HomeMy WebLinkAboutW K DICKSON CONTRACT AMENDMENT #1 TOPOGRAPHIC SURVEYING FOR AUGUSTA TEE CENTERWK
DICKSON
community infrastructure consuttonts
TOPOGRAPHIC SURVEYING FOR AUGUSTA TEE CENTER
Contract Amendment #1
1. Scope of Services.
Per your request, W.K. Dickson & Co., Inc. will provide additional topographic and utility
locations survey services for the Augusta Trade, Exhibit, and Events (TEE) Center (PO# 174907).
The topographic survey and utility locations will take place in the area along James Brown Blvd.
(9 Street) towards the river to include the turnaround area as the northern boundary and the east
side of the right of way as the eastern boundary. The western boundary will be the face of the
existing building — Augusta Marriot Hotel & Suites.
The size of the area for additional services is approximately one (1) acre.
2. Deliverables
Proposal survey drawings shall include two drawings and one CADD file, produced in
AutoCad2004 or a later version and provided to the OWNER'S Project Manager.
These additional services are a contract amendment in accordance to the agreement executed by
and between W.K. Dickson & Co., Inc. and the City of Augusta, GA for Augusta TEE Center
Design Survey Bid Item #09 -134, dated January 4, 2010.
3. Time of Performance. Work will begin upon receipt of notice to proceed and will be
completed in ten (10) days assuming timely access to properties.
4. Basis of Compensation.
A. Basic Services. The Owner shall pay the Consultant for services set forth above, Scope of
Services, a Lump Sum fee of $1,500.00 (Fifteen hundred dollars and 00/100 cents
A percentage of the Lump Sum Fee will be billed on the last day of each month. The
percentage billed will be the percentage of work estimated to be complete as of the day of
billing.
B. Additional Services. The OWNER shall pay the CONSULTANT for additional services
which are not specifically called for in above, Scope of Services, in accordance with the
CONSU LTANT'S standard rates.
1450 Greene Street
Suite 225
Augusta, GA 30901
Tel, 706.722.3479
Fax 706.722.6773
www.wkdickson.com
Transportation . Water Resources • Urban Development • Geomatics
Augusta TEE Ctr
Contract Amendment #1
March 18, 2010
Page 2 of 2
C. Premium Rate Adjustment. Should OWNER request an accelerated schedule requiring
CONSULTANT to work overtime hours, then a 1.25 premium rate adjustment shall be
applied to current hourly rates or lump sum fees as appropriate. Accelerated schedule and
premium rate adjustment shall be approved as part of compensation at time of contract
execution or by written amendment.
All work and compensation under this Contract Amendment shall be in accordance with the base
agreement dated January 4, 2010.
OWNER:
AUGUSTA - RICHMOND COUNTY, GA
By:
Title:
CONSULTANT:
W.K. DIC ZO., �C By:
Title: Vice President
Date:
kPFP L. '? li
Date: 03/18/2010
Augusta - Richmond County
CAPITAL IMPROVEMENTS PROGRAM MANAGEMENT
HEERY International, Inc.
501 Greene Street, Suite 313, Augusta, Georgia 30901
(706) 842 -5543; FAX (706) 821 -2484
Letter of Transmittal
X For approval
❑ As requested
❑ For Your Files
❑ For Your Use
❑ Revise & Submit
❑ Furnish as requested
❑ For Your Information
DATE: 22 March 2010
❑ As Discussed
TO: Fred Russell
ARC Administrator
FROM: Jacques Ware
SUBJECT: TEE Center
❑ For Review and Comment
Fred,
Please provide approval for W K Dickson Contract Amendment # 1 for the Topographic Surveying for
Augusta TEE Center. Additional topographic and utility survey is needed.
Feel free to contact me if you have additional questions.
9
7 #
ITEM: as dewdbed above
® Attached ❑ Under Separate Cover Via pickup from your courier
If Enclosures are not as noted kindly notify us at once.
Received by.
ryo ���,23 24;?S `s ?,
I �L68 G9