Loading...
HomeMy WebLinkAboutPointe West Drainage Augusta Richmond GA DOCUMENT NAME: ~\\\t~ ~-\- c\,(ill~ DOCUMENT TYPE: COO-t\O c+- YEAR: BOX NUMBER:, P ~ FILE NUMBER: \l6\ t) NUMBER OF PAGES: C1L\ '~ I I I I I I I I I I I I I I I I I I I' . -~~-... ~~ 11'/ J.:3 '/ u CONTRACT DOCUMENTS AND SPECIFICATIONS FOR POINTE WEST DRAINAGE IMPROVEMENTS PH. IA (EMERGENCY REPAIRS) PROJECT NO. 323-04-203823372 [ BID ITEM # 04-121 '.' . AlA Document A3l 2' Performance Bond BOND NO.1 04196011 Conforms with the American Institute of,Architects, AlA Document A312, , Any singular reference to, Contractor, Surety, OWner or other party shall, be considered plural where applicable" CONTRACTOR (Naine and Address): SOUTHEAST PIPE SURVEY, ,INt. 3523 WILLIAMS STREET PATTERSON, GEORGIA 31557 SURETY (Name and Principal Place of Business): , TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA - ONE' TOWER SQUARE . HARTFORD, CONNECTICUT 06183 OWNER (Name and Address): CITY OF AUGUSTA' 1815 MARVIN GRIFFIN ROAD AUGUSTA, GEORGIA 30906 CONSTRUCTION CONTRACT Date: , ' Amount: EIGHTY ONE THOUSAND TWO HUNDRED SEVENTY NINE AND 50/100 DOLLARS ($81,279.50) , ' , , , , Description (Niune and Location): POINTE WEST IMPROVEMENTS - PHASE IA (EMERGENCY REPAIRS) PROJECT NUMBER 323-04-203823372 . BOND Date (Not earlier than Construction Contract Date): Amount: EIGHTY ONE THOUSANDTWO HUNDRED SEVENTY NINE AND 50/100 DOLLARS ($81,279.50), ,. Modifications to this Bond: CONTP.l~CTOR' AS PRINCIPAL C,~n~~a:l~:::~~:~'_ HEAStaE' E SURVEY, I "'\. ,,;}.'~- I"'" '0 {'f' '!;~-;. :"1; . ~.::'. '~,:,':-: ,.' :.SigJi~#1i9,;'''' ,_ '0G }tanie:f1f,i(fT~tb: WilJ,is A. Thorntbn::-Vice flEesident (An~ -ad!:titiona:,s;gnatures appear on page 2.) (FOR"'I)-/FOiThJATION ONL Y - Name, Address and Telephoile) AGENT or BROKER: H & H INSURANCE SERVICES, INC. -3160 CAMPUS DRIVE, SUITE 100 NORCROSS, GEORGIA 30071 (770) 409-0014 1 The Contractor and the Surety, jointly and severally, bind themselves, " their heirs, executors, . admmistrators, , successors' and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference, 2 If the Contractor performs the Construction Contract, the Surety and the COil tractor shall have, 'no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3,1, ' 3 If there is no Owner Default, the Stirety's obligation under this Bond . shall ari se after: ' 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the ContraCtor and the Surety to be held not later than fIfteen days after receipt of such notice to discuss methods of ' performing the Construction Contract. If the Owner, the Contractor aild the Surety agree; the Contractor shall be allowed a reasonable time to SURETY 5026 (6-92) S-1852/GEEF10/99 Notice The laws of the State of Georgia proh:bit IDsurers from unfairly diSCriminating against any person based upon his or rter status as 6 vlctirn of family Violence, .' Page 1 of 2 ~ None . ,,"CJ Sfle Page 2 SURETY Company: TRAVELERS CASUALTY' AND (Corporate Seal) SURETY COMPANY OF AMERICA. · Signamre. .~ 6 .~~ Name and Title: CHRI OPHER B. WORTHAM ATTORNEY-IN-FACT OWNER'S REPRESENT A TIVE (Architect, Engineer ~r other party): ' ' perform the Construction Contract, but such an agreement shall not waive the Own'er's right; if any, subsequently to declare a Contractor Default; and . 3.2 The Owner has declared a Contractor Default and fonnally terminated the 'Contractor's right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received, notice as provided in Subparagraph 3.1; and 3.3 The Owner has 'agreed to pay the Balillice of the Contract , Price to the' Surety in accordance with the terms of the Construction Contract or to a contractor, selected to perform the Construction Contract in accordance' with the terms of the contract with the Owner. 4 When the Owner has satisfied the conditions of Paragraph 3, the 'Surety shall promptly and at the Surety's expense take one of the following actiol1s: ' 4.1 Arrange for the C6rttractor, with consent of the Owner, 'to perform and complekthe Construction Contract; or 4.2 Undertake to perform and' complete the ConstructionContrac,t itself, through its agents or through independent contractors; or ' 4.3 Obtain bids or negotiated 'proposals, from qualified contractors acceptable' to the' Owner Jor 'a contract for' performance, and completion of the, Construction Contract, arrange for a contract to be prepared for execution ,by the Owner and the contractor selected with the Own,er's concurrence, to be secured With performance and payment bonds executed by a qualified surety equivalent to the bonds, issued on' the Construction Contract,' and pay" to the Owner the amoWlt. of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or ," 4.4 Waive Its right tope~form and complete, arrange for completion, or obtain a new contractor and with reasonable promptness Wlder the circumstailces: ' ' .1 After investigation, cletennine the amount for which it may be liable to, the O\VIler and~, as soon as practicable after the amoWlt is determi?ed, tender payment therefor to the Own.er; or :. , ' .2 Deny liabilitY in whole or in part and notify the Owner citing reasons therefor: ' , " 5 If the Surety does not proceed as provided in Paragraph 4 with , reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional Written notice from 'the owner to the Surety demanding that, the Surety perform its obligations Wld,er this Bond; and the Owner shall be entitled to enforce any remedy available to' the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the , Surety has denied liability, in whole or in part, without further notice the ' Owner shall be entitled to enforce any remedy available to the Owner. 6, After the Owner has terminated theCorttractor's right to complete the Construction Contract, and if the Surety elects, to act Wlder Subparagraph 4.1,4,2, or 4,3' above, then the responsibilities'of the Surety to the Owner shall not be greater than those of the Contractor Wlder the Construction Contract, arid the responsibilities of the OWner to the SuretY shall not be greater than those of the OWner Wlder the Construction Contract. To the' limit of the amowit of this Bond, but subject to commitment by the Owner' of the Balance of the Contract Price to mitigation of costs and damages on the Cons~ction Contract, the Surety is obligated without duplication for: 6.1 The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract;, , 6.2 Additional legal, design professionaF and delay costs resulting from the Contractor~s Default, and resulting. from the 'actions or failure to act of the Surety Wlder Paragraph 4; and 6.3 Liquidated damages, or ifno liquidated damages are.specified in ' the. ConstruCtion Contract, actual damages caused by delayed performance or non-performance of the Contractor. MODIFICATIONS TO TIllS BOND ARE AS FOLLOWS: "'; .' 7' The Surety shall not be liable to the6~er or others for obligations of the Contractor that are unrelated,to',the Construction Contract, and the ,Balance of the Contract Price shall not be reduced or set off on accoWlt of any'such unrelated' obligations, No right of-action shall accrue on this ,Bond to any person or entity other than the Owner or its heirs executors administrators or succes~ors., ." " " .' , ' ~ The Suretyherebx waives no'tice of any change, inciudingchanges of trme, to the Consu:uctI,on Contract or to relat~d' subcontracts, purchase orders and other oblIgations. ' '~ '" ~yproceeding, legal or equitable, Wlder this Bond may be , mstItuted m any court ,of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two ' years after Contractor Default or Within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations Wlder this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available'to sUreties as a defense in the jurisdiction of the suit shall be applicable, ,10, 'Notice to the'Surety, the Owner or the Contractor shall be mailed or delivered to the addiess shown on the signatUre page, " 11 When this Bond has been furnished toco~ply with a statutory or , other legal. requirement in the location where the construction was to be ' p~rformed" any provision, in this Bond conflictmg with said statutory or legal re9urrement shall be deemed ,deleted herefrom and' provisions ' conformmg to such, statutory or other legal requirement shall be deemed incorporated herein, The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12 DEFINITIONS. 12.1 Balance of the Contract Price: The total amoWlt payable by the , Owner to the Contractor Wlder the Construction Contract after all , proper adjustments have beenniiIde; including allowance to' the Contractor of, any amoWlts received or to be received by the Owner in settlement of insurance or' other ClilimS for damages to which the Contractor is, entitled, reduced by all valid and proper payments made ,to or on behalf of the ContraCtor' Wlder the Construction , ,Contract. , ' ' }2.2 Construction Contract The agieement between the O~er and the Contractor identified on the signature page, including all Contract Documents and ch~ges thereto., " , 12.3' Contractor Default: Failure of the Contractor which has neither been remedied nor waived, to perform orotherwi~e to comply with the terms of the Construction C.ontract. . 12.4 Owner Default Failure of the Owne~ which has neither been remedied. nor waived, to pay ,the Contra~tor as required by the ConstructIOn Contract or to perform and complete or comply with the other terms thereof" .' (Space is provided below for additional signatures ofaddedparties, other than those appearing on tliecov~r page,) , CONTRACTOR AS PRINCIPAL SURETY " Company: (CorPorate Seal), Company: Signature: , Name'andTitle:, Address: $-18521GEEF 10/99 (Corporate Seal) Signature: Name and Title: . Address: Page 2 of 2 AlA Document A3 J 2 ' BOND NO, 104196011 , Payment', B,ond' , Conforms with the American Instihite.ofArchitects, AlA Document A312, , Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SOUTHEAST PIPE SURVEY, INC. 3523 WILLIAMS STREET PATTERSON, GEORGIA 31557 SURETY (Name and Principal Place of Business): TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA - ONE TOWER SQUARE HARTFORD; CONNECTICUT 06183 OWNER (Name and Address): CITY OF AUGUSTA 1815 MARVIN GRIFFIN ROAD AUGUSTA, GEORGIA 30906 CONSTRUCTION CONTRACT Date: . Amount: EIGHTY ONE THOUSAND TWO HUNDRED SEVENTY NINE AND 50/100 DOLLARS ($8.1,279.50) , Description (Name and Location): POINTE WEST IMPROVEMENTS~ PHASE IA (EMERGENCY REPAIRS) PROJECT NUMBER 323-04-203823372 BOND Date( Not earlier than Construction Contract Date): Amount: EIGHTY ONE THOUSAND TWO HUNDRED SEVENTY NINE AND 50/100 DOLLARS ($81,279.50) Modifications to this Bond: CONTRACTOR AS PRINCIPAL Co~pany:"SO~THEAST PIPE SURVEY, IN /:,';~i~:t{~'<: 's ~'SigifuiUre':~:'4' -~d J: .: ~ Nlr1rte'iii\(['fitle:':':'vhius A. Thornton/Vice f,resident ....,. _, ,,1/, -'"/'" .0' . , (~Y;,addj!1cnalJignatures appear on page 2.) -. (F9R~OIJI\'f1n:foN ONLY - Name, Address and Telephone)j\GENT or BROKER: H & H INSURANCE SERVICES, INC, - 3160 CAMPUS DRIVE,SUITE 100 NORCROSS, GEORGIA 30071 '(770) 409-0014 1 The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials ,and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein ;by reference, ' 2 With respect to the Owner, this obligation shall be null and void if the Contractor: ' 2.1 Promptly makes payment; directly or indirectly, for all sums due Claimants, and ' (Corporate Seal) 2.2 Defends, inderrmifies and holds harmless the Owner from claims, , demands, liens or suits by any person or entity whosec1aim, demand, lien' or suit is for the payment for labor, materials or equipment furnished for use in the performance of the Construction Contract" provided the Owner has promptly notified the Contractor and the Surety (at the address described in 'Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, 'liens or suits to the Contractor and the Surety, and provided there is no Owner Default. SURETY 5026 (6-92) S-1853/GEEF 3/00 Notice The laws of the State of Georgia , prohibit Insurers' from unfairly dlscnmlnatlng against any person based upon hiS or 'her status as , a victim of family violence, Page 1 of 2 o None ~ See Page 2 'SURETY Company: TRAVELERS CASUALTY AND (Corporate Seal) SURETY COMPANY OF AMERICA Signature .~ 2).~ Name and Title: CHRI QPHER B. WORTHAM , ATTORNEY-IN-FACT OWNER'S REPRESENT A TIVE (Architect, Engineer or other party): . 3 With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly, for all sums due, " 4 The Surety shall have no obligation to Claimants under this Bond until: 4.1. Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in' Paragraph '12) and sent a copy, or notice thereof, to the Owner, stating' that a claim is being made under ,this Bond and, with substantial accuracy, the amount of the claim, 4.2 Claimants who do not have a direct contract with the Contractor: .1 Have furnished written notice to the Contractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment inc1udedin the claim stating, with substantia:! accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whOm ~e labor was done or performed; and -:. ....:. , .. . ' : I .2 'Have either received a rejection' in whole or inparf from the 'Contractor, or not received within 30 days of furni'shing the above notice any communication from the Contractor by which' the Contractor has indicated the claim will be paid directly or indirectly; and ' ' .3 Not having been paid within the above 30'days, have sent a written notice to the Surety (at the, address, ,described in Paragraph 12) and sent a copy, or notice thereof, to the oWner stating 'that a claim: is ' being, made under this Bond and enclosing a copy of the previous written notice furnished to the , Contractor. 5 If a notice required by patagraph'4 is given by Owner to the Contractor or to, the Surety, that is sUfficient compliance. " , ,6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly, and at the Surety's expense take the following' actions: ",' I 6.1 'Send an answer to the ciaimant; with a copy to the Owner, within 45 days after receipt 'of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed, 6:2 Payor arrange for paynieut of any UIidisputed amounts, , 7 The Surety's total obligation shall not exceed the amount of this' Bo~d;' and the amount of this Bond shall be credited for any payments made in' , good faith by the Surety, ' 8 Amounts owed by the Owner to the Contractor under the Construction' 'Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Construction Performance ,Bond.' By the Contractor furnishirig and the Owner accepting this Bond, they. agree that all, funds earned by the Contractor in the 'performance of the Construction ,Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the' funds for the completion of the, work. 9 The ~urety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not he liable for payment of any costs or expenses of any Claimlint UIider this Bond, and shall have UIider this bond: no obligations to make payments to, give notiges on behalf of, or otherwise~ have obligations to Claimants under this Bond, ' . . ' ( 10 The Surety hereby waives notice of any change, inCluding changes of time, to the Construction Contract orto related subcontracts,purchase orders and other obligations, ' 11 No suit or action shall he ,commenced by a Claimant under this Bond other than in. a court of competent jurisdiction in the location in which, ' .; .-. th~ work or p8rt of the work is located or after the expiration of one year from the date ,(1) on which, the Claimant gave the notice required by Subparagraph 4,1. or Clause 4,2,3, or (2). on which the last labor or service was performed by anyone or the last, materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs, 'If the provisions of this Paragraph are void or prohibited by law, the minimum period oflirriitation available to sureties as a defense in the jurisdiction of the suit shall be applicable: ,12 Notice, to the Surety, the Owner or the Contracto~ shall be mailed or delivered to the address shown on, the' signature page, Actual receipt of notice by Surety, the Owner or the Contractor, however ,accomplished; shall be sufficient compliance as' ofthe date received at the address shown , on the signature page, ' 13 ' When this Bond has been furnished to, comply with a statutory or other, legal requirement' in the location where the' construction was to' be performed, any provision, in this Bond conflicting with said statutory or legal requirement shall' be deemed deleted herefrom and provisions ,conforming to such statutory or other legal requirement shall be deemed incorporated herein, The intent is that this Bond shall be construed as a statutory bond and not as a common law'bond, , ' 14' Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the, Contractor shall promptly furnish a copy of '. this Bond or shall permit a copy to be made, ' 15 DEFINITIONS 15~1 Ciaimant:, An individual o~ eritity having a direct contract with" the, Contractor or with a subcontractor of the Contractor, to furnish .labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in teims "labor, materials or equipment"that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in t.qe Construction Contract, architectural and engineering services required for performance of the work of the Contractor ,and the Contractor's subcontractors, and all other items for 'which a mechanic's lien may be asserted ill the jurisdiction where the labor, materials or equipment were furriished, 15.2 Construction Contract: The agreem~nt between the Owner and the, Contractor identified on, the signature' page, including all, Contract Documents and changes ~ereto, ,15.3' oWner Default: Failure of the Owner, which has neither been remedied' nor waived, to pay the Contra~tor as required by the 'Construction Contract or to perform and complete or comply with the other terms thereof THIS BOND IS HEREBY AMENDED SO THAT THE PROVISIONS AND LIMITATIONS OF O,C.GA ~ 36-91-93 ANq O:C.GAg 10-7-31 GEORGIA STATUTES~ WHICHEVER, IS APPLlCABl.E: NlD AlLNOTICE AND TIME ,LIMITATIONS PROVIDED ,THEREIN ARE INCORPORATED HEREIN BY AEFRENCE. ' MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: . . . '. . . '. . '. . (Space is provided below for additional, signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS 'PRINCIP AL SURETY Company: (Corporate Seal) Company: Signature: Name and Title: Address: S-1853/GEEF 3/00 (Corporate Seal) Signature: Name and Title: Address: Page 2 of 2 ~... Travelers . ~ , " IMPORTANT DISCLOSURE NOTICE OF TERRORISM INSURANCE COVERAGE On November 26, 2002, President Bush signed into law the Terrorism Risk Insurance Act of 2002 (the "Act"). The Act establishes a short-term program under which the Federal Government will share in the payment of covered losses caused by certain acts of international terrorism. We are providing you with this notice to inform you of the key features of the Act, and to let you know what effect, if any, the Act will have on your premium. Under the Act, insurers are required to provide coverage for certain losses caused by international acts of terrorism as defined, in the Act. The Act further provides that the Federal Governmentwill pay a share of such losses. Specifically, the Federal Government will pay 90% of the amount of covered losses caused by certain acts of terrorism which, is in excess of Travelers' statutorily established deductible for that year. The Act also caps the amount of terrqrism- related losses for which the Federal Gover'nm"ent or an insurer can be responsible at $100,000,000,000.00, provided, that the insurer has met its deductible.' " Please note that passage of the Act does not result in any change in. coverage under the attached policy or bond (or the policy or bond being quoted). Please also note that no separate additional premium charge has b"een made for the terrorism coverage required by the Act. The premium charge that is allocable to such coverage i$ inseparable from and imbedded in your overall premium, and is no more than one percent of your premium. ... l' ~. IN WITNESS WHEREOF, TRAVELERS CASUALTY AND SURETY CO:MPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY CO:MPANY and FARMINGTON CASUALTY CO:MPANY have caused this instrument to be signed by their Senior Vice President and their corporate seals to be hereto affixed this 3rd day of April 2002, }SS, Hartford COUNTY OF HARTFORD TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA TRAVELERS CASUALTY AND SURETY COMPANY FARMINGTON CASUALTY COMPAl"IY STATE OF CONNECTICUT .' ~llll'IHJl1t ,,~t-"o SUilt;~ #~""'/'"'-.:... "t,"\ !I~f ' -~ ~ ~ i HAA'iFORo. \ S I ~...\ CONN. / ~ff ~'..... ....~J ':'ao.( ;"~':,i' l~ /2r~~ - By 'George W. Thompson Senior Vice President On this 3rd day of April, 2002 before me personally came GEORGE W. THOMPSON to me known, who, ~eing by me duly sworn, did depose and say: that he/she is Senior Vice President of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, the corporations described in and which executed the above instrument; that he/she knows the seals of said corporations; that the seals affixed to the said instmment are such corporate seals; and that he/she executed the said instrument on behalf of the corporations by authority of his/her office under the Standing Resolutions thereof ' ~~ C-~' My commission expires June 30, 2006 Notary Public Marie C. Tetreault CERTIFICATE, I, the undefsigned, Assistant Secretary of TRAVELERS CASUALTY AND SURETY CpMPANY ,OF AMERICA, ,TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, stock corporations of the State of Connecticut, DO HEREBY CERTIFY that the f,Qregoing and attached Power of Attorney and Certificate of Authority remains in full force and has not been revoked; and furthermore, that the Standing Resolutions of the Boards of Directors; as set forth in the Certificate of Authority, are now in force, ' Signed and Sealed at the Home Office of the Company, in the City of Hartford, State of Connecticut. Dated this ,20 day of .. '1,lYJ1IIlIlMII.t, ,g~ ~-'I>O SUIltr~ ,~ ..-......~i,,\. H~I "--;.0. ~ ~ i HARTi'ORo. \ ~ j ~...: C~, /~# . ~~'" ....~~ 'I -;-- ~':~~ "........ 8y~-M-~ Kori M. Johanson Assistant Secretary, Bond "s .. .,.~,.. (~,F11 soo:r!) 'p;:lq:JImU S! ~ I tpTqA\ O~ llUl)[ell::Jpun JO puoq hUll o~ j:J;JdS;ll 41L\\ ;J,rmnj ;J41 Ul ,{UlldrgoJ ;Jq1 uodn llUlpUlq pUll Pl[UA ;Jq IlllqS IU;JS ;J!llUTS:JUj pUll ;J,rmUm3!S ;J[lunS:JUj q:Jns hq P;:l!Jlll;:l:l puu p;:lln::l;JX;:l os l;JMOd q:Jns ,{Ull pUll ,(trndillOJ ;J41 uodn llUlpmq pUll Pl[UA dq nuqs rU;JS ;:l[!illtS:JUj 10 ;J,rmUmllS ;J[nIlIS:JUj q:Jns llu!-ffi;:lq ;JlU::lYlll::l:J 10 h;JWOllU jO l;JMOd q::lns ,{Ull pUll 'jO;J1;J41 ;:llTllUU ;J41 m ,uOlull1[qo SllUllU\\ 1;:l410 pUll SiSUl1Ull;JPun pUll spuoq ;JUllS;JllU pUll llulln:J::lx;J jO A[UO s:;lsodmd 10J ,PU.:r-Ul-SA::lWOlN 10 S::l!-ffi1::l1;);JS llIll1S!SSY lU;JP!S;:l'H 'SlU::lplS::l1d ;J:JIA lU::lpIS::l'H llmlUloddu 01;J1;J41 llUllU[::ll ::llu:J!j!lld:J hUll 0110 ,{;:lWonu JO l;:lA\od hUll 01 ::l[IUIIS:JUJ hq P;JXillU ;:lq hum hUlldwoJ ::l41 JO [U::lS ::l41 pUll "\..ml::lJ:J;)S lUlllSISSY AUll "\..ml;J1:J;JS hUll 'W::lPIS::l1d ::l:JIA lUTI1SIssV hIm ')u::lprs::>l,'[ ;J:J1A ,{Ull 'lU;JP!S::lld ;J:JIA JO!UdS hUll 'lU::lPIS;J1d ::l:JIA ;JAqn:J::lX3' hUll 'lU::lP!S;J1d :sl::l;)illO ;JUL\\OIloJ ::lql JO q:Ju::> JO ::llTllUU;JIS ::>ql llnu :C13'.LOA :paJJa puc a;).JoJ IInJ U! A\OU S! uO!l"IOS;)H 4;)!4,\\' A,\[Y dH! 0::>; A.L1:YilSY::> l\[O.L~NIWHVd puc ANYdWO::> A.LnIilS <INY A.L'lVI1SY::> SH31:JlA YH.L 'y::>rn3WV dO ANYdl\!O::> A.LnIIlS <INY A.L1:YIlSY::> SH3'1U YH..L JO S.lOP;).I!<I JO Sp.llWS: ;)4J Aq P;)JOA UOn"IOsaH ~U!PUCJS ~U!,\\OIlOJ a4J JO ,(J!.Iol{Jnp. Aq pUC J;)pun (p;)Jupd .10 IC;)!UC4;);)w) al!w!s;)p.J Aq pa(p.as pUC pa~!s S! .\JPoqJ"Y JO aJp.;)!J!J.la::> pUC Aau.w>>y JO .Ia,\\Od S!4..L "\lU041nu JO uOlluil;:l[;:lP UdllllA\ U OlllIlmSlTld Sl;J:Jillo hUlldilloJ ::llOW 10 ;:lUO .(q JO '(luo41nu JO S::llU:J!.PU;:l:J JI::l41lO ;J1U:J!jlll;J:J l::lq 10 slq Ul p::lqms;J1d l;:lA\od::l41 OlllIlmSlTld SlU;Jlly pUll rm.:r-U1-s,(;:lWOll\f ;J10ill 10 ;olUO ,(q (p;JJmb;)l Jl '[UdS l::lpun) P::llnJ;JX::l h!np (q) 10 'h.ml::l1;);:lS lUlllSISSY 10 h.ml;JJ;);JS U Aq [U::lS s,huudwoJ ::lq~ 41IM p::l[U::lS pUll p::llS::lllU '(Inp pUll ,\,rrrj;:ll:JdS llffilSISSY hUU 10 '\..ml::l1;);JS ::lIUlOdJOJ ::ll./l '1;JlTlSU::l111mi)SISSY ,(Ull '1::llnSU;J11 ::l41 'lU::lpIS::l1d ::l::lIA puo:J;JS hUll 'lU::lpIS::l1d ::l:JIA ,{UU 10 lU;:lpIS::l1d ;J::lIA lO\ll::lS . AUll 'IUdpIS::l1d ::l:J!A ;JAlln:J::lX3' ,{Ull 'UllUIJIBqJ d:JIA XUU 'lUdp~Sd1d ::lql,(q p;millS (p.) U::lqA\ AUlldwoJ d41 uodn ;JU~PU!q pUll Pl[UA dq [[uqs llU[)[Bu;)pun , [UUOljlpUO:J 10 '::l;)Ull~O:J::lJ 'puoq U JO ;WUUU ::l41 Ul ,uOlU;Jl[qo llmllL\\ 10 'h~IU1U::lpU! ]0 j:Ju~UO::l 'd;)UllZlm30:J::l1 'puoq ,(UlI llltU :C1J10A 'Artnd1:JdS ::l41]0 ::l:JillO i:1q~ Ul P<>[!J Sl ]Od1::l41,(do:J U pLm iSU!) ll, \\ U1 sluol)uil;J[dp q:Jns q;)U;J lUll! p::lpLA01d ',{trndUIOJ STql]O Sd::lhOldill;J 10 Sl::l:JillO ::llOill 10 ::lUO'Ol hlU041nu llmoi'l;J10j ::l4~ JO llUd AUU JO Ilu dlllg;J.!,~p ,(IlW ' lU::lplS::l1d d:J1A hUll 10 lU::lplS;J1d ;J::llA 10lU::lS ,(tffi '~U::lP!S;J1d d:J1A ::lAlln:J::lX3' hUll 'UllUIJIll4J ;J::llA ,{Ull '~U::lplS::l1d ;)41 'UllUU!llqJ ::ll{llUtU :dnOA ' 'l::l410 illTq U::lAli'l l::l,\\od ::ll./l ::l){Oh::l1 pUll d;Jlmoddu Lpns hUll dAOUId1 hBw ::lUIll AUllW SlOPdJ1G]O p.roog ::ll{l10 Sl::l:Jillo PIllS]O ,(Ull pUll '7lllD{lllldPun [IlUOlllpUO:J 10 'd:JUllZ!ullO:J::lJ 'puoq U]O ;JlnlllU ::ll{l Ul ,u01ll31[qo S7lUllUo\\ J::ll{lO pUll 'hFU1U::lPUlJOSj:JU~UO:J 'S;J::lUllZlUllO::l::lJ 'spuoq [U::lS s,,{UlldUIOJ ;Jl{ll{l!,\\ [U;JS pUll ::lUffiU S,hUlldillOJ ;J41lflLA\ milS 01 ::lq!l;)S::lld ,{Bill A1UOl{lnu]0 ::llll:J!jIU::l:J 1::l4 10 Slq su A~!.Iolflnu 4:Jns ;J::l~moddu 4:Jns ;JAIll ,\UUI pUll AUlldUIO::l ;J41]0 ][mpq uo pUll JO] PI1 o~ s)U::llly pUll j:Ju.:r-m-SA::lWOnv lUlOddu AUill h.m~;J1;)::lS ~lIll1SISSY ,{trn 10 A1lll::l1::l;JS ;J1U10dJOJ ::ll./l '.L;llTlSll::l1lllffilS!SSV ,(Ull '1::llTlSll::l11 ;JI./l 'lU::lPIS::lJd ::l;)[A PUO?::lS AUll 'lU;JpIS;J1d;J:J1A hUll '~U::lP~S::lld ;J;)IA 10lU::lS ,(Ull '~U::lplS;J1d ::l;)IA ;JAl)n:J::lx3' hUll 'uUUlI1u4J ;J:JIA'ArID '~I.L;lP!S;J1d;:ll{l 'UllLiumqJ::l1./l ~UtU :a3'lOA, :l::J:::llJ:::l put:: :::l::J10J [[11J U! .\\OU :::llE suollnlosdCi q::J!qA\ 'S:::l!uBdlliOJ pms JO suollnlos:::l1! a'U1put?lS a'U!MOlIOJ :::lql JO Al!lOl.{lnB Aq pUB l':::lpUn :::lpBlli S! lU:::lllilU!oddB S!l!.L 'p:::llli1guO::J pUB p:::l!JPB1 ,(q;J1::llj' ;)lB 'U:::lA!a' U!:::ll:::lq '\JIlOlj'lnB :::lln 011uBnS1nd 'l::JB.:f-lf!-(S)A:::llUOUV pres JO Sl::JB :::llj'l [[B pUB 'S:::l~dlliOJ :::l41 JO Sl:::l::J!1JO P;)Z~oqlnB '\lnp ;)41 ,(q pau~ls :::ll:::lM aUIBs::l41 J! SB lU:::llX:::l aures :::ll.{l' 01 prm AllllJ SB ,(q:::l1:;J41 'S:::l!uBdUIOJ :::ll.{l pmq 01 P1!~ puoq .JiJd SCI V770 a (00 '000.'000'0 r sJ Non7IYV N3.1 fo Ulns iJl{1 2u!piJiJ:JXiJ IOU 01:::l1:::lq1 lU;;Jpl::JU! SlU:::lSUO::J Ire prm Arm prm ~UPlBU:::lpUn lBUOll!PUO::J 10 ';)::JllBZlU~O:J:::l1 'puoq B JO :::lln)BU al.{l U! ,U01Bi3!lqO Sa'UllIlA\ 1:::l410 pUB ',~lUUl:::lpU! JO Sl::JBllUO::J 'S:::l::JUt?Z!Ua'O::J:::l1 'spuoq lIB pU~ ;(UB 'l:JB pUl~ ::llnlBualS ~[OS l:::lllJSllJ: Aq :(S)lU:::lUIrulSU! ~U!MOl!OJ ;;Jlj'l 'S:::l~B1S ,p:::l1lUO al.{l U!qllA\ :::l::JBld AUB lB ':::la'p:::l!<\\OID[::J~ pUB a1nj:::lX:::l 'Ua'IS 01 P;>ll:::lJUO::J Aq;mq '~!loqlnB pIm l:::lA\od 1111J q1~M 'l::JBd~Ul~(S)A:::lWOnv [llJA\BI pUB aru111:::lql 'C!~.I0~'SSOJJ.lON JO 'UCW::l(O:) A;)(J!tJS ',\;)JJPO~ .Y a"5a'1 'll;u,qnog ,Y.I;)f '}(Sn 'y CP!JJUd 'Inud OM (;)uq;)!W 'WP.qJ.loM os: .Ia4dolsP4::> :lUloddc prm :::l~n~!]suo::J ':::l){BUI SlU:::lS:::l1d :::lS::lq1 ,.(q op pUB 'p:::l1UlOddB pUB P:::l1nlHSUO::J 'apBlli qlBq C,sa!uBdlliOJ" ::lq~ 1::llJBUl:::l1:::lq) 'In::J!]::JauuoJJo :::llB1S' 'P10]1lBH JO :\lunOJ 'p10J+lBH J~ Al!J ::lq1 U! S:::l::J9JO [Bdl::JU!.Id lT~1.{l a'UlABq pUB 'In::Jl1::J::lUUOJ JO alB1S :::lIp JO SA\BI aq11:::lpun P:::lZlUBa'lO '\lnp SUO~lB10cUO::J 'ANYdWO::> A..L'lVilSY:) NO..L~NI1\rnVd pUB ANYdWO:) A..LnIilS <INY ,A..L'lVnsy::> SH3'13A YH.l 'YJHl3H!Y .10 ANYdWO:) A..LIDIilS ([NY A..L'lVilSV::> SH3'13AYH..L ..LVR..L 'S..LN3SnId 3:S3H..L AS: SNOSH3d '1'1Y MON)I ..L:)Yd-NI-(S)A3NHO..L..LY .10 A..LlliOH..LflYdO 3..LYJIdI..LH3::> ([NY A3NHO..L..LY dO H3M.Od Z906-f8190 1n::l!l:J.;luuO,:) 'PJoJlJllH ANV'dWO,:) A.L'IYflSV,:) NO~~NlWHV.!I ANV'dWO,:) A~IDIDS <INV A~'IVnsv,:) SHa'I:IAVID. V,:)lliawv .!IO ANVdWQ,:) A~:nmS <INV A.L'IYIlSV':) SHa'I:IA VID. ACORD~ CERTIFICATE OF LIABILITY INSURANCE CSRKD I DATE (MM/DDIYYYY) SOUT -13 08/17/04 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION H & H Insurance Services, Inc. ' ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE ,MJ, CW, PL,KH HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 3160 Campus Drive, Suite 100 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Norcross GA 30071 Phone: 770-409-0014 Fax:770-368-0404 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A: Continental Casualty Compan, 31127 INSURER B: Transportation Insurance Co Southeast Pi~e Survey, Inc. INSURER C: National Fire Ins. of Hartfc rd P. O. Box 47 INSURER 0: Ohio Casualty Group Patterson GA 31557 INSURER E: Great American Insurance Co COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS ~ND CONDITIONS'OF SUCH POLICIES, AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, '~~~ ~s~a TYPE OF INSURANCE POLICY NUMBER P_qL~~1'! EFF~tf,w;E P8k!fr:Y(~~,bRD~N LIMITS DATE MMIDD GENERAL LIABILITY EACH OCCURRENCE $1,000,000. f-- A X COMMERCIAL GENERAl LIABILITY C020644234l4 10/26/03 10/26/04 PREMISES (Ea occurence) $50,000. I CLAIMS MADE [!J OCCUR MED EXP (Anyone person) $5,000. ~ Contractual Liab. PERSONAL & ADV INJURY $1,000,000. A GENERAL AGGREGATE $2,000,000. f-- GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $2 , 000 , 00 0 . II !xl PRO- n POLICY X JECT LOC AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT f-- $1,000,000. B ~ ANY AUTO BUA2064423459 10/26/03 10/26/04 (Ea accident) ALL OWNED AUTOS BODILY INJURY f-- $ SCHEDULED AUTOS (Per person) f-- ~ HIRED AUTOS BODILY INJURY $ ~ NON-OWNED AUTOS (Per accident) ~ $1,000. ColI. Ded , PROPERTY DAMAGE $ X $1,000. Comp Ded. (Per accident) GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $ R ANY AUTO OTHER THAN EA ACC $ AUTO ONLY: , AGG $ EXCESS/UMBRELLA L1ABILITY~ EACH OCCURRENCE $1,000,000. l!J OCCUR o CLAIMS MADE - A , CUP2064423509 10/26/03 10/26/04 AGGREGATE $1,000,000. Retention $10,000 R DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND ' ' X I TORY LIMITS I 10TH- ER C EMPLOYERS' LIABILITY W2064423557 10/26/03 10/26/04 E,L. EACH ACCIDENT - $500,000. ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? E,L. DISEASE - EA EMPLOYEE $500,000. ~~~~I~tS~~J:~~c5~s below E.L DISEASE - POLICY LIMIT $500,000. OTHER - - D Excess Liability EC05299,30l0 .. 10/26/03 10/26/04 Limit $5,000,000 E Installation Float IMP 602864700 11/05/03 11/05/04 Limit $1,000,000 DESCRIPTION OF ,OPERATIONS / LOCATIONS / VEHIC:LES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS Project: pointe West Subdivision Drainage Improvement-Phase lA/project #323-04-203823372.Certificate holder is included as an additional insured, under the general 1iabil~ty coverage, as respects work performed by the named insured at, referenced project. Waiver of Subrogation under the general liability coverage applies. CERTIFICATE HOLDER AUGUSTA CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATIO DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR . Augusta, GA Public Works Department 'Teresa c. Smi th P. E. 1815 Marvin Griffin Road Augusta GA 30906 @ ACORD CORPORATION 1988 ACORD 25 (2001/08) I I I I I I I I I 'I I I I I I I I I I I LIST OF PROJECT DOCUMENTS POINTE WEST DRAINAGE IMPROVEMENTS Project No, 323-04-203823372 SECTION PAGES Georgia Prompt Pay Act PPA-I Special Conditions SP-I thru SP-3 Agreement A-I thru A-4 General Conditions I thru 33 Supplementary Conditions SC-I thru SC-2 Proposal' P-I thru P-6 Site Location Map SLM-I General Notes G-l thru G-16 Traffic Control 'TC-I thru TC-23 \. , ~'. " r, I I I I I I .1 I I .1 I I I I I I I I I. '. .~ ::. : , .'\ ') ~ ;~:.,t- ;' . , . .. J,' 'j,"" .;'i,J _V.',"-l ~:_.....:,;.,ti. ~ ~j: ~"'.. :.:: __ ~ ...., \ - I, GEORGIA.PROMPT PAY ACT This Agreement is intended by the Parties to, and does, supersede any and all provisions of the Georgia Prompt Pay Act, O.C.G.A.Section 13-11-1, et seq. In the event any provisi<;>n of this Agreement is inconsistent with any provision of the Prompt Pay Act, the provision of this Agreement shall control. Allc1aims, disputes and other matters in question between the Owner and the Contractor arising out of or relating to the Agreement, or the breach thereof, shall be decided in the Superior Court of Richmond Count, Georgia. The Contractor, by executing this Agreement, specifically consents to venue in Richmond County and waives any right to contest the venue in the Superior Court of Richmond County, Georgia. ' ';i:\. Notwithstanding any provision of the law to the contrary, the parties agree that no interest shall be due Contractor on any sum held as retainage pursuant to this Agreement and Contractor specifically waives any claim to same. NOTICE All references in this document" which includes all paperS, writings, drawings, plans or photographs to be used in connection with this document, to "Richmond County Board of Commissioners" shall be deemed to mean "Augusta Richmond County Commission- ,Council'and all references to "Chairman" shall be deemed to mean "Mayor". DISPOSALS Prior to any material from this project being wasted or otherwise disposed of outside the project limits the Contractor shall furnish the Engineer a copy of written permission, signed by the property owner (or his authorized agent) describing the estimated amount and type of material to be placed on said property. If any portland ceinent concrete, asphaltic concrete, wood or other such materials are to be wasted on the property, a copy of the owner's inert landfill permit, issued by the Environmental Protection Division shall be furnished to the Engineer prior to any such waste being removed from the project. . . In all cases, regardless of the material being wasted, 'a grading permit issued by Augusta Richmond CountY must be furnished to the Engineer, " PPA-l Rev: 9/1 I/03 I I I I I I I I I I I I I I I I I I I Revised 8/10/2004 ~. ~: ~ .:" . ~ . i ", " ,.~~ 1';' I " ., ~.... , " .. .: 't..... ,I.'i ...."'-c "!.! ~,~. \....:.: ,,.: '.~'UO:~'. '.~i ,~_.; '~,",'" ~ ~ POINTE WEST DRAINAGE IMPROVEMENTS Project No. 323-04-203823372 SPECIAL CONDITIONS SCOPE: \ '- This project includes the emergency repairs to include CCTV Inspection, cleaning and lining of existing CMP, Four alternates are provided to all bidders; The Contractor shall supply all materials, equipment, labor and supervision necessary to properly complete this proj~ct as specified. ~ ' . TERMINI ,ANn LENGTH: ':r:.~\ (See Location Maps) LUMP SUM CONSTRUCTION: Item Number 230-1000 Lump Sum Construction includes, but is not limited to, the following: Locating, maintaining and reclaiming borrow and/or disposal areas, right of way considerations, construction staking, removals and relocations not covered by a separate pay item, excavation, sawing pavement, and any other item , not covered by a specific pay item. ' CONTRACT TIME: All bidders must bid all four alternates. Each alternate shall include the amount of contract time arid shall be in calendar days the bidder anticipates he will require to complete the project. The number of, calendar days requested should represent the days required to construct the project once, the Notice To Proceed has been issued.' NOTE: It is highly recommended that any fabrication and delivery time be listed separately for each alternate. SP-I I I' I I I I I I I I I I I I I I I I I ,I " Revised 8/10/2004 ::. . ~ .