HomeMy WebLinkAboutFinal Change Order For Project 10160 Augusta Richmond GA DOCUMENTNAME:hN>.' CbJ O~if ~()r \?ru:\<-cl [01&0 DOCUMENT TYPE: {\~ e.-n\ o'{'Q-(,du.l'l, YEAR: 02- BOX NUMBER: t Lt FILE NUMBER: 1568 L NUMBER OF PAGES: ~~ ',',1 - ........~ r MEMORANDUM TO: GEORGE R KOLB, CITY ADMINISTRATOR FROM: JAMES RUSH, CH2M HILL PROGRAM PROJECT ENGINEER SUBJECT: FINAL CHANGE ORDER FOR PROJECT 10160 DATE: 01/21/02 CC: FILE 10160 Please find attached Change Order #3 for the above referenced project. This change order covers the unforeseen construction services requiring the design engineer's attention throughout the duration of this Project. . Additional Construction Services for Project 10160 $7,900 For your convenience I have attached a breakdown of the applicable unforeseen events and the design engineer's hours and costs. If you have any questions or concerns please contact me at 303- 2426. l' 7' ~~~ CHANGE ORDER PROJECT TITLE 18" Raw Water Main Conversion Project ORIGINAL CONTRACT DATE 9/11/2000 CO NUMBER BID ITEM DA1E - , " n/a 1/21/02 PROJECT NUMBER 10160 OWNER AUGUSTA COMMISSION PO NUMBER P35302 The following change order is hereby made to the proposal for the above project: PAYEE ZEL Engineers TOTAL AMOUNT OF ruIS CHANGE ORDER $ The contract time will be INCREASED by Q calendar days as a result of this change. 7,900.00 ORIGINAL CONTRACT COST PREVIOUS CHANGE ORDER (INCREASE) THIS CHANGE ORDER (INCREASE) TOTAL CONTRACT WITH CHANGE ORDER $ $ $ $ 10,030.00 9,935.00 7,900.00 27,865.00 FUNDING NUMBER/ACCOUNT NUMBER 509043410 5212115 ~'ft1# 80110160 REQUES1ED BY: ~... li . - . ENGINEER ~ 1/ ~IffiAo SUBMITIED BY: FINANCE ENDORSEMENT: . f111MC!. ~ ~~ OiOrnA COM OLLER . RECOMMENDED BY: APPROVED BY: DATE: DATE: DATE: DATE: DA1E: 5212115 1/2l/D'Z- ( ! 2-1.( t/ ~ 1- c3 0 -0 J..... ~/l~ L- Ift0~ . 1" ,,~. ,',' .. i .'~ ;- 18" Raw Water Main Conversion Engineering Change Order #3 , . rlifIl,' llD'fSCffip'tion~~\ ',- ',::.,,,. {.:. ,',. ' 1 Provide construction administration during the pigging of the 18-inch raw water main, 2 Provide construction administration during the pipeline blowout at Berckmans Road and Rae's Creek, 3 Provide construction administration and assist in finding a solution when piping problems persisted during the pigging operation, 4 Provide additional design assistance and coordination in obtaining a new easement near Lombardy Court 5 Prepared Change Order for Owner Requested Items, 6 Revise Chlorination Procedure 7 Evaluate the impact of completing a full pressure test on the 18, inch raw water main as requested by the owner, Investigate the pipe wall thicknesses on the 50-year old pipe and determine pressures the pipe is capable of withstanding, i ,aw.r_ 18.0 4.0 8,0 3,0 1.0 20,0 29,5 $1,710.00 $380,00 $760,00 $285,00 $95.00 $1,900,00 $2,802,50 101600201 21 C03 Backup 1 t~$7J9'00r00~1'~i'~ ~~'- '__~"___'. ._. ___,__,__,.-;.v~~ 01/21/2002