Loading...
HomeMy WebLinkAboutAlexander Drive Augusta Richmond GA DOCUMENT NAME: A \ e..-~~(\.6. if \)r. DOCUMENT TYPE: ~ e....yY\.O r~ U4Y\ YEAR: 0 L BOX NUMBER: t Y FILE NUMBER:)J 65 ~ NUMBER OF PAGES: t\ Public Works and Engineering Department Teresa C. Smith, P.E., Director Pre-Construction Section Sandra Grimes Pre-Construction Engineer 1815 Marvin GriffIn Road Augusta, Georgia 30906 (706) 796-5040 Fax (706) 796-5045 MEMORANDUM OF TRANSMITTAL Date: To: ~/YLLl-d .^o: ~';;A) ~ QO..:u ~~ ..,otnlrl-V From: \J~~v J(l;ncL\ D-jj/~ Subject: ~Cvnb J)~ Project No.: 3~ 3 -() {._ ..;( q to F .23 :1.) S- File Reference No.: 0 .;(- 0/ 4( /}) . Weare sending. you ~ttached 0 under separate cover: # CODies Dated DescriDtion .\ I ~ -1\-0\ Lx. t r 1 ."To:of L&PA Comments: rr-::D<L U olA.R.- -0: /€.s. . \ t e ~ p)lL C 6'1\ +nU J; VY\ ;1-.JL J. TOM COLEMAN, JR COMMISSIONER (404) 656-5206 FRANK L DANCHETZ CHIEF ENGINEER (404) 656-5277 Department of Transportation StI;1.te of Georgia #2 CapitoC Square, S.W. Atfanta, Georgia 30334-1002 HAROLD E L1NNENKOHL DEPUTY COMMISSIONER (404) 656-5212 BILLY F. SHARP TREASURER (404) 656-5224 December 21, 2001 RECEIVED Honorable Bob Young, Mayor Augusta-Richmond County Commission- Council 530 Greene Street, Augusta, Georgia 30911 JAN 2 2002 PUBLIC WORKS & ENGINEERING Dear Mayor Young: I am returning for your files an executed agreement between the Georgia Department of Transportation and Richmond County for the following project: PROJECT#: STP-OOOI-OO(794) Richmond County, P.I.#0001794 For Alexander Drive from Washington Road to Riverwatch Parkway We look forward to working with you on the successful completion of this joint Project. Should you have any questions, please contact me at (404) 656-5320. Herman T. Griffin, P.E. State Transportation Programming Engineer HTG:as Enclosure c: Percy Middlebrooks, w/attachment Michael L. Thomas, P:E. - District 2 Mike Thomas, Attn: David qriffith Teresa Smith, Director of public Works George Brewer, District Design Engineer .-; .' , .. AGREEMENT BETWEEN DEP ARTMENT OF TRANSPORA TION STATE OF GEORGIA AND AUGUSTA-RICHMOND COUNTY, GEORGIA For Alexander Dr-in from .Washington Road to Rivenvatch Parkway This AGREEMENT is made and entered into this 'l!!:.. day ofM ,2001. by and between the DEPARTMENT OF TRANSPORTATION, an agency of the State of Georgia, hereinafter called the "DEPARTMENT", and AUGUSTA-RICHMOND COUNTY, GEORGIA acting by and through it.s Mayor and theAugusta-Richrnond County Commissioners, hereinafter call the" CITY". WHEREAS, the CITY has represented to the DEPARTMENT a desire to improve the roadway facilities along Alexander Qrive from Washington Road to Riverwatch Parkway, in the CITY of Augusta, Richmon~ County, Georgia, currently described as Georgia Department of Transportation Project Number STP-OOOl-OO (794), P. 1. Number 0001794, hereinafter referred as the "PROJECT; and WHEREAS, the CITY has represented to the DEPARTMENT a desireto participate in providing the preconstr'uction engineering activities need for the. improvements, relocating the utilities, and other costs as specified in the AGREEMENT, and the D EP AR TMENT has relied upon such representations and . .... ... WHEREAS, the DEPARTMENT has expressed a willingness to participate in the funding of the construction of the PROJECT with funds of the DEPARTMENT, funds apportioned to the DEPARTMENT by the Federal Highway Administration, hereinafter referred to as the "FHW A", under Title 23, Unites States Code, Section 104, or a combination of funds from any of the above sources; subject to those certain conditions set forth in the AGREEMENT. THEREFORE inconsideration of the mutual promises made and of the benefits to flow from one to the other, the DEP AR TMENT and the CITY hereby agree each with the other as follows: . 1. Primary Consultant firms hired by the CITY to provide services on the PROJECT shall be prequalified with the DEPARTMENT in the appropriate area-classes. The DEPARTMENT shall, on request, furnish the CITY with a list of prequalified consultant firms in the appropriate area-classes. 2. The PROJECT construction and right or way plans shall be prepared in English units. 