~. ... r ~ , , AUGUSTA-RICHMOND COuNTY" uTILiTiEs DEPARTMENT WATER SYSTEM: / No water valves, lines, or services shall be shut off or worked on without notifying all property owners, businesses, and the Utilities Department 24 hours in: advance. A Utilities Department representative must, also be present. Any work done without notification to the Utilities Department will result in the enforcement of the Augusta-Richmond County Municipal Code Sections 5-2-7 and 5-2-13, which regulates the unauthorized operation of the water system. Violations of this ordinance, in accordance with Sections 5-2-40 and 1-6-1, shall be punishable by a fine not exceeding one thousand dollars or by imprisonment not exceeding sixty (60) days in jail, either or both, in the discretion of the presiding Magistrate Court Judge. STAND OF PERMANENT GRASS: / If a satisfactory stand of permanent grass has not been obtained prior to the Final Inspection the 'contractor shall begin watering and continue watering until a permanent stand of grass is accepted by the engineer, Water sources shall be public streams and/or farm ponds if Augusta' Richmond County watering restrictions prohibit other sources. If for any reason watering is not a viable action, the contractor shall treat all unacceptable areas with loose sod as prescribed in Subsection 700.08A and 700.08C. There will be no additional payment for this work. SP-l ,"f ~"i1.; .I I I I I I I I I I I I I I I I I I I I SECTION A AGREEMENT / THIS AGREEMENT, made on the "'i; day Of~, 200 If by and between the City of Au!!usta party of the first part, hereinafter called the OWNER, arid &:'DVTf-{G}to-r ?/~G ~ A.u!:...,.., .:2Nc , party of the second part, hereinafter called the CONTRACTOR. WITNESSETH, that the Contractor and the Owner, for the considerations hereinafter mgnes, agree as follows: ' ARTICLE I - SCOPE OF THE WORK: The Contractor hereby agrees to furnish ,all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled: POINTE wEST IMPROVEMENTS-PHASE IA (EMERGENCY REPAIRS) PROJECT NUMBER: 323-04-203823372 , And in accordance with the requirements and provisions of the Contract Documents as defined in the General and Special Conditions hereto attached, which' are hereby made a part of this agreement. ARTICLE II - TIME OF COMPLETION - LIQUIDATED DAMAGES: The work to be performed under this Contract shall be commenced within -14 calendar day~ after the date of written notice by the Owner to the Contractor to proceed. All work shall be completed within 14 calendar days. It is hereby understood and mutually agreed, by and between the contractor and the Owner, that the date of beginning, rate of progress and the time for completion of the work to be done hereunder are ESSENTIAL CONDITIONS of this contract. Contractor agrees that said,work shall be executed regularly, diligently, and uninterruptedly at such rate of progress as will insure full completion thereof within the time specified. It is , . expressly understood and agreed by and between the Contractor and the Owner, that the time for completion of the work described herein is a reasonable time for completion of the same, taking into consideration the average climatic range and construction conditions prevailing in this locality. A-l Rev: 9/11103 '~':'; "I '. I' I I I I I I I I I I I I I I I I I I ..'j . ....,. . ~... ..- ,"', ':", ..:~~}j'~ ._' I ~. _ ,. IF THE CONTRACTOR SHALL NEGLECT; FAIL, OR REFUSE TO COMPLETE THE WORK WITHIN THE TIME HEREIN SPECIFIED, then the contractor does , hereby. agree, as a part of the consideration for the awarding of this contract, to pay the Owner the sum of Five Hundred Dollars ($500), not as a penalty, but as liquidated' damages for such breach of contract as hereinafter set forth, for each and every calendar day that the contractor shall be in default after the time stipulated in the Contract for completing the work. . The said amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty of fixing and ascertaining the, actual damages the Owner would, in such event, sustain, and said amounts shall be retained from time to time by the Owner from current periodical estimates. It is further agreed that time is of the essence of each and every'portion of this Contract and the specifications wherein a definite portion and certain length of time is fixed for the additional time is allowed for the completion of a work, the new time limit fixed by ex.tension shall be the essence of this contract. ':~\ ARTICLE III - PAYMENT: (a) The Contract sum The owner shall pay to the Contractor for the performance of th'e contraCt the amount as stated in the Proposal and Schedule of Items. No variation~ shall be made in the amount except as set forth in the specifications attached hereto. (b) 'Progress Payment No later than the fifth day of every month, the Contractor shall submit to the Owner's Engineer, an estimate covering the percentage of the total amount of the contract which has been completed from the start of the job up to and including the last working day of the proceeding month, together . with such supporting evidence as may be required by the Owner and/or the Engineer. This estimate shall include only the quantities in place and at the unit prices as set forth in the Bid Schedule. On the vendor run, following approval of the invoice for payment, the owner shall after deducting previous payments made, pay to 'the ' Contractor 90% of the amount of the estimate on units accepted in place. The 10% retained percentage may be held by the Owner until the final completion and acceptance of all work ,under the Contract. A-2 Rev: 9/11103 I I I I I I I I I I I I I I I I I I I , 1 . ..r" I "f'" \. . , " . ~ . . ARTICLE TV -ACCEPTANCE AND FlNAL pAYMENT: (a) Upon receipt of written notice that the work is ready for fmal inspection acceptance, the Engineer shall within 10 days, make such inspection and when he 'finds the work acceptable under the contract' and the contract , fully performed, he will promptly issue a final certificate, over his own signature, stating that the work required by this Contract has been..' completed and is accepted by him under the terms and conditions thereof, and the entire balance found to be due the Contractor, including the retained percentage, shall be paid to the Contractor by the owner within 15 days after the date of said fmal certificate. (b) Before final payment is due, the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with work have been paid, except that in case of 'disputed indebtedness of liens of evidence of payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. .~~\ (c) ',The making and acceptance of the fmal payment shall constitute a waiver of all claims by the Owner, other than those arising from unsettled'liens, from faulty work appearing within 12 months after final payment, from requirements of the specifications, or from manufacturer's guarantees, It shall also constitute a waiver of all claims by the contractor except those previously made and still unsettled. (d) If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Engineer, so certifies, the Owner shall upon certification of the Engineer, and without terminating the contract, make paYment of the balance due for that portion ofthe work ~lly completed and accepted. ( e) Notwithstanding, any provision of the General Conditions, there shall be ' no substitution' of materials or change in means" methods, techniques, sequences or procedures of construction that are not determined to be equivalent to those indicated or required in the Contract Document, , without an Amendment to the Contract. Each payment shall be made under the terms and conditions governing fmal payment, except that it shall not constitute 'a waiver of claims. A-3 Rev: 9/11/03 IN WITNESS WHEREOF, the partIes hereto have executed this Agreement in three (3) counterparts, each of which shall be deemed an original, in the year and day first mentioned above. ' .' \ ' AUGUSTA, GEORGIA ..(AUGUSTA~RICHMOND COUNTY~~ ....... .cOMMISSION COUNCIL l (Owner) . ~'J), c'fltle: Me,.' gr gftJa@ If'!, ~ {JI, ~ommigEiElR C9YBsil: I I I I I I I I I I I I I I I I I I I . ::l~~lLOU;~Sll Title: Vice President ;".:, #, ~i,"Y ,'\<;nr, Address: 3523 Williams Street (}f',( Patterson, Ga. 31557 / A-4 01'-- \ .f . ';,,;\ ,,;~ -:: . , ';," "\."; , ", Inc. ", ~ ~~ '.. I~ :;.' -.,~ . -.. ~ I~~ .~'~ SEAL ~ Rev: 9/11/03 I I I I / I I I I I .1 'I I I I I I I I I. GENERAL CONDITIONS ~.; , ' "I , I '\ I I I I I I I :1 I ,I I I I I I I I I I TABLE OF CONTENTS OF GENERAL CONDITIONS Article Number Title DEFINITIONS.,.,..., ,.", "..,..,. " ,...", ., .,...".. . ....... .,., ., PRELI~lINARY MA.TTERS ......................................... 3 CONTRACT DOCUMENTS: INTENT.'AMENDING AND RE USE........... . ....... .. .. .. . .. . .. 4 AVAILABILITY OF LANDS: PHYSICAL CONDITIONS: REFERENCE POINTS. . . ,. ,. . . . . ., .. , . . . .,. . .. .. . ., . . , . , , . . . , . , . .. . 5 BONDS AND INSURANCE......................................,.- 6 CONTRACTOR'S RESPONSIBILITIES.,."." ',.,...,.,',."... ~.., 7 OTHER \VORK '.....,.,.,..".".,..,.,.........,.....,...,'.,...., 8 OWNER'S RESPONSIBILITIES",....,...".."...,......,......., 9 ENGINEER'S STATUS DURING CONSTRUCTION.......... ~... 10 CHANGES IN THE WORK....."................,......,.....,.... II CHANGE OF CONTRACT PRICE..." .,."... " ,.,.,." ., ., ., . . .., 12 CHANGE OF CONTRACT TIME........,....,..................... " 13 WARRANTY AND GUARANTEE: TESTS AND INSPECTION'S: CORRECTION. REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK ....... ...,.."..,'...,..', 14 PA YMENTS TO CONTRACTOR AND-COMPLETION ............ 15 SUSPENSION OF WORK AND TERMINATION",.,.. ..,....,., 16 ARBITRATION,..,., .'.,.."."....,..,',.", ,.,.. '.. ,.,.....,.".... 17 MISCELLANEOUS""".,.,...,....,.,.",. ~..".,......,..,.,.,.. 3 , " ~~;\ Page 7 8 ' , 9 10 II 14 18,. 19 19 21 21 24 " 24 26 29 31 32 I, I INDEX TO GENEtL\t cbNDlt!ONS I Article or Paragraph Number Acceptance of Insurance ,............................ 5.13 Access to the Work .,....,..................,........ 13.2 Addenda-<iefinition of (see definition of Specifications) . . . , . . . . . , . , . . . . . . . . . . . . . . . . , . . . .. . . . .-. .. I Agreement-<iefinition of ................................ l All Risk Insurance ...'................................. 5.6 , Amendment. Written.............................' 1. 3.1.1 Application for Payment-<iefinition of .,.,.............. I Application for Payment. Final ,..................... 14.12 Application forPrcgress Payment ,....."............ 14.2 Application for Progress Payment-review of .... 14.4-14.7 Arbitration ..,.,.....,............ .'..................... 16 Authorized Variation in Work......................... 9.5 Availability of Lands .................................. 4.1 Award. Notice of-<iefined .............................. I I I I I' I , Before Stanlng Construction ........,....,........ 2.5-2.7 Bid-<iennition of ........,.....,.,.........,....,....... 1 Bonds and Insurance-in general ........................ 5 Bonds-<iefinition of . . . . . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . .. 1 Bonds. Delivery of ................................ 2.1.5.1 Bonds. Performance and Other .....::.............' 5,1-5.2 'I ,I Cash Allowances ...................:................. 11.8 Change Order-<iefinition of ...,......................... 1" Change Orders-to be executed .,..,................. 10.4 Changes in the Work ......,..................,......... ] 0 Claims. Waiver of-on Final Payment ............... 14.16 Clarifications and Interpretations .'.,.,................. 9.4 Cleaning ,.....,... ~ . . . . , , . , . . . . . . , . . . . . . . . . . . . . . . . . .. 6.17 Completion,., . .. ,.......... ...........,..,. ..........,. 14 I Completion. ~ubstantial ..",.,...,......,......, 14.8-14.9 Conference. Preconstruction ........,.,............... 2.8 Conflict. Error. Discrepancy-Comractor to Report "..,..,..."........"............... 2.5, 3.3 Construction Machinery. Equipment. etc. ............. 6,4 Continuing Work ......................,.............. 6.29 Contract Documents-amending'and supplementing .,............,.................... 3.4-3.5 Contract Documents-<ietinition of ',.,.................,. 1 Contract Documents-Intent ,...........,......... 3.1-3.3 Contract Documents-Reuse of ..,."...,..........,.. 3,6 Contract Price. Change of ,........................,.... II Contract Price-definition ,... ,. . , .. , . . . . . .. .. . '. .. . , , . .., I Contract Time. Change of .,............................ 12 Contract Time. Commencement of ..,."..,...,.,..... 2'.3 Contract Time-definition of ...'........................ 1 Contractor-<ierlnition of ................................ 1 Contractor May SlOp Work or Terminate ...,'......... 15.5 Contractor's Continuing Obligation,................. .14.15 Contractor's'Duty to Report Discrepancy in Documents .................................. ~.5. 3.2 Contractor's Fee--Cost Plus ..' 11.4,5.6.] 1.5:1. 11.6-11.'7 Contractor's Liability Insurance....................... 5.3 Contractor's Responsibilities--in general ..............., 6 I I I I I '1 I I I Contractor's Warranty of Title.. .. .. .. .. .. .... .. .. .... 14.3 Contractors-<>ther ................. . . . . . . . . . . . . . . . . , . . .. 7 Contractual Liability Insurance. .... .. .... .... .....:... 5,4 Coordinating Comractor-<iefinition of ................ 7.4 Coordination ...-......,............,......,............ 7.4 Copies of Documents. .. . .. .. ... .. .. .. .. .. .. ... . . . .. ... 2.2 Correction or Removal of Defective Work ........... 13 .11 Correction Period. One Year ........................ 13 .12 Correction. Removal or Acceptance of Defective W ork~in general ...............,..... . .. ... 13.11-13. 14 Cost-net decrease..............:....:...........,. 11.6.2 Cost of Work.................................... 11.4-11.5 Costs. Supplemental. . . . . . . .. . . .. .. . . . . _. . . . . . . . . . .. 11.4.5 . '1' ;~\\ , Day-<iefinition of . . . . . . . . . . . . . . . . . . . . . .. . . .. . . . . . . . . . . " I Defecrive-<ietinition of ................................. 1 Defecrive Work. Acceptance of , . . . . . . . . . . . . . . . .. . . . " 13.13 Defecrive Work. Correction or Removal of '......... 13.11' Defective Work-in general .............., 13, lA. 7, 14. 11 Defective Work. Rejecting. .... . . ... .. ............. .... 9.6 Definitions ',...,......................................... I Delivery of Bonds, .. .. . .. . , .. .. .. .. .. .. .. .. .. .. .. .. ... 2.1 Determination for U nit Prices ...........,............ 9.10 Disputes. Decisions by Engineer............,.... 9.11-9.12 Documents, Copies of .......................... ~ .. .'.... 2.2 Documents, Record .................................. 6.19 Documents. Reuse ......... .'...,...., .......... .... .,.. 3.6 Drawings-definition of.. .. .. . .. .. .. ... .. .. . ... .. .. .. ... J Easements .,......,......... '. . . . . . . . .-. . . . . . . . . . , . . . . .. 4.1 Effective date of Agreement-<iennition of .. ,... ......... 1 Emergencies ,...,.....,........................,...... 6.22 Engineer-<ietinition of '................................. 1 Engineer's Decisions ..........'................. 9.10-9,12 Engineer's--Notice Work is Acceptable......., ..... 14.13 Engineer's Recommendation of Payment ...... ]4':4, 14.13 Engineer's Responsibilities, Limitations on ................. 6.6 ,9 . 11 ,9 . 13 -9. 16 , 18 .,2 Engineer's Status During Construction-in general ,..... 9 Equipment. Labor. Materials and. '..... .... .. ..... 6.3-6.6 Equivalent Materials and Equipment ...:.............. 6.7 Explorations of physical conditions,. ... . .., .. .. .. ,... 4.2 Fee. Comractor's-Costs Plus.."............;......, 1 1.6 'Field Order-<iefinition of ..,..........,.......,.,.......' I Field Order-issued by Engineer ,.............,. 3.5.1,9.5 Final Application for Payment......"............... 14.12 Final Inspection.........,.. ........,................ 14.11 Final Payment and Acceptance .,....'................ 14.13 Final Payment. Recommendation of ,.......... 14.13-14.14 General Provisions "......."..,................ ] 1,]-17.4 General Requirements-detinition of . . . . . . , . . . . . . . . . . : . .. 1 General Requirements--principal references to ..".,."........ 2.6. ~.4, 6:4, 6.6-6.7.6.23 ~ I I, Giving Notice ...,.................................... 17.1 Guarantee of Work-by Contractor..:.';,......::; ~.: iJ. i I Indemnification. . . . , . . . . . . . . . . . . . . . . . . . . . . .. 6.3ChS.32. 7.5 Inspection. Final .................................... 14.11 Inspection.Tests and..... ..................,......... 13.3 Insurance, Bonds and-in general ....................... 5 Insurance. Certificates of ........................... 2.7. 5 Insurance-<ompleted operations. . . . . . . . . . . . .. . . . . . . .. 5.3 Insurance. Contract~r's Liability ...............:....,. 5.3 Insurance. Contractual Liability..............,........ 5.4 Insurance. Owner's Liability ...............;.......... 5.5 Insurance. Property .............................. 5.6-5.13 Insurance-:Waiver of Rights ......................... 5.11 Intent of Contract Documents,..........;....... 3.3,9..14 Interpretations and Clarifications "..............:..... 9.4 Investigations of physical conditions......,...... ... . .. 4.2 I I I I Labor, Materials and Equipment .................. 6.3-6.5 Laws and Regul;uions--:<lefinition of . . . . . . . . . . . . , . . . . . . .. I Laws and Regulations-general. ... . ... . ......,..... .. 6.14 Liability Insurance-Contractor's ........,.,.......". 5,3 Liability Insurance-Owner's ......................... 5.5 Liens-definitionsof ................................ 14.2 Limitations on Engineer's ( Responsibilities ..;.................. 6.6, 9.] I. 9. B-9.] 6 I , II Materials and equipment-furnished by Contractor .... 6.3 Materials and equipment-not ' incorporated in Work .............................. 14.2 Materials or equipment-equivalent ................... 6.7 Misc~l1a~eous Provisions ....................... :', .. .. .. 1 Z Multl-pnme contracts ................................... I :1 I Notice, Giving of............ ......................... 17.1 Notice of Acceptability ,of Project ,........,..... '.... 14.13 Notice of Award-detinition of ........................ ..1 Notice to Proceed-detinition of ......................... I Notice to Proceed-giving of ..............:........... 2.3 I "Or-Equal" Items.. , . .. . .. .. ......... ........... .. . ... 6.7 Other contractors ...,...............,................... ,7 Other work .., . : . , . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . , . . . . . . .. 7 Overtime Work-prohibition of ... .. .. .. .... ..... .,. ... 6:3 Owner-definition of .................................... I Owner May Correct Defective Work.........,.,..... 13.14 Owner May Stop Work. . . . .. .. .. .. . .. .. ........ . . .,'. 13.10 Owner May Suspend Work. Terminate .......... 15.1-15:4 /' Owner's Duty to Execute Change Orders.,....., ,. .., 11.3 Owner's Liability Insurance ..,........................ 5,5 Owner's Representative-Engineer to serve as . .'., .... 9.1 Owner~s Responsibilities-in general .:.................. 3 Owner's Separate Representative at site........... ... .9.3 I I I" I Partial Utilization ... -1-. . . .. ... . .. .. . . . . '........ . .. 14.10 '" Partial Utilization-definition of.....,................. .. I Partial Utilization-Property Insurance,.,......."... 5.15 Patent Fees and Royalties ",........,................ 6,1: Payments. Recommendation Of ........... 14.4c14,7,14,13 Paymeim to C0ntractor-in general ..........."....... 14 I I I Payments to Contractor-when due ........... 14.4, 14,13 Payments to Contractor-withholding ,.......,....,.. 14.7 Performance and other Bonds ..................... 5.1-5.2 Permits. . . . . , . . . . . . . . . . . .. . . . . . ; . . . .. . . . . . ... . .'. . . . . ... 6.13 Physical Conditions ...........................:....... 4,2, Physicil Conditions-Engineer's review ............. 4.2.4 Physical Conditions--existing structures... .. .. . . . . .. 4.2.2 Physical Conditions--explorations and reports. .. . . .. 4.2.1 Physical Cl)nditions-possible document change ..... 4.2.~ Physical Conditions-price and time adjustments ,... 4.2.5 Physical Conditions-report of differing ............. 4.2.3 Physical Conditions-Underground Facilities .......... 4.3, Preconstruction Conference ............................ 2.8 Preliminary Matters ............................:........ 2 Premises, Use of ".............................. 6.16-6.18 Price. Change of Contract'. . . . . . . . . . . . , . . .. . . . . . . . . ... .. II Price-Contract-definition of .......,.................... I, Progress Payment. Applications for:, ...... ....... .... 14.2 Progress Payment-retainage ......................... 14.2, I :~;' Progress schedule ..:............ 2.6.2.9,6.6.6.29, 15.2.6 Project--definition of ...........................,........ 1 Project Representation-provision for ................. 9.3 Project Representative. Resident--detinition of ,......... I Project. Starting the ...........................,..,.... 2.4 Property Insurance............................... 5.6-5.13 Property Insurance-Partial Utilization ....... ..,........ 5.15 Property Insurance-Receipt and Application of Proceeds......................,............ 5.12-5.13 Protection. Safety and ........................... 6.20-6.21 Punch list, ...................................;....... 14.11 Recommendation of Payment. .... .. ,.......... 14.4. 14.13 Record Documents .................,................. 6.19 Reference Points ......,............................... 4.4 Regulations, Laws and ............................... 6.14 Rejecting Defective Work ............................. 9.6 Related Work at Site ........................;..... 7.1-7.3 Remedies Not Exclusive ............................. 17.4 Removal or Correction of Defective Work ,.......... 13.11 Resident Project Representative--definition of ........... I Resident Project Representative-provision for ..,...,. 9;3 Responsibilities. Contractor'S-:in general ,.............. 6 Responsibilities. Engineer's-,-ingenera! ...............,. 9 Responsibilities. Owner's-in general. ...... .......,...., 8 Retainage ;...........,.............,.,............... i4.2 Reuse of Documents .........................,....:... 3.5 Rights of Way ..,'..............."...,.......,........ 4.1 Royalties. Patent Fees and ........................... 6.12 Safety and Protection.:..... 6.20-6.21, 18.1-18.2 Samples.... ... , .. . ... .. .. .. . . ... . .. .. ,. ...... '" 6.23-6.28 Schedule of progress'........ 2.6, 2.8-2.9.6.6.6.29, 15.2.6 Schedule of Shop Drawing submissions.,.................... 2.6, 2.8-2.9.6.23, 14.1 Schedule of values ...................... 2.6,2.8-2.9. 14.1 Schedules, Finalizing. ...... ...... .. . _ .. .. .. .. ......... 2.9 Shop Drawings and Samples. .... ... .... ,.. , ..... 6.23-6.28 Shop DrawingS-definition of . .. , . .. .. .. .. .. .. ..; ..,. , . '" 1 Shop Drawings, use to approve substitutions. .; , .. .. .... . . . ..... .. .. .... .. .. ....... 6.1.3 5 I I Site, Visits to-by Engineer.......,............. ~..... ,9.2 Specifications-definition of ............................. 1 Staning Construction. Before....... ..........,....., 2.5.2.8 Staning the Project...... .,....... ... .......... .......,. 2.4 Stopping Work-by Contractor.. .. ..."........ ...... 15.5 Stopping Work-by Owner,....... ...........,...... 13.10 Subcontractor-<iefinition of . . . . . . . . . . . . . . . . . . . . . . .. . . ... 1 Subcontractors-in general ....................... 6.8-6.11 . Subcontracts--required provisions ............5.11.1, 6.11 11.4.3 Substantial Completion-certification of .............. 14.8 Substantial Completion-definition of . . . . . . . . . . . . . . . . . . .. 1 Substitute or "Or-Equal" Items '....................... 6.7 Subsurface Conditions. . . . . . . . . . . . . . . . . . . . . . . .. . ... 4.2-4.3 Supplemental costs ..................,...,.......... 11.4.5 SupplementarY Conditions-detinition of ...,.......,..., I SupplementarY Conditions--pri~cipal references to .. 2.2,4.2.5.1.'5.3,5.6-5.8',6.3,6.13,6.23, , 7.4,9.3 Supplementing Contract Documents............... 3.4-3.5 Supplier......:(jefinition of,.. , . .. ..... ..........,....,.....,. I Supplier-principal references to ... 3.6.6.5. 6.7-6.9, 6.20, 6.24,9.13,9,16. 11.8, 13.4, 14.12 Surety-consent to payment.,................. 14.12, 14.14 Surety-Engineer has no duty to ,.................... 9,13 Surety'-notice to............ ,......... ..... 10.1,10.5,15.2 Surety-qualification of ........................,.. 5.1.5,2 Suspending Work, by Owner......................... 15.1 Suspension of Work and Termination-in general... .... 15 Superintendent-Contractor's ...............,......... 6.2 Supervision and Superintendence. . . . . . . . . . . . . . . . .. 6.1-6.2 I I I I I I I I I Taxes--Payment by Contractor.. , . . .. ................ 6.15 Terminatio~by Contractor.......................... 15.5 Termination-by Owner............... '.......... ,15.2-15.4 Termination, Suspension of Work and-in general .,.... 15 Tests and Inspections ........................... 13.3-13.7 Time, Change of Contract .............................. 12 I I I I I I I I Time, Computation of ................................ 17.2 Time. Contract-detinition of .... . .. .. ...... . . ~ ..,. ....... 1 Uncovering Work .........................."... 13.8-13.9 Underground Facilities-definition of , .... .. .. ., ...... .., I Underground Facilities--not shown or indicated.,... 4.3.2 Underground Facilities--protection of ..,....,... 4.3.6.20 Underground Facilities--shown or indicated, ; .. .. ... 4.3.1 U nit Price W ork-detinition of ...,...................... 1 Unit Price Work-general................. 11.9.14.1. 14.5 Unit Prices..........:.............. .. .............. 11.3.1 Unit Prices. Determinations for..... ...... . .,.......... 9.10 Use of Premise~ ................................. 6.16-6.18 Utility owners.......................... 6.13.6.20. 7.2-7.3 Values, Schedule of ......................... 2.6.2.9, 14.1 Variations in Work-Authorized...... ...... .. 6.25, 6.~7, 9.5 '~:" Visits to Site:-by Engineer ........................,... 9.2 Waiver of Claims-on Final Payment................ 14,16. Waiver of Rights by insured panies .....,.".... 5.10, 6.11 Warranty and Guarantee-by Contractor ..,.:........ 13.1 Warranty of Title. Contractor's..,...........,........ 14.3 Work, Access to ,.....................,..,.."........ 13.2 Work-by others ..............,........,........,....... 7 Work Continuing During Disputes .......:............ 6.29 Work, Cost of ................................ .'.. 11.4-1 L5 Work-<ietinition of ....,..........,..................... I Work Directive Change-definition of ...,............... 1 Work Directive Change-principal , references to ......:.....................3.4.3,10.1-10.2 Work, Neglected by Contractor ...........,.........13.14 Work. Stopping by Contractor......-....,............. 15.5 Work. Stopping by Owner. .. .. ..... ......... .... 15.1-15.4 Written Amendment-detinition of ...................... I Written Amendment-principal references to ....:................ 3.4.1. 10.1, 11.2, 12.1 "I 6 I I / GENERAL CONDiTIONS I ARTICLE I-DEFINITIONS I Wherever used in these General Conuitions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof: , I Addenda.,-Written or graphic instruments issued prior to the opening of Bids which clarify. correct or change the, bidding documents or the Contract Documents. I Agreemelll- The written agreement between OWN ER and CONTRACTOR covering the Work to be performed: other Contract Documents are attached to (he Agreement and made a part thereof as provided therein, I Application ji)r Paymelll- The form accepted by ENG 1-' NEER which is to be used by CONTRACTOR in requesting progress -gr final payments and which is to -include such sup- porting documentation as is required by the Contract Documents, I I Bid-c- The offer or proposal of the bidder submitted on the prescribed form setting forth ~Qe prices for the Work to be performed. I Bonds-Bid. performance and payment bonds and other instruments of security. I Change Order-A document recommended by ENGINEER, which is signed by CONTRACTOR and OWNER and autho- rizes, an addition, deletion or revision in the Work. or an adjustment in the Contract Price or the Contract Time. issued on or after the Effective Date of the Agreement. ' I Contract Docllments- The Agreement. Addenda (which per- tain to the Contract Documents). CONTRACTOR's Bid (including documentation accompanying the Bid and any post- Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement. the Bonds. these General Conditions. the Supplementary Conditions, the Specifications and the Drawings as the same are more spe- cifically identified in the Agreement. together with all amend- ments, modifications and supplements issued pursuant to paragraphs 3.4 and 3.5 on or after the Effective Date of the Agreement. I I I Cont/'(/('( Price-The moneys payable by OWNER to CON- TRACTOR under the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11,9,1 in the case of Unit Price Work). I I ContrCl('( Timl!- The number of days (computed as provided in par:lgraph 17,2) or the Liate stated in the Agreement for the' completion of ,the Work. I CONTRACTOR-The person. firm or corporation with whom , ~ OWN ER has entered into the Agreement. I 'defecril'e-An adjective which when modifying the word Work refers to Work that is unsatisfactory. faulty or deficient, or does not conform to the Contract Documents" or does not meet the requirements of any inspection, reference standard. test or approval referred to in the Contract Documents, or has beerr'damagedpriOr, to ENGINEER's recommendation of final payment (unless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14,8 or 14.101, DraH'ings- The drawings which show the character and scope of the Work to be performed and which have been prepared or approved by ENGINEER and are referred to in the Con- tract Documents, Effectil'e D(I(e of the Axreement- The date indicated in the Agreement on which it becomes effective. but if no such date is indicated it means the date on which the Agreement is, ' signed and delivered by the last of the two parties to sign and"":, deliver. E.YGINEER- The person, firm or corporation named as such in the Agreement. ' Field Order-A, written order issued by ENGINEER which orders minor changes in the Work in accordance with para- graph 9.5 but which does not involve a change in the Contract Price or, the Contract Time, General Reqllirements-Sections of Division I of the Speci- fications. Lall's and Regulations: Laws or Regulations-Laws. rules. regulations. ordinances, codes and/or orders, Notice of Award-The written notice by OWNER 10 the app~rent successful bidder stating that upon compliance by the apparent successful bidder with the conditions precedent enumerated therein. within the time specified, OWNER will sign and deliver the Agreement. Notice to Proceed-A written notice given by OWNER to CONTRACTOR(with a copy toENG INEER) fixing the date on which the Contract Time will commence to run and on which CONTRACTOR shall start to 1Jerform CONTRAC- TOR'S obligations under the Contract Documents, OWNER-The public body or authority. corporation, asso- ciation. firm or person with whom CONTRI\CTOR has entered into the Agreement and forwhom the Work is to be provided. - I ' Partial Utili::.ativlI-Placing a portion of the Work in service for the purpose f~r which it is intended (or a related purpose) before reaching Substantial Completion for all the Work, Project-The total construction of which the Work to be provided under the Contract Documents may be the whole. 'or a part as inLiicated elsewhere in the Contract Documents. Resident P/'(~iecr Rl'pre,\'I!/i/Cltil'e- The authorized represen" tative of ENGINEER who is assigned to the site or any part thereof. 7 I I Shop Drawings-All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR to illustrate some portion of the Work and all illustrations, brochures, standard schedules; perfor- mance charts, instructions,-diagrams and other information prepared by a Supplier and submitted by CONTRAcrOR to illustrate material or equipment for some portion of the Work. I I Specifications-Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workman- ship as applied to the Work and certain administrative details applicable thereto. I I Subcontractor-An individual, firm or cOf1loration having a direct contract with CONTRACTOR or with any other Sub- contractor for the performance of a part of the Work at the site. I Substantial Completion- The Work (or a specified pan thereof) has progressed to the point where, in the opinion of ENGI- NEER as evidenced by ENGINEER's definitive certificate of Substantial Completion" it is sufficiently complete. in accordance with the Contract Documents, so that the Work' (or specified part) can be utilized for the purposes for which it is intended; or if there be no such certificate issued. when final paymeilt is due in accordance ;,vith paragraph 14.13. The terms .. substantially complete", and .. substantially com- pleted" as applied to any Work refer to Substantial Comple- tion thereof. I I I I Supplementary Conditions-The part of the Contract Docu- ments which amends or supplements these General Condi- tions. I Supplier-A -manufacturer, fabricator, supplier, distributor. materialman or vendor. ' I Underground Facilities-All pipelines, conduits, ducts. cables. wires. manholes, vaults. tanks, tunnels or other such facilities or attachmerits. and any encasements containing such facil- ities which have been installed underground to furnish any of the following services or materials: electricity. gases. steam, liquid petroleum products, telephone or other communica- tions. cable television. sewage and drainage removal. traffic or other control systems or water, I I Unit Price Work-Work to be paid for on the basis of unit prices. I Work-The entire completed construction orthe various sep- arately identifiable parts thereof required to be furnished under the Contract Documents. Work is the result of per- forming services. furnishing labor and furnishing and incor- porating materials and equipment into the construction, all as required by the Contract Documents. I I Work Directive Change-A written directive to CONTRAC- TOR. issu~don or after the Effective Date of the Agreement arid signed by OWNER and recommended by ENGINEER. I ordering an addition. deletion or revision in the Work. or responding to differing or unforeseen physical conditions under which the Work is to be perfOrmed as provided in paragraph 4.2 or 4.3 or to emergencies under paragraph 6.22. A Work Directive Change may not change the Contract Price or the Contract Time, but is evidence that the panies expect that the change directed or documented by a Work Directive Change will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Time as provided in paragraph 10.2. Written Amendmenr-A written amendment of the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally deal- ing with the noriengineering or nontechnical rather than suictiy Work-related aspects of the Contract Documems. ARTICLE 2-PRELIMINAR Y MA TIERS Delivery of Bonds: , 2.1. When CONTRACTOR delivers the executed Agree- ments to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with paragraph 5.1. Copies of Documents: 2.2. OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in the Supplementary Con- ditions) of the Contract Documents as are reasonably nec- essary for the execution of the Work. Additional copies will be furnished. upon request, at the cost of reproduction. Commencement of Contract Time: Notice to Proceed: 2.3. The Contract Time will commence to run on the thirtieth day after the Effective Date of the Agreement. or. if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within thirty days after the Effective Date of the Agree- ment, In no event will the Contract Time commence to run later than the seventy-fifth day after the day of Bid opening or the thirtieth. day after the Effective Date of the Agreement. whichever date is earlier. Starting the Project: 2.4. CONTRACTOR shall stan to perform the Work on the date when the Contract Time commences to run, but no Work shall be done at the site prior to the date on wtJich the Contract Time commences to run. Before Starting Construction: 2,5. Before undertaking each part of the Work. CON- TRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown 8 '~;" " , j I I I I I I I I I I I I I I I I I I I thereon and all applicable field measurements, CONTRAC: TOR shall promptly report in writing to ENGINEER any conflict. error or discrepancy which CO:r-lTRACTOR may discover and shall obtain a written interpretation or clarifi- cation from ENGINEER before proceeding with any Work affected thereby: however. CONTRACTOR shall not be lia- ble to OWNER or ENGINEER for failure to report any conflict. error or discrepancy in the Contract Documents, unless CONTRA.CTOR had actual knowledge thereof or should reasonably have known thereof. 