Loading...
HomeMy WebLinkAboutRaw Water Main Conversion Project Augusta Richmond GA DOCUMENT NAME: ~0.~ ~+er me.- \' r.. t20n verS(OV'\ 'Pro~-e..t.+ DOCUMENT TYPE: me.. m 0 Y tArl du m YEAR: ;)00' BOX NUMBER: (;) FILE NUMBER: ) 5 L/ o~ NUMBER OF PAGES: - b \ MEMORANDUM TO: FROM: SUBJECT: DATE: CC: GEORGE R KOLB, CITY ADMINISTRATOR N. MAX HICKS, DIRECTOR, AUGUSTA UTILITIES 10160: 18" RAW WATER MAIN CONVERSION PROJECT 05/17/01 FILE Please find attached Change Order #2 for the above referenced project. This change order adds the construction services for this project to ZEL Engineers existing contract. · Construction Services for the 18" Raw Water Main Conversion Project $9,935 The existing contract for ZEL Engineers includes the revision of the pre-existing raw water main conversion plan (1986) and additional services required by a scope change for this project. ,'~:~ ~ ': t~ .{.Ii. .~~ ;.i.~~'" .~.. . MAY 1 8 2001 L.l .l\.11C.1~~fA<~ ~1J8'I' ~~ CHANGE ORDER CO NUMBER 2 BID ITEM n/a DATE 5/17/01 PROJECT TITLE 18" Raw Water Main Conversion Project ORIGINAL CONTRACT DATE 9/11/2000 PROJECT NUMBER 10160 OWNER AUGUSTA COMMISSION PO NUMBER P35302 The following change order is hereby made to the proposal for the above project: PAYEE ZEL Engineers TOTAL AMOUNT OF THIS a-IANGE ORDER $ 9,935.00 The contract time will be ~CREASED by Q calendar days as a result of this change. ORIGIl\JAL CONfRACI COST $ 27,600.00 l)~4'a~'iS' PREVIOUS CHANGE ORDER (INCREASE) $ 10,030.00 P as 30 ~ TIllS CHANGE ORDER (INrnEASE) $ 9,935.00 TOTAL CONfRACI wrrn a-IANGE ORDER $ 47,565.00 FUNDlNG NUNIBERI ACCOUNT NillvlBER 509043410 5212115 APPROVED BY: 5212115 REQUESTED BY: DATE: S//7/0/ I , SUB!\mED BY: DATE: 5,//7 It!) ( S/ II?/O I DATE: FIl\JANCE ENDORSEMENT: RECOMMENDED BY: DATE: 5- Iii ...01 shr/G J 5/21 /0 I f r DATE: 2: E 1i35 Telfair Street [j Augusta'EGeNorgGia 3,09NOI-E249E4 R S Ted W. Ellis. P.E.. Chm. of Board. Emeritus Joseph J. Tankersley, P.E., President Jorge E. Jimenez. P.E., Vice-President Charles D. Drown, P.E.. Treasurer ZIMMERM.A.i..~, EVANS A..L~ LEOPOLD, L~c. (706) 724-5627 www.ZELENGINEERS.COM Kenneth E. Green, P.E., Secretary John R. Evans. P.E. R. Nelson WUliams, P.E. John R. Armstrong. P.E.. Retired March 9, 2001 2000-P04 Mr. run Ru~ Program Project Engineer CH2M HIT..L Augusta 2000 Program Office 360 Bay Street Suite 100 ~ Ga. 30901 Re: ADD No. 10160 18 inch Raw Water Pipeline Conversion Dear Tun: We have reviewed the proposal we provided for the post design services in light of Blair Construction being the contractor we will be dealing with. Based on our past experience with them, we have shifted professional engineer hours to the staff engineer level and reduced a:rrumber of the tasks as wen. We therefore would like to offer this amended proposal to provide the post design engineering services. We propose to provide Post Design Services for this project for $9,900. Please let us know if you have any questions in this regard and we will respond appropriately. Thank you for your assistance in this matter. Sincerely, JEJ: 51 ., l' ~ i Ii [ MAR 1 2 2001 b 2000 P04 AUD No. 10160 CPS 18 in RW Convasian.doc BY: ggg.__._.---..-----a ZEL Engineers Professional Services Proposal Cost Worksheet AUGUSTA UTILITIES OEPT ACIP 2000 No. 10160: 18" Raw Water Conversion TasklD Description Total Prepare action plan to implement the recommendation to place the Washington Rd. and west Augusta areas on the elev. 500 pressure 1 system $ 3,680 Present computer runs of the areas under consideration showing high and low nodal pressures and flows on the 500 and the 564 pressure 2 system after inteqration of the 18 RWL into the distribution system $ 2,280 RevIew CAG's 1988 design for applicability and convert adopted parts into digital drawings with cover sheet and title blocks. Provide any additional design necessary for the implementation of the conversion 4 Iplan based on proposed pressure system proposed borders. $ 8.845 4.b Prepare Railroad CrossinCl Pennit packaCle $ 495 Conduct review of all recommendations with Operation Superintendent 5 and staff to fullv consider operational perspective. $ 1,520 Hold project scoping meeting with Management and Construction Manager to clearly define scope and fine-tune proposal costs and 6 responsibilities. $ 1,520 Provide Project Management schedules and Microsoft Project Gantt 7 charts for the professional effort. $ 1,520 Provide proposed construction schedule Gantt chart showing 8 considerations for various restrictive conditions $ 1,520 Provide semi-monthly project meetings with Construction Manager 9 and Ub1ities Staff. $ 2,280 Provide for three review efforts and written responses to all comments 10 in a timely manner $ 3,180 Provide 8 hours of hands-on manipulation of the H20Net computer model for a designated Utilities Department engineer to become familiar 11 with the inner -workings of the model of the distribution system. $ 760 $ 27,600 Addltlonallterns N12 Additional DesiCln alonCl Berkman's Rd. $ 3,000 N13 Additional Desian on Apricot La. $ 2,500 N14 Preparation of Easements $ 4,530 $ 10,030 ZEL Engineers AUGUSTA UTlUTlES OEPT ACIP 2000 No. 10160: 18" Raw Water Conversion N15 I'Ost uesJgn ~ervjces - t'roposal Costs MHrs Biddina and Neaotiating Assistance $ 380 6 General Administration of Construction Contract $ 1,530 22 Pre-Construction Conference $ 345 6 Site visits and observation of construction $ 1,820 28 Defective Work $ 490 7 Clarification and Internretations: Reld Orders $ 1,290 18 ChanQe Orders and ChanCle Order Directives $ 430 6 Shoo Drawinos $ 740 12 Substitutes and "or equal" $ 405 7 Insoections and tests $ 670 10 DisaClreement between Owner and Contractor $ 330 6 APplications for Pavrnent $ 335 5 Contractor's ComDletion Documents $ 455 7 Subtantial Comoletion $ 525 9 1-mal Notice of AcceptaOlllty ".. ~ 2 Projected Construction Duration = 30 weeks ( $ 9,935 \ 151 "-- ./ DOCUMENT FLOW (Office Of The Administrator) DATE: May 21, 2001 TO: Bob Youn!:!, Mavor FROM: Alexandra Alston, Executive Secretary DOCUMENT ATTACHED: 10160: 18" Raw Water Main Conversion Proiect (from M. Hicks, dated 5/17/01) ACTION REQUIRED: Initial/Forward! Return to Administrator's Office RETURNED BY: DATE: ***********************************************************************************************,1, 11.l" 1 J. A,\ A ************************************ (ADMINISTRATOR'S OFFICE USE) RETURNED TO: DATE: INITIALS: