Loading...
HomeMy WebLinkAboutW K DICKSON CONTRACT AMENDMENT #1 TOPOGRAPHIC SURVEYING FOR AUGUSTA TEE CENTERWK DICKSON community infrastructure consuttonts TOPOGRAPHIC SURVEYING FOR AUGUSTA TEE CENTER Contract Amendment #1 1. Scope of Services. Per your request, W.K. Dickson & Co., Inc. will provide additional topographic and utility locations survey services for the Augusta Trade, Exhibit, and Events (TEE) Center (PO# 174907). The topographic survey and utility locations will take place in the area along James Brown Blvd. (9 Street) towards the river to include the turnaround area as the northern boundary and the east side of the right of way as the eastern boundary. The western boundary will be the face of the existing building — Augusta Marriot Hotel & Suites. The size of the area for additional services is approximately one (1) acre. 2. Deliverables Proposal survey drawings shall include two drawings and one CADD file, produced in AutoCad2004 or a later version and provided to the OWNER'S Project Manager. These additional services are a contract amendment in accordance to the agreement executed by and between W.K. Dickson & Co., Inc. and the City of Augusta, GA for Augusta TEE Center Design Survey Bid Item #09 -134, dated January 4, 2010. 3. Time of Performance. Work will begin upon receipt of notice to proceed and will be completed in ten (10) days assuming timely access to properties. 4. Basis of Compensation. A. Basic Services. The Owner shall pay the Consultant for services set forth above, Scope of Services, a Lump Sum fee of $1,500.00 (Fifteen hundred dollars and 00/100 cents A percentage of the Lump Sum Fee will be billed on the last day of each month. The percentage billed will be the percentage of work estimated to be complete as of the day of billing. B. Additional Services. The OWNER shall pay the CONSULTANT for additional services which are not specifically called for in above, Scope of Services, in accordance with the CONSU LTANT'S standard rates. 1450 Greene Street Suite 225 Augusta, GA 30901 Tel, 706.722.3479 Fax 706.722.6773 www.wkdickson.com Transportation . Water Resources • Urban Development • Geomatics Augusta TEE Ctr Contract Amendment #1 March 18, 2010 Page 2 of 2 C. Premium Rate Adjustment. Should OWNER request an accelerated schedule requiring CONSULTANT to work overtime hours, then a 1.25 premium rate adjustment shall be applied to current hourly rates or lump sum fees as appropriate. Accelerated schedule and premium rate adjustment shall be approved as part of compensation at time of contract execution or by written amendment. All work and compensation under this Contract Amendment shall be in accordance with the base agreement dated January 4, 2010. OWNER: AUGUSTA - RICHMOND COUNTY, GA By: Title: CONSULTANT: W.K. DIC ZO., �C By: Title: Vice President Date: kPFP L. '? li Date: 03/18/2010 Augusta - Richmond County CAPITAL IMPROVEMENTS PROGRAM MANAGEMENT HEERY International, Inc. 501 Greene Street, Suite 313, Augusta, Georgia 30901 (706) 842 -5543; FAX (706) 821 -2484 Letter of Transmittal X For approval ❑ As requested ❑ For Your Files ❑ For Your Use ❑ Revise & Submit ❑ Furnish as requested ❑ For Your Information DATE: 22 March 2010 ❑ As Discussed TO: Fred Russell ARC Administrator FROM: Jacques Ware SUBJECT: TEE Center ❑ For Review and Comment Fred, Please provide approval for W K Dickson Contract Amendment # 1 for the Topographic Surveying for Augusta TEE Center. Additional topographic and utility survey is needed. Feel free to contact me if you have additional questions. 9 7 # ITEM: as dewdbed above ® Attached ❑ Under Separate Cover Via pickup from your courier If Enclosures are not as noted kindly notify us at once. Received by. ryo ���,23 24;?S `s ?, I �L68 G9