on Stevens Creek Road - To Be Filed " ,'--< -, Change Order Form Change Order Number SIX Project Title STEVENS CREEK RD OrigInal Contract Date: 2-06-02 Owner: ARC Contractor: Mabus Brothers Construction Date: September 18. 2003 Project Number: 323-04-296823235 P.O. Number: 53950 JUSTIFICATION: SEE ATTACHED TOTAL AMOUNT OF TillS CHANGE ORDER $ -470.00 The Contract time on Stevens Creek Rd. will increase by ~calendar days as a result of this change order. Original Contnict Amount $ 1,157,552.20 Previous Change Order(s) Total $ (- 8.135.10 ) This Change Order ( Decreased/Incroasod) $ ( -470.00 ) TOTAL CONTRACT WITH CHANGE ORDER(S) *********** $ 1.148.947.10 Approved By: Submitted By: /JIlt Date: September 18.2003 Date: q//o;k-B I {- Date: 1-74-I:7J Date: ~/ ~j ~ Date: ~ft,fi, Date: 9-/9-03 Requested By: Accepted By: _/ CC: Errick Thompson, P.E., Assistant Director-Engineering Eric Edwards, Preconstruction Engineer Purchasing Department, Geri Sams Finance Department, Kakoli Basu Accountant, Public Works and Engineering Agenda File . ,~ ,.' ,. '\- .. Change Order Form Change Order SIX Project No. 326-04-288811018 .- Justification Page 2 (SEE ATTACHED) DELETE: THE 19MM MIX UNDERRAN 395 TONS THE 25MM MIX UNDERRAN 100 TONS ADD: THE LEVELING OVERRAN 496 TONS ADDITIONAL LEVELING WAS REQUIRED DUE TO FIELD CONDITIONS NOT REFLECTED ON THE PLANS. THE UNDERRUNS IN 19MM AND THE 25MM MIXES WILL BE USED TO SATISFY THE COSTS FOR THE REQUIRED ADDITIONAL LEVELING DELETE 395 TONS OF 19MM MIX AT $39.50/TN = $15,602.50 100 TONS OF 25MM MIX AT $39.25/TN = $3,925.00 DELETE TOTAL = $19,527.50 ADD 495 TONS OF LEVELING AT $38.50/TN = $19,057.50 ADD TOTAL = $19,057.50 TOTAL = $19,527.50 - $19.057.50 $470.00