2.6. Within ten days after the Effective Date of the Agree- ment (unless otherwise specified in the General Require- ments). CONTRACTOR shall submit to ENGINEER for review: 2.6.1. an estimated progress schedul,e indicating the starting and completion dates of the various stages of the Work: 2.6.2. a preliminary schedule of Shop Drawing,.sub- missions: and 2.6,3. a preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work which will be con- firmed in writing by CONTRACTOR at the time of sub- mission. 2.7, Before any Work at the site is started. CONTRAC- TOR shall deliver to OWNER, with a copy to ENGINEER. certificates (and other evidence of insurance requested by OWNER) which CONTRACTOR is required to purchase and maintain in accordance with paragraphs 5.3 and 5.4. and OWNER shall deliver to CONTRACTOR certificates land other evidence of insurance requested by CONTRACTOR) which OWNE'R is required to purchase and maintain in accordance with paragraphs 5.6 and 5.7, Preconstruction Conference: 2.8, Within twenty days after the Effective Date of the Agreement. but before CONTRACTOR starts the Work at the site, a conference attended by CONTRACTOR. ENGI-' NEER and others as appropriate will be held to discuss the' schedules referred to in paragraph 2.6. to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment. and,to establish a working understanding among the parties as to the Work. Fina/i:.ing Schedules: 2,9, At kast ten days before submission of the first Appli- cation for P.l~'ment a conference attended by CONTRAC- TOR, ENGINEER and others as appropriate will be held to finalize the schedules submitted in acconJance with para- '...... / graph 2.6. The finalized progress schedule will be acceptable to ENGINEER as providing an orderly progression of the Work to completion within the Contract Time. but such acceptance will neither impose on ENGINEER responsibility for the progress or scheduling'of the Work nor relieve CON- TRACTOR from full responsibility therefor. The finalized schedule of Shop Drawing submissions will be acceptable to ENGINEER as providing a workable arrangement for pro- cessing the submissions. The finalized schedule of values will be acceptable to ENGINEER as to form and substance. ARTICLE 3-CONTRACT DOCUMENTS: INTENT. AMENDING. REUSE 1 ment: 3.1. The Contract Documents comprise the entire agree:~\ ment between OWNER and CONTRACTOR concerning the ' Work. The Contract Documents are complementary: what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with '" the law of the place of the Project. 3.2. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereon to be con- structed in accordance with the Contract Documents. Any Work. materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result will be supplied whether or not specifically called for, When words which have a well-known technical or trade meaning are used to describe Work, materials or equipment such words shall bi: interpreted in accordance with that meaning. Reference to standard specifications. manu~ls or codes of any technical societv, organization or association. or to the Law~or Regulations o'f any governmental authority. whether such reference be specific or by implication. shall mean the latest standard specification. manual. code or Laws or Regulations in effect at the time of opening of Bids (or, on 'the Effective Date of the Agreement if there were no Bidsl. except as may be otherwise specifically stated. However. no provision of any referenced standard specification. manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of OWNER. CONTRACTOR or ENGINEER, or any of their consuitants; agents or employ- ees from those set forth in the Contract Documents.. nor shall it be effective to assign to ENGINEER. or any of ENGI- NEER's consultants, agents or employees. any duty or' authority to supervise or direct the furnishing or. performance of the Work or any duty or authority to undertake responsi- bility contrary to the provisions of paragraph 9,15 or 9,16, Clarifications and interpretations pf the Contract Documents ~hall be issued by ENGINEER as provided in paragraph 9.4, 3-.3. If. during the performance of the Work, CONTRAC- TOR finds a conflict. error or discrepancy in the' Contract Documents, CONTRACTOR shall so report to ENGINEER in writing atl!)nce and before proceeding with the Work atTected thereby shall obtain a written interpretation or clarification 9 I I from ENGINEER; however. CONTRACTOR shall ri~i be liable to OWNER or ENGINEER for failure to repo" any conflict, error or discrepancy in the Contract Documents unless CONTRACTOR had actual knowledge thereof or should reasonably have'known thereof. I I Amending and Supplementing Contract Documents: 3.4. The Contract Documents may be amended to pro- vide for additions. deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: I I 3.4.1. a forma! Written Amendment, 3.4.2. a Change Order (pursuant to paragraph 10.4). or I 3.4.3. a Work Directive Change (pursuant to para- graph 10.1). I As indicated in paragraphs 11.1 and 12.1. Contract Price and Contract Time may only be changed by a Change Order or a Written Amendment. I 3.5. In addition, the requirements of the Contract-Docu- ments may be supplemented. and minor variations and devia- tions in the Work may be authorized. in one or more of the following ways: I, 3.5.1. a Field Order (pursuant to paragraph 9.5), I 3.5.1. ENGlNEER's approval of a Shop Drawing or sample (pursuant to paragraphs 6.26 and 6.27), or I 3.5.3.' ENGINEER's written interpretation or clarifi- cation (pursuant to paragraph 9.4), I Reuse of Documents:' 3.6., Neither CONTRACTOR nor any Subcontractor or Supplier or other person or organization performing or fur- n~shing any or'the Work under a direct or indirect contract with OWNER shall have or acquire any title to or ownership rights in any of the Drawings. Specifications or other docu- ments (or copies of any thereof) prepared by or bearing the seal of ENGINEER: and they shall not reuse any of them on extensions of the Project or an'y other project without written consent of OWNER and ENGINEER and specific written verification 'or adaptation by ENGINEER. I I I ARTICLE ~A V AILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS I AvailabiJily of LAnds: 4.1. OWNER shall furnish. as indicated in the Contract Documents, ,the lands upon which the Work is to be per- formed, rights-of-way and easements for access thereto. and I I r \ '~1 _,",: . I ..:. '.' .. . shcn otHer lands which are designated for the use of CON. TRACTOR. Easements for permanent structures or perma-' nent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. If CONTRACTOR believes that any delay in ' OWNER's furnishing these lands. rights-of-way or ease- ments entitles CONTRACTOR to an extension of the Con. tract Time. CONTRACTOR may make a, claim therefor as provided in Article 12. CONTRACTOR shall.provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. Physical Conditions: 4.2.1. Explorations and Reports: Reference, is made to the Supplementary Conditions for identification of those .', reports of explorations and tests of subsurface conditions' ~;\ at the site that have been utilized by ENGINEER in prep- aration of the Contract Documents, CONTRACTOR may rely upon the accuracy of the technical data contained in such repo"s, but not upon nontechnical data. interpreta-' ' tions or opin'ions contained therein orfor the completeness ". ' thereof for CONTRACTOKs purposes. Except as indi- cated in the immediately preceding sentence and in para- graph 4.2.6, CONTRACTOR shall have full responsibility with respect to subsurface conditions at the site. ' 4.2.2. Existing Structures: Reference is'made to the Supplementary Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site that have been utilized by ENGI- NEER in preparation of the Contract Documents. CON- TRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the complete- ness thereof for CONTRACTOR's purposes. Except as indicated in ,the immediately preceding sentence and in paragraph 4.2.6. CONTRACTOR shall have full respon- sibility, with respect to physical conditions in or relating to such structures. 4.2.3. ReporT of Differing. Conditions: If CONTRAC. '\ TOR believes that: 4.2.3.1. any t~chnical data on which CONTRAC~ TOR is entitled to rely as provided in paragraphs 4.2.1 and 4.2.2 is inaccurate: or 4.2.3.2. any physical condition uncovered or revealed at the site differs materially from that indi- cated, reflected or referred to in the Contract Docu- ments, CONTRACTOR shall, promptly after becoming aware thereof and before performing any Wbrk in connection therewith (except in an emergency as permitted by para- graph 6.221. notify OWNER and ENGINEER in writing about the inaccuracy or difference. 10 I I I I I I I I I I I I I I I I I I I I '\ 4,2.4, ENGINEER's Re\'il'\\':ENGINEER v.:iii promptly review the pertinent conditions. detennine the necessity of obtaining additional explorations or tests with respect thereto and advise OWN ER in writing( with a copy to CONT~ACTOR) of ENGINEER's findings and con- clusions, 4.2.5. Possihle Document Change: If ENGINEER concludes that there is a material error in the Contract Documents or that because, of newlvdiscovered condi- tions a change in the Contract Doc~~ents is required. a Work Directive Change or a Change Order will be issued as provided in Article 10 to retlect and document the consequences of the inaccuracy or difference. 4.2.6, Possihle Pricl! and Til/le Adjustl/le/lts: In each such case. an increase or decrease in the Contract Price or an extension or. shortening of the Contract Time, or any combination thereof. will be allowable to the extent that they are attributable to any such inaccuracy or difference. If OW~ER and CONTRACTOR are unable to agree as to the amount or length thereof. a claim may be made therefor as provided in Articles II and 12, Physical Conditions-l/nderground Facilities: 4,3,1. Shown or Indicated: The information and data shown or indicated in the Contract Docu(l1ems with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to OWNER or ENG IN EER by the owners of such Underground Facil- ities or by others. Unless it is otherwise expressly pro- vided in the Supplementary Conditions: 4.3.1,1, OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or data: and. .+.}.1.2. CONTRACTOR shall have full responsi- bility for reviewing and checking all such information and data. for locating all Underground Facilities shown or indicated in the Contract Documents, for coordina- tion of the, Work with the owners of such Underground Facilities during construction, for the ,safety and pro- tection thereof as provided in paragraph 6,20 and repairing any damage thereto resulting from the Work. the cost of all of which will be considered as having been included in the Contract Price. 4,3,2. .vilt Sholl'/I or Indicated. If an Underground Facility is uncovered or revealed at or contiguous to the site which was not' shown or indicated in' the Contract Documents and which CONTRACTOR could not reason- ably have been expected to be aware of. CONTRACTOR shall. promptly after becoming aware thereof and before performing any Work affected thereby (except in an emer- gency as permitted by paragraph 6.22!. identify the owner of such UndagrounJ Facility and give written notice thereof to that oi.\iner and tl) OWNER and ENGINEER, ENGI- N EER will promptly review .the Underground Facility to ..J,i\ /' / " 8et~rfuine aid extent to which the Contract Documents should be modified to reflect and document the eonse- 'quences of the existence of the Underground Facility, and the Contract 'Documents will be amended or supplemented to the extent necessary, During such time~ CONTRAC- TOR shall be responsible for the safety and protection of such Underground Facility as provided in paragraph 6.;0. CONTRACTOR shall be allowed an increase in the Con- tract Price or an extension of the Contract Time. or both, to the extent that they are attributable to the existence of any Underground Facility that was not shown or indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of. If the parties are unable to agree as 'to the amount or length thereof. CONTRACTOR may make a claim therefor as provided in Articles II and 12. . ~~:'. Reference Points: '4.4, OWN ER sha)l provide engineering surveys to estab- lish reference points for construction which in ENG IN EER 's judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for lay- '" ing out the Work (unless otherwise specified in the General Requirements), shall protect and preserve the established reference points and shall make no changes or relocations without the prior written approval of OWNER, CONTRAC- TOR shall report to ENGINEER whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations. and shall be respon- sible for the accurate replacement or relocation of such ref- erence points by professionally qualified personnel. ARTICLE 5-BONDS AND INSURANCE Performance and Other Bonds: 5.1. CONTRACTOR shall furnish performance and pay- ment Bonds. each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all CONTRACTOR's obligations under the Contract Docu- , , ments, These Bonds shall remain in effect at least until one year after the date when final payment becomes due, except as otherwise provided by Law or Regulation or by the Con- tract Documents. CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary Condi- tions. All Bonds shall be in the forms prescribed by Law or Regulation or by the Contract Documents and be executed by such sureties as are named in the current list of "Com- panies Holding Certificates of Authority as Acceptable Sure- ties on Federal Bonds and as Acceptable Reinsuring Com- panies" as published in Circular 570 (amended) by the Audit Staff Bureau' of Accounts. U ,S, Treasury Department. All Bonds signed by an agent must be accompanied by a'certified copy' of the authority to act. 5.2, If [he surety on any Bond furnished by CONTRAC- TOR is declared a bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of II I I , the Project is located or it ceases to meet the requirements of paragraph 5.1, CONTRACTOR shall within five days thereafter substitute another Bond and Surety, both of which must be acceptable to OWNER. I I I Contractor's Liability Insurance: 5.3. CONTRACTOR shall purchase and maintain such. comprehensive general liability and other insurance as is appropriate for the Work being performed and furnished and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR's perfor- mance and furnishing of the Work and CONTRACTOR's other obligations under the Contract Documents, whether it is to be performed or furnished by CONTRACTOR, by any Subcontractor, by anyone directly or indirectly employed by any of them to perform or furnish any of the Work, or by anyone for whose acts any of them may be liable: ' I I I I 5.3.1. Claims under workers' or workmen's compen- sation. disability benefits and other similar employee ben- efit acts: I 5.3.2. Claims for damages because of bodily injury. occupational sickness or disease, or death of CONTRAC- TOR's employees; I 5.3.3. Claims for damages because of bodily injury, sickness or disease, or death of any person other than CONTRACTOR's employees: I 5.3.4. Claims for damages insurl:d by personal injury liability coverage which are sustained (a) by any person as a result of an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (b) by any other person for any other reason: I 5.3.5. Claims for damages. other than to the Work itself, because of injury to or destruction of tangible prop- erty wherever located. including loss of use resulting therefrom: I I 5.3.6. Claims arising out of operation of Laws or Reg- ulation~ for damages because of bodily injury or death of any person or for damage to property: and I 5.3.7. Claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. I The insurance required by this paragraph 5.3 shall include the specific coverages and be written for not less than the limits of liability and coverages provided in the Supplemen- tary Conditions, or required by law, whichever is greater. The comprehensive general liability insurance shall include completed operations insurance. All of the policies of insur- ance so required to be purchased and maintained (or the certificates or other evidence thereot) shall contain a provi- sion or endorsement that' the coverage afforded will not be cancelled, materially changed or renewal refused until at least I 'I I thirty days' prior written notice has been given to OWNER and ENGINEER by certified mail. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting. removing or replacing defective Work in accordance with paragraph 13.12, In addition, CONTRACTOR shall maintain such completed operations insurance for at least two years after final payment and furnish OWNER with evidence of continuation of such insurance at final payment and one year thereafter. Contractual LiabiJily Insurance: 5.4. The comprehensive general liability insurance required by paragraph 5,3 will include contractual liability insurance applicable to CONTRACTOR's obligations under paragraphs 6.30 and 6.31. . I f,,', Owner's LiabiJily Insurance: 5.5. OWNER shall pe responsible for purchasing and maintaining OWNER's own liability insurance and, at OWNER's option, may purchase and maintain such'insur~ ance as will protect OWNER against claims which may arise from operations under the Contract Documents. Property Insurance: 5.6. Unless otherwise provided in the SupplementarY Conditioris, OWNER shall purchase and maintain property insurance upon the Work at the site to the full insurable value thereof (subject to such deductible amounts as may be pro- vided in the Supplementary Conditions or required by Laws and Regulations). This insurance shall include the interests of-OWNER. CONTRACTOR. Subcontractors, ENGINEER and ENGINEER's consultants in the Work, all of whom shall be listed as insureds or additional insured panies. shall insure against the perils, of fire and extended coverage and shall include "all risk" insurance for physical loss and damage including theft. vandalism and malicious mischief, collapse and water damage. and such other perils as may be provided in the Supplementary Conditions. and shall include damages. losses and expenses arising out of or resulting f~6m any insured loss or incurred in the repair or replacement of any insured property (including but not limited to fees and charges of engineers, architects, attorneys and other professionals). If not covered under the "all risk," insurance or otherwise pro- vided in the Supplementary Conditions, CONTRACTOR shall purchase and maintain similar property insurance on portions of the Work stored on and off the site.or in transit when such portions of the Work are to be included in an Application for Payment. 5.7. OWNER shall purchase and maintain such boiler and machinery insurance or additional propeny insurance as may be required by the Supplementary Conditions or Law,s and Regulations which will include the interests of OWNER. CONTRACTOR. Subcontractors, ENGINEER AND ENGINEER's consultants in the Work. all of whom shall be listed as insured or additional insured panies. 12 -I 1 5.8. All the policies of insurance (or the certificates or other evidence thereof) required to be purchased and main- tained by OWNER in acc'ordance with paragraphs' 5.6 and 5,7 will contain a provision or endorsement that the coverage afforded will not be cancelled or materially changed or renewal refused until at leas,t thirty days' prior written notice has been given to CONTRACTOR 'by certified mail and will contain waiver provisions in accordance with paragraph 5. n .2. I I I 5.9, OWNER shall not be responsible for purchasing and maintaining any property insurance to protect the intert:sts of CONTRACTOR, Subcontractors or others in the Work to the extent of any deductible amounts that are provided in the Supplementary Conditions. The risk of loss within the deductible amount, will be borne by CONTRACTOR. Sub- contracror or others suffering any such loss and if any of them wishes, property insurance coverage within the limits of such amounts. each may purchase and maintain it at the purchas- er's own expense. I I I 5.10. .If CONTRACTOR requests in writing that other special insurance be included in the ,property insurance pol- icy. OWNER shall, if possible, include such insurance, and the cost thereof will be charged to CONTRACTOR by appro- priate Change Order or Written Amendment. Prior to com- mencement of the Work at the site, OWNER shaH in writing advise CONTRACTOR whether or not su~h other insurance has been procured by OWNER. I I Waiver of Rights: 5.11.1. OWNER and CONTRACTOR waive all rights against each other for all losses and damages caused by any of the perils covered by the policies of insurance provided in response to paragraphs 5.6 and 5,7 and any other property insurance applicable to the Work. and also waive all such rights against the Subcontractors, ENGI- NEER, ENGINEER's consultants and all other parties named as insureds in such policies for losses and damages so caused. As required by paragraph 6.11. each subcon- tract between CONTRACTOR and a Subcontractor will contain similar waiver provisions by the Subcontractor in favor of OWNER, CONTRACTOR, ENGINEER. ENGI- NEER 's consultants and all otherpanies named as insureds, None of the above waivers shaH extend to ~herights that . an'y of the insured parties may have to the proceeds of insurance held by OWNER as trustee or otherwise pay- abl~ under any policy so issued. I I I I I ),11.2. OWNER and CONTRACTOR intend that any policies provided in response to paragraphs ),6 and ),7 shall protect all of the parties insured and provide primary coverage for all losses and damages caused by the perils co\'ered thereby, Accordingly. all such policies shall con- tain provisions to the effect that in the event of payment of any loss or damilge the insurer will have no rights ~)f recovery against any of the parties named as insureds or additional insureds, and if-the insurers require separate waiver forms to be signed by ENGINEER or ENGI- NEER's cllnsultant OWNER will obtain the same, and if I I I I such waiver forms are required of any Subcontractor, CONTRACTOR will obtain the same, , Receipt and Application of Proceeds: 5.12. Any insured loss under the policies of insurance required by paragraphs 5,6 and 5.7 will be adjusted with OWNER and made payable to OWNER as trustee for the insureds, as their interestsmay appear, subject to the require- ments of any applicable mortgage clause and of paragraph 5.13. OWNER shall deposit in a separate account any money so received. and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached the damaged Work shall be repaired or replaced. the moneys so received applied on account thereof and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment. 5.13. OWNER as trustee shall have power to adjust and settle any loss with the insurers unless one'of the parties in interest shall object in writing within fifteen days after'the occurrence of loss to OWNER's exercise of this power. If such objection be made, OWNER as trustee shall make set- , tlement with the insurers in accordaI)ce with such agreement as the parties in interest may reach. If required in writing by any party in interest, OWNER ,as trustee shall, upon the occurrence of an insured loss. give bond for the proper per- formance of such duties. Acceptance of Insurance: 5.14. If OWNER has any objection to the coverage afforded by or other provisions of the insurance req1.:ired to be pur- chased and maintained by CONTRACTOR in accordance with paragraphs 5,3 and 5.4 on the basis,ofits not complying with the Contract Documents. OWNER shall notify CON- TRACTOR in writing thereof within ten days of the date of delivery of such certificates to OWNER in accordance with paragraph :'.7, If CONTRACTOR has any objection to the coverage afforded by or other provisions of the policies of insurance required to be purchased and maintained by OWNER in accordance with paragraphs 5.6 and 5.7 on the basis of their no~ complying with the Contract Documents. CON- TRACTOR shall notify OWNER in writing thereof within ten days of the date of delivery of such certificates to CON- TRACTOR in accordance with paragraph 2.7. OWNER and CONTRACTOR shall each provide to the other such addi- tional information in respect of insurance provided by each as the other may reasonably request. Failure by OWNER or CONTRACTOR to give any such notice of objection within the time provided shall constitute acceptance of such insur- ance purchased by the other as complyin,g with the Contract Documents, Partial Utili:;ation-Properry Insurance: 5.15. 'If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Comple- lion of all the Work, such use or occupancy may be accom- plished in accordam:e with paragraph 14,1,0: provided lhat no 13 I ~ I such use or occupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected the changes in coverage neces- sitated thereby. The insurers' providing the property insur- anceshall consent by endorsement on the policy or policies', but the property insurance shall not be cancelled or lapse on account of any such partial use or occupancy. I I I ARTICLE 6-CONTRACTOR'S R~SPONSIBILITIES I Supervision and Superintendence: 6.1. CONTRACTOR shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Doc- uments. CONTRACTOR shall be solely responsible for the' means. methods. techniques, sequences and procedures of construction. but CONTRACTOR shall not be responsible for the negligence of others in the design or selection of a specific means, method, technique, sequence or procedure of construction which is indicated in and required by the Contract Documents. CONTRACTOR shall be responsible to see that the finished Work complies accurately with the Contract Documents. I I I I 6.2. CONTRACTOR shall keep on the Work at all times during its progress a competent resident superintendent. who shall not be replaced without written notice to OWNER and ,ENGINEER except under extraordinary circumstances. The s~perintendent will be CONTRACTOR's representative at the site and shall have authority to act on behalf of CON- TRACTOR. All communications given to the superintendent shall be as bipding as if given to CONTRACTOR.' I I I Labor, MaterUzls and Equipment: 6.3. CONTRACTOR shall provide competent. suitably qualified personnel to survey and layout the Work and per- form construction as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the site. Except in connection with the safety or protection of persons or the Work or property at the site o'r adjacent thereto. and except as otherwise indicated in the Contract Documents. all Work at the site shall be performed during regular working hours. and CONTRACTOR will not permit overtime work or the performance of Work on Sat- urday. Sunday or any legal holiday without OWNER's writ- ten consent given after prior written notice to ENGINEER. I I I 6.4. Unless otherwise specified in the General Require- ments. CONTRACTOR shall furnish and assume full respon- sibility for all materials. equipment. labor, transPortation. construction equipment and machinery. tools, appliances. fuel. power. light, heat, telephone. water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance. testing, start-up and,completion of the Work. I I I 6.5, All materials and equipment shall be of good quality and new, except as otherwise provided in the Contract Doc- uments. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied.. installed, con- nected. erected, used. cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents: but no pro- vision of any such instructions will be effective to assign to ENGINEER, or any of ENGINEER'sconsultants, agents or employees, any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or author- ity to undertake responsibility contrary'to the provisions of paragraph 9.15 or9.16. Adjusting Progress Schedule: 6.6. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.9) adjust. ments in the progress schedule to reflect the impact thereon of new developments: these win conform generally to the progress schedule then in effect and additionally'will comply with any provisions of the General Requirements applicable thereto. ' 'f :~...', Substifutes or "Or-Equal" Items: 6.7.1. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a ,proprietary item or the name of a particular Supplier the naming of the item is intended ,to establish the type. function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other Suppliers may be accepted, by ENGINEER if sufficient information is submitted by CONTRACTOR to allow ENGINEER to determine that, the material or equipment proposed is equivalent or equal to that named. The procedure for review by ENGINEER will include the following as supplemented in the General Requirements. Requests for review of substitute items oC material and equipment will not be accepted by ENGI- NEER from anyone other than CONTRACTOR. If CON- TRACTOR wishes to furnish or use a substitute item of material or equipment. CONTRACTOR shall make writ- ten application to ENGINEER for acceptance thereof. certifying that the proposed substitute will perform ade- , quately the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that spec- ified. The application will state that the, evaluation and acceptance of the proposed substitute will not prejudice CONTRACTOR's achievement of Substantial Comple- tion on time, whether or not acceptance of the substitute for ,use in the Work' will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to 'adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the Work is subject to payment ofany license fee or 14 I I I 1- I I I I I I I I' I I I I I I I royalty, All variations of the proposed substitute from that specified will be identified in the application and available maintenance. repair and replacement service will be indi- cated. The application will also contain an itemized esti- mate of all costs that wilt result directly or indirectly from acceptance of such substitute. including costs of redesign and claims of other contractors affected by the resulting change. all of which shall be considered by ENGINEER in evaluating the proposed substitute.. ENGINEER may require CONTRACTOR to furnish at CONTRACTOR.s expense additional data about the proposed substitute. 6,7,:'. If a specific means, method. technique. sequence or procedure of construction is indicated in or required by the Contract Documents. CONTRACTOR ma~ furnish or utilize a substitute means. method. sequence. technique or procedure of construction acceptable to ENGINEER. if CONTRACTOR submits sufficient information to allow ENGINEER to determine that the substitute proposed is equivalent.to that indicated or required by the Contract Documents. The procedure for review by ENGINEER will be-similar to that provided in paragraph 6.7, I as applied by ENGINEER and as may be supplemented in the Gen- eral Requirements. 6,7.3., ENGINEER will be allowed a reasonable time within which to evaluate each proposed substitute, ENGI- ,N EER will be the sole judge of acceptability, and no substitute will be ordered. installed or utilized without ENGINEER's prior written acceptance which will be evi- , ,denced by either a Change Order or an approved Shop Drawing. OWNER may require CONTRACTOR to fur- nish at CONTRACTOR's expense a special performance guarantee or other surety with respect to any substitute, ENGINEER will record time required by ENGINEER and ENGINEER's consultants in eva:uating substitutions proposed by CONTRACTOR and in making changes in the Contract -Documents occasioned thereby, Whether or not ENGINEER accepts a proposed substitute. CON- TRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER's consultants for'evaluat- ing each proposed substitute. Conceming Subcontractors, Suppliers and Others: 6,8.1.' CONTRACTOR shall not employ any Subcon- tractor. Supplier or other person or organization (including those acceptable to OWNER and ENGINEER as indi- cated in paragraph 0.8,:'). whether initially or as a substi- tute. against whom OWNER or ENGINEER may have reasonable objection, CONTRACTOR shall not be required to employ any Subcontractor. Supplier or other person or organization to furnish or perform any of the Work against whom CONTRACTOR has reasonable objectiLlO., 6.8,:'. If the Supplementary Conditions require the identity of cenain Subcontractors. Suppliers or other per- sons' or organizations (including those who are to furnish the principal items of materials and cquipmentl to be sub- , mitted to OWN ER in advance of the specified date prior to the Effective Date of the Agreement for acceptance by OWNER and ENGINEER and if CONTRACTOR has submitted a list thereof in accordance with the Supple- mentary Conditions. OWN ER's or ENGINEER '5 accept- ance (either in writing or by failing to make written objec- tion thereto by the date indicated for acceptance orobjec- tion in'the bidding documents or the Contract Documents) of any such Subcontractor. Supplier or other person or organization so identified may be revoked ,on the basis of reasonable objection after due investigation. in which case CONTRACTOR shall submit an acceptable substitute. the Contract Price will be increased by the difference in, the cost occasioned by such substitution and an appropriate Chan~e Order will be .issued or Written Amendment signed. No acceptance by OWNER or ENGINEER of any such Subcontractor. Supplier or other person or organization shall constitute a waiver of any right of OWNER or ENGI- NEER to reject defectil'e Work. ':t'~\ 6.9, CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the Subcon- tractors, Suppliers and other persons and organizations per" forming or furnishing any of the Work under a direct or indirect contract with CONTRACTOR just as CONTRAC- ,TOR is responsible for CONTRACTOR's own acts and omis- sions. Nothing in the Contract Documents shall create any contractual relationship between OWNER or ENGINEER and any such Subcontractor. Supplier or other person or organization. nor shall it create any obligation on the part of OWNER or ENGINEER to payor to see to the payment of any moneys due, any such Subcontractor. Supplier or other person or organization except as ,may otherwise be required by Laws and Regulations. 6.10. The divisions and sections of the Specifications and the identifications of any Drawings shall not control CON- TRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade, 6.11, All Work performed for CONTRACTOR by a Sub- contractor will be pursuant to an approprikte agreement between CONTRACTOR and the Subcontractor which spe- cifically binds the Subcontractor to the applicable terms ,and conditions of the Contract Documents for the benefit of OWNER and ENGINEER and contains waiver provisions as required by paragraph 5,11. CONTRACTOR shall pay each Subcontractor a just share of any ihsurance moneys received by CONTRACTOR on account of losses under pol- icies issued pursuant to paragraphs 5;6 and 5,7, Patint Fees and Royalties: 6.12. CONTRACTOR shall pay all license fees and roy~ alties and assume all cost's incident to the use in the perfor- mance of the Work or the inc.orporalion in the Work of any invention. design. process. product 'or device w~ichis the subject of patent rights or copyrights held by others. If a particular invention. design, process. product or device is specified in the Contract Documents for use in the perfor- mance of the Work and if to the actual knowledge of OWN ER 15 I ~ 1 or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any'1icense fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. CONTRACTOR shall indemnify and hold harmless OWNER and ,ENGINEER and anyone directly or indirectly employed by either of them from and against all claims, damages, losses and expenses (including attorneys' fees and court and arbitration costs) arising out of any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design,'process. product or device not specified in the Contract Documents. and 'shall defend all such claims in connection wiih any alleged infringement of such rights. 