UTILIT~SE"UICE CO., inc.
WATER TANK MAINTENANCE
CONTRACT
Owner RICHMOND COUNTY CORRECTIONAL INSTITUTE
Tank Size 100,000 ELEVATED
lJocation TOBACCO ROAD -- AUGUSTA, GEORGIA
Date APRIL 1, 1996
iCl1986 FSI
.
..l"'.....-,,"'-
./ .
':'.
..
c 1986 FSI
UTILIT!ij . SEAUICE CO., inc.
P.O.Box 1354 . PERRY, GA 31069
~
Phone (912) 987-0303
FAX (912) 987-2991
@
WATER TANK MAINTENANCE CONTRACT
This agreement entered into by and between RICHMOND COUNTY CORRECTIONAL
INSTITUTE hereinafter known as the Owner, and Utility Service Co.,
Inc. hereinafter known as the Company.
The Owner agrees to employ the Company to provide the professional service needed to maintain
its 100,000 gallon water storage tank located at
TOBACCO ROAD -- AUGUSTA, GEORGIA
This agreement binds the Company to total responsibility for the care and maintenance of the above
described water storage tank. Care and maintenance shall -include but not be limited to the
following:
The Company will annually inspect and service the tank beginning in the year 1996 The
tank and tower will be thoroughly inspeCted to assure that the structure is in a sound water tight
condition.
Biennially, beginning with the first washout/inspection in 1997 ,the tank will be completely
drained and cleaned to remove all mud, silt, and other accumulations that might be harmful to the
tank or its contents. This cleaning will utilize high pressure equipment with chemical injection.
After cleaning is completed, the interior will be thoroughly inspected and disinfected prior to
returning the tank to service.
The Company shall furnish all specialized services including engineering and inspection services
needed to carry out any and all repairs to the tank and tower needed during the term of this contract.
These repairs include steel replacement, steel parts, expansion joints, water level indicators,
sway rod adjustments, manhole covers/gaskets, and other component parts of the tank or tower.
The Company will clean and repaint the interior and/or exterior of the tank at such time as
complete repainting is needed. The need for interior painting to be determined by the thickness of
the existing liner and its protective condition. The need for exterior painting to be determined
by the appearance and protective condition of the existing paint.
When painting is needed, all products and procedures will be equal to, or exceed the requirements
of the GEORGIA ENVIRONMENTAL PROTECTION DIVISION the American Water Works
Ass'ociation, and the Steel Structures Painting Council as to surfa~e preparation, coating materials,
and disinfection.
When interior renovation is needed, procedures as outlined in A.W.W.A. - DI02 specifications
for cleaning and coating of potable water tanks will be followed. Only material approved for use
in potable water tanks will be used on any interior surface area.
At such time that the exterior needs painting, the owner may select the color, or color scheme.
The Company will select the type and brand of paint that best suits the application.
The Company will install an anti-climb device on the access ladder to prevent unauthorized
persons from climbing the tower.
Page 1 of 3
c 1986 FSI
A lock will be installed on the roof hatch of the tank to prevent any unauthorized entry to the water
tank. Keys to the tank will be retained by the Owner and the Company.
The Company will E!"()vide emergency service to handle any problems with the tank at no additional
cost to the Owner. Reasonable travel time must be allowed for the repair unit to reach the tank site.
The Company will furnish relief valves, if needed, to install in the water system so the Owner can
pump direct and maintain water pressure while the tank is being serviced.
The Company will furnish current certificates of insurance coverage to the Owner at the time
any work is performed, or upon renewal of any policy.
The Owner shall have the right to continue this contract for an indefinite period of time providing
the ann ual fee is paid in accordance wi th the terms of pay men t. A base fee of $ 5 . 100 .00
has been established for this tank.
The above annual fee will remain constant for the first three (3) years of this agreement. In year
1999 and each third year thereafter, the annual fee will be adjusted to reflect the current
cost of service. The adjustments, either up or down, shall be limited to a maximum of 5% annually.
It is agreed that future mandated environmental, health, or safety requirements which cause
significant changes in the cost of tank maintenance will be just cause for modification of this
agreement. This contract does not include the containment or disposal of any hazardous waste
materials. .
This contract is subject to cancl;llation by the Owner only if intent to cancel is received by Company
one hundred and twenty (120) days prior to the anniversary date. Notice of Cancellation to be
delivered by registered mail and signed by three (3) authorized voting offiCials of the Owner's
management and/or Commissioners,
This Agreement signed this
7
day of 111 ~
UTILITY SERVICE CO., INC.
