Loading...
HomeMy WebLinkAboutCook Road & Glendale Subdivision Augusta Richmond GA DOCUMENT NAME: C. D (') \ <. 1(0 p.- a e Q,... \ EN\) fl Lb g \J r., \) \ v', S ; 0 AJ DOCUMENT TYPE: LO f\J -r a.f\'C '\ YEAR: 1 ~q ~ BOX NUMBER: 1"""J FILE NUMBER: ( Lf I d 0 NUMBER OF PAGES: I ~ .-" " r,. , . ,; ,~ Change Order Number: 1 Date: March 1. 1999 Project Title: Cook Rd & Glendale Suhdivision Original Contract Date: Project Number: 323-04-296823403 Owner: Augusta-Richmond County P.O. Number: 1 fil04'l Contractor: Mahus Brothers Constmction Co , Tnc The following change order is hereby made to the proposal for the above project: Constmction of water offsets at Cook Road and installation of 16" valve box. TOT AL AMOUNT OF THIS CHANGE ORDER $ 52.833.93 The Contract time will be Increased by 60 calendar days as a result of this change, The date of completion including this change order is December 15. 1999. Original Contract Amount $1,438,650.15 This Change Order (Increased / Decreased) $ 52,833.93 TOTAL CONTRACT WITH CHANGE ORDER(S) $1,491,484.08 ************* Requested By: Date: ~/,L/ J9 , . ., Submitted By: Date: ~~~hg Finance End Date: 3/3 Jr., . r Date: 3/1--:t-l~ ~ Approved By: Date: 5~.:J. 3_ e::; ~ Accepted By: Date: 3-22.-'77 ,. . , ' . ;;:. ~\JS 11~ ~~o :2: ~ ~ ,.. . ~ ~"6 :1 fa 'Ii' -o,:-',y <<.. "b" ~1,tTIO:-: l' ,so'''' ~o A04D .p.uu MABus BROTHERS CONSTRUCTION CO., INC. 920 MOLLY POND ROAD AUGUSTA, GEORGIA 30901 706-722-8941 FAX 706-722-7521 TO: ROBERT CLEMENTS FROM: LARRY GOOLSBY DATE: FEBRUARY 2,1999 RE: Vj) ~\JS 11~ ~~O :E I~ ~ '" ~, ..ii ~ "';0,. ~v .y Q J/. -0" <1' ?(""Ab: ~(.:eno~l'~'\9-' ~~O,QO .AUU COST FOR WATER OFF SETS @ COOK ROAD / INSTALLATION OF 16" VALVE/BOX TOTAL COST 6" off set @ culvert on Olive Road Price includes: 1. Traffic Control 2. Concrete Blocking 3. Asphalt Sawing 4, 8" Concrete, 2" Asphalt Patch 5. 6" Bends, Fittings - 4 EA 6. 6" DIP Main - 36 LF 7. 6" DIP Main Restrained Joint - 36 LF 8. 18" Steel Casing - 20 LF 9. End Seals, Spacer 10. Backfill Material 16" off set @ culvert on Olive Road Price includes: 1. Traffic Control 2. Concrete Blocking 3. Asphalt Sawing 4, 8" Concrete, 2" Asphalt Patch 5. 16" Bends, Fittings - 4 EA 6. 16" DIP Main - 36 LF 7, 16" DIP Main Restrained Joint - 36 LF 8. 30" Steel Casing - 20 LF 9. End Seal Spacers 10. Backfill Material $52,833.93 LS $12,787.80 LS $18,256.00 " .. 'I ;;. J' ~/ , . 16" offset @ 36" RCP on Olive Road LS $14,498.00 1. Traffic Control 2. Concrete Blocking 3. Asphalt Sawing 4. 8" Concrete Patch 5. 16" Bends Fittings - 4 EA 6. 16" DIP Main - 36 LF 7. 16" DIP Main Restrained Joint - 36 LF 8. Backfill Material ~\JS lJ+. ~~o ;; ~ ~:; '& "i. ~.:-' <7 .(~ .....~/;CTlO~ ':.t>'''' - """"D"OAD .p.\'P MABus BROTHERS CONSTRUCTION CO., INC. 920 MOLLY POND ROAD AUGUSTA, GEORGIA 30901 706-722-8941 FAX 706-722-7521 Labor, Equipment, Materials for installing 16" Water Valve Digging up 16" for County to mic 1/7/99 I&hQr Foreman Labor Equipment Pickup Track Hoe Back Hoe Wacker Tamp Dump Truck Materials Traffic Drums (2/EA) Asphalt Type I Bkfl 6 hr@, 25.00 6 hr @ 16.50 150.00 99.00 Subtotal 249.00 35.00/Day 2 hr@ 85.00 1 hr @ 65.00 @ 65.00/Day 2 hr @ 45.00 35,00 170.00 65.00 65.00 90.00 Subtotal 425.00 @ 85.00/Day 2 TN @ 23,50 10CY @ 16.00 Subtotal 85.00 47,00 160.00 292,00 Daily Total 966.00 ~\JS lJ1!. ~~o ~ · C,I') 0< .. 'I&~ yj \ ":"Ij. "I.Y~.,. (.I-"b~(~(:no,:,l~'\\l- . l"o'O,q040er..1$J :> - . , . rt: " . Dug out for line stop / dug out and installed 16" V /B 1/27/99 Labm: Foreman 14.5 hrs @ 25.00 362.50 Foreman 16,0 hrs @ 25.00 400.00 Labor (5 men) 47.0 hrs@ 16,50 775.50 Subtotal 1,538.00 Equipment Pickup @ 35.00/Day 35.00 Track Hoe 12 hrs @ 85,00 1,020.00 Backhoe 2 hrs @ 65.00 130.00 Wacker tamp @ 65.00/Day 65.00 Dump truck 12 hrs @ 45.00 540.00 Subtotal 1,790.00 Materials Sand Clay 30 CY@ 5.50 165.00 Crusher Run Stone 16.24 iN @ 12.00 194.88 Rental Signs LS 150.00 Saw Blades LS 80.25 Subtotal 590.13 Daily Total 3,918,13 ,. -.... "'~... ,2 ~ .. Dug out and patch with concrete 1/28/99 L.aJmr Foreman 6 hrs @ 25.00 150.00 Foreman 6 hrs @ 25.00 150.00 Labor (3 men) 18 hrs @ 16.50 297.00 Subtotal 597.00 Equipment Pickup @ 35.00fDay 35.00 Track Hoe 3 hrs @ , 85.00 255.00 Back Hoe 1 hrs @ 65.00 65,00 Wacker Tamp @ 65.00fDay 65.00 Dump Truck 3 hrs @ 45.00 13 5.00 Subtotal 555.00 Materials Concrete HE 7CY@ 66,00 462.00 Subtotal 462.00 Daily T ota) 1,614.00 ~ ~ .' Install aspahlt patch 1/29/99 Labm: Foreman 4 hrs @ 25.00 100,00 Foreman 3 hrs @ 25.00 75.00 Labor (3 men) 9hrs@ 16.50 148,50 Subtotal 323.50 Equipment Pickup @ 35.00/Day 35.00 Flatbed 2 hrs @ 35.00 70.00 Roller LS, 245.00 Subtotal 350.00 Materials Asphalt 5TN@ 23.50 117.50 Tack 3GL@ 1.00 3.00 Subtotal 120,50 Daily Total 794.00