3. The CITY shall contribute towards the PROJECT by funding all cost for the preconstruction engineering (design). The preconstruction engineering activities shall be accomplished in accordance with the DEPARTMENT's Plan Development Process, the applicable guidelines of the American Association of State Highway and TranspOliation Officials (AASHTO), the DEPARTMENT's Standard Specifications for the Construction of Roads and Bridges, the DEPARTMENT's Plan Presentation Guide, PROJECT schedules, and applicable guidelines of the DEPARTMENT. The CITY's responsibility for design shall include but is not limited to the following: a. Prepare the PROJECT concept report in accordance with the format used by the DEPARTMENT. The corlcept for the PROJECT shall be developed to accommodate the future traffic volumes as generated by the CITY and approved by the DEPARTMENT. The concept report shall be approved by the DEPARTMENT pfior.to the CITY beginning further development of the PROJECT plans. It is recognized by the parties that the approved concept may be modified by the CITY as required by the DEPARTMENT and reapproved by the DEPARTMENT during the course of design due tOpublic input, envirorunental requirements, or right of way considerations; b. Develop the PROJECT's base year (year facility is expected to be open to traffic) and design year (base year plus 20 years) traffic volumes. This shall include average daily traffic (ADT) and morning (am) and evening (pm) peak hour volumes. The traffic shaii show all through and turning movement volumes at intersections for the ADT and peak hour volumes and shall indicate the percentage of trucks expected onthe facility. c. Validate (check and update) the approved PROJECT concept and prepare a Project Design Book for approval by the DEPARTMENT prior to the beginning of preliminary plans. d. Prepare environmental studies, documentation, and reports for the PROJECT that show the PROJECT is in compliance with the provisions of the National Environmental Protectiori Act and Georgia Envifbilfi1ental Protection Act, as appropriate to the PROJECT funding. This shall include any and all archaeological, historical, ecological, air, noise, underground storage tanks (UST), and hazardous wast~ site studies required. The CITY shall submit to the DEPARTMENT all environmental documents and reports for review and approval by the D EP AR TMENT and the FHW A. e. Prepare all public hearing and public information displays and conduct all required public hearings and public infonnation meetings in accordance with DEP ARTMENT practice. f. Perform all surveys, mapping, and soil investigation studies needed for design of the PROJECT. g. Perform all work required to obtain project permits, including, but not limited to, US Army Corps of Engineers 404 and Federal Emergency Management Agency (FEMA) approvals. These efforts shi:ill be coordinated with the DEP AR TMENT. h. Prepare the PROjECTs. drainage design including erosion control pians aGd the development of the hydraulic studies for the Federal Emergency Management Agency Floodways and acquisitio.n of all necessary permits associated with the drainage design. I. Prepare traffic studies, preliminary construction plans, including a cost estimate for the Preliminary Field Plan Review, preliminary and final utility plans, preliminary and final right of way plans, staking of the required right of way, and the final construction plans including erosion control, traffic ". handling, and constructiori sequence plans and specifications including special provisions for the PROJECT. J. Provide certification, by a Georgia Registered Professional Engineer, that the construction plans have been prepared under the guidance of the professional engineer and are in accordancewith acceptable industry standards. 4. The DEPARTMENT shall review and has approval authority for all aspects of the PROJECT. The DEPARTMENT will work with the FHWA to obtain all needed approvals with information furnished by the CITY. 5. Upon the CITY's determination of the rights of way required for the PROJECT and the approval of the right of way plans by the DEPARTMENT: the CITY shall fund the acquisition and acquire the necessary rights of way for the PROJECT. Right of way acquisition shall be in accordance with the law and the rules and regulations of the FHW A including but not limited to, Title 23, Unit~d States Code: (lJnifol1l1 Act), and 49 CFR Part 24, and the rules and regulations of the DEPARTMENT. Failure to follow these requirements will result in loss of Federal funding for the project and it will be the responsibility of the CITY to make up tbe loss of that funding. All required right of way shall be obtained and cleared of obstructions, including underground storage tanks, prior to the DEPARTMENT's advertising the project for bids. The CITY shall further be responsible for making all changes to the approved right of way plans, as deemed necessary by the :;.. DEPARTMENT, for whatever reason, as needed to purchase the right of way or to match actual conditions encountered. 