1 I I I I Permits: 6.13: Unless otherwise provided in the Supplementary Conditions. CONTRACTOR shall obtain and pay for all con- struction permits and licenses. OWNER shall as'sist CON- TRACTOR: when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work, which are 'applieable at the time of opening of Bids, or if there are no Bids on the Effectjve Date of the Agreement. CON- TRACTOR shall pay all charges of utility owners for con- nections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto such as plant investment fees. ' I I I I Laws and Regulations: 6.14.1. CONTRACTOR, shall give all notices and comply with all Laws and Regulations applicable to fur- nishing and performance of the Work. Except where oth- erwise expressly required by applicable Laws and Regu- lations. neither OWNER nor ENGINEER shall be respon- sible for monitoring CONTRACTOR's compliance with any Laws or Regulations. I I 6.14.2. If CONTRACTOR observes that the Specifi- cations or Drawings are at variance with any Laws or Regulations. CONTRACTOR shall give ENGINEER' prompt written notice thereof. and any necessary changes will be authorized by one of the methods indicated in paragraph 3.4. If CONTRA<;:TOR performs any Work knowing or having reason to know that it is contrary to . such Laws or Regulations" and without. such notice to ENGINEER, CONTRACTOR shall bear all costs arising therefrom: however. it shall not be CONTRACTOR's pri- mary responsibility to make certain that the Specifications and Drawings are in accordance with such Laws and Regulations. I I I 1 Tares: 6.15. CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by CONTRAC- TOR in accordance with the Laws and Regulations of the I, I place ,of the Project which are applicable during the perfor- mance of the Work. Use of Premises: \. 6,16. CONTRACTOR shall confine construction equip- ment, the storage of materials and equipment and the oper- . ations of workers to the Project site and land and areas iden- tified in and permitted by the Contract Documents and other land and areas permitted by Laws and Regulations, rights- of-way, permits and easements. and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any land or areas contig. uous thereto, resulting from the performance of the Work. Should any claim be made against OWNER or ENGINEER:~;'. by any such owner or o~cupant because of the performance of the Work, CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim by arbitration or at law. CONTRACTOR shall, to the fullest extent permitted by Laws and Regulations. indemnify , , and hold OWNER and ENGINEER hannless from and against all claims. damages. losses and expenses (including, but not limited to, fees of engineers, architects, attorneys'and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action. legal or equi. table. brought by any such other party against OWNER or ENGINEER to the extent based on a claim arising out of CONTRACTOR's performance of the Work. 6.17. During the progress of the Work. CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work CONTRACTOR shall remove all waste materials, rubbish arid debris from and about the premises as welf as all tools, appliances. construction equip- ment and machinery, and surplus materials. and shall leave the site clean and ready for occupancy by OWNER. CON- TRACTOR shall restore to original condition all property not designated for alteration by the Contract Documents. 6.18. CONTRACTOR shall not load nor permit any pan of any structure to be 10Cided in any manner that will endanger the structure. nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. Record Documents: , 6.19, CONTRACTOR shall maintain in a safe place at the site one record copy of all Drawings, Specifications, Addenda. Written Amendments, Change Orders, Work Directive Changes. Field Orders and written interpretations and Clarifications (issued pursuant to paragraph 9.4) in good order and annotated to show all changes made during con- struction. These record documents together with all approved samples and a counterpan of all approved,Shop Drawings will be available to ENGINEER for reference. Upon com- 16 I I pletion of the Work. these record documents. satnpies ~hd Shop Drawings will be delivered to ENGINEER for OWNER. I Safety and Protection.: 6.20. CONTRACTOR shall be responsible for initiating. maintaining and supervising all safety,precautions and pro- grams in connection with the Work, CONTRACTOR shall take all necessary precautions for the safety of. and shall provide the necessary protection .to prevent damage, injury or loss w: I I I 6..20.1. all' employees on the Work and other persons and organizations who may be affected thereby: 6,20,2. all the Work and materials and equipment .to be incorporated therein. whether in storage on or off the site: and I 6,20.3. other property at the site or adjacent thereto. incluo'ing trees, 'shrubs. lawns. walks, pavements, road- ways. structures. utilities and Underground Facilities not designated for removal. relocation or replacement 'in the course of construction. I I , CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the safety of persons or property orto protect them from damage. injury or loss: and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and udlity owners when prosecution of the Work may atfect them, and shall cooperate with them in the pro- tection: removal. relocation and replacement of their prop- erty, .-\11 damage. injury or loss to any property referred to in paragraph 6,20.2 or, 6,20,] caused. directly or indirectly. in whole or in part. by CONTRACTOR. any Subcontractor. Supplier or any other person or organization directly or indi- rectly employed by,any of'them to perform or furnish any of the Work or anyone for whose acts any of them may be liable. shall be remedied by CONTRACTOR (except damage or loss ,attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or anyone employed by either of them or anyone for whose acts either of them- may be liable. and not attributable, directly or indi- recily. in whole or in parI. to the fault or negligence of CON- TRACTOR>. CONTRACTOR's duties and responsibilities for the safety and protection of the Work shall continue umil such time as all the Work is completed and ENG I:-lEERhas issued a notice to OWNER and CONTRACTOR in accord- ance with paragraph 14,13 that the Work is acceptable (except as otherwise expressly provided in connection with Substan- tial Completion>. I 'I I I I I I I 6.21. CONTRACTOR shall designate a respllnsible rep- resentative at the site whose duty shali be the prevention llf accidents. This person shall be CONTRACTOR's superin- tendent unless otherwise Jesignated in writin~ by CON- TRACTOR 10 OWN ER. I I , Em~rginde.i-: 6.22. In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, CONTRACTOR, without special instruction or authorization from ENGINEER or OWNER. is obligated to act to prevent threatened damage, injury or 10ss.'CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes 'that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If ENGI- NEERdetermines ,that a change in the Contract Documents is required because of the action taken in response to an emergency, a Work Directive Change or Change Order will be issued to document the consequences of the changes or variations. Shop Drawings and Samples: 6.23. After checking and verifying all field measurement~~. and after complying with applicable procedures specified in . the General Requirements, CONTRACTORshall submit to ENGINEER for review and approval in accordance with the accepted schedule of Shop Drawing, submissions (see para.. ; , graph 2.9), odor other appropriate action if so indicated in ,'" the Supplementary Conditions. five copies (unless otherwise specified in the General RequirementsJof all Shop Drawings. which will bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's responsi- bilities under the Contract Documents with respect to the review of the submission, All submissions will be identified as ENGINEER may require. The data shown on the Shop Drawings will be complete with respect to quantities, dimen- sions, specified performance and design criteria, materials and similar data to enable ENGINEER to review the infor- mation as required. 6.24. CONTRACTOR shall also submit to ENGINEER for review and approval with such promptness as to cause no delay in Work. all samples required b'y the Contract Doc- uments, All samples will have been checked by and accom- panied by a specific written indication that CONTRACTOR has satisfied CONTRACTOR's responsibilities under the Contract Documents with respect to the review of the sub- mission and will be identified clearly as to material. S4pplier, pertinent data such as catalog numbers and the use for which intended, 6,25.1: Before submission of each Shop Drawing or sample CONTRACTOR shall haY,e determined and veri- fiedall quantities. dimensions. specified performance cri- teria. installation requirements. materials. catalog num- bers and similar data with respect thereto and reviewed or coordinated each Shop Drawing or sample with other Shop Drawings and samples and with the requirements of the Work and the Contract Documents. 6.25,2. At the time of each submission. CONTRAC- TOR shall give ENGIN EER specific written notice of each variation that the Shop Drawings or samples may have from the req'uirements llf the Cllntracl DO,cuments. and. in addition. shall cause a specific notation to be made on 17 I I. each Shop Drawing submitted to ENGINEER for review and approval of each such variation. 1 6.26. ENGINEER will review and approve with reason- able promptness Shop Drawings and samples. but ENGI- NEER's review and approval will be only for conformance with the design concept of the Project and for compliance with the information, given in the Contract Documents and shall not extend to means. me~hods, techniques, sequences or procedures of construction (except where a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents) or to safety precautions orlprograms incident thereto. The review and approval of a separate'item as such will not indicate approval of the assembly in which the item functions. CON- TRACTOR shall make corrections required by ENGINEER, and shall return the required number of correct,ed copies of Shop Drawings and submit as required new samples for review and approvaL CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals. I I 1 1 I 6.27. ENGINEER's review and approval of Shop Draw- ings or samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of submission as required by paragraph 6.15.2 and ENGINEER has given written approval of each such varia- tion by a specific written notation thereof incorporated in or accompanying the Shop Drawing or sample approval; nor will any approval by ENGINEER relieve CONTRACTOR from responsibility for errors or omissions in'the Shop Draw- ings or from responsibility for having complied with the pro- visions of paragraph 6.25.1. I I I I 6.28. Where a Shop Drawing or sample is required by the Specifications. any related Work perfonned prior to ENGI- NEER 's review and approval of the pertinent submission will be the sole expense and responsibility of CONTRACTOR. I I Continuing the Work: 6.29. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNI;R. No Work shall be delayed or postponed pend- ing resolution of any disputes or disagreements, except as permitted by paragraph 15,5 or as CONTRACTOR and OWNER may otherwise'agree in writing. I I Indemnification: 6.30. To the fullest extent permitted by Laws and Regu- lations CONTRACTOR shall indemnify and hold harmless OWNER and ENGINEER and their consultants. agents and employees from and against all claims, damages. losses and expenses, direct. indirect or consequential (including but not limited to fees and ~harges of engineers. architects, attorneys and other professionals and court and arbitration costs) ari~- ing out of or resulting from the performance of the Work, 1 1 I provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible,property (other than the Work itself) including the loss of use resulting therefrom and (b) is caused, in whole or in part by any negligent act or omission of CONTRACTOR. any Subcontractor, any person or organization directly or indirectly employed by any of them to perfonn or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder or arises' by or is imposed by Law and Regulations regardless of the negligence of any such party. 6.31. In any and all claims against OWNER or ENGI- NEER or any of their consultants. agents or employees, by any employee of CONTRACTOR, any Subcontractor, any person or organization directly or indirectly employed by any . I of them to perfonn orfurnish any of the Work or anyone for :'\'; whose acts any of them may be liable. the indemnification obligation, under paragraph 6.30 shall not be limited in any way by any limitation on the amount or tYPe:: of damages. compensation or benefits payable by or for CONTRACTOR or any such Subcontractor or other person or organization under workers' or workmen's compensation acts. disability benefit acts or other employee benefit acts. 6.32. The obligations of CONTRACTOR under para- graph 6.30 shall not extend to the liability of ENGINEER, ENGINE'ER's consultants. agents or employees arising out of the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders. designs or specifications. ARTICLE 7-OTHER WORK Related Work at Site: 7,1, OWNER may perfonn other work related to the Proj- ect at the site by OWNER's own forces, have other work perfonned by utility owners or let other direct contracts therefor which shall contain General Conditions similar to these. If the fact that such other work is to be perfonned was not noted in the Contract Documents. written notice thereof will be given to CONTRACTOR prior to starting any such other work; and. if CONTRACTOR believes that such perfor- mance will involve additional expense to CONTRACTOR or requires additional time and the parties are unable to agree as to the extent thereof. CONTRACTOR may make a claim therefor as provided in Articles II and 12. 7.2. CONTRACTOR shall afford each utility owner and other contractor who is a party to such a direct contract (or OWNER, if OWNER is perfonning the additional work with OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work. and shall properly connect and coordinate the Work with theirs. CONTRACTOR shall do all cutting, fining and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. CON- 18 I I I I, I I I I I I I I, , \ I I I I I I I TRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their ,work with the written consent of ENG IN EER and the others whose work will be affected, The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors. 7.3, If any part of CONTRACTOR's Work depends fOr proper execution or results upon the work of any such other contractor 'or utility owner lor OWNERl. CONTRACTOR shall inspect and promptly report to ENGINEER in writing any delays.'defects or deficiencies in such work that render it unavai'lilble or u,nsuitable for such proper execution and results. CONTRACTOR's failure so to report will constitute an acceptance of the other work as fit and proper for integra- tion with CONTRACTOR's Work except for latent or'non- apparent defects and deficiencies in the other work. Coordination: 7.4. If OWNER contracts with others for the perfor-, mance of other work on the Project at the site. the person or organization who will have authority and responsibility for coordination, of the activities among the various prime con- tractors will be identified in the Supplementary Conditions, : and the specific matters to be covered by such authority and responsibility will be itemized, and the extent of such autho~- ity and responsibilities will be provided, in the Supplementary Conditions. Unless otherwise provided in the Supplementary Conditions. neither OWNER nor ENGINEER shall have ariy authority or responsibility in respect of such coordination, ARTICLE 8-0WNER'S RESPONSIBILITIES 8,\. OWNER shall issue all communications to CON- TRACTOR through ENGINEER. 8,2. In case of termin'ation of the employment of ENGI- NEER. OWNER shall appoint an engineer against whom CONTRACTOR makes ~o reasonable objection, whose sta- tus under the Contract Documents shall be that of the former ENGINEER. Any dispute in connection with such appoint- ment shall be subject to arbitration. 8,3, OWNER shall furnish the data required of OWNER under the Contract Documents promptly and shall make pay- ments to CONTRACTOR promptly after they are due as provided in paragraphs 14.4 and 14.13, 8.4. OWNER's duties in respect of providing lands and easem~nts and provieing engineering surveys to establish reference points are set forth in paragraphs 4, I and 4.4, Para- graph 4,2 refers to OWNER's identifying and making avail- able to CONTRACTOR copies of reports of explorations and tests of subsurt'ace conditions at the site and in existing struc- itires Which have been utilized by ENGINEER in preparing the Drawings and Specifications. 8.5. OWNER's responsibilities in respect of purchasing and maintaining liability and property insurance are set forth in paragraphs 5.5 through 5.8. 8.6. . OWNER is obligated to execute Change Orders as indicated in paragraph 10.4, 8.7. OWNER's responsibility in respect of certain inspections, tests and approvaJs is set forth in paragraph 13.4. 8,8. [n connection with OWNER's right to stop Work or suspend Work. see paragraphs I3.1O and I .:i. 1. Paragraph 15.2 deals with OWNER's right to terminate services of CON- TRACTOR under certain circumstances. .~\ ARTICLE 9-ENGINEER'S STATUS DURING CONSTRUCTION Owner's Representative: 9,\, ENGINEER will be OWNER's representative dur- ing the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during constructio,n are set forth in the Con- tract Documents and shall not be extended without' written consent of OWNER and ENGINEER. J Visits to Site: 9,2. ENGINEER will make visits to the site at intervals appropriate to the various stages of construction to observe ,the progress and quality of the executed Work and to deter- mine, in general. if the Work is proceeding in accordance with the Contract Documents. ENGINEERwill not be re'luired to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform td the Contract Documents, On the basis of such visits and on-site observations as an experienced and qualified design profes- sional. ENGINEER will keep OWNER informed of the prog- ress of the Work and will endeavor to guard OWNER against defects and deficiencies, in the Work, Project Representation: 9.3. If OWNER and ENGINEER agree. ENGINEER will furnish a' Resident Project Representative to assist ENGINEER in observing the performance of the Work, The duties, responsibilities and limitations of. authority of any such Resident Project Representative and assistants will be as provided in the Supplementary Conditions, If OWNER designates another agent to represent OWN ER at the site who is not ENGINEER's agent or employee. the duties, responsibilities and limitations of authority of such other person will be as provided in the Supplementary Conditions. 19 I I Clarifications and InlerpreUUions: 9.4. ENGINEER will issue with reasonable ,promptness such written clarificafions or interpretations of the require- ments of the Contract Documents (in the form qf Drawings or otherwise) as ENGINEER may detennine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. If CONTRACTOR believes that a written clarification or interpretation justifies an increase in the Contraci Price or an extension of the Contract. Time and the parties are unable to agree to the amount or extent thereof. CONTRACTOR may make a claim therefor as provided in Article 11 or Article 12. I I I I Aulhorize~ Var.ations in Work: 9.5. EN,GINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are consistent with the overall intent of the Contract Documents. These may be accomplished by a Field Order 'and will be binding on OWNER. and also on CONTRACTOR who shall perform the Work involved promptly. If CONTRACTOR believes that a Field Order justifies an increas'e in the Contract Price or an extension of the Contract Time and the parties are unable to agree as to ' the amount or extent thereof, CONTRACTOR may make a claim therefor as provided in Article II or 12. I I I I Rejecting Defective Work: 9.6. ENGINEER wjll have authority to disapprove or , reject Work which ENGINEER believes to be defective, and will also have authority to require special inspection orresting of the Work as provided in paragraph 13.9. whether or not the Work is fabricated, installed or completed. I I Shop Drawings, Change Orders and Payments: 9.7. In connection with ENGINEER's responsibility for Shop Drawings and samples, see paragraphs 6.23 through 6.29 inclusive. ' I I 9.8. In connection with ENGINEER's responsibilities as to Change Orders. see Articles 10. ll.and 12'. 9.9, In connection with ENGINEER's responsibilities in respect of Applications for Payment, etc.. see Article 14. ' I Determinations for Unit Prices: 9,10, ENGINEER will determine the actual quantities and classifications of Unit Price Work performed by CON- TRACTOR. ENGINEER will review with CONTRACTOR ENGINEER's preliminary determinations on such matters ,before rendering a written decision thereon (by recommen- dation of an Application for Payment or otherwise). ENGI- NEER's written decisions thereon will be final and binding upon OWNER and CONTRACTOR, unless. within ten days after the date of any such decision, either OWNER or CON. TRACTOR delivers to the other party to the Agreement and I I I I to ENGINEER written notice of intention to appeal from such a decision. ' Decisions on Disputes: 9.11. ENGINEER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work or the interpretation of the requirements of the Contract Documents pertaining to the performance and furnishing of the Work and claims under Articles II and 12 in respect of changes in the Contract Price or Contract Time will be referred initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph, which ENGINEER will render in writing within a reasonable time. Written notice of each such claim. dispute and other matter will be delivered by the claimant to ENGINEER and the other party to the Agreement promptly (but in no event later than thirty days) after the occurrence of the event giving rise thereto, and written supporting data will be submitted to ENGINEER and the other party within sixty days after such occurrence unless ENGINEER allows an additional period of time to ascertain more accurate data in supp~rt of the claim. , I ~l\ 9.12. When functioning as interpreter and judge under paragraphs 9, iO and 9.11, ENGINEER will not show par- tiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such 'capacity. The' rendering of a decision by ENGINEER pursuant to paragraphs 9.10 and 9.11 with respect to any such claim, dispute or other matter (except any which have been waived by the making or acceptance of final pay. ment as provided in paragraph 14.16) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such claim. dispute or other matter, ' Limiuzlions on ENGINEER's Responsibilities: 9,13. Neither ENGINEER's authority to act under this Article 9 or elsewhere in the Contract Documents ,nor an'y decision made by ENGI\:'lEER in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of ENGINEER to CONTRACTOR. any Sub- contractor, any Supplier, orany other person or organization performing any of the Work. orto any surety for any of them. 9'.14. Whenever in the Contract Documents the tenns "as ordered". .. as directed". .. as required"; .. as allowed". .. as approved" or terms of like effect or import are used, or the. adjectives "reasonable", "suitable". "acceptable ...' "proper" or "satisfactory" or adjectives of like effect or import are used to describe a requirement. direction. review orjudgment of ENGINEER as to the Work, it is intended that such requirement.' direction. review or judgment will be solCly to evaluate the Work for compliance with the Contract Docu- ments (unless there is a specific statement indicating other- wise), The use of any such term or adjective shall not be 20 I I I I I I I I I I I I I I I I I I I "' ,'. - effective to assign to ENGINEER any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph '9.15 or 9,16. 9.15, ENGINEER will not be responsible for CON- TRACTOR's means, methods. techniques, sequences or pro- cedures of construction, or the safety precautions and pro- grams incident thereto. and ENGINEER will not be respon- sible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents, 9.16, ENGINEER will not be responsible for the acts 'or omissions of CONTRACTOR or of any Subcontractor. any Supplier, or of any other person or organization performing or furnishing,any of the Work, ' ARTICLE IO-CHANGES IN THE WORK 10. I. Without invalidating the Agreement and without notice to any surety. OWNER may. at any time or from time to time, order additions. deletions or revisions in the Work: these will be authorized by a Written Amendment. a Change Order, or a Work Directive Change. Upon receipt of any such document, ,CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). 10,2. If OWNER and CONTRACTOR are unable to agree as to the extent. if any, of an increase or decrease in the Contract Price or an ext~nsion or shortening of the Contract, Time that should be allowed as a result of a Work Directive Change. a claim may be made therefor as provided in Article II or Article 12. 10,3, CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any Work performed that is not required by the Contract Documents as amended, modified and supple- mented as provided in paragraphs 3.4 and 3.5. except in tbe case of an emergency as provided in paragraph 6,22 and except in the case of uncovering Work as provided in para- graph 13.9. IDA. OWNER and CONTRACTOR shall execute appro- priate Change Orders (or Written Amendments) covering: 10.4.1, changes in the Work which are ordered by OWNER pursuant to paragraph 10.1, are required because of acceptance of defecril'e Work under paragraph 13. 1 ~ or correcting ddecril'e Work under paragraph 13,14. or are agreed to-by 'the parties: ' 10.4.2. changes in the Contract Price or Contract Time which are agreed to by the parties: and I, ,'I ' 10:4;3: changes in the Contract Price or Contract Time which embody the substance of any written decision ren- dered by ENGINEER pursuant to paragraph9,11: provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal. CON- TRACTOR shall carryon the Work and adhere to the prog- ress schedule as provided in paragraph 6.29, 10.5, If notice of any change affecting the general scope of the Work or the provisions of the Contract' Documents (including, but not limited to, Contract Price or Contract Time) is required by the provisions of any Bond to be given to a surety. the giving of any such notice will be CONTRAC- TOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. " '~l'; ARTICLE Il-:-CHANGE OF CONTRACT PRICE. 11.1. The Contract Price constitutes the total compen- sation (subject to authorized adjustments) payable to CON- TRACTOR for performing the Work. All duties. responsibil- ities and obligations assigned, to or undertaken by CON- TRACTOR shall be at his expense without change in the Contract Price. 11,2. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any claim for an increase or decrease in the Contract Price shall be based on written notice delivered by the party making the claim to the other pany and to ENGINEER promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the,claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after such occurrence (unless ENGINEER allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accompanied by claimant's written statement that the amount claimed covers all known amounts (direct. indirect and con- sequential) to which the claimant is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Price shall be determined by ENGINEER in accor- dance with paragraph 9,11 if OWNER and CONTRACTOR cannot otherwise ag~ee on the amount involved~ No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph I L2. 11.3. The value of any Work covered by a Change Order , or of any claim for an increase or decrease in the Contract Price shall be determined in one ,of the following ways: ,11.3, I. Where the Work involved is covered by unit prices contained in the Contract Documents. byapplica- tion of unit prices to the quantities of the items involved , (subject to the provisions of paragraphs It.9, I. through 11.9,3, inclusivel. 11 I I I I I I I I I I I I I I I I I I I 11.3.2. By mutual acceptance of a lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 11.6.2.1). ' 11.3.3. On the basis of the Cost of the Work (deter- mined as provided in paragraphs 11.4 and 11.5) plus a CONTRACTOR's Fee for overhead and profit (deter- mined as, provided in paragraphs 11.6 and 11.7). Cost of the Work: 11.4. The tenn Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in' the proper perfonnance of the Work. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project. shall include only the following items and shall not include any of the costs itemized in paragraph 11.5: 11.4.1.- Payroll costs for employees in the direct employ of CONTRACTOR in the perfonnance of the Work under schedules of job classifications agreed upon by OWNER, ,and CONTRACTOR. Payroll costs for employees not, employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and ,wages plus the cost of fringe benefits which shall include social security contributions, unemployment. excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and hol- iday pay applicable thereto. Such employees shall include superintendents and foremen at the site. The expenses of ' perfonning Work after regular working hours. on Satur- day, Sunday or legal holidays, shall be included in the above to the extent authorized by OWNER. 11.4.2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of trans- ponation and storage thereof. and Suppliers' field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade discounts, rebates and refunds and all returns from sale of surplus materials and equipment shall accrue to OWNER. and CONTRACTOR shall make provisions so that they may be obtained. 11.4.3. Payments made by CONTRACTOR to the Subcontractors for Work perfonned by Subcontractors. If required by OWNER. CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to CON- TRACTOR and shall deliver such bids to OWNER who' will then detennine, with the advice of ENGINEER, which bids will be accepted. If a subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work Plus a Fee; the Subcontractor's Cost of the Work shall be dctcnnincd in the same manner as CONTRAC- TOR's Cost of the Work. All subcontracts shall be subject to the other provisions of the Contract Documents insofar as applicable. 11.4.4., Costs of special consultants (including but not limited to 'engineers, architects, testing laboratories, sur- veyors, attorneys and accountants) employed for services specifically related to the Work. II :4.5. Supplemental costs including the following: 11.4.5. I . The proportion of necessary transporta-, tion, travel and subsistence expenses of CONTRAC- TOR's employees incurred in discharge of duties con- nected with the Work. 11.4.5.2. Cost. including transportation and main- tenance. of all materials, supplies. equipment. machin- ery, appliances, office and temporary facilities at the site and hand tools not owned by the workers. which are consumed in the perfonnance of the Work, and cost less market value of such items u sed but not consumed which remain the property of CONTRACTOR. . " :~~;... 11.4.5.3. Rentals of all construction equipment and machinery and the pans thereof whether rented from CONTRACTOR or others in accordance with rental , agreements approved by OWN'ER with the advice of ENGINEER, and the costs of transportation. loading, unloading, installation, dismantling and removal thereof-all in accordance with terms of said rental agreements. The rental of any such equipment. machin- ery or pans shall cease when the use thereof is no longer necessary for the Work. '11.4.5.4. Sales. consumer. use or similar taxes related to the Work. and for which CONTRACTOR is liable, imposed by Laws and Regulations. ,11.4.5.5. Deposits lost for causes other than negli- gence of CONTRACTOR, any Subcontractor or any- one directly or indireCtly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for pennits and licenses. 11.4.5.6, Losses and damages (and related expenses). not compensated by insurance or otherwise, to the Work or otherwise sustained by CONTRACTOR in connection with the perfonnance and furnishing of the Work (except losses and damages within the deductible amounts of property insuran,ce establish'ed by OWNER in accordance with paragraph 5.9), pro- vided they have resulted from causes other than the negligence of CONTRACTOR; any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages and expenses shall be included in the Cost of the Work for the purpose of determining CONTRAC" TOR's Fee. If. however, any such loss or damage 22 I I I I I I I I I I I I I I I I I I I requires reconstruction and CONTRACTOR is plac~8 in charge thereof. CONTRACTOR shall be paid for services a fee proportionate to that stated in paragraph 11,6,2, i IA.5,7. The cost of utilities. fuel and sanitary facilities at the site. ' 1104.5,8. ,Minor expenses such as telegrams. long distance telephone calls, telephone service at the site. 'expressage and similar petty cash items in connection with the Work. 11.4.5.9. Cost of premiums for additional Bonds 'and insurance required because of changes in the Work and premiums for property insurance coverage within the limits 'of the deductible amounts established by OWNER in accordance with paragraph 5,9, Ii .5. The term Cost of the 'Nork shall not include any of the following: ' 11.5.1, Payroll co~ts and other compensation of CON . TRACTOR's officers. executives. principals (of partner. ship and sole proprietorships). general managers. engi- neers. architects. estimators. attorneys. auditors. accoun- tants. purchasing and contracting agents, expeditors. timekeepers. clerks ,and other, personnel employed by CONTRACTOR whether at the site or in CONTRAC- TOR's principal or a branch office for general administra- tion of the Work and not specifically included in the agreed upon schedule of job classifications referred to in para- graph 11,4,1 or specifically covered by paragraph 11.4.4- all of which are to be considered administrative costs covered by the CONTRACTOR's Fee. 11.5,2. Expenses ('If CONTRACTOR's principal and branch offices other than CONTRACTOR's office at the site. 11,5,3, Any part of CONTRACTOR's capital expenses. including interest on CONTRACTOR'S capital employed for the Work and charges against CONTRACTOR for delinquent payments, 11,5.4, Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by t,he Contract Documents to purchase and maintain the same (except for the cosl\of premiums covered by sub- paragraph 11.4,5.9 above), 11.5.5, . Costs due to the negligence of CONTRAC. TOR. any Subcontractor. or anyone directly or indirectl~' employed by any of I ~cm or for \Vho~e acts any of them may be li.ible, in..:I'.lding but not limited to. the correction of de.f(-( Ii" \''-urk. Jisposal of materials' or equipment wrongly Sli, ~",~. ,: "1aking good any dam,lge to prop. erty, 11,5.6. Qther overhead or general expense costs l)f any kiml and the costs of any item not specitically and expressly included in paragraph 11.4. CONTRACTOR's Fee.