( /t L-l /5>1 ~/l
I/~ ~
19 '/~
by JEFF GEORGE, GA REPRESENTATIVE
title
witness ~ J. az~
by MAY 0 R
. .Ad' .d title
witness 1f//I/dJ~P~ .
seal:
seal:
_+-o:~~~..;....-~,..~
:-:'7 ---- ~ .....:......
......:- -
",,-. ... -.,':) .~, "
Addendums to Contract on page 3
Page 2 of 3
c 1986 FSI
Addendums to Contract Number 100,000 ELEV
Dated 4-1-96
,
No. 1
utility Service Company shall repair leak in riser and recoat as
required to ensure the tank is protected from corrosion and has
a good appearance.
./
/
Utilit{s0~ce Co.A;,c.
by (/A#//~
date ~ / I / Cj b . .
witness ~~ J, .~
No.2
PAYMENT TERMS: Officials shall have option of payment terms of
either monthly, quarterly, semi-annual, or annually..
(PLEASE CIRCLE PREFERRED METHOD OF PAYMENT)
UtiIitY(~
by ~'c7.bv-;~-
. date Lf7/ !C(b
witness . ~.I~^ J.~
No. 3
Utility Service Co., Inc.
by
date
Owner
by
date
witness
witness
Page 3 of 3
:;
~,
UTILIT~ . SEAUIC! CO., inc.
WATER TANK MAINTENANCE
CONTRACT
Owner RICHMOND COUNTY CORRECTIONAL INSTITUTE
Tank Size 100,000 ELEVATED
Location TOBACCO ROAD -- AUGUSTA, GEORGIA
Date APRIL 1, 1996
.. .
c 1986 FSI
I
c 1986 FSI
UTILIT~ SEAUICE CQ., inc.
P.O.Box 1354 . PERRY, GA 31069
~
Phone (9121 987-0303
FAX (9121987-2991
WATER TANK MAINTENANCE CONTRACT
This agreement entered into by and between RICHMOND COUNTY CORRECTIONAL
INSTITUTE - hereinafter known as the Owner, and Utility Service Co.,
Inc. hereinafter known as the Company.
The Owner agrees to employ the Company to provide the professional service needed to maintain
its 100,000 gallon water storage tank located at
TOBACCO ROAD -- AUGUSTA, GEORGIA
This agreement binds the Company to total responsi bility for the care and maintenance of the above
described water storage tank. Care and maintenance shall 'include but not be limited to the
following:
The Company will annually inspect and service the tank beginning in the year 1996 The
tank and tower will be thoroughly inspected to assure that the structure is in a sound water tight
condition.
Biennially, beginning with the first washout/inspection in 1997 ,the tank will be completely
drained and cleaned to remove all mud, silt, and other accumulations that might be harmful to the
tank or its contents. This cleaning will utilize high pressure equipmentwith chemical injection.
After cleaning is completed, the interior will be thoroughly inspected and disinfected prior to
returning the tank to service.
The Company shall furnish all specialized services including engineering and inspection services
needed to carry out any and all repairs to the tank and tower needed during the term of this contract.
These repairs include steel replacement, steel parts, expansion joints, water level indicators,
sway rod adjustments, manhole covers/gaskets, and other component parts of the tank or tower.
The Company will clean and repaint the interior and/or exterior of the tank at such time as
complete repainting is needed. The need for interior painting to be determined by the thickness of
the existing liner and its protective condition. The need for exterior painting to be determined
by the appearance and protective condition of the existing paint.
When painting is needed, all products and procedures will be equal to, or exceed the requirements
of the GEORGIA ENVIRONMENTAL PROTECTION DIVISION. the American Water Works
Association, and the Steel Structures Painting Council as to surface preparation, coating materials,
and disinfection.
When interior renovation is needed, procedures as outlined in A.W.W.A. - DI02 specifications
for cleaning and coating of potable water tanks will be followed. Only material approved for use
in potable water tanks will be used on any interior surface area.
At such time that the exterior needs painting, the owner may select the color, or color scheme.
The Company will select the type and brand of paint that best suits the application.
The Company will install an anti-climb device on the access ladder to prevent unauthorized
persons from climbing the tower. ,- .
Page 1 of 3
;
c 1986 FSI
A lock will be installed on the roof hatch of the tank to prevent any unauthorized entry to the water
tank. Keys to the tank will be retained by the Owner and the Company.
The Company will provide emergency service to handle any problems with the tank at no additional
cost to the Owner. Reasonable travel time must be allowed for the repair unit to reach the tank site.