6. The City shall be responsible for all utility relocC!tion costs necessary for the construction of the PROJECT. 7. The CITY shall be responsible for all costs for providing energy, maintenance, and operational costs of any roadway and interchange lighting within the PROJECT limits. 8. The CITY shall follow the DEPARTMENT's procedures for identification of existing and proposed utility facilities on the PROJECT. These procedures, in part, require all requests for existing, proposed, or. relocated facilities to flow through the DEPARTMENT's Project Liaison and the District Utilities Engineer. 9. Upon completion and approval of the PROJECT plans, certification that all needed rights of way have been obtained and cleared of obstructions, and certification that all needed permits for the PROJECT have been obtained by the CITY, the DEPARTMENT shall let the PROJECT for construction. Except as provided herein and upon receipt of an acceptable bid, the DEP ARTMENT shall bear all costs for construction, including all costs associated with inspection and niaterials testing during construction. The ':;.- , " DEPARTMENT shall be solely responsible for securing and awarding the construction contract f01' the PROJECT. 10. The CITY agrees that all reports, plans, drawings, studies specifications, estimates, maps, computations, computer diskettes andprintouts, and any other data prepared under the terms of this agreement shall become the property of the DEPARTMENT. This data shall be organized, indexed, bound, and delivered to the DEPARTMENT no later than the advertisement of the PROJECT for letting. The DEPARTMENT shall have the right to use this material without restriction or limitation and without compensation to the CITY. 11. THE CITY shall be responsible for making all revisions to the plans including revisions made after the PROJECT is let and under construction. All revisions shall be coordinated with the DEPARTMENT prior to issue. 12. The CITY shall prepare all shop drawings for approval by the DEPARTMENT. 13. Both the CITY and the DEPARTMENT hereby acknowledge that time is of the essence and both parties shall adhere to the priorities established in the approved Transp01iationImprovement Program/State Transportation Improvement Program (TIP/STIP) or earlier. Furthermore, all parties shall adhere to the detailed project schedule, as approved by the DEPARTMENT. In the completion of respective commitments contaIned herein, if a change in the schedule is needed, the DEPARTMENT shall have final authority. If, for any reason, the CITY does not produce acceptab~e deliverables at the milestone dates defined in the cun-ent TIP/STIP, or in the approved schedule, the DEP ARTME~T reserves the right to delay the project's implementation until funds can be re-identified for construction or right of way, as applicable. 14. This AGREEEMNT is made and entered into in Fulton County, Georgia, and shall be governed and construed under the laws of the State of Georgia. The covenants herein contained shall, except as otherwise provided, accrue to the benefit of and be binding uponthe successors and assigns of the parties hereto. ";'\:;.'" .; . ~ IN WITNESS WHEREOF, the DEPARTMENT and the CITY have caused these presents to be executed under seal by their duly authorized representatives. RECOMMENDED: AUGUSTA-RICHMOND COUNTY COMMISSIONERS . *" R~[CHMOND C.ounty, Georgia ? ~. BY. ' .~ ~." Mayor ~ n ~4f ri vLn~ i7 aJtf-- Director of Preconstruction Signed, sealed and delivered this 13'ti- Day, of, j}trl/c-m~~7L 2001: in the Presence of: ,.;J~ tv lJ]~~ Witness J~~ ~Co""~GM";' My CommlS&lonExplres JefL 4. . "-.'.) DEPARTMENT OF TRANSPORTATION BY~ . COmmlSSlG!~er .. ....,........., ,L.0lii. ATTEST: ~~ ~~pI