~ 11,6. The CONTRACTOR's Fee allowed toCONTRAC. TOR for overhead and profit shall be determined as follows: 11,6: I, a mutually acceptable fixed fee: or if none can be agreed upon, 11.6,2. <J, fee based on the following percentages of the various portions of the Cost of the Work: 11,6,2,1. for costs incurred under paragraphs 11.4.1 and 11.4,2. the CONTRACTOR's Fee shall be fifteen percent: 11..6,2.2. forccstsincurredunderparagraph 11..4.3: the CONTRACTOR's Fee shall be f.vepercent: and if ' a subcontract is on the basis of Cost of the Work Plus .1 a Fee. the maximum allowable to CONTRACTOR on ,fool'. account of overhead and profit of all Subcontractors . shall be fifteen percent: 11.6.2,3. no fee shall be payable on the basis of costs itemized under paragraphs 11.4.4, 1104.5 and 11,5: 11.6.2.4, 'the amount of credit to be allowed by CONTRACTOR to OWNER for any such change which results in a net decrease in cost will be the amount of the actual net decrease plus a deduction in CONTRAC- TOR's Fee by an amount equal to ten percent of the net decrease; and 11.6,2.5. when both additions and credits are involved in any 'one change. the adjustment in CON- TRACTOR's Fee shall be computed on the basis of the "- net change in accordance with paragraphs 11.6.2,1 through I \'6,2.4, inclusive, 11.7, Whenever the cost of any Work is to be determined pursuant to paragraph, 11,4 or 11,5. CONTRACTOR will submit in form acceptable to ENGINEER an itemized cost "- breakdown together with supporting data, Cash Allowances: 11.8. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract 'pocuments and shall cause the Work so covered to be done by such Subcontractors or Suppliers and for such sums within the limit of the allowances as may be acceptable to ENGI. NEER. CONTRACTOR agrees that: 11.8, I. The allowances include the cost to CON- TRACTOR rless any applicable trade discounts) of mate- rials and equipment required by the allowances to be deliv- eredat the site, and all applicable laxes: and 11,8.2, CONTRACTOR's costs for unloading and handling on the site, labor. installation costs. overhead. profit and other expenses contemplated for the allowances ha ve been included in the Contract Price and not in the 23 I I allowances. No demand for additional payment on account of any, thereof will be valid. . I Prior to final payment, an .appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances. and the Contract Price shall be correspond- ingly adjusted. I I Unit PrU:e Work: 11.9.1. Where the Contract Documents provide that all or part of the Work is to be U nit Price Work. initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit prices for each separately identified item of Unit Price Work times the estimated quantity of each item as indi- cated in the Agreement. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quan- tities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER in accor- dance with Paragraph 9.10. I I I I 11.9.2. Each unit price will be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR' s overhead 'and profit for each sep- arately identified item. I I i 1.9.3. Where the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item , indicated in the Agreement and there is no corresponding adjustment with respect to any other item of Work and if CONTRACTOR believes that CONTRACTOR has incurred additional expense as a result thereof. CON- TRACTOR may make a .claim for an increase in the Con- tract Price in accordance with Article II if the parties are u'nable to agree as to the amount of any such increase. I I I ARTICLE 12-CHANGE OF CONTRACT TIME I 12.1. The Contract Time may only be changed by a Change Order or a Written Amendment. Any claim for an extension o,r shortening of the Contract Time shall be based on written notice delivered by the party making the claim to, the other party and to ENGINEER promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the extent of the claim with supporting data shall be deliv- ered within sixty days after such occurrence (unless ENGI- NEER allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accom- ' panied by the claimant's written statement that the adjust- ment claimed is the entire adjustment to which the claimant , has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Time I II I I' shall be determined by ENGINEER in accordance 'with para- graph 9.11 if OWNER and CONTRACTOR cannot otherwise agree. No claim for an adjustment in the Contract Time will be valid if not submitted in accordance with the requirements of this paragraph 12.1. 12.2. The Contract Time will be extended in an amount equal to time lost due to delays beyond the control of CON. TRACTOR if a claim is made therefor as provided in para'. graph 12.1. Such delays shall include. but not be limited to. acts or neglect by OWNER or others performing additional work as contemplated 'by Article 7, or to fires, floods. labor disputes. epidemics. abnormal weather conditions or acts of God. 12.3. All time limits stated in the Contract Documents are of the essence of the Agreement. The provisions of this .' ~\\ Article 12 shall not exclude recovery for damages (including but not limited to fees and charges of engineers. architects. attorneys and other professionals and court and arbitration costs) for delay by either party. ARTICLE 13-WARRANTY AND GUARANTEE; TESTS AND INSPECTIONS; CORRECTION. REMOV AL OR ACCEPTANCE OF DEFECTIVE WORK WlU'TrlIIty and GlUUYUllee: 13,1. ' CONTRACTOR warrants and guarantees to OWNER and ENGINEER that all Work will be in accor- dance with the Contract Documents and will not be defeCTive. . Prompt notice of all defects shall be given to CONTRAC- TOR. All defective Work. whether or not in place. 'may be rejected. corrected or accepted as provided in this Article 13. Access to Work: 13.2. ENGINEER and ENGINEER's representatives. , other representatives of OWNER. testing agencies and gov- ernmental agencies with jurisdictional interests will have access to the Work at reasonable times for their observation. inspecting and testing. CONTRACTOR shall provide proper and safe conditions, for such access, Tests and Inspections: 13.3. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections. tests or approvals. ' 13.4. If Laws or Regulations of any public body, having jurisdiction require any Work (or part thereoO to specifically be inspected. tested or approved, CONTRACTOR shall assume full responsibility therefor. pay all costs in connection therewith and furnish ENGINEER the required certificates of inspection. testing or approval. CONTRACTOR shall also 24 I I I I I I I I I I I I I I I I I I I be responsible f9r and shall pay all costs in connection with any inspection or testing required in connection with OWN- ER's or ENGINEER's acceptance of a Supplier of materials or equipment proposed to be incorporated in the Work, or of materials or equipment submitted for approval prior to CON- TRACTOR's purchase thereoffor incorporation in the Work. The cost of all inspections, tests and approvals in addition to the above which are required by the Contract Documents shall be paid by OWNER (unless otherwise specified!. 13 ,5. All inspections. tests ,or approvals other than those required by Laws or Regulations of any public body having jurisdiction shall be performed by organizations acceptable to OWNER and CONTRACTOR (or by ENGI0iEER if so specified !. 13.6. If any Work (including the work of others) that is to be inspected, tested or approved is covered without written concurrence of ENGINEER. it must. if requested by ENGI- NEER., be uncovered f.or observation. Such uncovering shall , be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR's inten- tion to cover the same and ENGINEER has not acted with reasonable promptness in response to such notice. 13.7, Neither observations by ENGINEER nor inspec- , tions. tests or approvals by others shall relieve CONTRAC- ' TOR from CONTRACTOR's obligations to perform the Work in accordance with the Contract Documents. Uncovering Work: 13,8, If any Work is covered contrary to the w,ritlen request of ENGINEER. it must. if requested by ENGI:-.iEER. be uncovered for ENGINEER's observation and replaced at CONTRACTOR's expense, 13,9. If EN GIN EER considers it necessary or advisable that' covered Work be observed by ENGINEER or inspected ,or tested by others. CONTRACTOR. at ENGINEER's request. shall uncover. expose or otherwise make available for observation. inspection ~r testing as ENGI~EER may require. that portion of the Work in question. furnishing all necessary labor. material and equipment. If it is found that such Work is dt:.fectil'('; CONTRACTOR shall ,bear all direct. indirect and consequential costs of such uncovering. expo- sure. observation, inspection and testing and of satisfactory reconstruction. (including but norlimited to fees andcharges of engineers. architects. ~ttorneys and other professionals). and OWN ER shall be entitled to an appropriate decrease in the Contract Price, and. if the parties are unable lL1 agree as to the: amount thereof. may make a claim therefor as provided in Article II, If. ho\\ ':\er. slIch WLlrk is not fl1und to t>e dej"Cli\'(', CO'-:TR'ACTOR shall be allowed 'an increase in 'the CllOtract Pri~<.: ,'I' ..il c.\,.:nsion of the Contract Time.l1r both, directly ilttnL1l1tat>le tLl such uncovering, e:>,:pOSllre. obse:rvation. inspection, testing and reconstruclil1n: and, if the partie:s are unablt: to' agree as to the: amount or exteOl thereof. CONTRACTOR may make a claim therefor as pro- vided in Articles I [ and [2. Owner May Stop the Work: , 13.10, If the Work is defeetil'e. or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment. or fails to furnish pr perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to S!oP the Work, or any portion thereof. until the cause for such order has been eliminated: however, this right of OWNER tostop the Work shall not give rise to any duty on 'the part of OWNER to exercise this right for the benefit of CONTRACTOR or any other party. Correction or Removal of Defective Work: 13.11. Ifrequired by ENGINEER, CONTRACTOR shallA promptly. as directed. either correct all defectil'e Work, whether or not fabricated. installed or 'completed. or, if the Work has been rejected by ENGINEER. remove it from the site and replace it with nondefecth'e Work. CONTRACTOR shall bear all direct. indirect and consequential costs of such correction or removallincluding but not limited to fees and charges of engineers, architects. attorneys and other profes- sionals) made necessary thereby. '.\ One Year Correction Period: 13, [2. If within one year after the date of Substantial Completion or such Iqnger period of time as may be pre- scribed by Laws or Regulations or by the terms of any appli- cable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defectil'e, CONTR.A"CTOR shall promptly. without cost to OWNER and in accordance with OWNER's written instructions, either correct such defeetil'e Work. or. if it has been rejected by OWNER. remove it from 'the site and replace it with lIondefectil'e Work. If CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work cor" rected or the rejected Work removed and replaced. and all direct. indirect and consequential costs of such removal and replacement (including but not limited to fees and charges of engineers. architects. attorneys and other professional;) will be paid by CONTRACTOR. In special cir,cumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work. the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. Acceptance of Defective Work: 13.13. If. instead of requiring correction or removal and replacement of defeetil'/! Work. OWNER land. 'prior to ENGINEER's recommendation of final payment. also ENGIN EER) prefers to accept it. OWNER may do so. CON- TRACTOR shall bear all direct. indirect and consequential 25 I I costs attributable to OWNER's evaluation of and determi- nation to accept such defective, Work (such costs to be approved by ENGINEER as to reasonableness and to include but not be limited to fees and charges of engineers. architects. attor- neys and other professionals), If any such acceptance occurs prior to ENGINEER's recommendation of final payment. a Change Order will be issued incorporating the necessary revi- sions in the Contract Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price, and. if the parties are unable to agree as to the amount thereof, OWNER may make a claim therefor as provided in Article 11. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER. I I I I I OWNER May Correct Defective Work: 13.14. If CONTRACTOR fails within a reasonable time after written notice of ENGINEER to proceed to correct and to correct defective Work or to remove' and replace rejected Work as required by ENGINEER in accordance with para- graph 13.11, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CON-' TRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days' writ- ten notice to CONTRACTOR. correct and remedy any such deficiency. In e~ercising the rights and remedies under this paragraph OWNER shall proceed expeditiously. To the extent necessary to complete corrective and remedial action, OWNER may exclude CONTRACTOR-from all or part of the site, take possession of all or part of the Work, and suspend CON- TRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction ,equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER. OWNER's represen- tatives, agents and employees such access to the site as may be necessary to enable OWNER to exercise the rights and remedies under this paragraph. All direct. indirect and con- sequential costs of OWNER in exercising such rights and remedies will be charged against CONTRACTOR in an amount approved as to reasonableness by ENGINEER. and a Change Order will be issued incorporating the necessary ,revisions in the Contract Documents with respect to the Work: and OWNER shall be entitled to' an appropriate decrease in the Contract Price, and, if the' parties are unable to agree as to the amount thereof; OWNER may make a claim therefor as provided in Article 11. Such qirect. indirect and consequen- tial costs will include but not be limited to fees and charges of engineers, architects. attorneys and other professionals, all court and arbitration costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of CONTRACTOR's defective Work. CONTRACTOR shall not be allowed an extension of the Contract Time because of any delay in per- fonnance of the Work attributable to the exercise by OWNER of OWNER's rights and remedies hereunder. I I I I I I I I I I I I ARTICLE 14-PA YMENTS TO CONTRACTOR AND COMPLETION Schedule of Values: '14,1. .The schedule of values established as provided in paragraph 2.9 will serve as the basis for progress payments and will be incorporated into a form of Application for Pay- ment acceptable to ENGINEER. Progress payments on account of Unit Price Work will be based on the number of units completed. ApplicaJionfor Progress Paymelll: 14.2. At least twenty days before each progress payment is scheduled (but not more often than once a month). CON- TRACTOR shall submit to ENGINEER for review an Appli- ,I cation for Payment filled out and signed by CONTRACTOR r,,\ covering the Work completed as of the date of the Application and accompanied by such supporting documentation 'as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice or other documentation warranting that OWNER has received' the materials and equipment free and clear of an liens, charges, security interests and encumbrances (which are hereinafter in these General Conditions referred to as "Liens") and evidence that the materials, and equipment are covered by appropriate property insurance and other arrangements to protect OWNER's interest therein. all of which will be sat- isfactory to OWNER. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. "I CONTRACTOR's Warranty of Title: ]4,3. CONTRACTOR warrants and guarantees that title to a1] Work, materials and equipment covered by any Appli- cation for Payment, whether incorporated in the Project or not. will pass to OWNER no later than the time of payment free and clear of all Liens. Revuw of AppliCalions for Progress Paymelll: 14.4. ENGINEER will, within ten days after receipt of 'each Application for Payment, either indicate in writing a recommendation of payment and present the Application, to OWNER. or return the Application to CONTRACTOR indi- cating in writing ENGINEER's reasons for refusing to rec- ommend payment. In the latter case, CONTRACTOR may make the necessary corrections and resubniit the Applica- tion. Ten days after presentation of the Application for Pay- ment with ENGINEER's recommendation, the amount rec- ommended will (subject to the provisions of the last sentence of paragraph ]4.7) become due and when due will be paid by OWNER to CONTRACTOR. i4.5. ENGINEER's recommendation\of any payment requested in an Application for Payment will constitute a 26 I I I I I I I I I I I I I I I I I I I representation by ENGINEER to OWNER. based on ENGI- NEER's on-site observations of the Work in progress as an experienced and qualified design professional and on ENGI- NEER's review of the Application for Payment and the accompanying data and schedules that the Work has pro- gressed to the point indicated: that. to the best of ENGI- NEER's knowledge, information and belief. the quality of the' Work is in accordance with the Contract Documents (subject to an evaluation of [he Work as a functioning whole prior to or upon Substantial Completion. to the results of any ,subsequent tests called for in the Contract Documents. to a final determination of quantities and classifications for Unit Price Work under paragraph 9, 10. and to any other qualifi- cations stated in the recommendation): and that CONTRAC- TOR is entitled to payment of the amount recommended, However. by recommending any such payment ENGINEER will not thereby be deemed to have represented that exhaus- tive or continuous ,on-site inspections have been made to check the quality or the quantity of the Work beyond the responsibilities specifically assigned to ENGINEER in the Contract Documents or that there may not be other matters or issues-between the parties that might entitle CONTRAC- TOR to be paid additionally by OWNER or OWNER to withhold payment to CONTRACTOR, 14,6. ENGIN E~R 's recommendation of final payment will constitute an additional representation by ENGINEER to OWNER that the conditions precedent to CONTRAC- TOR's being entitled to final payment as set forth in paragraph 14.13 have been fulfilled. '14,7, ENGINEER may refuse to recommend the whole or any part of any payment if. in ENGINEER's opinion. it would be incorrect to make such representations to OWNER, ENGINEER may also refuse to recommend any such pay- ment. or, because of subsequently discovered evidence or the results of subsequent inspections or tests. nullify any such payment previously recommended. to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: 14.7,1. the Work is defecti\'e, or completed Work has been damage? requiring correction 'or replacement. 14.7.~. the Contract Price has been reduced by Writ- ten Amendment or Change Order. 14,7.3. OWNER has been required to correct defee- the Work or complete Work in accordance with paragraph 13.14. or 14,7.4. of ENGINEER's actual knowledge of the occurrence of any of the events enumerated in paragraphs 15,~.1 through 15,~.9 inclusive, OWNER may' refuse to make payment of the full amount recommended by ENGIN EER because claims have been made against OWNER on account of CONTRACTOR's per- formance or furnishing of the Work or Liens have been filed in connection with the Work or [here are other items entitling OWNER to a set-off against the amount recommended, but OWNER must give CONTRACTOR immediate written notice (with a copy to ENGIN EER) stating the reasons for such action. Substantial Completion: 14.8. When CONTRACTOR considers the, entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request' that ENGI- NEER issue a certificate of Substantial Completion. Within a reasonable time thereafter. OWNER. CONTRACTOR and ENGINEER shall make an inspection of the Work to deter- mine the sratus of completion. If ENGINEER does not con- 'sider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefor. If1.\o', . ENGINEER considers the Work substantially complete; '; ENGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or cor- " rected before final payment. OWNER shall have seven days .' after receipt of the tentative certificate during which to make written objection to ENGINEER as to any provisions of the certificate or attached list. If. after considering such objec- tions. ENGINEER concludes that the Work is not substan- tially complete, ENGINEER will within fou~een days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing, stating the reasons therefor. If. after consideration of OWNER's objections, ENGINEER considers the Work substantially complete, ENG rNEER will within said fourteen days execute and deliver to OWNER and CONTRACTOR a definitive certificate of Substantial , , Completion (with a revised tentative list of items to be com- pleted or corrected) reflecting such changes from' the tentative certificate as ENGINEER believes justified after consider- ation of any objections from OWN ER. At the time of delivery of the tentative certificate of Substantial Completion ENGI- NEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR,with respect to security, operation. safety, maintenance. heat, utilities, insurance and warranties. Unless, OWNER and CONTRACTOR agree otherwise in writing and so inform ENGINEER prio~ to ENGINEER's issuing the definitive certificate of Substantial Completion. ENGIN EER's afore-' said recommendation will be binding on OWNER.and CON- TRACTOR until final payment. 14.9. OWNER shall have the right to exclude CON- TRACTOR from the Work after the date of Substantial Com- pletion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list. .Partw.l Utilization: 14.10. Use by OWNER orany finished part of the Work. ,which has specifically b~t:n identified in the Contract Do.;u- ' 27 I I I I I I I I I I I I I I I I I I I ments, or which OWNER, ENGINEER and CONTRAC- TOR agree constitutes a separately functioning and useable part of the Work that can be used by OWNER without sig- nificant interference with CONTRACTOR's performance of , the remainder of the Work, 'may be accomplished prior to Substantial Completion of all the Work subject 'to the follow- Ing: 14.10.1. OWNER at -any time may request CON- TRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CON- TRACTOR agrees, CONTRACTOR will certify to OWNER and ENGINEER that said part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. CON- TRACTOR at anytime may notify OWNER and ENGI- NEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substan~ tiaily complete and request ENGINEER to issue a certif- icate of Substantial Completion for,that 'part of the Work. Within a.teasonable time after either such request. OWNER. CONTRACTOR and ENGINEER shall make an inspec- tion of that part of the Work to determine its s.atus of completion, If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part of the Work to be substantially complete, the provisions of para- graphs 14.8 and 14.9 will apply with respect to certification of Substantial Completion of that part of the Work and the 'division of responsibility in respect thereof and access thereto. 14.10.1. OWNER may at any time request CON- . TRACTOR in writing to permit OWNER to take over operation of any such part of the Work although it is not substantially complete. A copy of such request will be sent to ENGINEER and within a reasonable time there- after OWNER. CONTRACTOR and ENGINEER shall make an inspection of that part of the Work to determine its status of completion and will prepare a list of the items remaining to be completed or corrected thereon before final payment. If CONTRACTOR does not object in writ- ing to OWNER and ENGINEER that such part of the' Work is not ready for separate operation by OWNER. ENGINEER will finalize the list of items to be completed or corrected and will deliver such list to OWNER and CONTRACTOR together with a written recommendation as to the division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation. safety. maintenance. utilities, insur- ance. warranties and guarantees for that part of the Work which will become binding upon OWNER and CON- TRACTOR at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writ- ing and so informed ENGINEER), During such operation and prior to Substantial Completion of such part of the Work, OWNER shall allow CONTRACTOR reasonable access to complete or con-ect items on said list and to complete other related Work, 14.10,3. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of paragraph 5.15 in respect of property insurance. Final Inspection: '-. 14,11. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete. ENGI- NEER will make a final inspection with OWNER and CON- TRACTOR ,and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures ,as are necessary to remedy such defi- ciencies. Final Application for Payment: 14.12. After CONTRACTOR has completed all such cor- , rections to the satisfaction of ENGINEER and delivered all maintenance ,and operating instructions, schedules. guaran- tees. Bonds. certificates of inspection. marked-up record documents (as provided in paragraph 6.19) and other docu- ments-all as required by the Contract Documents. and after ENGINEER has indicated that the Work is acceptable (sub- ject to the provisions of paragraph 1'4.16). CONTRACTOR may make application for final payment following the pro- cedure for progress payments. The final Application for Pay- ment shall be accompanied by all documentation called for in the Contract Documents, together with complete and legally effective releases or waivers (satisfactory to OWNER) of all Liens arising out of or filed in connection with the Wofk. In , lieu thereof and as approved by OWNER. CONTRACTOR may furnish receipts or releases in full: an affidavit of CON. TRACTOR that the releases and receipts include all labor, services, materi3J and equipment for which a Lien could be filed. and that all payrolls. material and equipment bills. and other indebtedness connected with the Work for which OWNERorOWNER's property might in any way be respon- , , sible. have been paid or otherwise satisfied: and consent of the surety, if any. to final payment. If any Subcontractor or Supplier fails to furnish a, release or receipt in full. CON- TRACTOR may furnish a Bond or other collateral satisfac. tory to, OWNER to indemnify OWNER against any Lien. '.t:\ . Final Payment and Acceptance: 14.13. If. on the basis of ENGINEER's observation of ,the Work during construction and final inspection, and ENGINEER's review of the final Application for Payment and accompanying documentation-all as required by the Contract Documents, ENGINEER is satisfied thai the Work has been completed and CONTRACTOR 's other obligations under the Contract Documents have been fulfilled, ENGI- NEER will, within ten days after receipt of the ,final Appli- cation for Payment. indicate in writing ENGINE,ER's rec. ommendation of payment and present the Application to OWNER for payment. Thereupon ENGINEER will give written notice to OWNER arid CONTRACTOR that the Work is acceptable subject to .the provisions of paragraph 14.16. 28 I I I I I I I I I I I I I I I I I I I Otherwise, ENGINEER wili return the Application to coN- TRACTOR, indicating in writing the reasons for refusing to recommend final payment. in which case CONTRACTOR shall make the necessary corrections and resubmit the Appli- cation. Thirty days after presentation to OWNER' of the Application and, accompanying documentation, in appropri- ate form andsubstance. and with ENGINEER's recommen- dation and notice of acceptability, the amount recommended by ENGIN EER will become due and will be paid by OWNER to CONTRACTOR. 14.] 4, If, through no fault of CONTRACTOR, final com- pletion of the Work is significantly delayed and if ENGI- NEER so confirms. OWNER shall. upon receipt of CON- TRACTOR's final Application for Payment and recommen- dation of ENGINEER. and without terminating the Agree- ment. r,nake payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is l~ss than theretainage stipulated in the Agree- ment. and if Bonds have been furnished as required in para- graph 5,1. the written consent of the surety to the payment of the balance due for that portion of the Work fully com- pleted and accepted shall be submitted by CONTRACTOR to ENGINEER with the Application for such payment. Such pay'ment shall be made under the 'terms and conditions gov- erning final payment,' except that it shall not constitute a waiver of claims.' Contractor's Continuing Obligation: 14,15. CONTRACTOR's obligation to perform and com- plete the Work in accordance with the Contract Documents shall be absolute, Neither recommendation of any progress or final'payment by ENGINEER. nor the issuance of a cer- tificate of Substantial Completion. nor any payment by OWNER to CONTRACTOR under the Contract Documents. nor any use or occupancy of the Work or any part thereof by OWNER. nor any act of acceptance by OWNER nor any failure to do so. nor any review and approval of a Shop Drawing or sample submission, nor the issuance of a notice of acceptability by ENGINEER pursuant to paragraph 14.13. nor any correction of defective Work by OWNER will con- sii.tUte an acceptance of Work not in accordance with the Contract Documents or a release of CONTRACTOR's obli- gation to perform the Work in accordance with the Contract Documents (except as provided in paragraph 14.161. Wah'er of Claims: 14.'16, The making and acceptance of final payment will constitute: 14,16. I. a waiver of all claims by OWN ER against CONTRACTOR. except claims arising from unsettled Liens. from LleF'nil'(' Work appearing after final inspec- tion pursuant to paragraph 14, II or from failure w comply with [he Contract Documents or the terms of any special guarantees specified therein: however. it will not consti- tute a waiver hy OWNER of any rights in rt:sp<:ct l)t' 20N~RACT6R's continuing obligations under the Con- tract Documents; and 14.16,2, ,a waiver of all claims by CONTRACTOR against OWNER other than those previously made in writ" ing and still unsettled. ARTICLE IS-SUSPENSION OF WORK AND TERMINATION Owner May Suspend Work: 15.1. OWNER may. at any time and without cause, sus- pend the Work or any portion .thereof-for a period of not more than ninety days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the dater~'. so fixed. CONTRACTOR shall be allowed an increase in the ' Contract Price or an extension of the Contract Time. or both, directly attributable to any' suspension if CONTRACTOR makes an approved claim therefor as provided in Articles II and 12. Owner May Terminate: 15.2. Upon the occurrence of anyone or more of the fallowing events: 15.2.1. if CONTRACTOR commences a voluhtary case) under any chapter of the Bankruptcy Code (Title 11. United States Code), as now or hereafter in effect, ,or if CON- TRACTOR takes any equivalent or similar action by filing a petition or otherwise under any other federal or'state law in effect at such time relating to the bankruptcy or insolvency: 15,2,2. if a petition is filed against CONTRACTOR under any. chapter of the Bankruptcy Code as now or hereafter in effect at the time of filing, or if a petition is filed,seeking any such equivalent or similar relief against CONTRACTOR under any other federal or state law in effect at the time relating to bankruptc'y or insolvency,; 15.2.3, if CONTRACTOR makes a general assignment for the benefit of creditors: ' 15,2.4. if a trustee. receiver. cuslOdian or agent of CONTRACTOR is appointed under applicable law or under contract, whose appointment or authority to take charge of' property of CONTRACTOR is for the purpose of enforcing a Lien against such property or for the purpose of general administration of such property for the benefit of CONTRACTOR's creditors; 15,2.5, if CONTRACTOR admits in writing an inabil- ity to pay its debts generally as they become tlue'; , ~ 15,2.6. if CONTRACTOR persistently fails to perform the Work in accordance with [he Contract Documents 29 I I I I I I I I I I I I I I I I I I I (including. but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to ,the progress schedule established under paragraph 2.9 as revised from time to time): 15.2.7, if CONTRACTOR disregards Laws or Regu- lations of any public body having jurisdiction: ' 15.2.8. , if CONTRACTOR disregards the authority of ENGINEER; or 15.2.9.. if CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Docu- ments; OWNER may, after giving CONTRACTOR (and the surety, if there be one) seven days' written notice and to the extent permitted by Laws and Regulations, terminate the services of CONTRACTOR. exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTOR's tools. appliances. construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the, Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price e'xceeds thedirect. indirect and consequential costs of completing the Work (including but not limited to fees and charges of engineers. architects. attor- neys and other professionals and court and arbitration costs) such excess will be paid to CONTRACTOR.' If such costs exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such costs incurred by OWNER will be approved as to reasonableness by ENGINEER and incor- porated in a Change Order, but when exercising any rights, or remedies under this paragraph OWNER shall not be required to ob~in the lowest price for the Work performed, 15.3. Where CONTRACTOR's servic'es have been so terminated by OWNER. the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may, 'thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will' not release CONTRACTOR from liability. 15.4. Upon seven days' written notice to CONTRAC- TOR and ENGINEER. OWNER'may. without cause and without prejudice to any other right or remedy. elect to aban- , don the Work and ,terminate the Agreement. In such case. CONTRACTOR shall be paid for all Work executed and any expense sustained plus reasonable termination expenses. which will include, but not be limited to. direct, indirect and con- sequential costs (including. but not limited to. fees and charges of engineers. architects, attorneys and other professionals and court and arbitration costs). , " ~l. Contractor May Stop Work or Termintiu: 15.5. If, through no act or fault of CONTRACTOR, the Work is ,>uspended for a period of more than ninety days\by OWNER or under an order of court or other public authority. " , or ENGINEER fails to act on any Application for Payment within thirty days after it is submitted, or OWNER fails for thirty days to pay CONTRACTOR any s'umfinally deter- mined to be due. then CONTRACTOR may, upon seven days' written notice to OWNER and ENGINEER, terminate the Agreement and recover from OWNER payment for all Work executed and any expense sustained plus reasonable termination expenses. In addition and in lieu of terminating the Agreement. if ENGINEER has failed to. act on an Appli- cation for Payment or OWNER has failed to'make any pay. ment as aforesaid. CONTRACTOR may upon seven days' written notice to OWNER and ENGINEER stop ,the Work until payment of all amounts then due, The provisions of this paragraph shaUnot relieve CONTRACTOR of the obligations under paragraph 6.29 to carry on the Work in accordance with the progress schedule and without delay during disputes and disagreements with OWNER. ,(The remainder of this page was left blank intentionally,] 30 I I I I I I I I I I I I I I I I I I I J.' , .' .,.,. ~" ~ ARTICLE 16--ARBITRATION 16.1 All claims, disputes and other matters in question getwee~ OWNER and CONTRACTOR arising out of, or relating to, the Contract Docu~ ments or the breach thereof shall be decided under Georgia Law in the Superior Court o'f Richmond County, Georgia. ' \ (The remainder of this page was left blank intentionally.) , , ~,,~\ 31 I I -I I' I I I I I I I I, I I I, I I I I . , ~l\ (This page was left blank intentionally.) 