MEMORANDUM
TO:
FROM:
SUBJECT:
DATE:
CC:
GEORGE R KOLB, CITY ADMINISTRATOR
N. MAX HICKS, DIRECTOR, AUGUSTA UTILITIES
10160: 18" RAW WATER MAIN CONVERSION PROJECT
05/17/01
FILE
Please find attached Change Order #2 for the above referenced project. This change order adds the
construction services for this project to ZEL Engineers existing contract.
· Construction Services for the 18" Raw Water Main Conversion Project
$9,935
The existing contract for ZEL Engineers includes the revision of the pre-existing raw water main
conversion plan (1986) and additional services required by a scope change for this project.
,'~:~ ~
': t~ .{.Ii.
.~~ ;.i.~~'"
.~.. .
MAY 1 8 2001 L.l
.l\.11C.1~~fA<~ ~1J8'I'
~~
CHANGE ORDER
CO NUMBER 2
BID ITEM n/a
DATE 5/17/01
PROJECT TITLE
18" Raw Water Main Conversion Project
ORIGINAL CONTRACT DATE 9/11/2000
PROJECT NUMBER 10160
OWNER AUGUSTA COMMISSION
PO NUMBER
P35302
The following change order is hereby made to the proposal for the above project:
PAYEE
ZEL Engineers
TOTAL AMOUNT OF THIS a-IANGE ORDER
$
9,935.00
The contract time will be ~CREASED by Q calendar days as a result of this change.
ORIGIl\JAL CONfRACI COST
$
27,600.00 l)~4'a~'iS'
PREVIOUS CHANGE ORDER (INCREASE)
$
10,030.00 P as 30 ~
TIllS CHANGE ORDER (INrnEASE)
$
9,935.00
TOTAL CONfRACI wrrn a-IANGE ORDER
$
47,565.00
FUNDlNG NUNIBERI ACCOUNT NillvlBER
509043410
5212115
APPROVED BY:
5212115
REQUESTED BY:
DATE: S//7/0/
I ,
SUB!\mED BY:
DATE:
5,//7 It!) (
S/ II?/O I
DATE:
FIl\JANCE ENDORSEMENT:
RECOMMENDED BY:
DATE:
5- Iii ...01
shr/G J
5/21 /0 I
f r
DATE:
2: E 1i35 Telfair Street
[j Augusta'EGeNorgGia 3,09NOI-E249E4 R S
Ted W. Ellis. P.E.. Chm. of Board. Emeritus
Joseph J. Tankersley, P.E., President
Jorge E. Jimenez. P.E., Vice-President
Charles D. Drown, P.E.. Treasurer ZIMMERM.A.i..~, EVANS A..L~ LEOPOLD, L~c.
(706) 724-5627
www.ZELENGINEERS.COM
Kenneth E. Green, P.E., Secretary
John R. Evans. P.E.
R. Nelson WUliams, P.E.
John R. Armstrong. P.E.. Retired
March 9, 2001
2000-P04
Mr. run Ru~ Program Project Engineer
CH2M HIT..L
Augusta 2000 Program Office
360 Bay Street
Suite 100
~ Ga. 30901
Re: ADD No. 10160 18 inch Raw Water Pipeline Conversion
Dear Tun:
We have reviewed the proposal we provided for the post design services in light of Blair
Construction being the contractor we will be dealing with. Based on our past experience with them,
we have shifted professional engineer hours to the staff engineer level and reduced a:rrumber of the
tasks as wen. We therefore would like to offer this amended proposal to provide the post design
engineering services. We propose to provide Post Design Services for this project for $9,900. Please
let us know if you have any questions in this regard and we will respond appropriately. Thank you for
your assistance in this matter.
Sincerely,
JEJ: 51
.,
l' ~ i Ii
[ MAR 1 2 2001 b
2000 P04 AUD No. 10160 CPS 18 in RW
Convasian.doc
BY: ggg.__._.---..-----a
ZEL Engineers
Professional Services Proposal Cost Worksheet
AUGUSTA UTILITIES OEPT ACIP 2000 No. 10160: 18" Raw Water Conversion
TasklD Description Total
Prepare action plan to implement the recommendation to place the
Washington Rd. and west Augusta areas on the elev. 500 pressure
1 system $ 3,680
Present computer runs of the areas under consideration showing high
and low nodal pressures and flows on the 500 and the 564 pressure
2 system after inteqration of the 18 RWL into the distribution system $ 2,280
RevIew CAG's 1988 design for applicability and convert adopted parts
into digital drawings with cover sheet and title blocks. Provide any
additional design necessary for the implementation of the conversion
4 Iplan based on proposed pressure system proposed borders. $ 8.845
4.b Prepare Railroad CrossinCl Pennit packaCle $ 495
Conduct review of all recommendations with Operation Superintendent
5 and staff to fullv consider operational perspective. $ 1,520
Hold project scoping meeting with Management and Construction
Manager to clearly define scope and fine-tune proposal costs and
6 responsibilities. $ 1,520
Provide Project Management schedules and Microsoft Project Gantt
7 charts for the professional effort. $ 1,520
Provide proposed construction schedule Gantt chart showing
8 considerations for various restrictive conditions $ 1,520
Provide semi-monthly project meetings with Construction Manager
9 and Ub1ities Staff. $ 2,280
Provide for three review efforts and written responses to all comments
10 in a timely manner $ 3,180
Provide 8 hours of hands-on manipulation of the H20Net computer
model for a designated Utilities Department engineer to become familiar
11 with the inner -workings of the model of the distribution system. $ 760
$ 27,600
Addltlonallterns
N12 Additional DesiCln alonCl Berkman's Rd. $ 3,000
N13 Additional Desian on Apricot La. $ 2,500
N14 Preparation of Easements $ 4,530
$ 10,030
ZEL Engineers
AUGUSTA UTlUTlES OEPT ACIP 2000 No. 10160: 18" Raw Water Conversion
N15 I'Ost uesJgn ~ervjces - t'roposal Costs MHrs
Biddina and Neaotiating Assistance $ 380 6
General Administration of Construction Contract $ 1,530 22
Pre-Construction Conference $ 345 6
Site visits and observation of construction $ 1,820 28
Defective Work $ 490 7
Clarification and Internretations: Reld Orders $ 1,290 18
ChanQe Orders and ChanCle Order Directives $ 430 6
Shoo Drawinos $ 740 12
Substitutes and "or equal" $ 405 7
Insoections and tests $ 670 10
DisaClreement between Owner and Contractor $ 330 6
APplications for Pavrnent $ 335 5
Contractor's ComDletion Documents $ 455 7
Subtantial Comoletion $ 525 9
1-mal Notice of AcceptaOlllty ".. ~ 2
Projected Construction Duration = 30 weeks ( $ 9,935 \ 151
"-- ./
DOCUMENT FLOW
(Office Of The Administrator)
DATE:
May 21, 2001
TO:
Bob Youn!:!, Mavor
FROM:
Alexandra Alston, Executive Secretary
DOCUMENT ATTACHED: 10160: 18" Raw Water Main Conversion Proiect (from M. Hicks, dated 5/17/01)
ACTION REQUIRED:
Initial/Forward! Return to Administrator's Office
RETURNED BY:
DATE:
***********************************************************************************************,1, 11.l" 1 J. A,\ A ************************************
(ADMINISTRATOR'S OFFICE USE)
RETURNED TO:
DATE:
INITIALS: