MEMORANDUM
TO: GEORGE R KOLB, CITY ADMINISTRATOR
FROM: JAMES RUSH, CH2M HILL PROGRAM PROJECT ENGINEER
SUBJECT: FINAL CHANGE ORDER FOR PROJECT 10160
DATE: 01/21/02
CC: FILE 10160
Please find attached Change Order #3 for the above referenced project. This change order covers
the unforeseen construction services requiring the design engineer's attention throughout the
duration of this Project.
. Additional Construction Services for Project 10160
$7,900
For your convenience I have attached a breakdown of the applicable unforeseen events and the
design engineer's hours and costs. If you have any questions or concerns please contact me at 303-
2426.
l'
7'
~~~
CHANGE ORDER
PROJECT TITLE
18" Raw Water Main Conversion Project
ORIGINAL CONTRACT DATE 9/11/2000
CO NUMBER
BID ITEM
DA1E
-
,
"
n/a
1/21/02
PROJECT NUMBER 10160
OWNER AUGUSTA COMMISSION
PO NUMBER
P35302
The following change order is hereby made to the proposal for the above project:
PAYEE
ZEL Engineers
TOTAL AMOUNT OF ruIS CHANGE ORDER
$
The contract time will be INCREASED by Q calendar days as a result of this change.
7,900.00
ORIGINAL CONTRACT COST
PREVIOUS CHANGE ORDER (INCREASE)
THIS CHANGE ORDER (INCREASE)
TOTAL CONTRACT WITH CHANGE ORDER
$
$
$
$
10,030.00
9,935.00
7,900.00
27,865.00
FUNDING NUMBER/ACCOUNT NUMBER
509043410
5212115
~'ft1#
80110160
REQUES1ED BY:
~... li
. - . ENGINEER ~
1/ ~IffiAo
SUBMITIED BY:
FINANCE ENDORSEMENT: .
f111MC!. ~ ~~ OiOrnA
COM OLLER .
RECOMMENDED BY:
APPROVED BY:
DATE:
DATE:
DATE:
DATE:
DA1E:
5212115
1/2l/D'Z-
( ! 2-1.( t/ ~
1- c3 0 -0 J.....
~/l~ L-
Ift0~
.
1" ,,~.
,','
..
i
.'~
;-
18" Raw Water Main Conversion
Engineering Change Order #3
, . rlifIl,' llD'fSCffip'tion~~\ ',- ',::.,,,. {.:. ,',. '
1 Provide construction administration during the pigging of the
18-inch raw water main,
2 Provide construction administration during the pipeline blowout
at Berckmans Road and Rae's Creek,
3 Provide construction administration and assist in finding a
solution when piping problems persisted during the pigging
operation,
4 Provide additional design assistance and coordination in
obtaining a new easement near Lombardy Court
5 Prepared Change Order for Owner Requested Items,
6 Revise Chlorination Procedure
7 Evaluate the impact of completing a full pressure test on the 18,
inch raw water main as requested by the owner, Investigate
the pipe wall thicknesses on the 50-year old pipe and
determine pressures the pipe is capable of withstanding,
i
,aw.r_
18.0
4.0
8,0
3,0
1.0
20,0
29,5
$1,710.00
$380,00
$760,00
$285,00
$95.00
$1,900,00
$2,802,50
101600201 21 C03 Backup
1
t~$7J9'00r00~1'~i'~
~~'- '__~"___'. ._. ___,__,__,.-;.v~~
01/21/2002