32 I I I I I I I, I I I I I I I I I I I I ARTICLE 17-MISCELLANEOUS Giving Notice: ,17.1. Whenever any provISIon of the Contract Docu- ments requires the giving of written notice. it will be deemed to have been validly given if delivered in person to the indi- vidual or to a member of the firm or to an' officer of the corporation for whom it is intended. or if delivered at or sent by registered or certified mail. postage prepaid. to the last business address known to the giver of the notice. Computation of Time: 17.2.1. When any period of time is referred to in the Contract Documents by days. it will be computed to exclude the first and include the last,day of such period. If the last' day of any such period falls on a Saturday or Sunday or ,on a day made a legal holiday by the law of the applicable jurisdiction. such day will be omitted from'the computa- tion. 17 .2~2. A calendar day of twenty-four hours measured from midnight to the next midnight shall constitute a day. General: 17,3. Should OWNER or CONTRACTOR suffer injury or damage to person or property because of any error. omis- sion or act of the other party or of any of the other party's employees or agents or others for whose acts the other party is legally liable. claim will be made in writing to the other party within a reasonable time of the first obserVance of such injury or damage. The provisions' of this paragraph 17.3 shall not. be construed, as a substitute for or a waiver of the pro~ visions of any applicable statute of limitations or repose, 17.4. The duties and obligations 'imposed by these Gen- eral Conditions and the rights and remedies available here- under to the parties hereto. and, in particular but without limitation. the warranties, guarantees and obligations imposed upon CONTRACTOR by paragraphs 6.30. 13.1.13.12.13.14, 14.3 and 15.2' and' all of the rights and remedies available to 'OWNER and ENGINEER thereunder, are in addition to. and are not to be construed in any way as a limitation of. any rights and remedies available to aiw or all of them which are otherwise imposed or available by Laws or Regulations.by;, ' special warranty or guarantee or by other provisions of the' '; Contract Documents. and the provisions of this paragraph will be as effective as if repeated specifically in the Contract' Documents in connection with each particular duty, obliga- tion. right and remedy to which they apply. All representa- tions. warranties and guarantees made in the Contract Doc- uments will survive final payment and termination or como, pletion of the Agreement. / 33 I I I I I I I I I I I I I I I I I I I 1.1 1.2 SUPPLEMENTARY CONDiTIONS OWNER'S LIABILITY & PROPERTY INSURANCE: Section 5.5, 5.6, 5,7, 5.8, 5.9, 5.10 ofthe General Conditions shall be amended as follows: No additional liability or property insurance will be purchased by Augusta-Richmond Country for this project. Current insurance coverages will remain in 'effed for the life of this Contract. CONTRACTOR'S LIABILITY: As indicated under Section 5,3 of the General Conditions, the Contractor's Liability Insurance shall be in an amount not less than $200,000 for injuries, including accidental death, to anyone person, and subject to the same limit for each person, in an amount not less than $500,000 on account of one accident, and Contractor's Property Damage Insurance in an amount not less than $100,000 for all property damage sustained by anyone person in anyone accident; and a limit of liability of not less than $200,000 for any such damage sustained by two or more persons in anyone accident. ' , , ~1\ The contractor shall either (1) require each of his subcontractors to procure and to maintain during the life of his subcontract, Subcontractor's Liability and Property Damage Insurance of the type and in the same amounts as specified in the preceding paragraph, or (2) insure the activities of his subcontractors in his own policy. 1.3 SPECIAL HAZARDS: The contractor's and his Subcontractor's Liability and Property Damage Insurance shall provide adequate protection against the following special hazards: (a) Work within the right-of-ways of the Augusta-Richmond County Road System. (b) Work within easements granted by property Owners in connection with the construction of the project. ( c) Work in close proximity to existing water lines, telephone lines, gas lines, other utilities and private structures contiguous to the job site. SC-l Rev: 08/10104 I I I I I I I I I I I I I I I I I I I 1.4 TESTING LABORATORY: All testing and laboratory work in connection therewith shall be performed by an independent firm and paid for by the contractor. Copies of all test reports shall be forwarded to Augusta Public Works and Engineering Department., There wil1.be no separate payment for this work. . 1.5 SURVEYS: The Contractor will provide surveying for construction staking, horizontal control and vertical control as necessary. 1.6 PROGRESS PAYMENT: Section 14.2 of the General Conditions shall be amended as follows: . I r,\ The Contractor may submit monthly estimate for work completed I and materials properly stored as approved by the Engineer, When an estimate includes materials stored, a bill of sale, invoice or other documentation warranting that the Owner is receiving the material free and clear of all liens, charges, security interest and of all liens, charges, security interest 'and other, encumbrances shall be attached to the payment request. ' 1.7 ENGINEER: All references to "Engineer" shall be interpreted to mean the Director of Public Works arid Engineering, or his official designee, 1.8 UNDERGROUND UTILITIES: (References 4.3, 1.4,3;2) , The Contractor shall coordinate with all utility companies through the, "One Call" method or other appropriate steps to locate and avoid damage to all utilities that may affect or be affected by the Con~actor's work. 1.9 SAFETY: (Reference 6.20) j The Contractor shall use certified flagmen, barricades and signs as necessary to notify the public, in particular, those persons driving in the vicinity of the project, of the construction and its affect on traffic. SC-2 Rev: 08/10/04 I I I I. I I I I '1 I I I I I I I I I , I ,.------.- \..~, ) ) POlNTE WEST DRAINAGE lJ.\.1PROVEMENTS J?B.ASE I-A STOR1\i SEWER REPAIRS PROJECT NO. 323-04-203823372 AUGUSTA, GEORGIA July 21,2004 ( , &MOUNT ITEM NO. DESCRIPTION. oUANTITY. UNIT & UNIT PRICE, I. STORM SEWER 1, Mobilization fii9(!;t9.. dV 'fOfr9,w 1 L;S.@ $ /L.S. $ 1 ' 2. CCTV Inspection of Existing Pi~?:Required by City) ?JIG,?'f $ ~15 L,F. @ $ I, . IL.F . ,I :~';\ 3. Point Repair Allowance forNeeded Repairs to Existing Pipe Prior to Lining (See Note 2 Below) Lump Sum $ 5,000.00 Clean & Line 42" Cl\1P from HW #1 to SWT #3 Including SealiRg Liner at End Points. Minimum 15mm, thickness. 'lOS(8.} rrl ll1}.F. @ $ f).!f'f.'" /L.F, Clem & Line 54" CMP from SWT #6 to Stonn Box #7 Including Sealing Liner a.t End Points, Minimum 15mm ~)es:;I/1) LF. @ _$ 311:"'" /L.F. CCTV Inspectipn of Lined Pipe (If Required by City) 215 L.F, @ $ /,15 " fL.F. ' , 7. Remove and Replace Existing Drainage Structure Tops 1, ' Each @ . $ B ;).;5 t? pO /Each 4. $ ~71tJP~ 5. $' 36 Lf11- eO f ' s J ? G LJ. '5 $ h; vO:;. - $ ~/7-9i:(tl ' 6. TOTAL , Notes: 1. All bids will be on a unit price basis md final payment Vlill be based on actual work performed.. 2. Prior to p~onningany point repairs, any and all costs must be approved in the field by the. . inspector. . Submitted By: l-ufJ;/~ t./f pt'?$# Address ~ By: Title: , Date: 5/ l f,/ t7t/ lS~nH31IH~ ~ NOSH380~ 'N01SN~~~ . ?004--014 W'tiIC6 vOOl'9l'lnr Z 'd 99H 'ON .... ... "'... ., Q ~ ~ ~ 0:: ~ "" ~ a ~ gs ""J a<: "-" <: A: ~ . C) ......::J UI <: E I ~a ~~ i!:~~ ~G ~ Cl~. ~ "'"-f C'\j j;::: ....J ,).... ~ :s; kJ L;:' <n ~ ~ -J ~ a""'" <: f..,.:: .'-J -J ...... a""-J~ a<n IJ:.",~-J i!:::lU) u~ 1i)'lI,~L..J L..J:;;"' 4..U) c:;:>.::'Ci!: ~Ci)Q::: a~LJ<:aCl.. -. LlJ <n~....J CO<n~ &~~I ~~~~~~~ OlJJCJ j;:::.....~!:::~~'"' ~;<: -a.,4... ~liJ!--.I L..Jl5i!: ::lQ::&lSlU)[5~ 9::::Y:~ ~L.lj CQaa~ Cl..~:S; CQQa<:ti)@S [,.1(1.. tJ gs ?S Qj Q:: "' ~ 0:: ~[h~ Li:.~~~~8~ '-JCj~ h.-J~~ kJkJw Q::o~.i5",~f-f...:QjClQ:: ..L :::) a ,~ i:2 - a ~ '- :::) ~~(,) 5:(,) <: :::Ja<n I :a: U "'"' E1:>- tti '" ~ ;:;s GJ ~ ~, Cl.. kJ ~ ~ < ~ ~ ~ 8-f~ ~i!:l;iQ::~QQ~ L..J ? Qj :'Js f3 ~ l;j ~ ~~ ::r-"J-J (.,) Cj~cocJcJf..,.:: ~"'"-f-J w-JQ2a ;<: \ 4..:g~ C5~Q ..Q~~~. aat/) Q::e,-~~~Il)Lu L..J Q:a: (j · L..J a: co~& LulJ.J::::iQ2Cj~~ <n~ Cj~ Q.~ ~ ~ -J~""-I _r--lJ.j ~ ' ;;! 4.. a:f-i!:SlIi),,"Ii)~ ;:r:ea~,-"'( co~aa t/) <:1_kJ,-<:<:<:<:-J ~~a"l~Cl",Oj::::'::o::o::,! ~~r.:::~ ~G~~I::!~iJj ~o::::S~ ~ ~ ~ l.J -- . -..l ~ :;;! ~ ~ gs Cl L..J Sl Cl i:l: . U)i:l:~I--'~U) li:.i5i!:QjQ5it I-W_a<n<n-:::JQ:::Q... j;::: Q. (J ~ ~ ~ ~ LW LlJ kJS gs kJ a . ,Q.aaLJ:.lJ:.~ <:"'"-f ~ r--) . ' ~ Lei .~ ~. < tl I ~~.1 j!1 ~ z ~ .~ ~ I ~ ~ ~ : ~ ,'f ~ ~ ,,~~ 00 ~ ~ : g Ir! ~~~~~n ~,e= '~ .g J ~ ~~ J ~'a: ~.t ~I ~ ~ 9 ~ u '<I 1. .' ~_' ,,'0 .' .;; '" -H w <tl, '"'- 01'1") ><~;;5crio O~""C'I . lD't.:>+Ol ~~~....c:::; Ck:Q.0 . II OO-.J<(Q. tn t:: linii r:2 ~ < ~.~ ~ ~ ~ ~ ~ ~ rll ~ , IIJ ~ o !: I'/.l I ,I I I ~~g xC'iC'i 01'0 ",,+C'I .....vll ~ . c:: . W 0<("': 1-1- Vl(fl ~ .. ~ l' ~,I ~J ...- ! jh Q,) ~5 ~ ~ I >~ I} ..~ ~ : ~ I.i : ~ I~I : t d ~ .. Q,) a: ..c I~ ~ I a! ,t'il ~ III ' rn ill ~ g , ~ u <1 o CXl ~ I- LU l.Ll LL. :z o w ;..J <( C'..) Ul o C'I o v SN'V~)\~~3e scout fUllON - i i \. ~ E l' <:I I I I I I " I I I I I I I II I I I I I I . ~r: ~r' :'! :i GENERAL NOTES MASTER COpy REVISED 3 - 06 - 03 RLC ./ GENERAL NOTES ,ADJUSTING NllNOR STRUCTURES TO GRADE: This item' consists of raising or lowering the upper portion of existing manholes, water valve boxes, gas valve boxes or any other miscellaneous structures within the area of construction. There will be no separate payment for tbis work unless shown , as a separate pay item. * Prior to any resurfacing the contractor shall identify and reference' all .;~, . structures so the precise locations can be determined after resurfacing. This shall be done in the company of the ARC Inspector. This shall be the first order ' of '-work where minor structures requiring adjustment are included in the contract. AGGREGATE SURFACE COURSE: The item aggregate surface course is for use in inclement weather to facilitate the movement of local traffic along roadway construction and to permit ingress and egress at drives. When used for this purpose, Section 318, Georgia Standard Specifications, IS modified to permit truck dumping on unprepared and muddy subgrade. Section 318 is further modified to permit the use of crusher run stone as described in Subsection 806.02, The Contractor will have the choice of the following materials. Graded Aggregate Coarse Aggregate Size 467 Stabilizer Aggregate Type 1 or 2 ' Crushed Stone , Subsection 815.01 Subsection 800.01 Section 803 Subsection 806.02 All materials to be used as directed by the Engineer. AS-BUILT PLANS: The Contractor shall furnish a complete, legible set of "as-built" plans, in good condition, to the Project Inspector prior to the date of the Final Inspectio~. Such plans shall have all significant changes marked in red. The Project Inspector shall review the marked plans for accuracy, legibility and completeness. After the Project Inspector approves and signs the redlined plans, a qualified engineering finn, selected by the contractor, shall make arrangements to obtain the original approved plans ,from G-l I I I I' I "..~ , 1 I I I I I I I I I I I I I ~! ; ;.".. ... '/' the Public Works & Engineering Office; After originals have "as built" information incorporated, they shall be stamped and signed on the cover sheet by a registered Professional Engineer and returned to the Project Inspector for final processing. The Project Inspector shall sign the as-builts and place them in the permanent record files, There will be no separate payment unless otherwise shown. CASINGS: All steel casings being installed across any roadway and/or right-of-way shall have the joints continuously welded to obtain a watertight seal, The Contractor shall notify the Engineer when welds are ready for inspection. Welded casings backfilled without the Engineer's approval shall be uncovered for inspection at the Engineer's request. COMP ACTION: , . All compaction shall be as defined in the current edition of Georgia department bf:i,~" Transportation Specifications. Special attention shall be given to the backfill of minor structures (pipe, box culverts, manholes, catch basins, drop inlets, etc.). Compaction shall be achieved using approved tamps and soil layers of approximately 6 inches (loose measure) and in accordance With Georgia Department of Transportation Standards 1030-D and 1401. Backfilling operations of this nature shall not begin until the Contractor has on hand all equipment in good working 'concijtion, 'and competent operators. ' The backfilling of pipe and other minor structures shall be in accordance with Georgia Department of Transportation Standard specifications, Current Edition. Backfilling with, sand using jetting and/or flooding will not be allowed in any case without the written permission of the Engineer. NOTE: When sand and jetting/flooding method is used the warranty for the backfilled are~ is extended from 12 months to 24 months. A plan fqr the jetting/flooding shall be ,submitted at the PreConstruction Conference. CONCRETE: The Contractor shall have a slump cone on the project at all times when concrete is being placed. He shall, in the Engineer's presence, perform shimp tests as directed by the Engineer. Tests shall be performed by qualified personnel with' a properly . , ' 'cleaned slump cone. Allowable slumps are 2" minimum and 4" maximum. Class "A" concrete shall have a minimum of611 lbs. Cement per cubic yard.. Class '~B" concrete shall have a minimum of 470 lbs. Cement per cubic yard. Concrete not meeting these requirements will be rejected by the Engineer. NOTE: No concrete shall be placed until all required equipment such as slump cone, curing compound and dispensor, etc., all in good working condition, are on the site. Inspectors must be given a minimum one-hour advance notice. No concrete shall be " G-2 I I I I D I I I I I I I I I I I I I I plaoed without the Inspector present Wiiess 6tlletWis~ directed by the Engineer. All concrete shall be placed during the Inspectors normal working hours, 8:30 a.m. to ~:OO p.m. unless otherwise directed by the Engineer. Formed surfaces shall receive fiiiish immediately after removing forms. Forms shall be removed ,as provided in Section 500 of GA.DOT Specifications, CONSTRUCTION: Transition ties of proposed curb and gutter to existing curbs (va,lley gutter, granite curb, header curb, etc,) shall be paid for in the unit price bid for curb and gutter unless otherwise noted. At locations where new pavement is to be placed adjacent to existing paveinent, , without an overlay, or where curbing is to be placed across paved parking lots, ajoint , shall be sawed on a line to ensure pavement removal to be neat. Only those joints " sawed in'concretepavement will be paid for under the pay item-Sawed Joints. . . per :~,\ Linear Foot. Where curb and gutter is used and the shoulder elevations are higher than adjacent ground, the actUal direction of drainage runoff shall be determined by the Contractor. He shall make such provisions as necessary to ensure that no ponding is c~used by the , new construc,tion. He may place additional fill to provide drain inlets. Compensation will be under the price bid for the appropriate pay item. Driveway profiles ma~ also be altered allowing the concrete pad to slope down outside the back of the curb line not to exceed an algebraic difference of 0.07. This should be used primarily on the high side of super-elevated curves. The Contractor should Use caution with standard' variance and place special emphasis on hydraulic considerations. , ' The Contractor' shall provide borrow and/or' waste pits for this project. All, pits acquired for use on this project shali be reclaimed in accordance with Subsection 107.23 and Section 160 of the Standard Specifications and page PPA-l of this document. ' All storm drain pipe, side dra41 pipe, pipe culvert wing-walls, steps, retaining walls, , \ curbs and gutters, headwalls, all types of pavement, wooden structures, except those specifically shown as aremoval pay item will be removed as Clearing and Grubbing, Grading Complete, Grading Per Mile or Lump Sum,Construction. Cut and fill slopes outside of clear zones may be adjusted on construction where necessary to remain within the right of way. ' Curb cut ramps in ,accordance with Standard 9031-Ware to be used at all street intersections on this proj ect. G-3 I I I I I' I I I I I I I I I I I I I I Asphalt milling where specified fot us~ ori existing pavement that is to be resurfaced adj acent to curb and gutter. Finished surface on asphalt pavement shall not exceed W' above the gutter line as shown on Georgia Stand8.rd 9031-J. -CONSTRUCTION LAYOUT: Construction layout work shall be performed by the Contractor. See Section 149 of the Standard Specifications. The survey for this project was made by W. R. Toole Engineers, 722-4114. CONSTRUCTION SCHEDULE: .~::\ The Contractor shall prepare a schedule identifying the' primary construction activities and/or phases ~or constructing this project. ' This schedule shall be presented at the Pre-Construction Conference, When significant events occur that impacts the, schedule a revised construction schedule shall be submitted. DESIGN ALTERATIONS: The Commission-Council recognizes 'that various changes in design may be made as the project progresses. Any requests for additional payment will be processed based on actual work in place and the unit prices submitted as a part of this bid. Items not covered in this bid shall be priced separately and no work shall be ,done on these , items until approved, in writing, by the Engineer. ENGINEER: In all contract documents, specifications, supporting documents, etc., the term "ENGINEER" means, and shall be deemed to mean, the Augusta-Richmond CoUnty Public Works Director or ms/her designated representative. EROSION AND SEDIMENT CONTROL: The Contractor shall be responsible for all soil erosion and sediment control practices, All on-site erosion control shall comply with local Augusta Richmond County erosion and sediment control ordinances. The cost of this work shall be included in the cost of Lump sum Construction unless shown as a separate pay item. EXCESS MATERIAL: ( All excess materi'al is to be disposed of as directed by the Engineer or as noted in Subsection 107.23 of the Specifications and in accordance with page PP A-I. G-4 I~ I 11 I I I I I I I I I I I, I I I I I (' FENCE: All new fences called for on the plans and/or contract documents shall meet the requirements of Section 643 of the Georgia Department of Transportation Standard Specifications, current edition. New fence not meeting these Specs will be rejected. In contracts where remove and reset fence items are involved (either as pay items or as Lump Sum Construction) all replacement fence shall be equal to or better than the eXisting fence as approved by the Engineer. This means equal to 'or better than the original fence at the time of its installation. In accordance With Subsection 643,03D, the Contractor must furnish positive locking devices, padlocks and keys with all gate assemblies, ' FINISHING AND DRESSING: '~, All unpaved and natural areas which are disturbed by the construction of this project are to be returned to the pre-existing shape and slope and then finished and dressed. No separate payment will ,be made for grassing, fertilizing and mulching of disturbed areas, unless specifically shown as a pay item. ' FLAGGING: Flaggers shall be provided as required to hindle traffic, as specified in the Plans or Special Provisions, and as required by the Engineer. ' All Flag'gers shall meet the requirement of part 6F of the MUTeD arid must have received training and a certificate upon completion of the training from a Department approved training program, Failure to provide- certified Flaggers as required above shall be reason for the Engineer suspending work involving the Flagger(s) until the Contractor provides the certified Flagger(s). Flaggers shall wear a fluorescent orange cap or hat, and a fluorescent orange vest, shirt, or jacket, and shall use a Stop/slow paddle meeting the requil-ements of Sectio'n 6F -2 of the MUTCD for controlling traffic. The Stop/slow paddle shall have a shaft length of seven (7) feet minimum. In addition to the stop/slow paddle, a flagger may use a 24-inch square red/orange flag as an additional device to attract attention. For ,night work, the vest shall have reflectorized stripes on front and back. Signs for Flagger traffic control shall be placed in advance of the flaggiIig operation in accordance with the MUTCD. In addition to the signs required by the MUTeD, , signs at regular intervals, warning of the presence of the flagger shall be placed beyond the point where traffic can reasonably be expected to stop under the most severe conditions for that day's work. FOUNDATION BACKFILL MATERlAL, TYPE I: G-5 I I I I I I I I I I I I I -I I I I I I Foundation Backfill Materiai Type I shaii coDform to Georgia Standard 1030-D and Section 207 of the Standard Specifications, No separate payment will be made for this material or its placement. ' / FOUNDATION BACKFILL MATERIAL, TYPE II: Foundation Backfill Material, Type'n shall conform to Georgia Standard 1030-D and Section 207 of the Standard Specifications and shall be used in wet/unstable conditions as directed by the Engineer. It shall also be used beneath all concrete box culverts. Quantities shall be measured for payment in accordance with Georgia Standard 1030-D or as directed by the Engineer. Payment shall be per cubic yard unless otherwise specified in the contract. , . -~ ':~\ GRADES: With the approval of the Engineer, grades rg.ay be field adjusted to provide for best drainage, ' GRADING: In contracts where grading, including excavation for drainage structures, is accomplished under Section 210 (Grading Complete or Grading :Pel" Mile) or Section 230 (Lump Sum Construction), the Lump Sum. amount bid will include all work necessary to obtain the line, grade and compaction in accordance with the Specifications and other contract documents'. There will be no separate payment for' . any work of this nature including borrow and the removal of unsuitable andlor unstable material. However, the, Contractor shall make whatever investigations he deems'necessary to determine the extent of any borrow or removal necessary to meet contract requirements. If it develops that removal of unsuitable/unstable materials quantities could not have been predicted by the contractor from a reasonably thorough investigation of project conditions, the Contractor may request negotiation for payment for excavation of this nature in areas where the depth exceeds three (3) feet below subgrade~ The Owner will consider negotiation only when this type of removal is excessive and the Contractor provides evidence that he thorougWy investigated project conditions prior to entering his bid. Only those quantities in excess of three (3) below finished sub grade and/or normal excavation for drainage structures, ordered by the Engineer, will be considered for payment. GRASSING AND EROSION CONTROL: The Contractor shall bid on grassing, lump sum, and it shall be his responsibility to ' , ' determine the actual area to be grassed. No claims will be considered for extra compensation if the contractor relies on plan information to prepare his bid. , G-6 I ' I I I I" I I / I I I I I I I I I I I I 'All slope areas are to be grassed,uliie~s s116Wll otherwise on plans. Temporary grass is required ifpermanent grass season is out. The Contractor shall be responsible for all soil erosion and sediment control measures, . Allan-site erosion control shall comply with local erosion and sediment control ordinances. The cost of this work shall be included in the cost ,of the project unless shown as a separate pay item. . ' All unpaved and natural areaS which are distuibed by the construction of tms project are to be returned to the pre-existing shape and slope and then finished and 'dressed, No separate payment will be made for grassing, fertilizing and mulching of disturbed areas, unless specifically shown as a pay item. Discontinued roads or other areas inside or outside the project construction limits, but within the existing or required right-of-way, shall be obliterated and restored as nearly as possible to the original contour of the ground (see Section 205 of the Standard Specifications), No separate payment will be made for tllls work. ':t~\ Where, item number 700-6001 is shown as a payitein, Georgia Department of Transportation specifications are modified to provide that the lump sum price bid shall be full payment for all fertilizer, lime and nitrogen. No separate measurement for payment will be made for any work or materials required to accomplish a stand of pernianent grass. ' I ' If a satisfactory stand of permanent grass has not been obtained prior to the Final Inspection the contractor shall begin watering and continue watering until a permanent stand ,of grass is accepted by the Engineer, Water sources shall public, streams and/or farm, ponds if Augusta Richmond County watering, restrictions ' prohibit other sources. If for 'any reason watering is not a viable option. the contractor shall treat all unaccepted areas with loose sod as described in Subsection 700.08A and 700.08C. There will be no additional pay for this work. , , INFESTATION: The entire project is considered to be within the limits of an insect infested area. The contractor's attention is called to the following sections of the Standard Specifications: (A) 155 Insect control (B) 893 MiscellaneoUs Planting Materials. INSPECTIONS: This project will be inspected by the Engineer or his Representative. LANDSCAPING: All the requirements of Section 702, of the Georgia Department of Transportation Specifications, current edition, are applicable to this projeCt except as follows: there G-7 I I I I I' I I I I I I I I I I I I I, 1 ^. :.,.".]. "l' .. . <'..,.....ol-f will be no separate pay for staking, including Perimeter' Staking and for Spring Application, of Fertilizer. All costi ~1iRil pe included in prices bid for Landscape Items, Bag grown plants are not acceptable. LUMP SUM CONSTRUCTION: The Contractor shall provide breakdowns on all components that make up Lump Sum Construction. The breakdown shall provide the unit price assigned to each component. Forms designed specifically for these breakdowns MAILBOXES: EXisting mailboxes that are in conf1j.ct with the proposed construction shall be removed and relocated. Where feasible the existing mailboxes and supports may be utilized as approvedby the Engineer so long as the supports are of metal PIPE with a maXimum diameter of two(2) inches or woo~ with a maximum diameter of four(4) inches. Note: There shall be no supports of any material other than the two mentioned above. All existing mailboxes and supports containing brick, masonry of any type, metal, etc. shallbe disassembled and all components, not meeting the above reqUirements, shall be removed from the project and disposed in a proper manner, When not shown as a pay item~ paynient shall be included in the price bid for Lump Sum Construction and itemized as such. '!.~\ :MISCELLANEOUS DRAINAGE STRUCTURES: , All miscellaneous drainage structure such as Catch Basins, Drop Inlets, Manholes, ('Junction Boxes, Spring Boxes, Drain Inlets, special Inlets, etc., whether standard or special design shall be paid for Per Each, There will be no..-separate payment for additional depth unless specifically shown as a pay item. NOTE: All Catch Basins, Drop Inlets, manholes, exposed 'Junction Boxes, etc., with concrete topslabs shall include manhole rings and covers. ' The Contractor shall install the manhole rings and covers such that the steps can be easily accessed. NORMAL WORKING HOURS: The normal working hours for ARC Inspectors are from 8:30 AM to 5:00 PM, When the contractor elects to work outside these hours he shall be billed for the Inspectors salary plus benefits unless' such work is initiated by the Owner. The , contractor may utilize a certified testing company in lieu ofthe ARC Inspector when approved by the Engineer. Payment for the contractor's testing company will be the responsibility ofthe contractor; (See article below on TESTING. PATCHING AND REPAIR OF MlNOR DEFECTS: G-8 I I I D I I I I I I I I I I I I I I I Where needed, the contractor is required to patch and repair existing potholes, minor pavement defects and base failures in accordance with the Specifications. P A VEJvfENT CUTS: .... All pavement cuts shall be sawed with a neat vertical edge, regardless of material, consistently straight enough that a roller can follow the edge precisely to achieve the desired compaction. Irregular edges will not be accepted. Payment shall be included, in the price oft4e pipe. PAYIvfENT FOR PIPE CULVERT INSTALLATION: 1. Payment for pipe culvert or utility installation includes sawing and/or cutting and removing existiilg pavement and replacmg the pavement as specified in:~':': accordance with Standard 1401. ' Payment for pipe culvert includes plugging existing pipe with Class "A" or "B" concrete (See Georgia Standard 9031-L). ' Payment for pipe culvert includes any required Concrete collars (See Georgia Standard 9031-U), All concrete storm drain and longitudinal pipe shall include O-ring gaskets. 2. '3. 4. PIPE CULVERTS: Unless otherwise noted, all storm drain, longitudinal and stub pipes, are to be, reinforced concrete. All required pipe culverts shall be iIi accordaIice with Standard 1030-D. Foundation Backfill Material Type I shall conform to Georgia Standard 1030-:0, No separate pay item will be made for this material or its placement. Payment for pipe culvert or utility installation includes sawing and/or cutting and removing existing pavement sidewalk, curbing, etc" and replacing same as specified in accordance with Standard 1401. Payment for pipe culvert inc1udesplugging existing pipe with Class "A" or "B" concrete and for constructing concrete collars. The contractor shall include in his price bid for pipe, the additional cost of bends, tees, fasteners, appropriate gaskets, (see Section 848 of the Standard Specifications), and structure excavation. PRECAST CONCRETE UNITS: , . Precast Concrete Units, other than those specifically allowed by Georgia Department of Transportation Specifications, such as Drop Inlets, Catch Basins, Manholes, etc., G-9 J I I I I I'" D 1 I a a I I ! I I I I I I I ,~-;.l\ ,; .'l .~,~ r:: ,'. . .... .. r ;" shall not be installed without Written pefmission from the Engineer. Any such units installed without such written permission shall be removed from the project. RELOCATED WATER 11ETERS: Relocated water meters and water meter boxes may not be placed in the sidewalk. 'REMOVAL AND RESETTING OF ORNAMENTAL SHRUBS AND BUSHES AND SOD: , . It shall be the contractor's responsibility to remove 'and reset any and all existing ornamental shrubs and bushes and sod in conflict with proposed construction. Coordination with the property owners is essential in this endeavor. The contractor will not be held responsible for care and maintenance after removing and resetting these plants and sod except in cases where the Contractor's equipment causes 'r.:, irreparable damage or where plants and/or sod d.ies as the result of negligence on the Contractor's part. In which cases, the Contractor will be held responsible for replacement. Sod, shall be reset with ground preparation in accordance with Subsection 700.0S.A. No add.itional soil or fertilizer is required for resetting sod. The Contractor shall remove the sod in a manner that will be conducive to insuring that the reset sod will live. At the contractor's option, he may replace any sod he removes with new sod of the same type. No separate' payment Will be made for this work or replacements unless specifically shown as a pay item. ' , REMOVING AND RESETTING OF OBSTRUCTIONS: It shall be the Contractor's responsibility to remove and reset any andall obstructioils, such as fences, signs, concrete or brick planters, steps, walkways, brick or concrete entrance coluinns, etc., which are in conflict with construction. Contractors are responsible for the security of pets and/or personal property through the use of 'temporary fence if necessary. No separate payment will be made for this work except when shown as a separate pay item. ' I " RIGHT-OF-WAY AND EASEMENTS: The Contractor shall not perform any work outside the limits of the right-of-way or, easements. In' addition, no equipment or material shall be placed outside these areas - without written pennission of both the property owner and ,the Engineer. In the event. that the Contractor elects to, utilize private property for any purpose connected with the project, such as, but not -limited to, staging areas, equipment and/or material storage or simply as a convenience, he shall submit a written agreement to the , Engineer containing vital information such as limits,' of both area and time, the property is to be utilized and a description of the intended use. The agreement must be signed by both the property owner and the Contractor and will be reviewed and G-IO I' I I I I .+ I I I I I I I I I I I I I I recorded by the Engineer. Such agreements must be submitted pnor to the I contractor's use of the property, All buildings located on newly acquired RJW and/or easements shall be relocated by the Contractor. Such buildings on existing R/W and/or Easements shall be removed by the owner or will become the property of the Contractor. ,SALVAGEABLE MATERIALS: As directed by the- Engineer. or his representative, all salvageable materials, such as drainage pipe, which require removing but are not to be used on this project, are to be cleaned and stored within the right-of-way by the Contractor. These materials shall be picked up and transported by Augusta Richmond County forces. The Contractor is responsible and shall make restitution to Augusta-Richmond County for materials damaged through his negligence, SAW CUTS: When matching existing conditions, saw cuts shall be used as required by, Augusta- Richmond County. Only saw cuts in Portland Cement Concrete which are shown as contract pay items will be paid for separately. No saw cuts in asphaltic concrete will b,e paid for separately. Unless specifically noted this does not apply to pip~ trenches. 'SHOULDER WORK: All necessary cleaning of the existing pavement, including clipping of shoulders, required prior to resurfacing shall be the responsibility of the Contractor, The material displaced shall be removed, lowered or spread over the shoulder to an elevation and slope which will provide adequate drainage, The cost of such work shall be included in the prices bid for other items. SOD: Sod will not be paid for separately when used to match or replace sod on adjacent ,lawns as replacement in kind. See GDOT specifications, subsection 700.04.E. SPECIAL EVENTS: When SpeCial Events occur, such as the Augusta Masters Golf Tournament, all work' shall be safed up, shut down and maintained until the Engineer okays the resumption of work No project is exempt without the expressed approval of the Engineer. If these type work stoppages impose a hardship, contract time wise, cOIisideration will be given to extending the, contract time in' an amount commensurate with the delay caused by such work stoppages provided the Contractor has otherwise pursued the work diligently, G-ll '" , , :t,\. I I I I I " I I I I I I I I I I I I I I \ '. .... .,' -'.. .... ...\ .' SPECIFICATIONS, STANDARDS .ANJj OTHER DAtA: All references in this document, (includes all papers, writings, documents, drawings, or photographs used, or to be used, in connection with this document), to State Highway of Georgia, State Highway Department, Highway Department! or Department when the context thereof means the Georgia Department of Transportation means, and shall be deemed to mean, Augusta-Richmond County, Augusta-Richmond County Commission-Council Department of Engineering Services. The data, together with all other information shown on these plans, or indicated in any way thereby, whether by drawings or notes or in any other matter, are based upon field investigations and are believed to be indicative of actual conditions. However, the same, are shown as information only, are not-guaranteed, and do not bind Augusta- Richmond County, Georgia in any way. ,Only the actual quantities completed and accepted will be paid ,for. The attention of the bidder is specifically directed to Subsections 102.04, 102,05" and 104.03, of the Standard Specifications, 'of the Georgia Department of Transportation, current edition, which will be part of this contract. . :t~:~-> This project is based on, and ,shall be constructed in accordance with, the State of Georgia Department of Transportation Standard Specifications for Construction' of Roads and Bridges, current edition and any supplements thereto. All of these spec~fications shall be considered as though fully contained herein, In cases where conflicts arise within these specifications, they will be revised to resolve such conflict, Until the conflict is resolved, the interpretation of the Engineer shall control the situation. SPENDOUT SCHEDULE: A Spendout Schedule beginning with the Notice To Proceed and extending \ through the anticipated construction life of the proj ect, shall be submitted ,at the 'Preconstruction Conference. Such, schedule shall include the anticipated earnings on a monthly basis. STORAGE BUILDINGS: The existing sheds and/or buildings shown to be relocated will be relocated by the' contractor or reconstructed as required outside of the easement as rioted on the plans. Unless otherwise specified, the costs associated with this shall be included in Bid Item 230:- 1 000 Lump' Sum Construction and described in the itemization of Lump' Sum Construction. STORM DRAIN PIPE: G-12 I I I I H I I I I I I I I I I I I I I :f, . 