DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY:
Augusta-Richmond
DATE:
January 21, 199Y-
DESCRIBE TOPTIlREE PRIORITY PROJECTS CELOW. TIIIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE NEEDED.
IF ADDITIONAL PAGES ARE NEEDED, ATTACH PLAINWIIlTE PAPER TO TilE BACK OF THIS FORM. ALL ADDITIONAL
PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. ATTACH ONE MARKED MAP OFYOUR COUNTY
INDICATING THE PROJECTS SHOWN ON TIllS LIST. YOUR "DESCRIPTION OF PROJECT" SHOULD INCLUDE: BEGINNING
AND ENDING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
PRIORITY
NUMBER
1
PRIORITY
NUMBER
2
PRIORITY
NUMBER
3
Ilgg
DESCRII'TION OF PROJECT:
WALTON WAY IMPROVEMENTS
1.5 miles of milling, leveling, resurfacing and replacement
of curbs, gutters and sidewalks where needed. From
Milledge Road to 15th Street.
Total Estimated Construction Cost $700,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
BARTON CHAPEL ROAD INTERSECTION IMPROVEMENTS, PHASE I
Intersection improvements at (1) Glenn Hills Drive and Old
Barton Chapel Road; (2) Milledgeville Road and (3)
Wrightsboro Road.
Total Estimated Construction Cost = $900,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
MCCOMBS ROAD, SECTION I
1.4 miles of grading, draining, base and paving to a 2-lane
rural section from Broome Road to SR ~6. 80 ft of R/W
,. required.
Total Estimated Construction Cost = $500,000.
(Local Government to furnish design plans and quantities).
APPROVED:
(DOT Commissioner)
DATE APPROVED:
, '(
DOT 531
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROJECTS
CONSTRUCTION PRIORITY LIST
COUNTY: Augusta-Richmond
DATE: January 21. 1997
~
DESCRIBE TOP THREE PRIORITY PROJECTS BELOW. THIS LIST MAY CONTAIN AS MANY PROJECTS AS ARE NEEDED.
IFADDmONAL PAGES ARE NEEDED, ATrACH PLAINwmTE PAPER TO THE BACK OF THIS FORM. ALL ADDmONAL
PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. ATrACH ONE MARKED MAP OFYOUR COUNTY
INDICATING THE PROJECTS SHOWN ON THIS LIST. YOUR -DESCRIPTION OF PROJECT- SHOULD INCLUDE: BEGINNING
AND ENDING POINTS. NAME OF ROAD. APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
PRIORITY
NUMBER
4
PRIORITY
NUMBER
5
PRIORITY
NUMBER
6.
SIG
JIgg
DESCRIPTION OF PROJECT:
MCCOMBS ROAD, SECTION II
1.7 miles of grading, draining, base and paving to a 2-lane
rural section from Old Waynesboro Road to Broome Road. 80
ft of R/W required.
Total Estimated Construction Cost = $800,000.'
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
BARTON CHAPEL ROAD, PHASE II
1.64 miles of widening to 3-lanes, including curbs, gutters
and sidewalks where needed. From U.S. 1 to near Glenn Hills
Drive, then from South Old Barton Chapel Road to Milledgeville
Road.
Total Estimated Construction Cost = $1,700,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
BARTON CHAPEL ROAD, PHASE III
1.2 miles of widening to 3-lanes, incl~ding curbs, gutters and
sidewalks where needed. From Gordon Highway to near
Wrightsboro Road.
Total Estimated Construction Cost = $1,200,000.
(Local Government to furnish design plans and quantities).
APPROVED:
(DOT Commissioner)
DATE APPROVED:
t
DOT 531
'DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROJECI'S
CONSTRUCTION PRIORITY UST
COUNTY: Augusta-Richmond
DA~ January 21. 1997
DESCRlBE TOP THREE PIUOR.lTY PROJECTS BELOW. THIS UST MAY CONTAIN AS MANY PROJECTS AS ARE NEEDED,
IF ADDmONAL PAGES ARE NEEDED, A'ITACH PLAIN WHrrE PAPER. TO THE BACK OF THIS FORM, ALL ADDmONAL
PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL. A'ITACH ONE MARKED MAP OF YOUR COUNTY
INDICATING THE PROJECTS SHOWN ON THIS UST, YOUR 'DESCRIPI10N OF PROJECT' SHOULD INCLUDE: BEGINNING
AND ENDING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK.
DESCRIPI10N OF PROJECT:
PIUORIrY
NUMBER
7
STEVENS CREEK ROAD
0.3 miles of major widening and reconstruction from
Washington Road to Claussen Road intersection.
Total Estimated Construction Cost = $600,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
COOK ROAD AND GLENDALE sIn IMPROVEMENTS
PIUOR.lTY
NUMBER
8
Minor widening, add curbs, gutters and sidewalks, improve
drainage along Cook Road and all streets in Glendale SiD.
Total Estimated Construction Cost = $1,800,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
S.R. 56 @ PHINIZY ROAD INTERSECTION IMPROVEMENTS
PRIOR.lTY
NUMBER
9
Add decel lane on S.R. 56 and additional lanes on Phinizy
Road. Also add signal.
Total Estimated Construction Cost = $210,000.
(Signal Included)
(Local Government to furnish design plans and quantities).
APPROVED:
(DOT Commiuiooer)
!lag
DATE APPROVED:
'<
"
..
DOT 531
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
COUNTY CONTRACT PROrncrs
CONSTRUCTION PRIORrIY LIST
COUNTY: Augusta-Richmond
DATE: JaIli-tary 21, 1997
DESCRlBB TOP THREE PRIORITY PROIBCTS BELOW, THIS LIST MAY CONTAIN AS MANY PROJECI'S AS ARE NEEDED.
IF ADDmONAL PAGES ARE NEEDED, AlTACH PLAIN WHITE PAPER TO THB BACK OF THIS FORM, ALL ADDmONAL
PAGES SHOULD BE SIGNED BY THE AUTHORIZED COUNTY OFFICIAL, AlT ACH ONE MARKED MAP OF YOUR COUNTY
INDICATING THE PROJECI'S SHOWN ON THIS LIST, YOUR .DESCRIPTION OF PROJECT. SHOULD INCLUDE: BEGINNING
AND ENDING POINTS, NAME OF ROAD, APPROXIMATE LENGTH OF ROAD, AND NEEDED WORK..
PRIORITY
NUMBER.
10
PRIORITY
NUMBER.
11
PRIORITY
NUMBER.
12
DESCRIPTION OF PROJECT:
GLENN HILLS DRIVE IMPROVEMENTS
0.7 mile of widening to 3-lanes, including curbs, gutters
and sidewalks. From Barton Chapel Road to Glenn Hills Middle
School.
Total Estimated Construction Cost = $690,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
S.R. 56 @ OLD WAYNESBORO ROAD INTERSECTION IMPROVEMENTS
Add decel lane on S.R. 56, add lane on Old Waynesboro Road
and close another portion of Old Waynesboro Road.
Total Estimated Construction Cost = $200,000.
(Local Government to furnish design plans and quantities).
DESCRIPTION OF PROJECT:
FISH VILLAGE DRAINAGE IMPROVEMENTS
Overall drainage improvements in subdivision which floods
in normal storm.
Total Estimated Construction Cost = $200,000.
(Local Government to furnish design plans and quantities).
APPROVED:
(DOT Commiasioncr)
DATE APPROVED: