Loading...
HomeMy WebLinkAboutSouth Augusta Recreation Complex Augusta Richmond GA DOCUMENTNAME: South AUqU5h ~-eCYcrlt;on tomp Ie X . DOCUMENT TYPE: to n.tvad YEAR: '2J)DO BOX NUMBER: OJ F~ENU:MBER: lL-}~ tp~ NUMBER OF PAGES: ,_J t. ?'~, .~ l' " COMPTROLLER 0 CITY CLERK 0 CITY ENGINEER 0 CONTRACTOR 0 FIELD 0 OTHER F CITY OF AUGUSTA, GEORGIA PUBLIC WORKS DEPARTMENT CONTRJlICT CHANGE ORDER NO. 12 I Qate:- March 1, 2000 Project No.: 98-149 Contract Date: October 14, 1998 Project (Contract): SOUTH AUGUSTA RECREATION COMPLEX TO (CONTRACTOR): Blair Construction, Inc. You are directed to make the following changes in this Contract: 1. Adjust the contract quantities and corresponding dollar amounts per the attached sheet to reflect actual work constructed at the contract unit prices. 2. Provide credit for installation of natural birch wooden interior doors in lieu of the specified white birch. See the attached letter from Continental Construction Company, Inc., dated February 18, 2000. <$21,103.78> <$752.00> Total This Change Order <$21,855.78> Enclosures: The original Contract sum was . . . . . . .. $ 6,079,999.59 219,148.84 6,299,148.43 <21,855.78> 6,277,292.65 Net change by Previous Changer Order Numbers ................................... $ The Contract sum prior to the Change Order was .................................... $ The Contract sum will be (Increased) (Decressed)(Unchsflged) by this Change Order The new Contract sum including this Change Order will be: ............................ $ The Contract time will be (Increased) (Decressed)(Unchanged) by o ) Days The Date of Completion as of this date of this Change Order therefore is: September 6, 1999 BY:.*~/)ltif~J Date: - - CJO I By: of Augusta, Geortk Accepted: Blair Construction, Inc. Contractor Date: ~/f ;, - ;' "';: ; , , SOUTH AUGUST A REGIONAL PARK A TT ACHMENT FOR CHANGE ORDER NO. 12 PROJECT NO. 98-149 FINAL CONTRACT QUANTITY CHANGES March 2, 2000 ORIGINAL AcruAL REQUIRED REQUIRED CONTRACT CONSTRUCfED QUANTITY UNIT CONTRACT QUANTITY QUANTITY ADJUSTMENTS PRICE ADJUSTMENT I STREETS 4 6"GAB 9,382,00 7,439.44 (\ ,942.56) $15.000 ($29,138.40) 5 8"GAB 830.00 1,343.20 513.20 $19.500 $10,007.40 6 2'lYPE E ASPHALT 3,233.00 2,892.32 (340.68) $36.150 ($12,315.58) 8 2" WIND. SPR. RD OVERLAY 485.00 569.13 84.13 $38.000 $3,196.94 9 PRIME COAT 2,915.00 4,850.00 1,935.00 $1.800 $3,483.00 10 TACK COAT 990.00 169.00 (821.00) $1.700 ($1,395.70) ]I 4" SIDEWALK 942.00 1,597.60 655.60 $17,200 $11,276.32 ]l2 6" SIDEWALK 14,102.00 14,115.00 13,00 $21.150 $274.95 ][1 STORM SEWER 1 6"PYC 1,250.00 1,365.00 115.00 $14.000 $1,610.00 5 18" RCP 2,735.00 2,674.00 (61.00) $18.500 ($1,128.50) 8 36" RCP 2,331.00 2,389,00 58.00 $44.500 $2,581.00 9 42" RCP 1,183.00 1,133.00 (50.00) $58.000 ($2,900.00) II 18" FES 3.00 1.00 (2.00) $450.000 ($900.00) 22 TRENCH DRAINS 400.00 349.00 (51.00) $65.000 ($3,315.00) IU WATER 1 8"WATERMAIN 1,530.00 1,458.00 (72.00) $9.100 ($655.20) :2 6" WATER MAIN 1,410.00 1,565.00 155,00 $7.300 $1,131.50 4 3" WATER SERVICE 1,100.00 915.00 (185.00) $4.100 ($758.50) IV SANITARY SEWER I 8" SAN SEWER (6'-8') 458.00 . 455.00 (3.00) . $10.250 ($30.75) 2 8" SAN SEWER (8'-10') 1,233.00 . 1,230.00 (3.00) $11.600 ($34.80) :I 8" SAN SEWER (\0'-12') 721.00 716.00 (5.00) $13.500 ($67.50) .. 8" SAN SEWER (12'-14') 148.00 160.00 12.00 $14.800 $177.60 5 8" SAN SEWER (14'-16') 134.00 138,00 4.00 $16.500 $66.00 6 8" SAN SEWER (16'-18') 132.00 122.00 ( 10.00) $22.000 ($220.00) 7 8" SAN SEWER (18'-20') 218.00 208.00 (\ 0.00) $34.500 ($345.00) II 6" SAN SEWER SERVICE 830.00 733.00 (97.00) $7.250 ($703.25 ) V PLAYING FIELDS II 6' PYC COATED FENCE 8,830.00 9,575.00 745.00 $11.000 $8,195.00 9 24' PYCCOA T BACKSTOP 1,030.00 529.00 (501.00) $78.600 ($39,378.60) 10 18' PYC COAT BACKSTOP . 850.00 1,324.00 474.00 $62.000 $29,388.00 VlII LANDSCAPING 33 SOD 11,306.00 21,087.00 9,781.00 $3.400 $33,255.40 33A SPRIGGS 55,477.00 38,688.00 (16,789.00) $0.757 ($12,709.27) IX MISCELLANEOUS 1A SILTFENCE 12,055.00 11,720.00 (335.00) $3.000 ($1,005.00) liE TEMPORARY GRASSING 20.00 18.00 (2.00) $540.000 ($1,080.00) 3A 6" CONCRETE HEADER CURB 5,100.00 4,550.30 (549.70) $8.000 ($4,397,60) i SIGNAGE ALLOWANCE 30,000.00 16,731.77 (13,268.23 ) $1.000 ($13,268.23) TOTAL CHANGE ORDER NO. 12 (521,103.78) '\ o o ,,-... , ReHA 110 L HOlI1OH. PllfSIOfNT IIAlPIf C. (SICJ>) NEWMAN, veE PIIE$IOENT OtANNE MUSE. COll9OlIATE SECRETARY 706-860-3846 706-863-0306 (FAX) CONTINENTAL CONSTRUCTION COMPANY, INC. P,O. BOX 204198 . AUGUSTA. GEORGIA 30917-4198 <!...;.' '..~ February 18, 2000 Dennis Welch Cranston, ,Robertson, & Whitehurst, P.C. P.O. Box 2546 Augusta, Ga. 30903 Re: South Augusta Recreation Complex . Dear Dennis, . . Per our last telephone conversation, I ~ave worked up a credit for leaving the wood doors as instaUed. We installed plain sliced natural birch instead of plain sliced white birch. The difference in price is $752.00. See attached for backup. Also, please see the attached letter from the electrical contractor regarding Mr. Charles RoyiLI's final inspection item #8 in which he calls for finishing labeling the electrical panel boxes. We need clarification. ~.'. I~'. 'p Newman Vice President SN/dm