1'~ J! Unless otherwise noted, ali stofiri cifaln, loiigitudinal and stub pIpe are to be reinforced concrete and shall include O-ring gaskets. SUBCONTRACTORS : The Contractor shall furnish the official name, plus the name and telephone number of the 24 hour emergency contact of all :firms he proposes to use as Subcontractors in the work. This information is to be furnished at the PrecoIistruction Conference. However, no work shall be done on this project by a Subcontractor until the Contractor receives approval ofms Subcontractor(s) from the Engineer. 'NOTE: All submissions shall include the following information for each' 'Subcontractor: 1) Name of Subcontracting Firm 2) Description of Work To Be bone 'r~\ 3) Contact Person's Name and 24 Hour Phone N1lIDber SUPERELEV ATION: All horizontal circular curves are to be superelevated in accordance with Georgia Standard 9028-C as directed by the Engineer, TESTING OF THE WORK:' The Contractor shall employ a qualified materials testing laboratory to monitor more fully the quality of materials and work and to perform such tests as'may be required under the contract documents as conditions for acceptance of materials and work THE ENGlNEER MAY ORDER TESTING AT ANY TTh1E HE DEEMS PROPER , ' TO CONTROL THE QUALITY OF THE WORK. All test results are to be submitted to the Engineer, No separate payment will be made for employing the testing laboratory or any required tests. ' TEST ROLLING: Prior to placing any base course, the sub grade shall be test rolled <m six feet centers using a loaded dump truck or other equipment approved by the Engineer. TRAFFIC CONTROL: The Contractor shall provide construction signs in accordance with requirements of "Manual on Uniform Traffic Control Devices for Streets and Highways", current edition with added supplements and special provisions" The attention of the Contractor is specifically directed to Subsection 107.09 of the Standard Specifications regarding barricades, danger, warning, and detour signs~ G-13 I' 1 I I I I I I II I I I I I I I 1 1 1 All temporary signs, barricades, flashing iighis, striping and any other traffic control devices required during construction of this proj ect shall meet all requirements of the M.U,T,C.D., cutrent edition, as directed by the Engineer and be :furi:llshed by the Contractor with payment in acc9rdance with Section 150. The Contractor shall so conduct his operations that there will be a minimum of interference with, or interruption of, traffic on the travelway. This applies to the initial installation and the continuing maintenance and operation of the facility, At least one-lane, two-way, traffic shall be maintained at all tirrles unless approved otherwise by the Engineer. As a minimum, the Contractor must comply with the Manual on Uniform Traffic Control Devices, current edition and Georgia Standard 9102. The Contractor shall provide all temporary traffic control devices needed to safely direct traffic through the construction aiea,., All temporary traffic control devices are to be placed in accordance with Georgia , Department of Transportation Standards and Specifications. TRAFFIC DETOURS: Where detours are required and in accordance with Section 150 of the Standard Specifications and any Supplemen~sthereto, the Contractor shall file for approval a detour plan of operation for this project. This plan shall include details of staging and rerouting of traffic including estimated length of time for use of the detours. The Contractor shall so conduc.t his operations that there will be a minimum of , interference with, or interruption of, traffic upon and along the roadway. Tbis applies ' to the initial installation and thle continuing maintenance and operation of ,the facility, , At'least one~lane, two-way traffic shall be maintained at all times unless approved otherwise by the Engineer. As a minimum, the Contractor must comply with the Manual on Uniform Traffic Control bevices, current edition and Georgia Standard 9102. ' . UNIFORMED POLICE OFFICERS: When shoWn as a pay item Uniformed Off-Duty Police Officers shall be used as directed by the Engineer, The bid prige shall be $15.00/hour. UTILITIES: All utility facilities except those owned by Augusta Utilities Department which are in conflict with construction, not covered as specified items in the detailed estimate, are to be removed and relocated to clear construction by the respective owners' with the exception of Augusta Utilities and Augusta Traffic Engineering Unless added later to the contract as a supplemental item. All "above ground" utility structures will be, located as near as possible to the right-of-way line. ' G-14 '~\: '" I I I I I I I I I I I I I I I I I I I i \ The Contractor will not be paid for any deiays or extra expense' caused by utility facilities obstructions or any other items not being removed or relocated 'to clear construction in advance of his work. All known utility facilities are shown schematically on the plans, and not necessarily accurate in location as to plan or elevation. Utility facilities such as service lines or unknown facilities not shown on the plans will not relieve the Contractor of his ' responsibility under this requirement except as noted below. "Existing Utility Facilitie~" means any utility facility that exists on the highway project in its' origiD.al~ relocated or newly installed position. , Other than service lines from street mains to the abutting property the contractor will not be held responsible for the cost of repairs to damaged underground utility facilities when such facilities are not shown on the plans and their existence is unknown to the Contractor prior to the damage occurring, providing the Engineer determines the Contractor has otherwise fully complied with the Specifications. ." ~';\ The Contractor shall use the one-call ce:q.ter telephone number 1-800-282-7411 for the purposes of coordinating the marking of underground utilities, The Contractor's attention is directed to the probability of encountering private utility installations consisting of sanitary sewers, water, sprinkler systems, ornamental light systems, gas and underground telephone cables that either are obstructions to the execution of the work and, need to be moved out of the way or, if not, must be properly protected during construction. No separate payment will be made for this work. Public utilities of this nature except Augusta Utilities and Augusta Traffic Engineering will be handled by the utility owner. , THE FOLLOWING UTILITY CO:MP ANTES SHALL BE NOTIFIED BEFORE WORK BEGINS: Georgia Power Company 4220 Evans To Lock Rd. Evans, Georgia 30809 Telephone (706) 667-5633 Attention: David Wattwood Atlanta, Gas Light Co 1840 Wylds Rd. Augusta, Georgia 30913 Telephone (706) 481-1452 Attention: Carl Corley Bell South 3841 Wrightsboro Road Augusta, Georgia 30909 Telephone (706) 860-8582 Attention: Calvin Hamby Jefferson Energy Cooperative P. 0, Box 457 Wrens, GA 30833 Telephone (706) 547-2167 Attention: Roy Chambers G-15 J I I I I I I I I I I I I I I I, I I I I .~: Comcast P. 0, Box 3579 Augusta, Georgia 30904 Telephone (706) 739-1865 Attention: Kevin O'Meara AugUsta Utilities 360 Bay Street, Suite 180 Augusta, Georgia 30901 Telephone (706) 312-4132 Attention: Max Hicks AT&T 937 Greene St. Augusta, Georgia 30901 Telephone 706-836-2240 Attention: ,Bill Wadley Knology 3714 Wheeler Road Augusta, GA 30909 Telephone (706) 294-2975 Attention: Patrick Casey , KMC Telephone: , ..r ., ~i~ ATTENTION DENNIS NORVIEL UTILITY ACCOM:MODATION POLICY: , In so far 'as possible, work shall be scheduled so that open excavations will not be left overnight. Where trenches, pits or other excavations are within the clear roadside areas and cannot be backfilled, before leaving the job site, they shall be covered by timbers or metal plates and protected by reflectorized and/or lighted barricades as appropriate and as directed by the Engineer. Barricades sufficient to prevent a person from falling into an excavated or work area must be erected in areas where these conditions exist. VERTICAL GRADES: No existing or design grades are provided on this project. It is the Contractor's responsibility to provide his own grades ifhe so desires. WARRANTY: Unless otherwise specified, all contract work is subject to a l2~month warranty. The 12-month warranty is hereby modified to include the following: Any repairs, corrections or modifications performed within the last six months of the original 12- month warranty shall have the original 12-month warranty extended 180 calendar days past the date of such repairs, corrections or modifications. G-16 I' I I I I " , I I I I I I' I I, ,I I I I I I J.#"""-'I....A&..L'-...L,..L..J,..j,L,.... -. --..........'U..L. V-.L\"~J:')...L.L"""~ STATE OF GEORGIA . ".". ,',. hV~..:;~"'l,,ql:,.;.;,~,.. SPECIAL PROVISION SECTION 150- TRAFFIC CONTROL , August 28, 1995 First Use: October 20,1995 Modification of Special Provision Section 150 - Traffic Control (Rev, June 21, ~994) Retain Section 150 as written and add the following: For this project, all references to flags on construction warning signs in the Standard Construction Details listed below are deleted except for signs which are mounted at less than seven (7') feet in height (portable signs). Standard Construction Details . Typical By-Pass Detour,for Two-Lane Highway Typical Detour Across Median Transition of 4-Lane Divided Highway to 2-Lan,e Highway , Traffic Control General Notes, Standard Legend, Miscellaneous Details , . ~i\ . ( . . . In addition, G20-1, G20-2.A, and W20-1 signs shown on Georgia Standards 9102, 9106, 9107, and applicable Standard Construction Details shall conform to Part VI of the MUTCD, Revision 3, dated September 3, 1993. ' 150.02 WORK ZONES: Delete "Work Zon~s" and substitute: Temporary Traffic Control Zones. 150.02. 8.2,: Delete last sentence and substitute: Channelization device spacing shall,be 10 feet for 200 feet in advance of the temporary gore, and 10 feet for the first 100 feet of the temporary gore. 150.03. F.1. MATERIALS - INTERIM SIGNS: Retain as written and'add second paragraph. Posts for all interim signs shall,pe constructed to yield upon impact unless the posts are protected by guardrail, portable barrier, impact attenuator or other type of positive barrier protection, Unprotected posts shall meet the breakaway requirements of the "1985 AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals", Unprotected post splices will not be permitted any higher than four inches above the ground line to lessen the possibility of affectIDg the undercarriage of a vehicle. , < . 150.03.H. CONSTRUCTION WARNING SIGNS: CONSTRUCTION WARNING SIGNS THAT ARE REQUIRED TO BE MOUNTED AT SEVEN FEET IN HEIGHT NO LONGER REQUIRE THE USE OF WARNING FLAGS. . . Delete first sentence of second paragraph and substitute: Construction waming signs which are mounted at less than seven (eet in height (portable signs) shall have two 18 inch x 18 inch fluorescent red-orange or orange-red warning flags mounted on each sign. TC-/ I I I I '0, ::~ I I ,I I I I I I I I I I I I ; l' '\ .~ r Jo,.I.J..jL .l'")..J..,"4."~..L'. ...,;.fi. . . "- " _.. ."', ., \ -~.~_"""A "'...."'...........____. STATE OF GEORGIA r 150.04,E.2.a.2~: Retain as written and add: In l.ane shift areas skip lines are not allowed. Solid line's are required, 150.04. E.2.b.1.: Retain as written and add: In lane shift areas skip lines are not allowed, Solid Imes are required. 150.05 . D. TEMPORARY GUARDRAIL ANCHORAGE: Delete all references to Type 9 and substitute Type 11 (eleven). 150;10 PAYMENT: Item No. 641 - Delete reference to Type 9 and substitute Type 11 (eleven). SPECIAL PROVISION SECTION 15(}-T,RAFFIC CONTROL June 22, 1994 First Use: July 24, 1994 '~:\ Modification of Standard Specifications, 1993 Edition , Retain Section 150 as written and add the following: For this project, all references in the Standard Construction Details listed below to Type I Barricades, Type II Barricades, Type "A" flashing-lights and Type "C" steady burn lights are deleted, except that Type "c" lights will be required for tapers in nighttime lane closures. ' Standard Construction Details · Typical By-Pass Detour for Two-Lane Highway · Typical Detour Across Median . Transition of 4-Lane Divided, Highway to 2-Lane Highway · Traffic Control General Notes, Standard Legend, Miscellaneous Details In addition, G20-1, G20-2A, and W20-1 signs shown on Georgia Standards 9102, 9106, 9107, and applicable Standard Construction De.tails shall conform to Part VI of the MUTCD,- Revision 3, dated September 3, 1993. ' Detail "A" as shown on Georgia Standard 4960 is deleted. SPECIAL PROVISION , SECTION 15(}- TRAFFIC CONTROL Rev. June 21, 1994 First Use: July 24, 1994 , Rev.: August 16, 1994 / Modification of the Standard Specifications, Current Edition Delete Section 150 as written and substitute the (allowing: . 150.01 DESCRIPTION: This section as supplemented by the Plans, Specifications, andMUTCD shall be considered the Traffic ,Control Plan. Activities shall consist of furnishing, installing, maintaining, and removing necessary traffic signs, barricades, lights, signals, cones, pavement markings and other traffic control devices and shall include flagging and other means for guidance and protection ofvehicU1ar and -rc-z, I' I I I I I I I I I I I I, I I I I I I ... '! . :....:,...: -.....' .u.r::.rAK1.M.Cl'j.L, ,V',L ........~"4O')IU.l1id..t\..L.LVJ., STATE OF GEORGIA.. , . . . . J .' j ,: I~,;,' , ~ g. ~,_\ 1.~, i '. , . pedestrian traffic through the Work Zone. This, Wbrk shall illclude both maintaining existing devices (excluding Traffic Signals) and installillg additional devices as necessary ill construction work zones. When any provisions of this Specification or the Plaris do not meet the minimum requirements of the Manual on Uniform Traffic Control Devices (MU';I'CD), the MUTCD controls. The 1988 Edition of the MUTCD and Revision 3, dated September, 1993, of Part VI shall be in ,effect for the duration of the project. A. The Contractor shall designate a qualified individual as the Worksite Traffic Control Supervisor (WTCS) who shall be responsiqle for selecting, illstalling and maintaining all traffic, control devices ill accordance with the Plans, Specifications, Special Provisions arid the MUTCD. This individual's . traffic control responsibilities shall have priority over all other assigned duties, ' .As the representative 'of the Contractor, the WTCS shall have full authority to act on behalf of the Contractor ill administering the Traffic Control Plan. The WTCS shall have appropriate training ,in safe traffic control practices in accordance With Part VI of the MUTCD, In addition to the WTCS all others making decisions regarding traffic control must meet the training requirement.S of Part VI of the MUTCD. On projects where traffic control duties will not require full time supervision, the Engineer may allow the Contractor's Project Superintendent to serve as the WTCS as long as satisfactory results are obtained. ' 'TIle WTCS shall have a copy of the MUTCD on the job site. Copies of current MUTCD may be obtained from: U.S. Government Printing Office Superintendent of Documents Mail Stop: SSOP Washington, D.C. 20402-9328 'The WTCS shall be available on a 24-hour basis as needed to maintain traffic control devices with access to aU personnel, materials and equipment necessarJ to respond effectively to an emergency , situation withill forty~five (45) minutes of notification of the emergency. The WTCS shall supervise the initial installation of traffic control devices which will be reviewed by the Engineer prior to the beginning.of construction. Modifications to traffic control devices as required by sequence of operations or staged construction must be reviewed by the WTQS. The WTCS shall reguhirly perform inspections to ensure that traffic control is maintained. B. All traffic control devices used during the construction of a project shall meet the Standards uWized in the MUTCD, and shall comply with the requirements of these Specifications, Project Plans, and Special Provisions. Reference is tnade to Subsections 104.05, 107.07, and 107.09. C. All reflectorization for construction (black on orange) signs, object markers, and channelization , devices shall meet the requirements of Section 913, Type II or III unless otherwise specified. All other signs shall meet the requirements of Type I unless otherwise specified, D. No work shall be started on any project phase until the appropriate traffic control devices have been placed,in accordance with, Project requirements~ Changes to traffic flow shall not commence unless all labor, materials, and equipment necessary to make the changes are available on the Project. E. The Contractor shall secure the Engineer's approval of the Contractor's proposed plan of operation, sequence of work and methods of providing for the safe passage of vehicular and pedestrian traffic before it is placed in operation. The proposed plan of operation should supplemimt the approved traffic control plan. Any major changes to the approved traffic control plan, proposed by the ' . Contractor, are tabe submitted to the Department for approval in accordance With Subsection 104,03 of the Standard Specifications. . rC-3 . -I' :t,;\ '., I' I I I I. " I H I I I I I I I I I 'I I I , .'. ~ -:' ,AJ.L,.;,.L .cU.,",.L"'T~.,i",... V~~; ,J..~~,,~..., -...."'A.,I.:lr..,J...Lv..." STATE OF GEORGIA . Som,e additi~nal traffic control details Will be tequir~a prior to any major shifts of traffic. J'he tiaffic ' control details shall include.. but not be limited to, the following: 1. A detailed drawing showing traffic location andlaneage for each step of the change. 2. The location, size, and message of all signs required by the MUTeD', Plans, Special Provisions, and other signs as required to fit conditions. 3. The method to be used in, and the limits of, the obliteration of conflicting lines and markings. ~ ' 4. Type, location, and extent of new lines and markings. 5. Horizontal and vertical aligninent and superelevation rates for detours, including cross section and profile grades along each edge of existing pavement. ' 6. Drainage details for temporary and permanent alignments. '" 7. Location, length, and/or spacing of channelization and protective devices (temporary barrier,:~\', guardrail, barricades" ete,) . 8. -Starting time, duration and date ofplaIined change. 9. For each traffic shift, a paving plan, erection plan, or work site plan, as appropriate, detailing workforce, materials, and equipment necessary to accomplish the proposed work. This will be the minimum resource allocation required in order to start the work. The above details shall be submitted to the Engineer for approval at least 14 days prior to the anticipated traffic shift. The Contractor shall have traffic control details for a traffic shift which- has been approved by the Engineer prior to commencement of the physical shift. All preparatory work relative to the traffic shift which does not interfere with traffic shall be accomplished prior to the ' desii;nated starting ,time. The Engineer and the Contractor's representative will verify that all conditions have been met prior to the Contractor obtaining materials fot the actual traffic shift. ' F. Traffic control devices shall be in acceptable condition when first erected on the project and shall be maintaine,d in accordance with Subsection 104.05 throughout the construction period. All unacceptable traffic control devices shall be replaced within 24 hours. When not in use, all traffic control devices shall be removed, placed or covered so as not to be visible to traffic, Iftraffic control devices are left in placefor more than ten days after completion of the Work, the Department shall have the right to remove such devices, claim possession thereof, and deduct the cost of such removal from any monies due~or which may become due, the Contractor. G, The Department reserves the right to restrict construction operations when, in the opinion of the Engineer, the continuance of the Work would seriously hinder traffic flow on days immediately before, 'on, or after holidays or other days in which unusual traffic conditions exist, including threatening or inclement weather. 150.02 WORK ZONES: A In addition to the other provisions contained herein, work zo~e traffic control shall be accomplished using the following means and materials: 1. Portable advance warning signs as required by the contract or meeting the requirements ofthe MUTCD and Sub-Section 150.03.' , " . 2. Portable sequential or flashing arrow panels as shown in the Plans or Specifications for use on Interstate or multi-lane highway lane closure only, shall be a. minimum size of 48" high by 96" -rc-e;z 1 I, I I I { I n I I I I I I I I I I I 1 .' ,';":, ..:::\#.-..~..._,; .'~...f;;J,:;"'~"1",:,,~..;t. ~.' ", . 1.J~.t'AKT.M.hNT u.t< J.KAl"Il:S.t'V,KJ.Al.lU.N STATE OF GEORGIA r - wide with not l~ss than 15 lamps used for ffi~ [rtow: The arrow will occupy virtually the entire size of the arrow panel and shall have a minimum legibility distance of one mile. The minimum legibility distance is that distance at which the arrow panel can be comprehended by an observer on a surmy day, or clear night. Arrow panels shall be equipped with automatic dimming features ,for use during hours of darkness. The arrow panels shall also meet the requirements as shown in the MUTCD. The sequential or flashing arrow panels shall not be used for lane closures on two- lane, two-way highways when traffic is restricted to one-lane operations in which case, appropriate signing, flaggers and when required, pilot vehicles will be deemed sufficient. 3. Portable changeable message signs meeting the requirements of Section 632 and the MUTCD. 4. Channelization devices meeting the standards of the MUTCD and Subsection 150.05. 5. Precast concrete barrier meeting the requirements of Section 622. 6. Temporary traffic signals meeting the requirements of Section 647. 7. Pavement marking materials complying with Subsection 150.04.A. , ':6;\: B. LANE CLOSURES: 1. All lane closures shall have prior approval of the Engineer. Lane closures that require same direction traffic to be split around the Work Area will not be approved for roadways with posted speeds of 35 mph or greater, ,excluding turn lanes. 2. On multilane highways where traffic has been shifted to the inside lanes for overnight use, the entrance and exit ramps shan have chanrielization devices placed on both sides of the ramp. The temporary ramp taper length shall be greater than, or equal to, the existing taper length. Interim EXIT gore signs shall be placed at the ramp divergence. Channelization device spacing in the first 100 feet of the temporary gore shall be 25 feet. 3. Termination Area: The transition to normal or full width highway at the ,end of a lane cll:)sure shall be a maximum of 150 feet. 4. To provide the greatest possible convenience to the public in accordanc~ with Subsection 107.07, the Contractor shall remove all signs, lane closure markings, and devices immediately when lane closure work is completed or temporarily suspended for any length of time or as directed by the Engineer, ' ' C. TRAFFIC PACING METHOD: '- 1. PACrnG OF TRAFFIC: With prior approval from the Engineer, traffic may be paced allowing the Contractor up to ten (10) ,minutes maximuni to work in or above all lanes of traffic for the following purposes: a. Placing bridge members or other bridge .work. " b. Placing overhead sign structures. C. Other work items requiring interruption of traffic. The Contractor shall provide a unifonned police officer with patrol vehicle and blue flashing light for each direction of pacing. '.tne police officer, Erigineer, and flaggers at ramps shall be provided with a radio which will provide continuous contact with the' Contractor. -rc--..:) I I I I I ,,' . I I I I I I I I I I I I I I .. . '/' ..,:..J. \ -_.:'_-:'~':' :-': }.' :' U~l:" A.KT~.NT u.r :.l~;:Sl:"UktAT1U.N STATE OF GEORGIA When ready to start the work activity, the pC;iic~ vehiCle ,will pull into the travel lanes and act as a pilot vehicle slowing the traffic thereby providing a gap in traffic allowing the Contractor to perform the Work...Any on-ramps between the pace and' the work area shall be blocked during pacing of traffic, with a flagger properly dressed and equipped with a Stop/Slow paddle. Each ramp should be opened after the police vehicle has passed, ' Pilot vehicles shall travel at a safe pace speed, desirably not less than 20 mph interstate and 10 mph ' non-interstate. The Contractor shall provide a vehicle to proceed 'in front of the police vehicle and behind the other traffic in order to inform the Contractor's work force when all vehicles have cleared the area. Traffic will not be permitted to stop during pacing except fu extreme cases a.s approved by the Engineer. ' 2. METHODS OF SIGNING FOR TRAFFIC PACING: At a point not less than 1,000 feet in advance of the beginning point of the pace, the Contr:actor shall erect and cover a W-special sign (72 inch x 72 inch) with a Type "B" flashing light, with the legend "TRAFFICSLOWED AHEAD SHORT DELAY" (See Detail 150-A). A portable changeable message sign may be used in lieu of the W-special sign~ On divided highways this sign shall be double indicated. A worker with a two-way radio shall be posted at the sign, and upon notice that the traffic is to be paced shall turn on the flashing light and reveal the -sign. When traffic is not being paced, the flashing light shall be turned off and the sign covered or removed. W-special signs are reflectorized black on orange, Series "C" letters and border of the size specified. '~\ /c-r; I I I I I. .~ I I I I I I I I I I I I I I .LIJ..j.1..ru'-.i..!....~.i~.i.: ~~. ii~.~Ul~0l~.i.~.L..."...., STATE OF GEORGIA T~ ~. F'LlSHllIC LICHT ON TlUrF'IC SID( 53" 1,.5. ,. .... 'if ~ ~ ~ ~ ~ ~ 10. t" 5Z". -, 10" ~~@ 'I[g[Q) t!.~. u" ' '1--15 ~~~~[D) ~~(Q)~JU ..~~~~ w t...!. :... .L:/. ,. 12" ,. u. 7Z' ,- 1t. ~. C. t-Sl'tCIAL, S/GII (TtIraWn' ~T w;u(TEDl S J CH SHAl L HI. yt It. AO\ LE c[ 'i) .uID I(R)( R CIC CJWa REFUCTDfUZED 5AClCRtUHC DETAIL 150-A 1" w.IIClN , '#J' IICJlI)[R 3. lAD IllS . 12. 5ER. .c. 11. SER, .C. , " :~,1. 12- S[R. .C. ." stR. .C. D. The Contractor's trucks and other vehicles shall travel in the direction of normal roadway traffic unless separated by a positive barrier, or when construction activity necessitates otherwise, and shall not reverse dir~ction except at intersections, interchanges, or approved temporary crossings. E. The Contractor shall ensure that dust, mud, and other debris from construction activities do not interfere with normal traffic operations or adjacent properties, F. Existing street lighting shall remain lighted as long as practical and until removal is approved by the Engineer, . G. Adequate temporary lighting shall be provided at all nighttime work sites where workers will be immediately adjacent to traffic. ' H, For their own protection, workers in or adjacent to traffic during nighttime operation shall wear reflectorized vests. ' / t:::-;7, I I I I I 't. , I I I I I I I I I I I I I I :':';"j~'.'~.J~;f":?':", :(,~,'..~..., .~. ..' , -~""""""""."':'~"'''_ ._- -'-.-,---- -.............Ao........._.... STATE OF GEORGIA 1. The parking of Contractor's andlor workers persorial vehicles within the work area or adjacent to traffic is prohibited. J. The Worksite Traffic Control Supervisor CWTCS) shall monitor the work to ensure that all the rocks, boulders, construction debris, stockpiled materials, equipment, tools and other potential hazards are kept clear of the travel way, These items shall be stored in alocation, in so far as practical, where,they will not be subject to a vehicle running otTthe road and striking them. K.. All existing pedestrian walkways shall be maintained. Whenever changes to theworksite necessitate changes to existing walkways, temporary walkways shall be provided and maintained; with appropriate signs as necessary, to allow safe passage of pe.destrian traffic. 150.03 SIGNS: A. When required for proper tIaffic control during construction of the project, all existing guide, warning, and regulatory signs shall be maintained by the Contractor in accordance with these Specifications, Existing street name signs shall be maintained at street intersections, All existing illuminated signs shall remain l.ightedand be maintained by the Contractor. B. When not in use, all inappropriate traffic signs or portions thereof shall be removed, placed or covered so as not to be visible to traffic. All construction warning signs shall be removed within seven calendar days after time charges are stopped or pay items are complete. Subsequent pUnch-list or other work to be performed shall beacc'omplished utilizing temporary construction warning signs that shall be removed daily. ' ,',( :~;" C. The Contractor shall not remove any existing signs and supports without prior approval from the, Engineer. All existing signs and supports which are to be removed shall be stored and protected as directed by the Engineer, and become the property of the Department unless otherwise specified in the contract documents. D. Interim guide, warning, or regulatory signs required to direct traffic shall be furnished, installed, , reused and mairitained by the Contractor in accordance with the MUTCD, the Plans, Special Provisions, or as directedby the Engineer. These signs shall remain the propeTtyofthe Contra,ctor, The bottom of alhnterim signs shall be at least seven feet above the level of pavement edge. E. Existing special guide signs on the Project shall be maintained until conditions require a change in location or legend content. when change is required, existing signs shall be modified and continued in use if the required'modification canl be made within existing sign borders using design requirements (legend, letter size, spacing, border, etc.) equal to that 'of the existing signs, or of , Subsection lSO.03.E.5. Differing'legend designs shall not be miXed in the same sign. 1.' SPECIAL GUIDE SIGNS; Special guide signs are those expressway or freeway guide signs that are designed with a :ql.essage content (legend) that applies to a particular roadway location. When an existing special guide sign is in conflict with work to be performed, the Contractor shall remove the conflicting sign and reset it in a new, non-conflicting location whiCh has been approved by the Engineer. 2. INTERIM SPECIAL GuIDE SIGNS: When it is not possible to utilize existing signs, either in place or relocated, t1)e Contractor shall furnish, erect, maintain, modify, relocate, and remove new interim special guide signs in accordance with the Plans or as directed by the Engineer. 3. INTERIM OVERHEAD GUIDE SIGN S,TRUCTURES: Interim overhead special guide sign structures are not required to be lighted unless specifically required by the Plans. Iflighting is' required the sign shall be lighted as soon as erected and shall remain lighted, during the hours. of darkness, until the interim sign is no longer required. The Contractor shall notify the Power Company at least thirty (30) days prior to desiring connection to the power source. -rC-'8 I' 1 I I I I I I I I I .1 I I I I I I 1 DEPARTMENT UI' TKAN~.PURTATIU.N STATE OF GEORGIA 4. The installation of new permanent speCial guide signs and the permanent modification or resetting of existing special guide signs, when in'cluded in the contract, shall be accomplished as soon as practical to minimize the use of interim special,'guide signs, Iflighting is required by the Plans,all new permanent overhead special guide signs shall be lighted as soon as erected. 5. Interim special guide signs that may be required in addition to, or a replacement for, existing expressway and fre,eway (interstate) signs must be designed arid fabricated in compliance with the minimum requirements for guide signing contained in Part 2E "Guide Signs Expressways" and Part 2F "Guide Signs Freeways" of the MUTCD, except that the minimum size of all letters and numerals in the names of places, streets and highways on all signs shall be 16 inches Series "E" initial upper-case and 12 inches lower-case. All interstate shields on these signs shall be 48 inches and 60 inches for two-numeral and three-numeral routes, respectively. Additionally, the exit road name or route shield shall be placed on the exit gore sign. " F. MATERIALS - INTERIM SIGNS: 1. POSTS - Posts for all interim signs shall meet the requirements of Section 911 except that green or silver paint may be used in lieu of galvanization for steel posts or structural shape posts, Wood posts are not required to be pressure treated, 2. SIGN BLANKS AND PANELS - All sign blanks and panels shall conform to Section 9120fthe Specifications except that blanks and panels may be ferrous based or other metal alloys. Type 1 , and Type 2 sign blanks shall have a minimum. thickness of 0.08 inches regardless of the sign type used. Alternative sign blank materials (composites;poly carbonates, fiberglass reinforced plastics, recycled plastics, ete,) shall have :iletter of approval from the Office of Materials and Research for use as interim construction signs before these materials are allowed to be 'incorporated into the work. Signs shall be painted to prevent rust if other metals are used in lieu of aluminum, Plywoodblariks or panels will not be pemiitted. ' ' G. All existing, interim and new permanent signs shall be installed so as to be completely visible for an advance distance in compliance with the MUTCD. Limbs, brush, construction equipment and materials shall be kept clear of the driver's line of sight.to the signs. H. Advance warning signs shall be placed ahead of construction in accordance with Pari Vl of the MUTCD and shall include a series of at least three advance road construction (W20-1) signs placed, at the termiIii of the project. The series shall have th~ legend ROAD WORK (1500 FEET, 1000 FEET, AND 500 FEET.) In addition to the above, multi-lane dIvided highways shall also have the legend ROAD WORK (2 MILES, 1 MILE, AND 1/2 MILE.) On-ramps and at grade intersecting roadways shall be signed with a 'minimum of one ROAD WORK AHEAD sign. All construction warning signs shall have two 18 inch x 18 inch fluorescent red-orange or orange-red warning flags mOlll1ted on each including the project construction signs (G20-1 and G20-2.AJ Project mileage indicated on the G20-1 sign shall be the actual project mileage rOlll1ded up to the nearest whole mile. All construction warning signs on divided highways shall be double indicated (i.e., on the left and right sides of the roadway.) " 1. The sequential or flashing arrow panels shall be placed on the shoulder ator near the point where the lane closing transition begins, The panels shall be mOlll1ted on a vehicle, trailer, or other suitable support. Vehicle mounted panels shall be provided with remote controls. Minimum mounting height shall be seven feet above the roadway to the bottom of the panel, except on vehicle mounted panels which should be as high as practical, ' , J. The portable changeable message sign, when specified, shall be placed ahead of construction activities , and shall meet the requirer:nents of Section 632 and the MUTCD. /c-~ '~;:'. /' I I I I I I I I I' I I I I I I I I I I . .. . -': ..(~;,H:',"~'~ ,'. '..', U.cr.f\..K..l.M.cl"lJ. v...' ......