CITY OF AUGUSTA, GEORGIA
PUBLIC WORKS DEPARTMENT
CONTRJlICT CHANGE ORDER NO.
12
I
Qate:- March 1, 2000
Project No.: 98-149
Contract Date: October 14, 1998
Project (Contract): SOUTH AUGUSTA RECREATION COMPLEX
TO (CONTRACTOR): Blair Construction, Inc.
You are directed to make the following changes in this Contract:
1. Adjust the contract quantities and corresponding dollar amounts per the attached sheet to
reflect actual work constructed at the contract unit prices.
2. Provide credit for installation of natural birch wooden interior doors in lieu of the specified
white birch. See the attached letter from Continental Construction Company, Inc., dated
February 18, 2000.
<$21,103.78>
<$752.00>
Total This Change Order
<$21,855.78>
Enclosures:
The original Contract sum was
. . . . . . .. $
6,079,999.59
219,148.84
6,299,148.43
<21,855.78>
6,277,292.65
Net change by Previous Changer Order Numbers ................................... $
The Contract sum prior to the Change Order was .................................... $
The Contract sum will be (Increased) (Decressed)(Unchsflged) by this Change Order
The new Contract sum including this Change Order will be: ............................ $
The Contract time will be (Increased) (Decressed)(Unchanged) by
o
) Days
The Date of Completion as of this date of this Change Order therefore is: September 6, 1999
BY:.*~/)ltif~J
Date: - - CJO I
By:
of Augusta, Geortk
Accepted: Blair Construction, Inc.
Contractor
Date:
~/f
;, - ;' "';: ; ,
,
SOUTH AUGUST A REGIONAL PARK
A TT ACHMENT FOR CHANGE ORDER NO. 12
PROJECT NO. 98-149
FINAL CONTRACT QUANTITY CHANGES
March 2, 2000
ORIGINAL AcruAL REQUIRED REQUIRED
CONTRACT CONSTRUCfED QUANTITY UNIT CONTRACT
QUANTITY QUANTITY ADJUSTMENTS PRICE ADJUSTMENT
I STREETS
4 6"GAB 9,382,00 7,439.44 (\ ,942.56) $15.000 ($29,138.40)
5 8"GAB 830.00 1,343.20 513.20 $19.500 $10,007.40
6 2'lYPE E ASPHALT 3,233.00 2,892.32 (340.68) $36.150 ($12,315.58)
8 2" WIND. SPR. RD OVERLAY 485.00 569.13 84.13 $38.000 $3,196.94
9 PRIME COAT 2,915.00 4,850.00 1,935.00 $1.800 $3,483.00
10 TACK COAT 990.00 169.00 (821.00) $1.700 ($1,395.70)
]I 4" SIDEWALK 942.00 1,597.60 655.60 $17,200 $11,276.32
]l2 6" SIDEWALK 14,102.00 14,115.00 13,00 $21.150 $274.95
][1 STORM SEWER
1 6"PYC 1,250.00 1,365.00 115.00 $14.000 $1,610.00
5 18" RCP 2,735.00 2,674.00 (61.00) $18.500 ($1,128.50)
8 36" RCP 2,331.00 2,389,00 58.00 $44.500 $2,581.00
9 42" RCP 1,183.00 1,133.00 (50.00) $58.000 ($2,900.00)
II 18" FES 3.00 1.00 (2.00) $450.000 ($900.00)
22 TRENCH DRAINS 400.00 349.00 (51.00) $65.000 ($3,315.00)
IU WATER
1 8"WATERMAIN 1,530.00 1,458.00 (72.00) $9.100 ($655.20)
:2 6" WATER MAIN 1,410.00 1,565.00 155,00 $7.300 $1,131.50
4 3" WATER SERVICE 1,100.00 915.00 (185.00) $4.100 ($758.50)
IV SANITARY SEWER
I 8" SAN SEWER (6'-8') 458.00 . 455.00 (3.00) . $10.250 ($30.75)
2 8" SAN SEWER (8'-10') 1,233.00 . 1,230.00 (3.00) $11.600 ($34.80)
:I 8" SAN SEWER (\0'-12') 721.00 716.00 (5.00) $13.500 ($67.50)
.. 8" SAN SEWER (12'-14') 148.00 160.00 12.00 $14.800 $177.60
5 8" SAN SEWER (14'-16') 134.00 138,00 4.00 $16.500 $66.00
6 8" SAN SEWER (16'-18') 132.00 122.00 ( 10.00) $22.000 ($220.00)
7 8" SAN SEWER (18'-20') 218.00 208.00 (\ 0.00) $34.500 ($345.00)
II 6" SAN SEWER SERVICE 830.00 733.00 (97.00) $7.250 ($703.25 )
V PLAYING FIELDS
II 6' PYC COATED FENCE 8,830.00 9,575.00 745.00 $11.000 $8,195.00
9 24' PYCCOA T BACKSTOP 1,030.00 529.00 (501.00) $78.600 ($39,378.60)
10 18' PYC COAT BACKSTOP . 850.00 1,324.00 474.00 $62.000 $29,388.00
VlII LANDSCAPING
33 SOD 11,306.00 21,087.00 9,781.00 $3.400 $33,255.40
33A SPRIGGS 55,477.00 38,688.00 (16,789.00) $0.757 ($12,709.27)
IX MISCELLANEOUS
1A SILTFENCE 12,055.00 11,720.00 (335.00) $3.000 ($1,005.00)
liE TEMPORARY GRASSING 20.00 18.00 (2.00) $540.000 ($1,080.00)
3A 6" CONCRETE HEADER CURB 5,100.00 4,550.30 (549.70) $8.000 ($4,397,60)
i SIGNAGE ALLOWANCE 30,000.00 16,731.77 (13,268.23 ) $1.000 ($13,268.23)
TOTAL CHANGE ORDER NO. 12 (521,103.78)
'\
o
o
,,-...
,
ReHA 110 L HOlI1OH. PllfSIOfNT
IIAlPIf C. (SICJ>) NEWMAN, veE PIIE$IOENT
OtANNE MUSE. COll9OlIATE SECRETARY
706-860-3846
706-863-0306 (FAX)
CONTINENTAL CONSTRUCTION COMPANY, INC.
P,O. BOX 204198 . AUGUSTA. GEORGIA 30917-4198
<!...;.'
'..~
February 18, 2000
Dennis Welch
Cranston, ,Robertson, & Whitehurst, P.C.
P.O. Box 2546
Augusta, Ga. 30903
Re: South Augusta Recreation Complex .
Dear Dennis,
.
. Per our last telephone conversation, I ~ave worked up a credit for leaving the wood doors as
instaUed. We installed plain sliced natural birch instead of plain sliced white birch. The difference
in price is $752.00. See attached for backup.
Also, please see the attached letter from the electrical contractor regarding Mr. Charles
RoyiLI's final inspection item #8 in which he calls for finishing labeling the electrical panel boxes.
We need clarification.
~.'.
I~'.
'p Newman
Vice President