The Company will furnish relief valves, if needed, to install in the water system so the Owner can
pump direct and maintain water pressure while the tank is being serviced.
The Company will furnish current certificates of insurance coverage to the Owner at the time
any work is performed, or upon renewal of any policy.
The Owner shall have the right to continue this contract for an indefinite period of time providing
the annual fee is paid in accordance with the terms of payment. A base fee of $ 5 .100.00
has been established for this tank.
The above annual fee will remain constant for the first three (3) years of this agreement. In year
1999 and each third year thereafter, the annual fee will be adjusted to reflect the current
cost of service. The adjustments, either up or down, shall be limited to a maximum of 5% annually.
It is agreed that future mandated environmental, health, or safety requirements which cause
significant changes in the cost of tank maintenance will be just cause for modification of this
agreement. This contract does not include the containment or disposal of any hazardous waste
materials.
This contract is subject to cancellation by the Owner only if intentto cancel is received byCompany
one hundred and twenty (120) days prior to the anniversary date. Notice of Cancellation to be
delivered by registered mail and signed by three (3) authorized voting officials of the Owner's
management and/or Commissioners.
7
This Agreement signed this
day of 1f/ ~
UTILITY SERVICE CO., INC.
LI1 /5~'-;t~
19 '1~
.:-
by MA VOR
A..... . J title
witness 1fJ#/dJ9tP~
by JEFF GEORGE, GA REPRESENTATIVE
title
witness ~ .d - ~~
seal:
seal:
Addendums to Contract on page 3
Page 2 of 3
'\
c 1986 FSI
Addendums to Contract Number 100,000 ELEV
, Dated 4-1-96
No.1
utility Service Company shall repair leak in riser and recoat as
required to ensure the tank is protected from corrosion and has
a good appearance.
Utility Service Co.~c.
::,e'/ <-n;)}~~j~
witness ~;~ J.~
witness
No.2
PAYMENT TERMS: Officials shall have option of payment terms of
either monthly, qUarterly,~emi-annu~ annually.
(PLEASE CIRCLE PREFERRED METHOD OF PAYMENT)
,0"'.....-.
Utility, S~?~/rm( ,
by i.j . /L~ ~i!/&,vk__--
date r.. / If 7/ / q b /
witness ~.l:-~./A J.~
by
witness
No. 3
Utility Service Co., Inc.
by
date
Owner
by
date
witness
witness
Page 3 of 3
..
RICHMOND COUNTY CORRECTIONAL INSTITUTION
R. LEVERETI'
Warden
~t\
/t
1\
1\
Post Office Box 5259
AUGUSTA, GEORGIA 30906
April 12, 1996
,
~
1996
lAUGUSTA-RICHMOHD COUInY COMMISSIOHJ ,
J. BLACKBURN
Deputy Warden
fi\'n~a"@"~~- n7JF
' ~ ill. \ ~J ~'.ig l~' ~ 'ffi)
J i'h ~ :p.d'~~ \,;; ~1l i r '.
~:j~E~ p .. '~~d tlJ
APR 1 ~ ~ ~;~:..)
.>. ~. 1""0
NfgR~sO:.t/) .tJ1~:':.rr.'./
BOMfJ'1f "",. ,,,'~--~:~""'(';
~.. 'w~!,'dJ~t..~~_~::;';:-i"rT~.:' [;\7:":;:':;
Mr. Charles Dillard
Operations Administrator
530 Greene Street
Augusta, GA 30901
RE: Repairs to Water Tank
Dear Mr. Dillard:
On March 28, 1996, during a routine inspection of the water tank by the Utility Service
Company Incorporated, a leak was discovered at the top of the tank. The repairs and
painting of the tank was performed by them in July 1994. The tank is located on the
property of the Richmond County Correctional Institution (RCCI). The cost to repair the
tank is $4,250.00. The cost for repairs and a one (1) year maintenance contract is
$5,100.00. Enclosed is a copy of the proposals.
It is imperative that the repairs to the tank be done; however, there are no funds in my
budget to pay for the repairs or the maintenance contract. The water tank is necessary to
provide water to the Institution, Roads and Bridges and the Automotive shops.
RCCI pays a water bill each month as a customer of the Water Department. Accordingly,
I feel that the ownership of the water tank be transferred to the Water Department and the
repairs to the water tank should be made with funds from monies collected from water
revenue.
...
Page 2
April 12, 1996
I respectfully request that this matter be placed on the agenda for the Public Safety
Committee meeting on April 23, 1996 for discussion.
Sincerely,
~v~