~......,...... V.L'-.L~.L"''''''''' STATE OF GEORGIA, -, ..', ~ :I<. The flashing beacon assembly, when specified, s1:lall pe used in conjunction with construction warning signs, regulatory, or guide signs to inform traffic of speCial road conditions which require additional driver attention. The flashing beacon assembly shall be installed in accordance with the requirements of Section 64-7, . 150.04 PAVEMENT MARKINGS A, Generally, full pattern pavem~nt markings in acco~dance with Section 652 and in conformance with Section 3A and 3B, except 3B-3 and 3B-5, of the MUTeD are required on all courses before the roadway is opened to traffic. No passing zones shall be marked to conform to Section 150.04 E, During construction and maintenance activities on all highways open to traffic, ?oth existing markings and inarkings 'applied under tbis Section shall be fully maintained until Final Acceptance. If the pavement markings are, or become, unsatisfactory in the judgement of the Engineer due to wear, weathering, or construction activities, they shall be restored immediately. On resurfacing projects pavement markings shall be provided on all surfaces that are placed over existing markings. On widening and reconstruction projects (where the lane configuration is altered from the pre-construction layout) pavement markings will be as required by the Plans or the Engineer. On new construction projects .' pavement marking plans will be provided. ,\\,' 'B., MATERIALS: All traffic striping applied under this Section shall be a minimum four inches in width and shall conform to the requirements of Section 652, except as modified herein, Raised pavement markers (RPMs) "shall meet the requirements of Section 654. Markings on the final surface course which must be removed shall be a removable type. The Contractor will be permitted to use paint, thermoplastic, or tape on pavement which is to be overlaid as part of the project, unless otherwise directed by the Engineer. Partial (skip) reflectorization (Le. reflectorizing only a portion of a stripe) will not be allowed. C. USAGE: The ,Contractor shall sequen~e the work in such a manner as to allow the installation of markings in the fmallane configuration at the earliest possible stage. Inappropriate or conflictirigexisting pavement markings shall be removed. 'When shifting of traffic necessitates removal of centerline, lane lines, or edge lines, all such lines shall be removed prior to, during, or immediately after "any change so as to present the least interference with traffic. . Before any change in traffic lane(s) alignment, marking removal equipment shall be present on the project for immediate use, If marking removal equipment failures occur, the equipment shall be repaired or replaced (including leasing equipment if necessary), so' that the removal can be accomplished without delay. ' Except for the final surface, markings on asphaltic concrete may be obliterated by an overlay course, when approved by the Engineer, When an asphaltic concrete overlay is placed for the sole purpose of eliminating conflicting markings and the in place asphaltic concrete section will allow, selid overlay will be eligible for payment only if designated in the Plans. Overlays to obliterate lines will be paid for only once and further traffic shifts in the same area shall be accomplished with removable markings. Only the minimum asphaltic concrete thickness required to cover lines (generally 60 lbJsq, yd. of Asphaltic Concrete "H") will be allowed. Excessive build-up will not be permitted. When an overlay forthe sole purpose of eliminating conflicting markings is not allowed, the markings no longer applicable shall be removed in accordance with Subsection 656.02. The elimination of conflicting pavement markings by overpainting with paint or liquid asphalt is not acceptable. D, Raised pavement markers (RPMs) are required as listed below for all asphaltic concre~ pavements before the roadway is open to traffic. When Portland Cement Concrete is an intermediate' or fInal surface and is open to traffic, one calendar day is allowed for cleaning and drying before the , installation of RPMs is required. TC-/t? I I I I I. I I I I I I I I I I I I I I ~. ~. 1 '., ':1t,~ ~,..~~.}t~~~~'?Jl,::';J( .,,:~:r~,~\~'\'~~':?:~~:/;;'r,~..: . f ,.,' ~ ~..L..:I~ .61.J.".J.J.Y.&...J,..,;,J.'.:~- """..... _....""".....".IJ.~ :'r'~~.J..t"1.J...L\J..., STATE';0F GEeR6I::AC~;.~ ' '''t, 1. On Interstate and limited access highwayi. ililder cohstru.ction; excluding projects consisting primarily of aspHalt resurfacing items, retro-reflective raised pavement markers (RPMs) shall be placed and/or maintained on intermediate pavement surfaces opened to traffic as folloW's: a SUPPLEMENTING LANE LINES: 80 foot centers on skip lines with curvature less than three degrees. (Includes tangents.) 40 foot centers on solid lines and all lines with curvature between three degrees and six degrees. 20 foot centers on curves over six degrees, 20 foot centers onlane transitions or shifts. b. SUPPLEMENTING RAMP GORE LINES: 20 foot centers, two each, placedside by side,:~\: ' c. OTHER LINES: A1; shown on the plans or directed by the Engineer. ' , 2. On other highways under construction RPMs shall be used and/or maintained on intermediate pavement surfaces as follows: a SUPPLEMENTING LANE LINES AND SOLID LINES: 40 foot centers except on lane shifts, (Wben required in the Plans or Contract.) 20 foot centers on lane shifts. (Required in all cases.) , b, SUPPLEMENTING DOUBLE SOLID LINES: 40 foot centers (one each beside each line) except on lane shifts. (When required in the Plans or Contract.) , 20 foot centers on lane shifts, (Required in all cases.) RPMs are lli2.t allowed on right edge lines. E., EXCEPTIONS FOR INTERIM MARKINGS: Some exceptions to the time of placement and pattern of markings are permitted as noted beloW', however, full pattern pavement markings are required for the completed project. " 1. TWO-LANE, TWO-WAY ROAJJWAYS a. SKIP LINES: All interim skip (broken) stripe shall conform to Section 652 except that stripes shall be at least four feet long with a maximum gap of 36 feet. On curves greater than six degrees, a two-foot stripe with a maximum gap of 18 feet shall be used. In lane shift areas skip lines will not be allowed, Solid Lines will be required. Interim skip lines will be permitted for a period not to exceed 14 calendar days. Interim skip lines must be replaced with markings in full compliance with Section 652 prior to expiration of the 14 calendar day period. -rc-// I I I I I,': , 1 I I n I I I I I I I I I I . - ':,.:: <:"-)~~rl~r,,: l-X~-:'i\~ '~~~.i.l;.\.'p.~~~.~:,~~~,'~ry'.' )'., 10 I. JJLr ..tU'i..J.lYl...Cl'j .1V'&:'" ;L';.L~"uf, 0,.i:\:.1.l'\:1.LVn ~.. '., .. ...:.. , ',. ..... ,., I y.' sf ATE 'OF GEGR:GIA' .: ',.., . . '. ~ . Interim raised pavement markers may H~ substituted for the interim skip (broken) stnpes, If raised pavement markers are substituted for the four foot interim skip stripe, four markers spaced at equal intervals over a fOUI feet distance will be required. No separate payment will be made if the interim raised pavement markers are substituted for interim skip lines. Interim raised pavement markers shall be retro-reflective, shall be the same color as the pavement markers for which they are substituted, and shall be visible during daYtime~ The type of interim marker and method of attachment to the pavement must be approved by the Office of Materials and Research but in no case will the Dlarkers be attached by the use of nails. ' The interim raised pavement markers must be maintained nntil the full pattern pavement markings are applied. At the time full pattern pavement markings are applied the interim raised markers shall be removed in a manner that will not interfere with application of the full pattern pavement markings. b. NO PASSING BARRIER: On two-lane, two-way roadways for periods not to exceed three '!i:' calendar days where skipcenterlines are in place, no-passing zones maybe identified by using post or portable mounted DO NOT PASS regulatOry signs (R4-1 24" x 30") at the beginning and at intervals not to exceed 1/2 mile within each no-passing zone. A post or port.able mounted PASS WITH CARE regulatory sign (R4-124" x qO") shall be placed at the end of each no-passing zone. Post mounted signs shall be placed in accordance with the MUTCD, Portable signs must have a minimum vertical height of three feet above the pavement surface to the bottom of the sigri and be secured in such a manner as to not be easily blown over or misaligned. ' c, EDGELINES: (1) Bituminous Surface Treatment Paving: Edgelines will not be required on intermediate surfaces (including asphaltic concrete leveling for bituminous surface treatment paving) that are in use for a period ofless than 60 calendar days except at bIidge approaches, on lane ,transitions, lane shifts, and in such other areas as determined by the Engineer. On the final surface, edgelines must be placed within 30 calendar days of the time that the final surface was placed. (2).An Other Types of Pavement: Edgelines will not be required on intermediate surfaces that are in use for a period of less than 30 calendar days except at bridge approaches, on lane transitions, lane shifts, and in such other areas as determined by the Engineer. On the final, surface, edgelines must be placed within 14 calendar days of the time that the surface was placed. d. MISCELLANEOUS 'PAVEMENT MARKINGS: School zones, railroads, siopbars, symbols" words and other similar markings shall be placed on final surfaces conforming to Section 652 within 14 calendar days of completion of the final surface. On intermediate surfaces these markings will generally not be required unless specified by the Engineer because of special conditions or when the intermediate surface will be in tlSe for more than 45 calendar days. ,2. MULTI-LANE HIGHWAYS ~ WITH NO PAVED SHOULDER(S) OR PAVED SHOULDER(S) FOUR FEET ORLESS a. UNDIVIDED HIGHWAYS (INCLUDES PAVED CENTER TURN TANE) , (1) Centerlines and No-Passing Barriet - Full pattern centerlines and no-passing barriers shall be restored before nightfall. TC-/Z I I I I I, 1 I I, n I I I I I I I I I I : .;~ r,.. ~ ~,,~11 ';~;~, l~~l: rr.'~, ~ ~ / .t~:. ~ ~:~ ~f1r ~'~f:-:,1~ t~ ST*iE :OF, G~PR;qi{A. ~,",; (2) Lanelines '. Interim skip (broken) strip~ as described in Subse~tion 150.04.E.1.a. may be' used for periods not to exceed three calendar days. (3) Edgelines . Edgelmes shall be placed on intermediate and finaJ. surfaces within three calendar days of obliteration. ' b, DIVIDED HIGHWAYS (GRASS OR RAISED MEDIAN) (1) Lanelines - Full pattern skip stripe shall be restored before nightfall. (2) Centerline/Edgeline - Solid lines shall be placed on intermediate and final surfaces within " three calendar days of obliteration. c. Miscellaneous Pavement Markings Same as Subsection 150.04.E.1.d. 3. LIMITED ACCESS ROADWAYS AND ROADWAYS WITH PAVED SHOULDERS GREATER THAN FOUR FEET a. Same as Subsection 150.04.E.2. except as ~oted in (b) below. ,b. EDGELINES- (1) Asphaltic Concrete Pavement. Edgelines shall be placed on intermediate and final surfaces prior to opening to traffic. (2) Portland Cement Concrete Pavement- Edgelines shall be placed on any surface open to traffic no later than one calendar day after work is completed on a section of roadway. All. water and residue shall be removed prior to daily striping, F. APPLICATION OF PAVEMENT MARKINGS: The Contractor shall fumish layout, clean as necessary, and preline the surface for the placement of pavement markings applied under this Sectio'n, All existing marking tape on final surfaces shall be removed prior to placement of final markings, ' Pavement markings shall re-establish No-Passing Zones in the locations and configuration that eXisted prior tD construction, Existing No-Passing Zones shallbe clearly identified as to location prior to construction by staking or erection of DO NOT PASS and PASS WITH CARE signs, On new, location projects and on projects where either horizontal or vertical alignments have been modified, the location of No-Passing Zones will be identified by the Engirieer. G. MOBILE OPERATIONS: When pavement markings (centerlin~s, lane lines, and edge lines) are applied in a continuous operation by moving vehicles and equipment, the following minimum equipment and warning devices shall be required in addition to the requirements of the MUTeD: 1. A lead vehicle is required for two-way traffic conditions and shall have an approved sequential or flashing arrow panel mounted so as to be easily visible to oncoming traffic. A lead vehicle is not required for low volume off-system routes and one-way tI:affic applications. ' 2. The work vehicle applying markings sh~l have a sequential or flashing arrow panel mounted on the rear. lfthe work vehicle is also functioning as the lead vehicle then an approve,d arrow panel shall be mounted so as to be easily visible to oncoming traffic, The work vehicle shall follow directly behind the lead vehicle. 3., The work vehicle placing cones shall follow directly behind the work vehicle applying the markings. The cone work vehicle shall have a sequential or flashing arrow panel mounted on the rear. , -/ L:-/3 " 't,.;" ( " I I I, I I, .. 1 I I 'I n I I n I' I I I I I . . "1_ ',i-"::.-" ".":.~, ;';' ".~. : ',~ .~y.l' ~~-;. .t;.,~ i;':{\;. 'r:-:;,. .1JJ::rr ..t'1....1'...J. J.yJ......i.JJ.' ..&.' rV~ ''''.A. .LU~', U..J.... ~.L,,~.n.l.L\JJ., stATE OF GE6RGrA \ 4. 'For multi-lane roadways a protection vehicle ~hall follow the above vehicles and the protection vehicle shall also display a prominent sign with the legend pAss ON LEFT' (RIGHT). On interstate and liniited aCGess roadways, the protection vehicle shall be equipped with a truck. , mounted attenuator (TMA) that is certified for iinpacts not less than 45 mph in accordance with NCHRP 230. ' S, All vehicles shall be equipped with the official slow moving vehicle symbol sign and left and right- , side rear mounted flashing yellow lights. 150;05 CHANNELIZATION A. GENERAL: Channelization should clearly delineate the travelway through the work zone and alert drivers and pedestrians to conditio'ns created by work activities in or near the travel way, Channelization shall be done in accordance with the plans and specifications, the MUTeD, and the folloWing requirements. , ' , 1. Types of Devices Permitted for Channelization in Construction Work Zones: ,."' :~i" a DRUMS: (1) DESIGN: Drutns shall meet the miniinum requirement of the MUTCD and shall be reflectorized as required in Subsection lS0.0l.C. (2) APPLICATION: Drums shall be uSed as the required channelizing device to delineate the full length of a lane closure, shift, or encroachment, except as modified by this Subsection. (a) TRANSITION TAPERS AND LANE CLOSURES: Drums shall be used: on all transition tapers. The minimum length of the approach transition taper for a lane closure, shift, or encroachment for liighwayswith posted speed of 45 mph or greater shall be equal 'to the lane width of lateral shift (Ft.) x the posted speed liinit (Mph), (L = WS), but not less than lS0 feet, 'For multiple lane closures, only one lane may be closed per taper with a miriiinum tangent length of 2L between tapers. The length of a closed lane, excluding the transition taper, will be limited to two mile, unless otherwise approved or directed by' the Engineer. Drums shall be placed the full length of the taper spaced at maximum intervals in feet' equal to the numerical speed limit (EXAMPLE: 55 Mph Speed Limit = 55 feet maximum spacing). For taper lengths on urban, residential or other streets where the posted speed is 40 mph or less, the minimum length of the approach transition taper may be computed using the " formula L = WS2/60, Greater taper' length shall be used when required for individual situations. ' Drums with steady burning lights, for the length of the taper only, are required if the condition exists into the night. (b) LONGITUDINAL CHANNELIZATION: Drums shall be spaced as listed below for, various roadside work conditions except as modified by Subsection 150.06. Spacing shall be used for situations meeting any of the conditions listed as follows: (1) 50 FOOT SPACING MAXIMUM: (a) For difference in elevation exceeding two inches. (b) For healed sections no steeper than 4:1 as shown in Subsection 150.06, Detail ' 150-E.. -rc~/7Z I I I I I .. , I I I I I I I I I I I I I I ;-'~"':';""";,,,, ":~-:;..' ~-:'..-',,,,~-~II-t,:~~,~I'i._:.. . lJHP ARTMENT U..I:' T..K.AN~tuKl'ATlU.N STATE OF GEdRGrA. (2) 100 FOOT SPACING MAXIMU:M: (a) For difference in elevation of two inches or less. (b) Flush areas where equipment or workers are'within ten feet of the travel lane. (3) 200 FOOT SPACING MAxIMUM: Where equipment or workers, are more than ten feet from travel lane. Lateral offset clearance to be fciur feet from the travel lane, (a) For paved areas eight feet or greater in width that are paved flush with a standard width travel lane. (b) For disturbed shoulder areas not completed to typical section that are flush to the travel lane and considered a usable shoulder. When the appropriate signs are posted advising of conditions such as soft or low shoulder, drums may be removed after shoulders are completed to typical section and grassed and after guardrail or other safety devices have been installed. ';6:\ b. VERTICAL PANELS: (1) DESIGN: Jill vertical panels shall have a minimum of 270 square inches of retro-reflective area,facing the traffic and shallmeet the requirements of the MUTeD. (2) APPLICATION: Lane encroachment by the drum on thetravelway should permit a remaining lane width often feet. When encroachment reduces the travelwayto less than ten: feet, vertical panels shall be used to restore the travelway to ten feet or greater. No-other' application of vertical panels ,will be permitted. ' c. CONES: (1) DESIGN: All cones shall be a minimum of28 inches in height regardless of application and ' shall meet the requirement of the MUTCD~' ' , (2) APPLICATION: For longitudin'al channelizing only, cones will be permitted for daylight closures or minor shifts. (Drums are required for all tapers.) The use of cones for nighttime work will not be permitted. ' d. BARRICADES: (1) DESIGN: The use of Type I and Type II barricades will not be permitted. Type III barricades shall meet the minimum requirements of the MUTeD and shall be reflectorlzed as required in Subsection 150.01.C. ' (2) APPLICATION: Type III barricades shall be placed as required by the plans, the Standards, and as directed by the Engineer. e. WARNINGLIGHTS: (1) DESIGN: All warning lights shall meet the requirements of the MUTeD. (2) APPLICATI01>J:-, (a) Type A low-intensity flashing lights shall be used' as shown in the Plans, the StandarcLs, and as directed by the Engineer. Flashing lights are not required for advance warning signs in Subsection 150.03,H. ' \ -r-C-/5' I I I I II :~; .. I I I I I I I I I I I I I I . ,,";'~ ~ ~,~...r'. ~.~~I ~ t'r:~':".it.~;;:--J;~';~,:";':'~.t''';:':.. . ..,~.&. .cll..J.:"..L.L't'~.L,.... ;....... ---.-.-.... ""'....'"-.A..........---. STATE OF GEORGIA " ' '.. (b) Type C Steady-Burn lights shall be used on all tapers when tbe condition ex:istl into the nighl Steady-burn lights shall also be used as shown in the Plans, the Standards, and , as directed by the Engineer, f. PORTABLE BARRIERS: , , (i) DESIGN: Portable Barriers shall meet the ~equirements of Section 62'2 - PRECAST CONCRETE BARRIER. (2) APPLICATION: Portable Barriers shall be placed as required by the plans. standards, and as directed by the Engineer. When Portable Barrier is located 20 feet or less from a travel lane, yellow reflectors shall be fixed to the top of the barrier at intervals not greater than 50 feet and shall be mounted approximately two inches above the barrier. The reflectors shall be either 10" x 10" square Type V (or equal) reflective sheeting mounted pn flat-sheet panels, or 8" diameter center-mounted sea1ed prismatic reflex reflectors hou.sedin an aluminum backing with a single grommeted hole. Approach end of Portable Barrier shall be flared or protected by an impact attenuatar (crash~', cushion) or other approved treatment in accordance with Georgia Standard 4960, ' Construction Details and Standard Specifications. On interstate or other controlled access highways where lane shifts or crossovers cause opposing traffic to be separated by less than 40 ft., precast concrete barrier shall be used as a separator.' ' B. TEMPORARY SAND LOADED ATTENUATOR MODULES 1. DESCRIPTI,ON: Th:is work consists of the furnishing, installation, m~tenance, relocation, reuse as required, and removal of Temporary Sand Loaded Attenuator Modules for traffic impact attenuatars. 2. MATERIAI...S: Materials used in the Attenuator shall meet the requirements of Subsection 648.02 for Type 2 Sand Loaded Modules - Cylindrical Drums or Type 2-A Sand Loaded Modules - Stabilizer Drums with Wine Glass shaped Inner Containers. 3. CONSTRUCTION: Temporary Sand Loaded Attenuatar Module installation shall conform to the requirements of Subsection 648.03, Manufacturer's recommendations, and Georgia Standard 4960 and shall be installed at locations designated by the Engineer. C; PORTABLE IMPACT ATTENUATORS: 1. DESCRIPTION: This work consists of the furnishing (including spare parts), installation, maintenance, relocation, reuse as required, and removal of Portable Impact Attenuators, 2. MATERIALS: Materials ,used in the AttenuatoT shall meet the requirements of Section 650 for Type A Portable Impact Attenuators. 3. CONSTRUCTION: Portable Impact Attenuator installation shall conform to the requirements of Subsection 650.03, Manufacturer's recommendations, and Georgia Standard 4960 and shall be installed at locations designated by the Engineer, and/or shown on the plans. D. TEMPORARY GUARDRAIL ANCHORAGE -1)nJp.l~: 1. DESCRIPTION: This work consists of the furnishing, installation, maintenance and removal of Temporary Guardrail Anchorage - Type 11 used for Portable Barrier or temporary guardrail end treatment. TC-/~ I I I I I I I I I I I I I I I I I I I . :'. ',.-:: ~",: t'. ,I.. .:.! ',;.7/. ~ ..' >' "'.., un!' AKl.iv.i.b.N J. 'v:c."i'A.}U'ij;:).i V~J. .N.UV.... STATE OF GEORGIA { 2. MATERIALS: Materials used in the Temporary Guardrail Apchorage - Type 11 shall meet the requirements of Subsection 641.02 of the Standard Specifications and current Georgia Standards and may be new or used. Materials salvaged from the Project which meet the requirements of Standards may be utilized if available~The use of any salvaged mate1;ials will require 'prior approval of the Engineer. 3, CONSTRUCTION: Installation of the Temporary Guardrail Anchorage - Type 11 shall' confOml to the requirements of the Plans, current Georgia Standards and Subsection 641.03 of the Standard Specifications, Installation shall also include sufficient additional guardrail and appurtenances to effect the transition and connection to Temporary Concrete Barrier as required by the details in Georgia Standard 4960. 150.06 EXCAVATION ADJACENT TO A TRAVEL LANE: Construction work involving trenching adjacent to a travelway shall not begin until the Contractor is able to continuously place the required typical ,section to within two inches of the existing pavement elevation, or heal. the remaining difference in elevation to the traveled way as shown in Detail 150-E. , Channelization devices and placement during the construction period shall conform to the requirements, to,' of Subsection 150.05 and Details 150-B, 150-C, 150-D, and 150-E shown herein. In addition to the signs specified in Section 150 and the MUTeD, a W-20 sign with the legend "(LEFT) (RIGHT) LANE NARROWS" with two flags shall be kept just off the paving edge and 500 feet upstream of the point where channelization devices are erected on the paving edge. ' A. STONE BASES, SOIL,AGGREGATE BASES, AND SOIL BASES: Drop-offs in elevation of more than two inches between surfaces carrying, or adjacent to, traffic will not be allowed for mor.e than 24 hours, However, where the Contractor has demonstrated the ability to continuously excavate and backfill in a proficient manner, a single length of excavated area not to exceed 1000 feet may be left open as a start up area for periods not to exceed ,48 hours. B.- ASPHALT BASESIBINDERS: Drop-off's in elevation of more than two inches between surfaces carrying or adjacentto traffic will not be allowed for more than 48 hours. C. PORTLAND CEMENT CONCRETE AND CEMENT STABILIZED BASES: Construction work adjacent to the traveled way which involves these types of bases shall be healed within 48 hours after the curing period is complete for each section placed. D.llring the placement period, traffic control devices will be m accordance with Subsection 150.05 and Detail 150-B. D. MISCELLANEOUS EXCAVATIONS OR DROP-OFFS ADJACENT TO TRAVELWAY:Worksuch as drainage structures, utility facilities, or any other workwhich results in a drop-off adjacent to the travelway shall be performed expeditiously so as to minimize the exposure to the hazard. As soon as , ,practical, the excavation shall be backfilled to the minimum requirements of De tail 1 50-E. In no case will the drOp-offbe allowed to exist more than five calendar days. This may require stage construction, such as plating and backfilling the incomplete work. -rc- /7 l.}Jj,l' .A.K.i~Nl vr l..tdU~.-):;'JK.i.^.LJ.V.1.'" STATE OF GEORGIA I I I I I. ., I I I 0( I I I I I I I I < I I I NOTE. Drums reQUIred for thIs locatlon.sPaced at 50 F'T. Intervals. If the traveled way wIdth ' Is reduced "to less thon 10 feet by, the use of drums. vertIcal ponels snail be used In neu of drums. LocatIon of drums when drop-off exceeds ~ Inches. ----------\ . ' --~---------- 1" NEW CONSTRUCTION ~( TRAVEL LANE ~' DROP-OFF GREATER THAN 4 INCHES DETAIL 150-8 Drums spaced ot 50 feet Tntervols. t NEW CONSTRUCTION LocatIon of drums when' drop-off 152+ Inches to ~Inches. _1~:'~,-_,-___\ -----------\ +, TRAVEL LANE ~ DROP-OFF OF 2 + INCHES TO 4 INCHES DET AIL 150-C -:rc-/t? . '. r'i" " , I I I I I" I I I I I I I I I I I I I I J.J'~. ru.'-~""'f~.L' ~ U..i.;' ..t...:u-.h~J.... 0~,-.L.n..J..LV.L' STATE OF GEORGIA Drums spoced at 100 feet Intervola. Locotlon of drt.nl5 when drop-off Is Z Inches or les$. ~ft :..1- ______~.' -----------~ + ,-'f t NEW CONSTRUCTION TRAVEL LANE' b' ~;, < DROP-OFF OF 2 INCHES OR LESS ' ' DET AIL 150-D Locetlon of drums Immedlately ofter completJon, of heeled sectIon. spoced 01', 50 ft. Intervols. Compacted Qroded OQQreQete.subbese moterlelor dlrt. TOP OF DRUM TO BE LEVEL NO STEEPER THAN 4:1 2 ft. +1- ~ ----~----~\ -----~.----- <( t NEW CONSTRUCTION + TRAVEL' 'LANE 1r--+ HEALED SECTION DET AIL ISO-E / TC- /1 I I I I I " , I I I I I I I I I I I I I I " STATE OF GEORGIA 150,07 FLAGGING AND PILOT CARS: A F1aggers shall be provided as required to handle traffic, as specified in the Plans or Special Provisions, and as required by the Engineer. ' , B, All flaggers shall meet the requirements'of the MUTCD and must have received training and a certificate upon completion of the training from a Depa.rtnlent approved ,training program. Failure to provide certified flaggers as required above shall be reason for the Engineersuspending work involving the flagger(s) until the Contractor provides the certifiedflagger(s). ' C. F1aggers shall wear high-visibility clothing in compliance with the MUTeD and shall use a Stop/Slow paddle meeting the requirements of the MUTCD for controlling traffic. The Stop/Slow paddles shall have a shaft length of seven (7) feet minimum. In addition to the Stop/Slow paddle, a flagger may use a 24 inches square red/orange flag as an additional device to attract attention. For night work, the vest shall have reflectorized stripes on front and back. ' D. Pilot vehicles shall be provided if specified in the Plans or Specifications and meet the requirements' of the MUTeD. ,':~\ E. Signs for flagger traffic control shaJl be placed in advance of the flagging operation in accordance with th~ MUTeD. In addition to the signs required by the MUTCD, signs at regular intervals, warning of the prese:nce of the flagger shall be placed beyond the point where. traffic can reasonably be expected to stop under the most severe conditions for that day's work. 150.08 ENFORCEMENT: The safe passage of pedestrians and traffic through and around the temporary traffic control zone, while mini.ri1izing confusion and disruption to traffic flow, shall have priority over all other Contractor activities. Continued failure of the Contractor to comply with the requirements of Section 150 (TRAFFIC CONTROL) will result in non-refundable deductions of monies from the Contract as shown in this Subsection for non-performance of Work. Failure of the Contractor to comply with this Specification shall be reason for the Engineer suspending all other work on the Project, except erosion control and traffic control, taking corrective action as specified in Subsection 105,15, and/or withholding payment of monies due the Contractor for any work on the Project until traffic control deficiencies are corrected, These other actions shall be in addition to the deductions for non-performance of traffic control. ' '-rc-zo I I I I I ~. . I I I I I I I I ,I I I I I I '.. " . ' d-:: "t.. 'l. ~" .1. .' ; ~ 81' ATE OF GEORGIA , SCHEDULE OF DEDUCTIONS FOR EACH CALENDAR DAY OF DEFICIENCIES OF TRAFFIC CONTROL INSTALLATION AND/OR MAINTENANCE r ORIGINAL TOTAL CONTRACT AMOUNT I I From More Than To and Including' Daily Char2'e $0 $100,000 $100 100,000 1,000,000 250 1,000.000 , 5,000,000 500 5,000,000 20,000,000 750 20,000,000 40,000,000 1,000 40,000,000 - 1,500 .r ':~:\ 150.09 MEASUREMENT: r A TRAFFIC CONTROL: When listed as a pay item in the Proposal, payment will be made at the Lump Sum price bid, which will include all traffic control not paid for separately, and will be paid as follows: When the first Constmction Report is submitted, a payment of 25 (twenty-five) percent of the LUmp Sum price will be made. For each progress payment thereafter, the tota] of the Project percent complete shown on the last pay statement plus 25 (twenty-five) percent will be paid. Gess previous payments),not to exceed one hundred (100) percent and subject to normal retainage. . When no payment item for Traffic Control-Lump. Sum is shown in the Proposal, all of the requirements of Section 160 and the Traffic Control Plan shall be in full force and effect. The cost of complying witb these requirements will not be paid for separately, but shall be included in the overall bid submittal. . B. SIGNS: When shown as a pay item in the contract,interim special guide signs will be paid for as listed below. All otber regulatory, warning, and guide signs, as required by the Contract, will be paid for under Traffic Control Lump.Bum or included in the overall bid submitted. . '1. Interim ground mounted or interim overhead special guide signs will be measured for payment by the square foot. This payment shall be full compensation for furnishing the signs, including supports as required, erecting, illuminating overhead signs, maintaining, removing, re-erecting, and final re~oval from the Project. Payment will be made only one time regardless of the number of moves required. 2. Remove and reset existing specIal guide signs, ground mount or overhead, complete, in place,will be measured for payment per each. Payment will be made only one time regardless of the number of moves required. . 3. Modify special guide signs, ground mount or overhead, will be measured for payment by the square foot. The area-measured shall include only that portion of the sign modified. Payment shalf . include materials, removal from posts or supports when necessary, and remounting as required. ~, -r-c-Z/ I I I I 1,': . I I I I I I I I I I I I I I STATE OF GEORGIA C. PRECAST MEDIAN BARRIER: Precast Median Barrier will be measured as specified in Sectio'n 622. D. CHANGEABLE MESSAGE SIGN, PORTABLE: Changeable Message Sign, Portable will be measured as specified in Section 632. E. TEMPORARY GUARDRAIL ANCHORAGE, Type Ii: Temporary Guardrail Anchorage - Type 11 will be measured by each assembly, complete in place and accepted according to the details shown in the. plans, which shall also include the additional guardrail and appurtenances necessary for transition and cOImection to Temporary Concrete Barrier. Payinent shall include all necessary materials, equipment, labor, site preparation, maintenance and removal: F. TRAFFIC SIGNAL INSTALIATION - TEMPORARY: Traffic Signal Installation - Temporary will be measured as specified in Section 647. G. FLASHING BEACON ASSEMBLY: Flashing Beacon Assemblies will be measured as specified in Section 647. H. TEMPORARY, SAND LOADED ATTENUATOR MODULES: Each Sand Loaded Attenuator Module:~\ of the type specified includes all material components,hatdware, incidentals, labor, site preparation and maintenance. Each module will be measured for payment by the drum only once regardless of the number oflocations installed. Modules to replace those damaged or destroyed by traffic impact will also be measured by the unit for payment. Upon completion of the project, the modules shall be . . removed and retained by the Contractor. 1. PORTABLE IMPACT ATrENUATORS: Each Portable ImpactAttenuatorwiIl be measured by the . unit which shall include all material components, hardware, inci!ientals, labor, site preparation, and . maintenance, including spare parts recommended by the manufacture for repairing ri:linor accident damage. Each tmit will be measured only once regardless of the number oflocations installed, moves required, or number of repairs necessary because of traffic damage. Upon completion ofthe project, the units shall be removed and retained by the Contractor. J . PAVEMENT MARKINGS: Pavement markings will be measured as specified in Section 150. 150.10 PAYMENT: When shown in the Schedule of Items in the Proposal, the following items will be paid for separately. . Item No. 150. Traffic Control. . . . . . . ; . . . . . . . . . . . . . . . . . . . . . .. . . . . . : . . . . . . . . . . . . . . . Lump Sum , Item No. 150. Traffic Control, Soli.d Traffic Stripe _ Inch, (Color). . . .. . . . . . . . . per Linear Mile Item No. 150. Traffic Control, Skip Traffic Stripe_ Inch, (Color) ............. ~ per Line~ Mile Item No. 150. Traffic Control, Solid Traffic Stripe, Thermoplastic Inch, (Color) ........................... per Linear Mile Item No. 150. Traffic Control, Skip Traffic Stripe, Thermoplastic Inch, (Color) ........................... per Linear Mile Item No. 150. Traffic Control, Pavement Arrow with Raised Reflectors .......;....... .. per Each Item No. 150. Traffic Control, Raised Pavement Markers - All Types. . . . .. . . . . . . . . . . . . .. per Each Item No. 150. Interim Ground Mounted Special Guide Signs... ...... ....... ....' per Square Foot Item No. 150. Interim Overhead Special Guide Signs .......................... per Square Foot -r~z z. ~ \ ~'... .. '", ;. ~ .. STATE OF GEORGIA - Remove & Reset Existing Special Guide Signs, Ground Mount, Complete in Place. .. :. . ... '" .. . . . . . .. . . . . . .. " . .. per Each Remove & Reset, Existing Special Guide Signs, , , Overhead,Complete in Place ..................................... PeT Each Traffic Control, Temporary Sand Loaded Attenuator Modules ............ per Each Traffic Control, Portable Impact AttenuatoT . . . . . . . . . . . . .. . . . . . . . . . . '. . .. PeT Each Traffic Control, Pavement Markers, Words and Symbols. . . . . . . . . " per Square Foot Traffic Control, Pavement Arrow (Painted) With Raised Reflectors ........ per Each Modify Special Guide Sign, Ground Mount. . . . . . . . . . . . . . . . . . . . . .. per Square Foot Modify Special Guide Sign, Overhead ... . . . . . . . . . . . . . . . . . . . . . . .. per Square Foot , r ~i\ Precast Concrete Median B~er . . . . . . . . . . . . . . . . . '. . . .. . . . . . . . . . . per Lin,ear Foot Changeable Message Sign, Portable ... ~ . . . . ;.. " . . .. .. . . . . ~ . . . ... . . .. per Each Temporary Guardrail Anchorage, Type 11 ............................. per Each Traffic Signal Installation, Temp .... . " . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , Lump Sum Flashing Beacon Assembly, Structure Mounted .. . . . . . . . ~ . . . . . . . . . . . . . .. per Each Flashing Beacon Assembly, Cable Supported. . : . . ; . . . . . . . . . .. . . . . :. . . .. peT Each -rc - z, 3 "